    Description No. L B D/H Qty Rate Per Amount

    Construction of round Manhole with

    brick masonry in C.M (1:3) for depth

    less than 0.75m with a slope of

    30mm to 50mm in the channel along

    with sewer line including laying C.C

    mix (1:4:8) bed over a sand bed of

    150mm thick, plastering with C.M(1:4) 12mm thick including

    formation of sewer channel with C.C

    n\mix (1:2:4) and fixing of 560mm

    dia.clear opening size extra heavy

    duty manhole with frame including

    cost and conveyance of all materials

    and labour chargesetc.,complete as

    per the directions of departmental

    authorities for finished item of work.

    Earth work excavation 1x1 0.98 1.424 347.00 10 Cum 49.41

    Sand bed 1x1 0.15 0.220 162.00 1 Cum 35.64

    P.C.C (1:4:8) For bed concrete 1x1 0.15 0.220 1495.00 1 Cum 328.90

    Brick work in C.M (1:3) 1x1 0.51 0.300 2095.00 1 Cum 628.50

    P.C.C (1:2:4) For bed 1x1 0.08 0.220

    For Sewer Channel 1x1 (0.2+0.23)/2 0.058Deduct sewer portion 1x1 0.585 (0.2+0.07)/2 0.20 -0.016

    0.262 2129.00 1 Cum 557.80

    Plastering (1:4) 12mm thick - inside 0.31 0.546

    Top 0.25 0.636

    Out side 0.51 1.667

    For Sewr channel 0.246

    3.095 54.20 1 Sqm 167.75

    560mm dia. Frame and Cover 1x1 - - - 1.00 1040.34 1 No. 1040.34

    Conveyance of Earth 1x1 0.440

    0.68 0.600

    1.040 77.00 1 Cum 80.08

    Refilling of excavated Earth 1x1 0.384 8.30 1 Cum 3.19

    2891.61

    722.903614.51

    Add 25% extra for isolated workTotal --

    22/7 x 1.06 x 1.06/4

    Earth work - Conveyance(1.424-1.04)

    DATA FOR PRCAST R.C.C VALVE PIT CHAMBER

    22/7x 0.56

    22/7x 0.81

    22/7x 1.04

    22/7x 0.56 x 0.56/4

    22/7x1.36x1.36/4

    22/7x1.36x1.36/4

    22/7x1.36x1.36/4

    22/7x0.585x0.585/4

    22/7x0.585x0.585/4

    22/7x 0.81x 0.23

    Sand bed + C.C(1:4:8)

  • 8/3/2019 Work Slip of Devi Nagar-1

    2/37

    Description No. L B D/H Qty Rate Per Amount

    Construction of round Manhole with

    brick masonry in C.M (1:3) for depth

    less than 0.75m with a slope of

    30mm to 50mm in the channel along

    with sewer line including laying C.C

    mix (1:4:8) bed over a sand bed of

    150mm thick, plastering with C.M

    (1:4) 12mm thick including

    formation of sewer channel with C.C

    n\mix (1:2:4) and fixing of 560mmdia.clear opening size extra heavy

    duty manhole with frame including

    cost and conveyance of all materials

    and labour chargesetc.,complete as

    per the directions of departmental

    authorities for finished item of work.

  • 8/3/2019 Work Slip of Devi Nagar-1

    3/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    4/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    5/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    6/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    7/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    8/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    9/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    10/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    11/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    12/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    13/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    14/37

  • 8/3/2019 Work Slip of Devi Nagar-1

    15/37

    Rate Per Amount Rate

    2 4 5 6 8

    o. Description of itemQty.

    As per Sanctioned Estimate

    3

    Qty.

    3

    As per Execu

    P.M Consultancy charges @ 0.35%

    28600000.00

    As per Sanctioned Estimate 17955045.54

    As per Execution 8656101.48

    Difference less amount 9298944.06

    28600000.00

    19301055.94

    9298944.06

    Less

    More

  • 8/3/2019 Work Slip of Devi Nagar-1

    16/37

    Description of item Qty. Rate Per Amount

    Earth work excavation in loamy and clayey soils like B.C.Soils, red earth

    ordinary gravel as per SS 20-B with an initial lead of 10M etc., complete as

    per SS. For laying of Sewer lines.

    Depth 4.0 - 5.0Mts. 18.47 97.14 1 Cum 1794.18

    Construction of circular manholes with a slope of 30mm to 50mm in the

    channel along with sewer lines as per the approved departmental drawings

    including cutting of C.C/B.T/WBM, earth work excavation and laying of

    Sand bed of 150mm thick & layingof C.C.(1:4:8) bed with 40mm & 20mm

    H.B.G. metal, brick work with C.M. (1:3) for Manhole using 2nd class best

    quality.The rate includes plastering with C.M(1:3) 20mm thick both inside

    and out side and smooth finishing of Sewer channel, providing top coping

    150mm thick with R.C.C (1:1.5:3) including supply and fixing of 35 E.H.D

    FRP cover with frame and encapsulated plastic steps including cost and

    conveyance of all materials, seignorage charges including cost and

    fabrication of steel used in R.C.C coping as per S.S. including benching,

    channeling, finishing and refilling with excavated earth and conveyance of

    surplus earth & Shoring and Strutting etc., complete as per S.S and as

    directed by the departmental authorities for finished item of work. (APDSS

    NO.1325)

    a) Up to 0.75mts deep manhole 53 6479.00 1 No. 343387.00

    b) 3.16mts to 3.45mts deep manhole 4 40395.00 1 No. 161580.00

    c) 3.46mts to 3.75mts deep manhole 1 44583.00 1 No. 44583.00

    c) 3.76mts to 4.05mts deep manhole 3 50818.00 1 No. 152454.00

    d) 4.06mts to 4.35mts deep manhole 3 58033.00 1 No. 174099.00

    e) 4.36mts to 4.65mts deep manhole 2 63042.00 1 No. 126084.00

    Jointing the C.I. Pipes, fittings and valves with flanged ends including cost

    of jointing materials such as bolts, nuts, rubber insertion, white lead and

    including filling with water with a water lead upto 500 m and testing to

    required pressure etc., comp as per BIS No.3114/85.a) 100mm dia. 2 166.40 1Joint 332.80

    Supply and delivery of R.C.C NP-3 socket and spigot pipes & Rubber Rings

    confirming to BIS No.458/1988 , BIS 5382/1985, Lowering of RCC spigot

    and socket carefully in to the trench, laying them true to alignment and

    gradient, jointing with rubber rings and testing including filling with water

    with a lead upto 500m, including cost and conveyance to work spot and

    stacking at site, collection and supply of sand from krishna river bed and

    providing 150mm thick at bottom of the pipe, including cost and

    conveyance of all materials, seignorage and all labour charges, including all

    taxes and duties etc.,complete as per S.S., and as directed by the

    departmental authorities

    a) 350mm dia 262.90 1372.00 1Rmt 360698.80b) 400mm dia. 46.60 1549.00 1Rmt 72183.40

    c) 500mm dia. 9.30 1710.00 1Rmt 15903.00

    Supply and delivery of R.C.C NP-3 socket and spigot pipes & Rubber Rings

    confirming to BIS No.458/1988 , BIS 5382/1985, Lowering of RCC spigot

    and socket carefully in to the trench, laying them true to alignment and

    gradient, jointing with rubber rings and testing including filling with water

    with a lead upto 500m, including cost and conveyance to work spot and

    stacking at site, including cost and conveyance of all materials, seignorage

    and all labour charges, including all taxes and duties etc.,complete as per

    S.S., and as directed by the departmental authorities.

