Working GroupCore Team Meeting II

February 14, 2008

Page 2: Working Group Core Team Meeting II February 14, 2008

Meeting OverviewRecap Previous Meeting and Status Update

Work Group Structure Schedule Study Area Alternatives to be analyzed Additional model runs Discussion and concurrence on above items

Review and Approve Technical Working Group Recommendations: Wedge Area Zone splits Zonal Data: Wedge Area and Casino Additional Network Updates Highway Network Posted Speed Assumptions Transit Modeling Assumptions Transit Network Configurations Transit Service: Frequency and Proposed Speeds

Discussion of Performance Measures

Wrap up: Upcoming activities and Future Meetings 2

Page 3: Working Group Core Team Meeting II February 14, 2008

University Drive ConnectionWorking Group

Advisory/Oversight (Policy) GroupCore Working Group Technical Working Group

3

Page 4: Working Group Core Team Meeting II February 14, 2008

Schedule (Completed)01/11/2008: Joint MPO Meeting

01/23/2008: Working Group Core Team Meeting I

02/07/2008: Technical Working Group Meeting I

4

Page 5: Working Group Core Team Meeting II February 14, 2008

Upcoming Schedule02/14/08: Working Group Core Team Meeting II

Approve Modeling AssumptionsConduct Model RunsPrepare Model Run Results

03/06/08: Technical Working Group Meeting IIReview Model Run ResultsAssess Mitigation Needs

03/13/08: Working Group Core Team Meeting III

April 20008: Present findings to the MPOs

5

Page 6: Working Group Core Team Meeting II February 14, 2008

6

Study Area

Page 7: Working Group Core Team Meeting II February 14, 2008

Alternatives to be analyzedShown on the Model Alternative Table

5 University Drive alternatives (1a ~ 1e)3 Coral Ridge Drive alternatives(2a ~ 2c)4 SR-7 alternatives (3a ~ 3d)2 Lyons Road alternatives(4a & 4b)2 Sawgrass Expressway alternatives (5a & 5b)*1 FP&L ROW alternatives (6a)*Total: 17 Network alternatives

* for “investigation” only at this time

7

Page 8: Working Group Core Team Meeting II February 14, 2008

Additional Model Runs (1/2)For comparison, Alternative 1a will be run

“With” and “Without” additional developments of “Wedge” and “Expanded Casino”The “With” additional development Person Trip

Table of Alternative 1a will be the default “Locked” Trip Table for all other alternative model runs

The “Without”: 1 DU/10 Acre for Wedge Area, No Casino expansion trips (but with approved additional hotel/retail)

8

Page 9: Working Group Core Team Meeting II February 14, 2008

Additional Model Runs (2/2)Alternative 1d will be run with and without

the “Locked” trip table for comparison

9

Page 10: Working Group Core Team Meeting II February 14, 2008

Discussion and Concurrence

Page 11: Working Group Core Team Meeting II February 14, 2008

Proposed Zone Splits

11

Page 12: Working Group Core Team Meeting II February 14, 2008

Wedge Boundary

12

Page 13: Working Group Core Team Meeting II February 14, 2008

Zonal Data: “With” and “Without” Wedge

Wedge Development (Zone #779 SERPM)

Year HHs Autos Workers Pop H/M EmpInd EmpCom EmpServ HighEnroll2000 6 8 6 14 0 0 0 0 02030 13 20 15 34 0 0 0 0 0

Land Use Intensity Unit Net New TripsSingle Family Detached 2,822 DU 27,007

General Commercial 250,000 SF 6,610Total 33,617

New Vehicle Trips “With” Intensified Wedge Development

LRTP Zonal Data: “Without” Wedge Development

13

Page 14: Working Group Core Team Meeting II February 14, 2008

Zonal Data: Casino TAZ Zonal Data

Casino Development (Coconut Creek Casino Master Plan Traffic Impact Analysis)

Land Use Intensity Unit Net New Daily TripsCasino 1,363 Slots 6,363

Commercial 150,000 SF 5,890Resort Hotel 1,000 Rooms 2,419

Total 14,672

Broward TAZ #65 (SERPM TAZ 1665)

14

YearType of

DevelopmentHHs Autos Workers Pop H/M EmpInd EmpCom EmpServ HighEnroll

2000 - 0 0 0 0 0 3 706 15 0Casino 0 0 0 0 1,000 0 194 578 0Other 2,375 3,876 3,077 9,035 300 1,543 2,202 2,023 3,394Total 2,375 3,876 3,077 9,035 1,300 1,543 2,396 2,601 3,394

2030

Page 15: Working Group Core Team Meeting II February 14, 2008

Additional Network Update (1a)County Line Road East Terminus/connection

15

Page 16: Working Group Core Team Meeting II February 14, 2008

Additional Network Update (1b) County Line Road East Terminus/Connection to Hillsboro Blvd.

