Upload
phamanh
View
214
Download
0
Embed Size (px)
Citation preview
SmartGrid AMI and Other IT System Integration
GIS Integration to Visualize Capital Project Lifecycle
Emergent/Restorative ProcessIntegration
Sytem Integration Touch-point Optimization
Benefits Confirmation for Manual Processes to Workflow Automation
WMS OPPORTUNITIES1
2
3
4
5
Implementation Silo E�ect from Not Keeping Up with Evolving Technology Trends
Data Integrity from Improved Work Close-out
Uncertainty in How to Leverage with Investment in SmartGrid Technologies
Unrealized Opportunities for Further Information to Improve Performance
Integration with Unscheduled Restorative Work
A
B
C
D
E
Assess the existing state of the system and compare to initial goals and direction
Gather inputs related to future internal/external stakeholder needs
Provide insights on important trends from industry-leading subject matter experts
Discuss and prioritize next steps specific to your utility environment
Define best options going forward, focusing on ‘‘the next best dollar spent’’
WMS CHECKPOINTis designed to:
To support technology and business excellence, Excergy o�ers a high-impact assessment, WMS CheckPoint, to identify how you can optimize use of your WMS data and applications throughout theenterprise.
Utility Consulting and System Implementation
e x c e r g y. c o m | i n f o @ e x c e r g y. c o m
Are you fully leveraging your Work Management System(WMS) within your enterprise IT architecture and operational technologies for your Smart Grid?
Utilities are quickly coming to realize opportunities for expanding their WMS footprint within the organization.
and Challenges...
WORKMANAGEMENT
SYSTEM
GIS — as-built update tostructure mapping, mapproduct updatesEDMS — project archive
CLOSE OUTCIS — existing/new customertie to work requestGIS — existing other projectwork locations, impactedasset locations
PROJECT INITIATION
OMS — uponenergizingAMI — provisioningMWM — fieldinspection/redlining/as-built creation
EXECUTION
CAD — utility designintegration to workrequestGIS — network trackingTLM — voltage drop flickerfor capacity/feasibilityanalysisEAM — materialsprocurement withapproved design
PLANNING
Scheduling Software/EPR — workprioritization, change order/cancellationsMWM — field crew notification
SCHEDULING
Delivering peak performance on projects critical to your future
WORKMANAGEMENTSYSTEM