    For Manhole portiona) 350mm dia 10.20 1306.50 1Rmt 13326.30

    b) 400mm dia. 1.20 1603.90 1Rmt 1924.68

    c) 500mm dia. 2.40 1847.70 1Rmt 4434.48

    Providing VRCC mix of M30 grade design concrete mix (1:1.24:2.89)

    using 420Kgs of Cement, 60% of 20mm & 40% of 12mm size

    Abstract of Supplimental Items

    f Work :- Providing Sewer line Collection Network in Block-3 extended area covering Devi Nagar. (Rc.E9 - 45789/200

    Name of the Contractor: - M/s K. Rama Krishna Contractors Pvt.Ltd., Hyderabad

  • 8/3/2019 Work Slip of Devi Nagar-1

    17/37

    Description of item Qty. Rate Per Amount

    i) For Sump 35.20 4266.65 1Cum 150186.08

    ii) For Inlet, Screen & Grit chambers 15.69 4239.13 1Cum 66511.95

    Well sinking in sandy and other loose soils under water either by manual

    labour, divers, or dredgers, weighing the top of steining to assist sinking

    etc., including dewatering and other incidental charges such as hire charges

    for mechanical equipment etc,complete for an internal diameter of 8.00mts.

    Up to 2.00mts. from G.L 1.50 61755.95 1mt 92633.93

    2.00mts to 4.00mts depth 2.00 71014.94 1mt 142029.88

    4.00mts to 6.00mts depth 2.00 80273.94 1mt 160547.88

    6.00mts to 8.00mts depth 2.00 90516.03 1mt 181032.068.00mts to 10.00mts depth 1.80 100057.48 1mt 180103.46

    Sinking of Inlet, Screen & Grit chambers in Sandy and other loose soils

    either by manual labour, divers, or dredgers, weighing the top of steining to

    assist sinking etc., includingdewatering and other incidental charges such as

    hire charges for mechanical equipment etc.,complete as per S.S and as

    directed by the departmental authorities.

    Up to 2.00mts. from G.L 69.58 1228.10 1Cum 85451.20

    2.00mts to 4.00mts depth 69.58 1412.23 1Cum 98262.96

    4.00mts to 6.00mts depth 66.11 1596.36 1Cum 105535.36

    Providing VCC mix of M30 grade design concrete mix (1:1.24:2.89) using

    420Kgs of Cement, 60% of 20mm & 40% of 12mm size H.B.G.cruched

    metal from Kethanakonda quarry including cost of conveyance of all

    materials at site, labour charges for all operations in machine mixing, laying

    & vibrating of concrete, all delift charges, watering, curing, etc., complete

    as directed by the departmental authorities.

    60.09 3764.04 1Cum 226181.16

    Supply of 60 Capacity excavator (Proclainer) with loader including hire and

    operational charges, fuel charges, wages of driver and helper etc.,complete

    as per S.S., and as directed by the departmental authorities.

    19.00 600.00 1Hour 11400.00

    Supply and delivery of 315mm dia. HDPE Pipe of PE-80 Grade confirming

    to I.S.No.4984-1995 including cost and conveyance to work spot

    etc.,complete.

    18.00 1923.84 1Rmt. 34629.12

    Supply and delivery of 200mm dia. Unplasticised PVC Pipe confirming toI.S.No.4985/2000 (3rd revision) with bell ends as per specification

    including cost and conveyance to work spot etc.,complete.

    24.00 396.21 1Rmt. 9509.04

    C.C.mix (1:2:4) using 12mm size H.B.G crushed metal from approved

    quarries including cost and conveyance of all materials, seignorage charges

    and all labour charges including machine mixing, laying,vibrating, tamping

    and curing etc., complete as per APDSS. For Pump house flooring.

    1.53 3289.56 1Cum 5033.03

    Providing hand railing with 50mm dia. G.I. 'B' class Pipes including cost

    and conveyance to work spot and all labour charges for cutting and fixingin

    position, welding, grinding etc., complete as per S.S and as directed by the

    departmental authorities.

    17.90 337.17 1Rmt. 6035.34

    Plastering with CM (1:3) 12mm thick including cost and conveyance of all

    materials at site seignorage, labour charges, watering, curing etc., complete

    as per S.S

    207.50 940.04 10Sqmt 19505.83

    Manufacture, Supply, delivery and fixing in position of M.S. fabricated Inlet

    sluice gate of size 0.65x1.20m with suitable frame both sides supported by

    2.50m long 100x50x6mm size guide channels. The shutter fitted with

    3.45M long 65mm O.D M.S Pipe and 2.00m long 50mm dia.screw rod

    above the M.S. gear box. The screw rod is fitted with suitable gearbox

    supported on two Nos. of 150x75mm ISMB of 2.65 long rested on inlet

    chamber walls including cost and conveyane of all materials including

    erection and fixing of the gate with C.C. (1:1:5:3) mix including painting

    two coats with anti corrossive black paint over one coat of priming

    including all labour charges for fabrication, erection and fixing etc.,

    complete as per the directions of departemntal authorities for finished items

    of work.

    1.00 38000.00 1No. 38000.00

  • 8/3/2019 Work Slip of Devi Nagar-1

    18/37

    Description of item Qty. Rate Per Amount

    Manufacture, Supply, delivery and fixing in position of M.S. fabricated

    individual Grit chamber sluice gates of 2Nos. of size 0.65x1.20m for two

    vents. The shutters both sides supported by 2.50m long 100x50x6mm size

    guide channels. The shutter fitted with 3.45m long 65mm O.D M.S. Pipe

    and 2.00m long 50mm dia.screw rod above the M.S. box. The screw rod is

    fitted with suitable gear boxes supported on two Nos. of 150x75mm ISMB

    of 3.60m long rested on Grit chamber walls. The rate including fabrication

    of 3.60x0.65m size platform rested on ISMBs for operation of gates. the

    platform made out of 6mm thick checkered plate and the hand railing made

    out of 50x50x4mm size ISAs for verticals and three rows of 20mm dia.

    O.D. M.S Pipe on both sides for horizontals. The rate including cost and

    conveyane of all materials including erection and fixing of the gate with

    C.C. (1:1:5:3) mix including painting two coats with anti corrossive black

    paint over one coat of priming including all labour charges for fabrication,

    erection and fixing etc., complete as per the directions of departemntal

    authorities for finished items of work.

    1.00 76000.00 1No. 76000.00

    Fabrication, supply, deliveryand fixing in position of M.S. Ladder made out

    of 50x50x5mm size I.S.Angles for vertical support of 5.85M long and

    50x50x5mm size 16 Nos.I.S.Angles of 0.50M wide for steps including

    painting two coats with anti corrossive black paint over one coat of primingincluding all labour charges for fabrication, supply & fixing in position

    etc.,complete as per the directions of departmental authorities.

    115.00 47.74 1Kg. 5490.10

    Fabrication, supply, delivery and fixing in position of M.S. Screens made

    out of 50x20mm size M.S. Flats welded to M.S. Flats at top and bottom

    including painting two coats with anti corrossive black paint over one coat

    of priming including all labour charges for fabrication, supply & fixing in

    position etc.,complete as per the directions of departmental authorities.

    720.00 45.60 1Kg. 32832.00

    Brick masonary in CM (1:3) using 2nd class bricks including cost and

    conveyance of all materials at site, labour charges for all operations of work,

    watering etc., complete as per S.S

    For fixing of Screens 2.01 2594.44 1Cum 5214.82White washing two coats with Janatacem. The rate including cost and

    conveyance of all materials at site, labour charges, scaffolding charges etc.,

    complete as directed by the departmental authorities.

    431.09 104.72 10 Sqm 4514.37

    Removal of wet silt and sludge from sullage drains with aid of baskets and

    vessels including labour charges for all operations etc.,complete as per the

    directions of departmental authorities.

    89.40 95.55 1Cum 8542.17

    Engaging of Air Compressor equipment/Breaker for cutting of C.C blocks

    for laying of Pumping main including hire and operational charges of the

    equipment etc.,complete as directed by the departmental authorities.