16

Page 17: Working Group Core Team Meeting II February 14, 2008

Additional Network Update (2)New Turnpike Interchange

Turnpike is studying: Full Interchange at Clint Moore Road Partial Interchanges: to/from north at Yamato Road

and to/from south at Palmetto Park Road Full interchange at Palmetto Park Road

What should be coded onto the network?Should the new interchange be coded onto all

the alternatives? Or, a new alternative for comparison?

17

Page 18: Working Group Core Team Meeting II February 14, 2008

Yamato Rd

Clint Moore Rd

Glades Rd

Palmetto Park Rd

Sawgrass Exwy

Hillsboro Blvd

SW 18th St

Lox Rd

S.R

. 7

I-95

S.R

. 7

I-95

SERPM 6.02 Proposed

Existing interchange

Future interchange in existing SERPM model

Proposed partial interchange at Yamato Rd / Palmetto Park Rd

Interchanges on Turnpike

18

Page 19: Working Group Core Team Meeting II February 14, 2008

Proposed Posted Speeds forNew Links on each AlternativeTypical

8LD: 50 MPH (SR-7) 6LD: 45 MPH ~ 50 MPH (SR-7)4LD: 40 MPH ~ 45 MPH2L: 30 MPH

See the example on the following slide and separate Attachment for specifics

19

Page 20: Working Group Core Team Meeting II February 14, 2008
Page 21: Working Group Core Team Meeting II February 14, 2008

Model ApplicationUsing SERPM v6.02 with 2030 analysis year“Locking” the person trip table

Using the person trip table input to mode choice from the baseline alternative (1a) for all other alternatives

Entire model is run for baseline alternative Only necessary components are run for all

other alternatives (except additional runs for Alternative 1D)

21

Page 22: Working Group Core Team Meeting II February 14, 2008

22

Other AssumptionsThe price of gasoline is broadly included

in the auto operating cost, which is computed on a cost per mile basis

The model assumes that the auto operating cost does not increase over and above the inflation rate through 2030

Transit fares have been modified slightly reflect changes to existing fare structures, except for PalmTran-to-BCT transfers that assume a unified fare

Page 23: Working Group Core Team Meeting II February 14, 2008

Modeling TransitTravel forecasting models are sensitive mainly to

Operating and Service characteristics:Provider : Routing, Stops, Speed, Service frequency, and

Fare StructureUsers : travel time, wait time, out-of-pocket cost, and

transfers

Other characteristics, such as perceived safety, station/stop amenities and reliability are accounted for in the model, but it is not directly sensitive to themE.g., improving “perceived safety” will not increase

ridership

23

Page 24: Working Group Core Team Meeting II February 14, 2008

Transit Speed AssumptionsAll transit service will be mixed-flow unless

operating in exclusive transit lanesTransit speeds in mixed-flow lanes are a

function of the auto speedTransit speeds in exclusive transit lanes are

computed using average speeds for local service and equations in motion with an allowance for signal pre-emption for limited-stop services

24

Page 25: Working Group Core Team Meeting II February 14, 2008

25

Transit FaresPropose to adjust SERPM 2030 fares so that

they reflect current valuesBCT one-way fare from $1.00 to $1.50BCT pass from $2.50 to $2.36PalmTran one-way fare from $1.25 to $1.50PalmTran pass from $3.00 to $3.50

Assume no fare difference between services on exclusive ROW and in mixed-flow

Page 26: Working Group Core Team Meeting II February 14, 2008

Transit Network AssumptionsBased on the 2030 LRTP transit networksModifications for cross county service

integration:Coordinate transit service between northern

Broward and southern Palm Beach CountiesProvide service in “Wedge” area

26

Page 27: Working Group Core Team Meeting II February 14, 2008

Transit Network AssumptionsUsing the modified transit network for all

alternatives except:Alt 1e – apply exclusive transit lanes on University

Drive between County Line Road and Palmetto Park Road

Alts 3c, 3d – apply exclusive transit lanes on SR-7 from Golden Glades to Glades Road and on Glades Road from SR7 to Florida Atlantic University

Alt 4b – apply exclusive transit lanes along Lyons Road between Commercial Blvd and Glades Road and along Glades Road from SR-7 to Florida Atlantic University

27

Page 28: Working Group Core Team Meeting II February 14, 2008
Page 29: Working Group Core Team Meeting II February 14, 2008

