Workbench følgegruppemøde - Workbench følgegruppemøde - 28.04.201028.04.2010
Esben AukenEsben Auken
GeofysikSamarbejdet, Geologisk Institut, Aarhus Universitet
Agenda
1. Finished and ongoing projects
2. 2nd half year of 2010
3. Eventual
4. Next meeting
Support and drift Update releases - 2
• Major new developments
Maintenance releases - 5• Minor bug fixes of a character which has required an
immediately fix
Support through [email protected]• Intension to keep a response time of less than 24 hours• Fixes (always) takes longer - unfortunately - so be patient
Major new developments - SCI New user interface for the SCI module - setup is made in
a comprehensive wizard
A-priori information from three sources• directly from the GIS by selecting a number of models• attaching a grid to a layer interface • attaching a seismic interface to a layer interface• conductivity log attached to a number of models
A large number of optimizations in the database and inversion engine itself
Stabilizations of the inversion engine - ongoing work
Major new developments - DOI Implementation of DOI calculation in the inversion kernel
DOI calculated during an LCI or SCI run
Major new developments - DOI Implementation of DOI calculation in the inversion kernel
DOI calculated during an LCI or SCI run
DOI themes is created in the model visualization system
DOI
Visualization of LCI/SCI inversions nodes A number of new themes added - e.g DOI
Changed the internal format so themes integrates with profile sand GIS
Inversion kernel Implementation of the Depth of Investigation (DOI)
concept
Integration over finite gate length for TEM - will be used for all data collected after February 2010
Response re-sampling for accurate modeling of front gate for very early gate times
Update of the documentation
Upcoming release Hyper threaded batch gridding
Profiles - sections• dramatically increased load speed• duplicate function• size and scale synchronization • integration with GIS• interpolation of models• fading of models using DOI• seismic bitmaps• layer order
Upcoming release SCI + LCI has new inversion kernel configuration editor
SCI has increased stability and run logs are automatically saved
Help for LCI and SCI
Scheduled for June 1st. Developments stops at May 12th.
Agenda
1. Finished and ongoing projects
2. 2nd half year of 2010
3. Eventual
4. Next meeting
2nd half year - high priority
Deadline medio September 2010:
Full DOI implementation with fading of grids - requires rewriting the thematization functionality
GERDA data reporting system • alternative models• SCI inversions
New DBQ functionality supporting search in alternative models - requires rewriting
Creation of 3D grids for GeoScene3D
2nd half year - already scheduled projects SSV - support for grid calculations
QC of TEM, SkyTEM and PACES on the raw data level
Processing system for PACES data (major project)
New GIS component (major project)
Need some rescheduling by the steering group of GFS to accommodate the high priority projects
Agenda
1. Finished and ongoing projects
2. 2nd half year of 2010
3. Eventual
4. Next meeting
Agenda
1. Finished and ongoing projects
2. 2nd half year of 2010
3. Eventual
4. Next meeting
Next meeting November 10th, 2010
Minutes and ppt on the GFS homepage