    13.00 900.00 1Hour 11700.00

    Fabrication, supply, delivery and placing in position of M.S. pipes and

    specials made out of M.S. sheet including cost and conveyance and all

    labour charges for cutting, bending, welding, grinding including painting

    two coats with anti corrossive black paint over one coat of priming

    including transportation to work spot and placing in position etc.,complete

    as per the directions of departmental authorities.

    3139.00 65.00 1Kg. 204035.00

    Supply and delivery of spun yarn including cost and conveyance to work

    spot etc.,complete.15.00 50.63 1Kg. 759.45

    Supply and delivery of Pig lead including cost and conveyance to work spot

    etc.,complete.150.00 50.63 1Kg. 7594.50

    Jointing the D.I Pipes & fittings with S/S ends excluding cost of jointing

    materials such as lead or lead wool and hemp yarn but including sundries

    such as cost of fuel for melting lead, filling with water, with a water lead

    upto 500 m and testing to required pressure etc, complete as BIS

    No.3114/85

    a) 500mm dia. 7.00 325.50 1No. 2278.50

    4716112.31

    Tender Percentage @ 9.99% excess 471139.62

    5187251.93

  • 8/3/2019 Work Slip of Devi Nagar-1

    19/37

    0.06 Nos Mason 1st Class 206.00 Each 12.360.14 Nos Mason 2nd Class 188.00 Each 26.321.80 Nos Men Mazdoor 146.00 Each 262.801.40 Nos Women Mazdoor 146.00 Each 204.40

    Add 40% on Rs.505.88 202.35708.23

    0.54 Nos Mason 1st Class 206.00 Each 111.241.26 Nos Mason 2nd Class 188.00 Each 236.881.40 Nos Men Mazdoor 146.00 Each 204.401.40 Nos Women Mazdoor 146.00 Each 204.40

    Add 40% on Rs. 756.92 302.771059.69

    0.42 Nos Mason 1st Class 206.00 Each 86.520.98 Nos Mason 2nd Class 188.00 Each 184.240.70 Nos Men Mazdoor 146.00 Each 102.20

    2.10 Nos Women Mazdoor 146.00 Each 306.60Add 40% on Rs. 679.56 271.82951.38

    0.66 Nos Mason 1st Class 206.00 Each 135.961.54 Nos Mason 2nd Class 188.00 Each 289.520.50 Nos Men Mazdoor 146.00 Each 73.003.20 Nos Women Mazdoor 146.00 Each 467.20

    Add 40% on Rs. 965.68 386.271351.95

    0.33 Nos Mason 1st Class 206.00 Each 67.980.77 Nos Mason 2nd Class 188.00 Each 144.760.50 Nos Men Mazdoor 146.00 Each 73.001.10 Nos Women Mazdoor 146.00 Each 160.60

    Add 40% on 446.34 178.54624.88

    RCC (1:2:4) - 1 Cu.m0.12 Nos Mason 1st Class 206.00 Each 24.720.28 Nos Mason 2nd Class 188.00 Each 52.64

    2.10 Nos Men Mazdoor 146.00 Each 306.603.50 Nos Women Mazdoor 146.00 Each 511.00

    Add 40% on 894.96 357.981252.94

    0.70 Nos Mason 2nd Class 188.00 Each 131.60

    0.50 Nos Men Mazdoor 146.00 Each 73.00

    0.25 Nos Women Mazdoor 146.00 Each 36.50

    Add 40% of Rs.241.10 96.44

    337.54

    0.96 Nos Mason 1st Class 206.00 Each 197.76

    2.24 Nos Mason 2nd Class 188.00 Each 421.12

    2.20 Nos Men Mazdoor 146.00 Each 321.20

    1.10 Nos Women Mazdoor 146.00 Each 160.60

    LABOUR CHARGESAll Cement Concrete mixtures - 1 Cu.m

    R.R.MASONARY LABOUR CHARGES - 1 Cu.m

  • 8/3/2019 Work Slip of Devi Nagar-1

    20/37

    0.92 Cu.m Cost of 20mm H.G. Crushed Metal 1137.14 Cu.m 1046.17

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.33 MT Cement 43 grade 4300.00 1 MT 1419.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.88

    1 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    1 Cum 2 De-lift charges (2x18.90) 37.80 1Cum 37.80

    Add 40% on Rs.18.90 15.12

    Rate per 1Cum 3353.96

    Add for VAT @ 4% 134.16

    Rate per 1Cum 3488.121 C.C. (1:2:4) using 12mm H.G. Crushed Metal including cost

    and conveyance of all materials including all labour charges

    etc. complete. - 1 Cum

    0.92 Cu.m Cost of 20mm H.G. Crushed Metal 987.14 Cu.m 908.17

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.33 MT Cement 43 grade 4300.00 1 MT 1419.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.88

    1 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    Rate per 1Cum 3163.04Add for VAT @ 4% 126.52

    Rate per 1Cum 3289.56

    R.C.C. ITEMS

    2 V.R.C.C. M30 Grade design concrete mix (1:1.24:2.89) using

    60% of 20mm and 40% of 12mm H.B.G. Crushed Metal

    including cost and conveyance of all materials and labour

    charges etc. complete. - 1 Cum

    a) For Inlet, Screen & Grit chambers side wall up to 4.00Mts.

    Height

    0.515 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 585.63

    0.343 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 338.59

    0.368 Cum Sand for Mortar 284.76 1Cum 104.79

    0.420 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    3.200 Sqm Centering charges 393.00 1Sqm 1257.60

    5280.77

    Add for VAT @ 4% 211.23

    Rate per 1Cum 5492.00

    b) For Inlet, Screen & Grit chambers Curb0.515 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 585.63

    0.343 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 338.59

    0.368 Cum Sand for Mortar 284.76 1Cum 104.79

    0.420 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    6.063 Sqm Centering charges 393.00 1Sqm 2382.76

    6405.93

    Add for VAT @ 4% 256.24Rate per 1Cum 6662.17

    b) For Inlet Chamber side wall from 4.00Mts. to 6.00Mts.

    Height

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    Total

    Total

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    21/37

    e) For Well Curb

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    3.799 Sqm Centering charges 501.40 1Sqm 1904.82

    5959.69

    Add for VAT @ 4% 238.39Rate per 1Cum 6198.08

    f) For Sump side wall

    0.515 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 585.63

    0.343 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 338.59

    0.368 Cum Sand for Mortar 284.76 1Cum 104.79

    0.420 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    2.963 Sqm Centering charges 501.40 1Sqm 1485.655508.82

    Add for VAT @ 4% 220.35

    Rate per 1Cum 5729.17

    g) For Sump Partition wall up to 4.00Mts. Height

    0.515 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 585.63

    0.343 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 338.59

    0.368 Cum Sand for Mortar 284.76 1Cum 104.79

    0.420 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    6.667 Sqm Centering charges 501.40 1Sqm 3342.83

    7366.00

    Add for VAT @ 4% 294.64

    Rate per 1Cum 7660.64

    h) For Sump Partition wall from 4.00Mts. to 6.00Mts. Height

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.501 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    6.667 Sqm Centering charges 501.40 1Sqm 3342.83

    1 Cum De-lift charges 18.90 1Cum 18.90

    Add 40% on Rs.18.90 7.56

    7424.16

    Add for VAT @ 4% 296.97

    Rate per 1Cum 7721.13

    i) For Base Slab of Sump0.515 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 585.63

    0.343 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 338.59

    0.368 Cum Sand for Mortar 284.76 1Cum 104.79

    0.420 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    Total

    Total

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    22/37

    1 C.C. (1:3:6) using 66 2/3% of 40mm and 33 1/3% of 20mm

    H.G. Crushed Metal including cost and conveyance of allmaterials including mixing of FOSROC Monoplast water

    proof compund at 1 ltr per one bag of cement and labour

    charges etc. complete. - 1 Cum

    0.613 Cu.m Cost of 40mm H.G. Crushed Metal 805.89 Cu.m 494.01

    0.307 Cu.m Cost of 20mm H.G. Crushed Metal 1137.14 Cu.m 349.10

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.22 MT Cement 43 grade 4300.00 1 MT 946.00