29

Transit Service in Year 2000F

lorida’s Turnpike

Lyons Rd

Lox Rd

Glades Rd

Sawgrass Expy

Palmetto Park Rd

Sample Rd

S.R

. 7University D

r

Coral R

idge Dr

Page 30: Working Group Core Team Meeting II February 14, 2008

30

“Existing” SERPM 2030 LRTP Transit ServiceF

lorida’s Turnpike

Lyons Rd

Lox Rd

Glades Rd

Sawgrass Expy

Palmetto Park Rd

Sample Rd

County Line Rd

S.R

. 7University D

r

Coral R

idge Dr

#2 and Univ. Dr “Breeze” terminate at Sample Rd

#18 and #441 “Breeze” terminate near the County Line Rd

Page 31: Working Group Core Team Meeting II February 14, 2008

31

Proposed Baseline Transit ServiceF

lorida’s Turnpike

Lyons Rd

Lox Rd

Glades Rd

Palmetto Park Rd

Sample Rd

County Line Rd

Proposed park and ride lot

S.R

. 7

University

Dr

#88 now serves S.R.7 & Glades Rd parking lot

#2 and Univ. Dr .“Breeze” now serves to Boca Town Center

#18 and #441 “Breeze” now serve FAU

Sawgrass Expy

Page 32: Working Group Core Team Meeting II February 14, 2008

32

Transit Configuration B(University Dr. & Coral Ridge Dr. not extended)

Florida’s T

urnpike

Lyons Rd

Lox Rd

Glades Rd

Sawgrass Expy

Palmetto Park Rd

Sample Rd

County Line Rd

Without University Dr. Connection

#2, Univ. Dr. “Breeze” & #88 moved onto Holmberg Rd.

S.R

. 7University D

r

Coral R

idge Dr

Page 33: Working Group Core Team Meeting II February 14, 2008

33

Transit Configuration C (Coral Ridge Dr Extension)

Florida’s T

urnpike

Lyons Rd

Lox Rd

Glades Rd

Sawgrass Expy

Palmetto Park Rd

Sample Rd

County Line Rd

#2, Univ. Dr. “Breeze” & #88 moved onto Coral Ridge Extension

Coral Ridge Dr. Extension

S.R

. 7University D

r

Coral R

idge Dr

Page 34: Working Group Core Team Meeting II February 14, 2008

34

Transit Service Frequency

RoadwayService Frequency (vehicles/hr)

2000 2030 LRTP Proposed Baseline

Coral Ridge Dr. 2 2 2

University Dr. 3 10 10-14

S.R. - 7 6 10 10

Glades Rd. 2 10 22

Page 35: Working Group Core Team Meeting II February 14, 2008

Proposed Speeds (1)Congested Time on S.R. - 7 (Sample Rd.

to Glades Rd.)Proposed speeds partially based on TCRP 26a

and 26b reports

DirectionDistance

(miles)

Auto Time (min)

Bus Time (min)

Proposed Time (min) on

Exclusive Transit Lanes

Local Limited Stop

NB 6.5 12 28 19 to 23 13 to 16

SB 6.5 14 31 19 to 23 13 to 16All times represent 2030 congested condition 35

Page 36: Working Group Core Team Meeting II February 14, 2008

Proposed Speeds (2)Congested Speeds on S.R.- 7 (Sample

Rd. to Glades Rd.)Proposed speeds partially based on TCRP 26a

and 26b Reports

DirectionDistance

(miles)

Auto Time (mph)

Bus Time (mph)

Proposed Speed (mph) on

Exclusive Transit Lanes

Local Limited Stop

NB 6.5 33 14 17 to 21 25 to 30

SB 6.5 28 13 17 to 21 25 to 30All speeds represent 2030 congested condition

36

Page 37: Working Group Core Team Meeting II February 14, 2008

37

Example of Model OutputDifference in Daily Traffic Volume (1c vs. 1a)

Sawgrass Expy

Florida’s T

urnpike

Lyons Rd

Coral R

idge Dr

Pow

erline Rd

University D

r

S.R

. 7

Sample Rd

Yamato Rd

Palmetto Park Rd

I-95

County Line Rd

Lox Rd

Glades Rd

Volume decrease

Volume increase

Page 38: Working Group Core Team Meeting II February 14, 2008

Alternatives Evaluation andPerformance MeasuresSystems Information within the study area

System and Lane MilesSystem VMT and VHTTransit route miles, runs)

LOSLink VolumesPerson throughputTransit RidershipsAdditional Lane Miles Needed for each

AlternativeOther? 38

Page 39: Working Group Core Team Meeting II February 14, 2008

Wrap UpFuture ActivitiesNext Meetings

39