    4.40 Ltrs FOSROC Monoplast water proofing liquid 110.00 Cu.m 484.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.88

    1 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    Rate per 1Cum 3108.98

    Add for VAT @ 4% 124.36

    Rate per 1Cum 3233.34

    1 C.C. (1:2:4) using 20mm H.G. Crushed Metal including cost

    and conveyance of all materials including all labour charges

    etc. complete. - 1 Cum

    0.92 Cu.m Cost of 20mm H.G. Crushed Metal 1137.14 Cu.m 1046.17

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.33 MT Cement 43 grade 4300.00 1 MT 1419.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.881 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    1 Cum 2 De-lift charges (2x18.90) 37.80 1Cum 37.80

    Add 40% on Rs.18.90 15.12

    Rate per 1Cum 3353.96

    Add for VAT @ 4% 134.16

    Rate per 1Cum 3488.12

    1 C.C. (1:2:4) using 12mm H.G. Crushed Metal including cost

    and conveyance of all materials including all labour charges

    etc. complete. - 1 Cum0.92 Cu.m Cost of 20mm H.G. Crushed Metal 987.14 Cu.m 908.17

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.33 MT Cement 43 grade 4300.00 1 MT 1419.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.88

    1 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    23/37

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    5.000 Sqm Centering charges 393.00 1Sqm 1965.00

    6019.87

    Add for VAT @ 4% 240.79

    Rate per 1Cum 6260.66d) For Screen & Grit Chambers side wall from 4.00Mts. to

    6.00Mts. Height

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    5.000 Sqm Centering charges 393.00 1Sqm 1965.001 Cum De-lift charges 18.90 1Cum 18.90

    Add 40% on Rs.18.90 7.56

    6046.33

    Add for VAT @ 4% 241.85

    Rate per 1Cum 6288.18

    e) For Well Curb

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    3.799 Sqm Centering charges 501.40 1Sqm 1904.82

    5959.69

    Add for VAT @ 4% 238.39

    Rate per 1Cum 6198.08

    f) For Sump side wall

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.45

    0.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.220.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    3.200 Sqm Centering charges 501.40 1Sqm 1604.48

    5659.35

    Add for VAT @ 4% 226.37

    Rate per 1Cum 5885.72

    g) For Sump Partition wall up to 4.00Mts. Height

    0.521 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 592.450.347 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 342.54

    0.366 Cum Sand for Mortar 284.76 1Cum 104.22

    0.425 MT Cement 43 grade 4300.00 1MT 1827.50

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    Total

    Total

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    24/37

    1 Cum Machine mixing charges 37.50 1Cum 37.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    1 Cum Centering charges 376.00 1Cum 376.00

    1 Cum De-lift charges 18.90 1Cum 18.90

    Add 40% on Rs.18.90 7.56

    4659.78

    Add for VAT @ 4% 186.39

    Rate per 1Cum 4846.17

    b) For Well Curb0.511 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 581.08

    0.341 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 336.61

    0.371 Cum Sand for Mortar 284.76 1Cum 105.65

    0.42 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 1112.16 1Cum 1112.16

    1 Cum Vibrating charges 38.50 1Cum 38.50

    4.83 Sqm Centering charges 501.40 1Sqm 2421.76

    7513.92

    Add for VAT @ 4% 300.56

    Rate per 1Cum 7814.48

    For Side Wall up to 4.00M

    c) For Inlet side wall

    0.511 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 581.08

    0.341 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 336.61

    0.371 Cum Sand for Mortar 284.76 1Cum 105.65

    0.42 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 38.50 1Cum 38.501 Cum Vibrating charges 38.50 1Cum 38.50

    4.76 Sqm Centering charges 393.00 1Sqm 1870.68

    5889.18

    Add for VAT @ 4% 235.57

    Rate per 1Cum 6124.75

    d) For Screen & Grit chambers side wall

    0.511 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 581.08

    0.341 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 336.61

    0.371 Cum Sand for Mortar 284.76 1Cum 105.65

    0.42 MT Cement 43 grade 4300.00 1MT 1806.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 38.50 1Cum 38.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    2.86 Sqm Centering charges 393.00 1Sqm 1123.98

    5142 48

    Total

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    25/37

    3 V.R.C.C. M30 Grade design concrete mix (1:1.25:2.87) using

    60% of 20mm and 40% of 12mm H.B.G. Crushed Metal

    includingcost and conveyanceof all materials includingmixing

    of FOSROC Monoplast water proof compund at 1 ltr per one

    bag of cement and labour charges etc. complete. - 1 Cum

    a) For Base Slab of Sump

    0.511 Cum Cost of 20mm H.G. Crushed Metal 1137.14 1Cum 581.08

    0.341 Cum Cost of 12mm H.G. Crushed Metal 987.14 1Cum 336.61

    0.371 Cum Sand for Mortar 280.06 1Cum 103.90

    0.42 MT Cement 43 grade 4300.00 1 MT 1806.008.40 Ltrs FOSROC Monoplast water proofing liquid 110.00 1Cum 924.00

    1 Cum Labour charges for R.C.C.Items 1112.16 1Cum 1112.16

    1 Cum Machine mixing charges 38.50 1Cum 38.50

    1 Cum Vibrating charges 38.50 1Cum 38.50

    2 Delifts Delift Charges 18.90 1Delift 37.80

    Add 40% on 37.80 15.12

    4993.67

    Add for VAT @ 4% 199.75

    Rate per 1Cum 5193.42

    b) For Base Slab of Inlet, Screen & Grit chambers

    0.511 Cu.m Cost of 20mm H.G. Crushed Metal 987.14 Cu.m 504.43

    0.341 Cu.m Cost of 12mm H.G. Crushed Metal 987.14 Cu.m 336.61

    0.371 Cu.m Sand for Mortar 280.06 Cu.m 103.90

    0.42 MT Cement 43 grade 4300.00 1 MT 1806.00

    1 Cu.m Labour charges for R.C.C.Items 1112.16 Cu.m 1112.16

    1 Cu.m Centering charges 376.00 1Cum 376.00

    1 Cu.m Machine mixing charges 38.50 Cu.m 38.50

    1 Cu.m Vibrating charges 38.50 Cu.m 38.50

    1 Delift Delift Charges 18.90 1Delift 18.90

    Add 40% on 18.90

    4342.56

    Add for VAT @ 4% 173.70

    Rate per 1Cum 4516.26

    4 V.C.C. M30 Grade design concrete mix (1:1.25:2.87) using

    60% of 20mm and 40% of 12mm H.B.G. Crushed Metal

    includingcost and conveyanceof all materials includingmixing

    of FOSROC Monoplast water proof compund at 1 ltr per one

    bag of cement and labour charges etc. complete. - 1 Cum

    For Base Slab of Sump

    0.511 Cu.m Cost of 20mm H.G. Crushed Metal 280.06 Cu.m 143.11

    0.341 Cu.m Cost of 20mm H.G. Crushed Metal 987.14 Cu.m 336.61

    0.371 Cu.m Sand for Mortar 280.06 Cu.m 103.90

    0.42 MT Cement 43 grade 4300.00 1 MT 1806.00

    8.50 Ltrs FOSROC Monoplast water proofing liquid 110.00 1Ltr. 935.00

    1 Cu.m Labour charges for C.C.Items 628.88 Cu.m 628.88

    1 Cu.m Machine mixing charges 38.50 Cu.m 38.50

    1 Cu.m Vibrating charges 38.50 Cu.m 38.50

    2 Delifts Delift Charges 18.90 Sqm 37.80 Add 40% on 37.80

    4083.43

    Add for VAT @ 4% 163.34

    Rate per 1Cum 4246.77

    Total

    Total

    Total

  • 8/3/2019 Work Slip of Devi Nagar-1

    26/37

    114 V.R.C.C. (1:2:4) using 20mm H.G. Crushed Metal includingcost and conveyance of all materials and labour charges

    includingcentering, vibrating for BED BLOCKS, TEMPLATES,

    FOOTINGS etc. complete. - 1 Cum

    1 Cu.m Rate as per piles 6019.87 Cu.m 6019.87

    1 Cu.m Vibrating Charges #REF! Cu.m #REF!

    #REF!

    1 Cu.m Centering charges (Sl.No. 802) 715.00 Cu.m 715.00

    Rate per 1Cum #REF!

    115 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for PLINTH BEAM, LINTELS

    (LESS THAN 3.00m SPAN) etc. complete. - 1 Cum

    1 Cu.m Rate asper piles 6019.87 Cu.m 6019.87

    1 Cu.m Centering charges Sl.No. 805 1071.00 Cu.m 1071.00

    1 Cu.m Vibrating charges #REF! Cu.m #REF!

    Rate per 1Cum #REF!

    116 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour chargesincluding vibrating, centering for LINTELS FOR FIRST

    FLOOR etc. complete. - 1 Cum

    1 Cu.m Cost of RCC FOR Ground Floor #REF! Cu.m #REF!

    1 Cu.m Lift charges 55.00 Cu.m 55.00

    Rate per 1Cum #REF!

    117 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for LINTELS FOR SECOND

    FLOOR etc. complete. - 1 Cum1 Cu.m Cost of RCC FOR Ground Floor #REF! Cu.m #REF!

    1 Cu.m Lift charges between 2nd and 3rd (Sl.No. 809 & 810) 137.00 Cu.m 137.00

    Rate per 1Cum #REF!

    118 V.R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

  • 8/3/2019 Work Slip of Devi Nagar-1

    27/37

    1 Rmt. Cost of RCC Sunshades as above item 308.55 Cu.m 308.55

    1 Rmt. Lift charges (Sl.No. 810) 2.06 Rmt. 2.06

    Rate per 1 Rmt 310.61

    123 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for SUNSHADES OF 0.60 M

    WIDTH AND (0.075+0.05)/2 THICK etc. complete. - 1 Rmt.

    FOR SECOND FLOOR

    1 Rmt. Cost of RCC Sunshades as above item 308.55 Cu.m 308.55

    1 Rmt. Lift charges (Sl.No. 810) 5.14 Rmt. 5.14Rate per 1 Rmt 313.69

    124 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-

    BEAMS FOR GROUND FLOOR upto 3.66 Mtrs height etc.,

    complete. - 1 Cum

    1 Cu.m Rate as per piles 6019.87 Cu.m 6019.87

    1 Cu.m Centering charges sSl.No. 797) 1509.00 Cu.m 1509.00

    1 Cu.m Vibrating charges #REF! Cu.m #REF!Rate per 1 Cum #REF!

    125 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-

    BEAMS FOR FIRST FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor #REF! Cu.m #REF!

    1 Cu.m Lift charges Sl.No. 809 55.00 Cu.m 55.00

    Rate per 1 Cum #REF!

    126 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-

    BEAMS FOR SECOND FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor #REF! Cu.m #REF!

    1 Cu.m Lift charges between 2nd & 3rd (Sl.No. 810) 137.00 Cu.m 137.00

    Rate per 1 Cum #REF!

    127 R.C.C. (1:2:4) for 100mm thick RCC Slabs using 20mm H.G.

    Crushed Metal includingcost and conveyance of all materials

    and labour charges including vibrating, centering for ROOF

    SLAB FOR GROUND FLOOR upto 150mm thick etc.

    -1 Cu.m Rate as per piles 6019.87 Cu.m 6019.87

    10 sq.m Centering charges 1690.00 10 sq.m 1690.00

    1 Cu.m Vibrating charges #REF! Cu.m #REF!

    Rate per 1 Cum #REF!

    128 R.C.C. (1:2:4) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF SLAB FOR FIRST

    FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor #REF! Cu.m #REF!

  • 8/3/2019 Work Slip of Devi Nagar-1

    28/37

    1 Cu.m Lift charges between 2nd & 3rd floor (Sl.No. 809 & 810) 137.00 Cu.m 137.00

    Rate per 1 Cum 7551.87

    133 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating for PILES etc. complete. - 1 Cum

    0.92 Cu.m Cost of 20mm H.G. Crushed Metal 1137.14 Cu.m 1046.17

    0.46 Cu.m Sand for Mortar 284.76 Cu.m 130.99

    0.44 MT Cement 43 grade 4300.00 1 MT 1892.001 Cu.m Labour charges for R.C.C.Items 1112.16 Cu.m 1112.16

    1 Cu.m Machine mixing charges 37.50 Cu.m 37.50

    Rate per 1 Cum 4218.82

    134 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges etc.

    complete FOR CULVERT SLABS of lessthan 3.00 M Span

    1 Cum

    1 Cu.m Rate as per Piles 4218.82 Cu.m 4218.82

    1 Cu.m Centering charges Sl.No. 299 760.00 Cu.m 760.00

    1 Cu.m Vibrating charges 43.00 Cu.m 43.00

    Rate per 1 Cum 5021.82

    135 V.R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    includingcentering, vibrating for BED BLOCKS, TEMPLATES,

    FOOTINGS etc. complete. - 1 Cum

    1 Cu.m Rate as per piles 4218.82 Cu.m 4218.82

    1 Cu.m Vibrating Charges 43.00 Cu.m 43.00

    4261.821 Cu.m Centering charges (Sl.No. 802) 715.00 Cu.m 715.00

    Rate per 1 Cum 4976.82

    136 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for PLINTH BEAM, LINTELS

    (LESS THAN 3.00m SPAN) etc. complete. - 1 Cum

    1 Cu.m Rate asper piles 4218.82 Cu.m 4218.82

    1 Cu.m Centering charges Sl.No. 805 1071.00 Cu.m 1071.00

    1 Cu.m Vibrating charges 43.00 Cu.m 43.00

    Rate per 1 Cum 5332.82

    137 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for LINTELS FOR FIRST

    FLOOR etc. complete. - 1 Cum

    1 Cu.m Cost of RCC FOR Ground Floor 5332.82 Cu.m 5332.82

    1 Cu.m Lift charges 55.00 Cu.m 55.00

    Rate per 1 Cum 5387.82

    138 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for LINTELS FOR SECOND

    FLOOR etc complete 1 Cum

  • 8/3/2019 Work Slip of Devi Nagar-1

    29/37

    143 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for SUNSHADES OF 0.60 M

    WIDTH AND (0.075+0.05/2) THICK etc. complete. - 1 Rmt.

    FOR FIRST FLOOR

    1 Rmt. Cost of RCC Sunshades as above item 241.01 Cu.m 241.01

    1 Rmt. Lift charges (Sl.No. 810) 2.06 Rmt. 2.06

    Rate per 1Rmt 243.07

    144 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour chargesincluding vibrating, centering for SUNSHADES OF 0.60 M

    WIDTH AND (0.075+0.05)/2 THICK etc. complete. - 1 Rmt.

    FOR SECOND FLOOR

    1 Rmt. Cost of RCC Sunshades as above item 241.01 Cu.m 241.01

    1 Rmt. Lift charges (Sl.No. 810) 5.14 Rmt. 5.14

    Rate per 1Rmt 246.15

    145 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-

    BEAMS FOR GROUND FLOOR upto 3.66 Mtrs height etc.,

    complete. - 1 Cum

    1 Cu.m Rate as per piles 4218.82 Cu.m 4218.82

    1 Cu.m Centering charges sSl.No. 797) 1509.00 Cu.m 1509.00

    1 Cu.m Vibrating charges 43.00 Cu.m 43.00

    Rate per 1Cum 5770.82

    146 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-BEAMS FOR FIRST FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor 5770.82 Cu.m 5770.82

    1 Cu.m Lift charges Sl.No. 809 55.00 Cu.m 55.00

    Rate per 1Cum 5825.82

    147 R.C.C. (1:1.5:3) using 20mm H.G. Crushed Metal including

    cost and conveyance of all materials and labour charges

    including vibrating, centering for ROOF BEAMS AND T-

    BEAMS FOR SECOND FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor 5770.82 Cu.m 5770.821 Cu.m Lift charges between 2nd & 3rd (Sl.No. 810) 137.00 Cu.m 137.00

    Rate per 1Cum 5907.82

    148 R.C.C. (1:1.5:3) for 100mm thick RCC Slabs using 20mm

    H.G. Crushed Metal including cost and conveyance of all

    materials and labour charges includingvibrating, centering for

    ROOF SLAB FOR GROUND FLOOR upto 150mm thick etc.

    complete. - 10 sq.mm

    1 Cu.m Rate as per piles 4218.82 Cu.m 4218.82

    10 sq.m Centering charges 1690.00 10 sq.m 1690.00

    1 Cu.m Vibrating charges 43.00 Cu.m 43.00

    Rate per 1Cum 5951.82

    149 R.C.C. (1:1.5:3) for 100mm thick using 20mm H.G. Crushed

    Metal including cost and conveyance of all materials and

    l b h i l di ib ti t i f ROOF SLAB

  • 8/3/2019 Work Slip of Devi Nagar-1

    30/37

    153 R.C.C. (1:1.5:3) for 125mm thick using 20mm H.G. Crushed

    Metal including cost and conveyance of all materials and

    labour charges includingvibrating, centering for ROOF SLAB

    FOR SECOND FLOOR etc. complete. - 1 Cum

    1 Cu.m Rate as per Ground floor 5613.82 Cu.m 5613.82

    1 Cu.m Lift charges between 2nd & 3rd floor (Sl.No. 809 & 810) 137.00 Cu.m 137.00

    Rate as per 1Cum 5750.82

    154 R.R. Masonary work in CM (1:6) using rough stones from

    approved quarry including cost, seignorage and conveyance

    to the site and labour charges for mixing mortar, cutting,

    wedging of stones, curing etc., complete

    1.1 Cu.m Rough Stone #REF! Cu.m #REF!

    0.34 Cu.m Cement Mortar (1:6) #REF! Cu.m #REF!

    1 Cu.m Labour charges for R.R. Masonary 1059.69 Cu.m 1059.69

    Rate per 1Cum #REF!

    155 R.R. Masonary work in CM (1:5) using rough stones fromapproved quarry including cost, seignorage and conveyance

    to the site and labour charges for mixing mortar, cutting,

    wedging of stones, curing etc., complete

    1.1 Cu.m Rough Stone #REF! Cu.m #REF!

    0.34 Cu.m Cement Mortar (1:5) #REF! Cu.m #REF!

    1 Cu.m Labour charges for R.R. Masonary 1059.69 Cu.m 1059.69

    Rate per 1Cum #REF!

    156 Brick Masonary work in CM (1:5) using 2nd class bricks fromapproved quarry including cost, seignorage and conveyance

    to the site and labour charges for mixing mortar, curing etc.,

    complete FOR BASEMENT AND SUPERSTRUCTURE

    512 No Cost of Bricks #REF! 1000

    Nos

    #REF!

    0.20 Cu.m Cement Mortar (1:5) #REF! Cu.m #REF!

    1 Cu.m Labour charges for Brick Masonary 951.38 Cu.m 951.38

    Rate per 1Cum #REF!

    157 Brick Masonary work in CM (1:5) using 2nd class bricks from

    approved quarry including cost, seignorage and conveyance

    to the site and labour charges for mixing mortar, curing etc.,

    complete FOR FIRST FLOOR SUPERSTRUCTURE

    1 Cu.m Cost of Basement #REF! Cu.m #REF!

    1 Cu.m Scaffolding charges 40.00 Cu.m 40.00

    1 Cu.m Lift charges 46.00 Cu.m 46.00

    Rate per 1Cum #REF!

    158 Brick Masonary work in CM (1:5) using 2nd class bricks fromapproved quarry including cost, seignorage and conveyance

    to the site and labour charges for mixing mortar, curing etc.,

    complete FOR SECOND FLOOR SUPERSTRUCTURE

    1 Cu.m Cost of Basement #REF! Cu.m #REF!

    MASONARY WORKS

  • 8/3/2019 Work Slip of Devi Nagar-1

    31/37

    162 Brick Masonary work in CM (1:6) using hallow bricks of size

    400 x 200 x 200mm from local market including cost,

    seignorage and conveyanceto the site and labour charges for

    mixing mortar, curing etc., complete FOR BASEMENT

    57 Nos Cost of Hallow bricks (LR) 14.00 Each 798.00

    0.10 Cu.m Cement Mortar (1:6) #REF! Cu.m #REF!

    0.21 Nos Mason 1st class 206.00 Each 43.26

    0.49 Nos Mason 2nd class 188.00 Each 92.12

    0.35 Nos Men Mazdoor 146.00 Each 51.10

    1.05 Nos Women Mazdoor 146.00 Each 153.301 Cu.m Add 40% on Rs. 339.78 135.91

    Rate per 1Cum #REF!

    163 Plastering in CM(1:5) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for

    GROUND FLOOR -10 Sqm

    0.15 Cu.m Cement Mortar (1:5) #REF! Cu.m #REF!

    10 sq.m Labour charges for Plastering 624.88 Cu.m 624.88

    Rate per 10Sqm #REF!

    164 Plastering in CM(1:5) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for FIRST

    FLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Lift Charges Sl.No. 826 11.00 10 Sq.m 11.00

    10 sq.m Scaffolding charges Sl.No. 779 44.00 10 Sq.m 44.00

    Rate per 10Sqm #REF!

    165 Plastering in CM(1:5) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for

    SECOND FLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Lift Charges Sl.No. 827 19.00 10 Sq.m 19.00

    10 sq.m Scaffolding charges Sl.No. 780 88.00 10 Sq.m 88.00

    Rate per 10Sqm #REF!

    166 Plastering in CM(1:5) 20mm thick including cost &

    conveyance of all materials and labour charges etc. for

    GROUND FLOOR -10 Sqm

    0.21 Cu.m Cement Mortar (1:5) #REF! Cu.m #REF!

    10 sq.m Labour charges for Plastering 20MM THICK 1351.95 Cu.m 1351.95

    Rate per 10Sqm #REF!

    167 Plastering in CM(1:5) 20mm thick including cost &

    conveyance of all materials and labour charges etc. for FIRSTFLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 sq.m #REF!

    10 sq.m Lift Charges Sl.No. 826 11.00 10 Sq.m 11.00

    10 sq.m Scaffolding charges 44.00 10 Sq.m 44.00

  • 8/3/2019 Work Slip of Devi Nagar-1

    32/37

    172 Plastering in CM(1:4) 20mm thick including cost &

    conveyance of all materials and labour charges etc. for

    GROUND FLOOR -10 Sqm

    0.21 Cu.m Cement Mortar (1:4) #REF! Cu.m #REF!

    10 sq.m Labour charges for Plastering 20MM THICK 1351.95 Cu.m 1351.95

    Rate per 10Sqm #REF!

    173 Plastering in CM(1:4) 20mm thick including cost &

    conveyance of all materials and labour charges etc. for FIRST

    FLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Scaffolding charges 44.00 10 Sq.m 44.00

    10 sq.m Lift Charges 11.00 10 Sq.m 11.00

    Rate per 10Sqm #REF!

    174 Plastering in CM(1:4) 20mm thick including cost &

    conveyance of all materials and labour charges etc. for

    SECOND FLOOR -10 Sqm0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Scaffolding charges 88.00 10 Sq.m 88.00

    10 sq.m Lift Charges 19.00 10 Sq.m 19.00

    Rate per 10Sqm #REF!

    175 Plastering in CM(1:3) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for

    GROUND FLOOR -10 Sqm

    0.15 Cu.m Cement Mortar (1:3) #REF! Cu.m #REF!

    10 sq.m Labour charges for Plastering 12MM THICK 624.88 Cu.m 624.88

    Rate per 10Sqm #REF!

    176 Plastering in CM(1:3) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for FIRST

    FLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Scaffolding charges 44.00 10 Sq.m 44.00

    10 sq.m Lift Charges 11.00 10 Sq.m 11.00

    Rate per 10Sqm #REF!

    177 Plastering in CM(1:3) 12mm thick including cost &

    conveyance of all materials and labour charges etc. for

    SECOND FLOOR -10 Sqm

    0.00 sq.m Rate for Ground floor #REF! 10 Sq.m #REF!

    10 sq.m Scaffolding charges 88.00 10 Sq.m 88.00

    10 sq.m Lift Charges 19.00 10 Sq.m 19.00

    Rate per 10Sqm #REF!

  • 8/3/2019 Work Slip of Devi Nagar-1

    33/37

    182 Providing Weathering Proof Coarse with plastering in

    CM(1:3) 20mm thick using 1Kg., of acco-proof compound per

    1 bag of cement including cost & conveyance of all materials

    and labour charges etc. for 10 Sqm

    0.00 sq.m Plastering in Cm (1:3) 20mm thick 1885.50 Cu.m 1885.50

    2 Kgs Acco-proof Compound Sl.No. 300 24.00 Kg 48.00

    Rate per 10 Sqm 1933.50

    183 Rough Stone Dry packing for Aprons and Revetment usingRough Stones from approved quarry including cost &

    conveyance of all materials, labour charges, watering,

    ramming, mixing etc., complete as per SS - 1 Cu.m

    1.10 Cu.m Rough Stone 0.00 Cu.m 0.00

    0.12 Nos Stone cutter 1st class 0.00 Each 0.00

    0.28 Nos Stone cutter 2nd class 0.00 Each 0.00

    1.10 Nos Man mazdoor 0.00 Each 0.00

    0.70 Nos women mazdoor 0.00 Each 0.00

    Add 40% on Rs.

    0.00

    184 Quarry rubbish backing for Revetment - 1 Cu.m

    1.10 Cu.m Quarru rubbish 0.00 Cu.m 0.00

    0.70 Nos women mazdoor 0.00 Each 0.00

    Add 40% on Rs. 70.70 0.00

    0.00

    185 Gravel backing for Revetment - 1 Cu.m

    1.16 Cu.m Cost of Gravel 0.00 Cu.m 0.00

    0.70 Nos Men mazdoor 0.00 Each 0.00

    0.40 Nos women mazdoor 0.00 Each 0.00

    Add 40% on Rs. 111.10 0.00

    0.00

    186 Flooring with 40mm thick Cuddapah Slabs over existing bed

    set in CM(1:5) and pointing with CM(1:3) to full depth of slab

    including cost and conveyance of all materials and labour

    charges etc; completed as per ss -- 10 Sqm.0.50 sq.m 40mm thick Cuddapah slabs Sl.No. 30 1100.00 10 Sqm 1155.00

    0.12 cu.m Cement Mortor(1:5) 1695.9 1 Cum 203.51

    0.00 sq.m Pointing with CM(1:3) 811.07 10 Sqm 811.07

    0.00 sq.m Labour charges for floorings 1540.95 10 Sqm 1540.95

    Rate per 10 Sqm 3710.53

    187 Flooring with 50mm thick Cuddapah Slabs over existing bed

    set in CM(1:5) and pointing with CM(1:3) to full depth of slab

    including cost and conveyance of all materials and labour

    charges etc; completed as per ss -- 10 Sqm.

    0.50 sq.m 50mm thick Cuddapah slabs Sl.No. 31 1230.00 10 Sqm 1291.500.12 cu.m Cement Mortor(1:5) 1695.9 1 Cum 203.51

    0.00 sq.m Pointing with CM(1:3) 811.07 10 Sqm 811.07

    0.00 sq.m Labour charges for floorings 1540.95 10 Sqm 1540.95

    Rate per 10 Sqm 3847.03

    188 Flooring with 40mm thick Cuddapah Slabs only pointing with

    FLOORINGS AND ROOFINGS

  • 8/3/2019 Work Slip of Devi Nagar-1

    34/37

    193 Flooring with Bethemcherla polished coloured stones of

    25mm thick including cost and conveyance of all materials

    and labour charges etc; completed as per ss -- 10 Sqm.

    0.10 sq.m 25mm thick Bethemcherla polished coloured slabs 4214.00 10 Sqm 4256.14

    0.12 cu.m Cement mortar (1:5) 1695.90 cu.m 203.51

    0.05 cu.m Cement Putty for SEBRA in CM (1:3) 2540.7 cu.m 127.04

    0150 MT Cement 4400 MT 66.00

    0.00 sq.m Labour charges 1540.95 10 Sqm 1540.95

    Rate per 10 Sqm 6193.63

    194 Flooring with Glazed tiles (Colour) over a bed of in CM (1:3)

    and set in cement slush and pointing with CM (1:3) including

    cost and conveyance of all materials and labour charges etc,

    completed as per ss -- 10 Sqm.

    0.10 sq.m Glazed tiles (Colour) Sl.NO. 70 332.00 1 sq.m 3353.20

    0.12 cu.m Cement mortar (1:3) 2540.70 cu.m 304.88

    0.05 cu.m Cement Putty for SEBRA in CM (1:3) 2540.7 cu.m 127.04

    0150 MT Cement 4400 MT 66.00

    0.00 sq.m Labour charges 1120 10 Sqm 1120.00Rate per 10 Sqm 4971.12

    195 Flooring with Glazed tiles (white) over a bed of in CM (1:3)

    and set in cement slush and pointing with CM (1:3) including

    cost and conveyance of all materials and labour charges etc,

    completed as per ss -- 10 Sqm.

    0.10 sq.m Glazed tiles (White) 280.00 1 sq.m 2828.00

    0.12 cu.m Cement mortar (1:3) 2540.70 cu.m 304.88

    0.05 cu.m Cement Putty for SEBRA in CM (1:3) 2540.7 cu.m 127.04

    0150 MT Cement 4400 MT 66.00

    0.00 sq.m Labour charges 1120 10 Sqm 1120.00

    Rate per 10 Sqm 4445.92

    196 Supply, delivery and fixing of Skirting using black polished

    stone of 12mm average thick oer plastered surface in cement

    slush including cost and conveyance of all materials and

    labour charges, watering etc., complete as directed by the

    departmental authorities - 10 sq.m

    0.00 sq.m Cost of stones (LR) 0.00 1 sq.m 0.000.12 cu.m Cement mortar (1:6) 0.00 cu.m 0.00

    0150 MT Cement 0 MT 0.00

    0.00 sq.m Labour charges 0 10 Sqm 0.00

    0.00

    197 Supply, delivery and fixing of polished black cuddapah slabs

    using 12mm to 20mm thick over existing plastered surface set

    in CM (1:6) includingcost and conveyanceof all materials and

    labour charges, watering etc., complete as directed by the

    departmental authorities - 10 sq.m0.00 sq.m Polished cuddapah slab Sl.No. 38 1509.00 1 sq.m 1509.00

    0.12 cu.m Cement mortar (1:6) 1484.70 cu.m 178.16

    0150 MT Cement 4400 MT 66.00

    0.00 sq.m Labour charges 1540.95 10 Sqm 1540.95

    Rate per 10 Sqm 3294.11

  • 8/3/2019 Work Slip of Devi Nagar-1

    35/37

    201 Supply & fixing of Teak Wood Window etc., complete as

    directed by the departmental authorities - 1 sq.m

    0.059 cu.m Teak wood 0.00 cu.m 0.00

    1.20 sq.m Labour charges for Wrought and put up 0.00 1 sq.m 0.00

    Add 40% on Rs. 502.80 0.00

    2.00 Nos Tower bolts 0.00 Each 0.00

    8.00 Nos Butt hinges 75mm size 0.00 Each 0.00

    4.00 Nos Holtfasts 0.00 Each 0.00

    4.00 Nos Chainage hooks 200mm long (LR) 0.00 Each 0.00

    8.96 Kgs MS Rods 0.00 Kg 0.00Rate for 1.20 sq.m area door 0.00

    Rate for 1 sq.m area door 0.00

    202 White washing two coats with best shell lime including cost

    and conveyance of all materials and labour charges etc.,

    complete -- 10 Sqm.

    0.07 Cu.m Shell Lime 780.00 Cu.m 54.60

    0.48 Nos Mason / Brick layer 1 st Class 206.00 Each 98.88

    1.12 Nos Mason / Brick layer 2nd class 188.00 Each 210.560.50 Nos Man Mazdoor 146.00 Each 73.00

    2.70 Nos Women Mazdoor 146.00 Each 394.20

    Add 40% on Rs.776.64 310.66

    1141.90

    Sundries for Gum, Gungi water, Firewood including brushes

    etc.

    5.10

    Rate per 100 sq.m 1147.00

    Rate per 10 sq.m 114.70

    203 White washing single coat with best shell lime including cost

    and conveyance of all materials and labour charges etc.,

    complete -- 10 Sqm.

    0.05 Cu.m Shell Lime 780.00 Cu.m 39.00

    0.33 Nos Mason / Brick layer 1 st Class 206.00 Each 67.98

    0.77 Nos Mason / Brick layer 2nd class 188.00 Each 144.76

    0.30 Nos Man Mazdoor 146.00 Each 43.80

    1.90 Nos Women Mazdoor 146.00 Each 277.40

    Add 40% on Rs.533.94 533.94 213.58

    786.52

    Sundries for Gum, Gungi water, Firewood including brushesetc.

    3.48

    Rate per 100 sq.m 790.00

    Rate per 10 sq.m 79.00

    204 Colour washing single coat with best shell lime including cost

    and conveyance of all materials and labour charges etc.,

    complete -- 10 Sqm.

    0.00 sq.m Rate of white wash single coat 79.00 10 sq.m 79.00

    Add 50% for colour 39.50Rate per 10 sq.m 118.50

    205 Colour washing double coat with best shell lime including cost

    and conveyance of all materials and labour charges etc.,

    complete -- 10 Sqm.

    PAINTING ITEMS

  • 8/3/2019 Work Slip of Devi Nagar-1

    36/37

    Rate per 10 Sqm 305.00

    209 Primary Coat painting over new Iron work including cost and

    conveyance of all materials and labour charges etc., complete

    as per ss-- 10 Sqm.

    1.00 Kg Red Lead 74.00 Kg 74.00

    0.02 Kg Paint Drier 42.00 Kg 0.84

    0.50 Ltrs Linced oil 42.00 Ltrs 21.00

    0.21 Nos Painter 1st class 206.00 Each 43.26

    0.49 Nos Painter 2nd class 188.00 Each 92.12Add 40% on Rs.135.38 54.15

    Sundries including brushes, soap putty etc., 4.63

    Rate per 10 Sqm 290.00

    210 Primary Coat painting over new plastered surface including

    cost and conveyance of all materials and labour charges etc.,

    complete as per ss -- 10 Sqm.

    0.60 Kg Red Lead 74.00 Kg 44.40

    0.60 Kg White lead 67.00 Kg 40.20

    0.60 Ltrs Linced oil 42.00 Ltrs 25.200.21 Nos Painter 1st class 206.00 Each 43.26

    0.49 Nos Painter 2nd class 188.00 Each 92.12

    Add 40% on Rs.135.38 54.15

    Sundries including brushes, soap putty etc., 5.67

    Rate per 10 Sqm 305.00

    211 Painting two coats of synthetic enamel paint over one coat of

    primary coat Coat painting over new wood work including

    cost and conveyance of all materials and labour charges etc.,

    complete as per ss-- 10 Sqm. (At 14 sq.m per 1 Ltr.)

    0.00 sq.m Cost of primary coat (single) 305.00 10 sq.m 305.00

    1.20 Ltrs Paint 175.00 Kg 210.00

    0.36 Nos Painter 1st class 206.00 Each 74.16

    0.84 Nos Painter 2nd class 188.00 Each 157.92

    Add 40% on Rs.232.08 92.83

    Sundries for brushes 5.09

    Rate per 10 Sqm 845.00

    212 Painting one coat of synthetic enamel paint over old new

    wood work including cost and conveyance of all materials andlabour charges etc., completeas per ss-- 10 Sqm. (At 14 sq.m

    per 1 Ltr.)

    0.70 Ltrs Paint 175.00 Kg 122.50

    0.21 Nos Painter 1st class 206.00 Each 43.26

    0.49 Nos Painter 2nd class 188.00 Each 92.12

    Add 40% on Rs.135.38 54.15

    sundries for brushes 2.97

    Rate per 10 Sqm 315.00

    213Painting two coats of synthetic enamel paint over old woodwork including cost and conveyance of all materials and

    labour charges etc., complete as per ss-- 10 Sqm. (At 14

    sq.m per 1 Ltr.)

    1.10 Ltrs Paint 175.00 Kg 192.50

    0.36 Nos Painter 1st class 206.00 Each 74.16

  • 8/3/2019 Work Slip of Devi Nagar-1

    37/37

    217 Painting two coats of synthetic enamel paint over old Iron

    work including cost and conveyance of all materials and

    labour charges etc., complete as per ss-- 10 Sqm. (At 14

    sq.m per 1 Ltr.)

    0.90 Ltrs Paint 175.00 Kg 157.50

    0.33 Nos Painter 1st class 206.00 Each 67.98

    0.77 Nos Painter 2nd class 188.00 Each 144.76

    Add 40% on Rs.212.74 85.10

    LS Sundries for brushes 4.66

    Rate per 10 Sqm 460.00

    218 Painting single coat of synthetic enamel paint over new

    Plastered surface including cost and conveyance of all

    materials and labour charges etc., complete as per ss-- 10

    Sqm. (At 14 sq.m per 1 Ltr.)

    0.00 sq.m Cost of Primary coat 305.00 10 sq.m 305.00

    0.70 Ltrs Paint 175.00 Kg 122.50

    0.21 Nos Painter 1st class 206.00 Each 43.26

    0.49 Nos Painter 2nd class 188.00 Each 92.12

    Add 40% on Rs.135.38 54.15sundries for brushes 2.97

    Rate per 10 Sqm 620.00

    219 Painting two coats of synthetic enamel paint over one coat of

    primary coat painting over new plastered surface including

    cost and conveyance of all materials and labour charges etc.,

    complete as per ss-- 10 Sqm. (At 14 sq.m per 1 Ltr.)

    0.00 sq.m Cost of Primary coat over new plastered surface 305.00 10 sq.m 305.00

    1.20 Ltrs Paint 175.00 Kg 210.00

    0.36 Nos Painter 1st class 206.00 Each 74.16

    0.84 Nos Painter 2nd class 188.00 Each 157.92

    Add 40% on Rs.232.08 92.83

    Sundries for brushes 5.09

    Rate per 10 Sqm 845.00

    220 Painting single coat of synthetic enamel paint over old

    plastered surface including cost and conveyance of all

    materials and labour charges etc., complete -- 10 Sqm.

    0.70 Ltrs Paint 175.00 Kg 122.50

    0.21 Nos Painter 1st class 206.00 Each 43.260.49 Nos Painter 2nd class 188.00 Each 92.12

    Add 40% on Rs.135.38 54.15

    sundries for brushes 2.97

    Rate per 10 Sqm 315.00

    221 Painting two coats of synthetic enamel paint over old

    plastered surface including cost and conveyance of all

    materials and labour charges etc., complete -- 10 Sqm.

    1 10 Ltrs Paint 175 00 Kg 192 50