WORK PROGRESS WORK PROGRESS OF OF KERALA TOWNS KERALA TOWNS UPTO JANUARY 2007

WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Embed Size (px)

Citation preview

Page 1: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

WORK PROGRESSWORK PROGRESSOFOF

KERALA TOWNSKERALA TOWNS

UPTO JANUARY 2007

Page 2: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

7 Towns 7 Towns

Scheme Sanctioned on Scheme Sanctioned on 2020thth Nov 2002 Nov 2002

Page 3: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Construction of LT Lines, 11 kV Lines, Construction of LT Lines, 11 kV Lines, 11 kV-UG Cable & 33 kV Lines11 kV-UG Cable & 33 kV Lines

0

50

100

150

200

250

300

350

Target 319.5 188.65 126.05 28.5

Achievement 289.04 162.08 120.19 1.40

Construction of LT Lines

(km)

Construction of 11 kV lines

(km)

Construction of 11 kV U/G Cables (km)

New 33 kV Lines (km)

Page 4: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Reconductoring of LT Lines, 11 kV LinesReconductoring of LT Lines, 11 kV Lines& 66 kV Lines& 66 kV Lines

0

100

200

300

400

500

600

700

Target 611.80 115.00 10

Achievement 420.45 67.36 10

Reconductoring of LT Lines (km)

Reconductoring of 11 kV Lines (km)

Reconductoring of 66 kV Lines (km)

Page 5: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DTs, AB Switches & Installation of DTs, AB Switches & 9 KVAR LT Capacitors9 KVAR LT Capacitors

0

500

1000

1500

2000

2500

3000

3500

Target 333 888 3225

Achievement 333 754 2934

Installation of Distribution

Transformers

Installation of AB Switches

Installation of 9kVAR LT Capacitors

Page 6: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

New 66 kV , 33 kV SubstationsNew 66 kV , 33 kV Substations

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

Target 2 2

Achievement 2 0

New 66 kV GIS Substations New 33 kV Substations

Page 7: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DT, Feeder & Border MetersInstallation of DT, Feeder & Border Meters

0

500

1000

1500

2000

2500

3000

3500

Target 3414 167 93

Achievement 2958 159 71

Installation of DT Meters

Installation of Feeder Meters

Installation of Border Meters

Page 8: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Renovation & Modernization ofRenovation & Modernization ofDTs & SubstationsDTs & Substations

0

500

1000

1500

2000

2500

3000

Target 2745 22

Achievement 2586 22

R & M of DTs R & M of Substations

Page 9: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Computerised billing of sections &Computerised billing of sections &Computerised data logging at SSComputerised data logging at SS

0

10

20

30

40

50

60

Target 54 23

Achievement 54 22

Computerised Billing of Sections

Computerised data Logging at S/S

Page 10: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Meter Calibration & Consumer IndexingMeter Calibration & Consumer Indexing

0

100000

200000

300000

400000

500000

600000

Target 33 529000

Achievement 32 529000

Meter Calibration Consumer Indexing

Page 11: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Funds PositionFunds Position

0

50

100

150

200

Target (Rs.Cr.) 160.72

Achievement (Rs.Cr.) 131.09

Financial status upto 31.11.06 of 7 Towns scheme

Page 12: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

26 Towns 26 Towns

Sanctioned onSanctioned on2020thth September 2004 September 2004

Page 13: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Construction of 11 kV Lines, 11 kV-UG Construction of 11 kV Lines, 11 kV-UG Cable & Reconductoring of 11 kV Lines Cable & Reconductoring of 11 kV Lines

0

100

200

300

400

500

600

700

800

900

1000

Target 985 65 529

Achievement 851 29 295

Construction of 11 kV lines (km)

Construction of 11 kV U/G Cables (km)

Reconductoring of 11 kV Lines (km)

Page 14: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DTs, AB Switches & Installation of DTs, AB Switches & 9 kVAR LT Capacitors9 kVAR LT Capacitors

0

1000

2000

3000

4000

5000

6000

Target 1359 4321 5990

Achievement 1208 1538 1333

Installation of Distribution

Installation of AB Switch

Installation of 9kVAR LT

Page 15: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Renovation & Modernization ofRenovation & Modernization ofDTs & SubstationsDTs & Substations

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

Target 4543 38

Achievement 2089 29

R & M of DTs R & M of Substations

Page 16: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DT, Feeder & Border MetersInstallation of DT, Feeder & Border Meters

0

1000

2000

3000

4000

5000

6000

Target 5795 221 410

Achievement 1088 0 198

Installation of DT Meters

Installation of Feeder Meters

Installation of Border Meters

Page 17: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Computerised billing of sections, Computerised billing of sections, Computerised data logging at S/S & Call Computerised data logging at S/S & Call

CentreCentre

0

10

20

30

40

50

60

70

Target 66 38 32

Achievement 37 0 1

Computerised billing of sections

Computerised data logging at S/S

Call Centre

Page 18: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Consumer IndexingConsumer Indexing

740000

760000

780000

800000

820000

840000

860000

880000

900000

920000

940000

Target 921122

Achievement 813094

Consumer Indexing

Page 19: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Funds Position

0

20

40

60

80

100

120

140

Target (Rs.Cr.) 123.91

Achievement (Rs.Cr.) 78.5019745

Financial status upto 31.11.06 of 26 Towns scheme

Page 20: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

13 Towns 13 Towns

Sanctioned onSanctioned on23rd March 200523rd March 2005

Page 21: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Construction of 11kV Lines, 11kV-UG Cable Construction of 11kV Lines, 11kV-UG Cable & Reconductoring of 11kV Lines & Reconductoring of 11kV Lines

0

100

200

300

400

500

600

700

800

Target 732 30 250

Achievement 414 4 77

Construction of 11 kV lines (km)

Construction of 11 kV U/G Cables (km)

Reconductoring of 11 kV Lines (km)

Page 22: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DTs, AB Switches & Installation of DTs, AB Switches & 9kVAR LT Capacitors9kVAR LT Capacitors

0

500

1000

1500

2000

2500

Target 454 1821 2351

Achievement 334 414 0

Installation of Distribution

Transformers

Installation of AB Switch

Installation of 9KVAR LT Capacitors

Page 23: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Renovation & Modernization ofRenovation & Modernization ofDTs & SubstationsDTs & Substations

0

200

400

600

800

1000

1200

1400

1600

Target 1564 19

Achievement 425 6

R & M of DTs R & M of Substations

Page 24: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Installation of DT, Feeder & Border MetersInstallation of DT, Feeder & Border Meters

0

500

1000

1500

2000

2500

Target 2018 96 133

Achievement 112 4 10

Installation of DT Meters

Installation of Feeder Meters

Installation of Border Meters

Page 25: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Computerised billing of sections,Computerised billing of sections,Computerised data logging at SS & Call CentreComputerised data logging at SS & Call Centre

0

5

10

15

20

25

Target 20 24 13

Achievement 15 15 0

Computerised Billing of Sections

Computerised data Logging at S/S

Call Centre

Page 26: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Consumer IndexingConsumer Indexing

0

50000

100000

150000

200000

250000

300000

350000

Target 337764

Achievement 54652

Consumer Indexing

Page 27: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

Funds PositionFunds Position

0

10

20

30

40

50

60

Target (Rs.Cr.) 57.179548

Achievement (Rs.Cr.) 24.283095

Financial status upto 31.11.06 of 13 Towns scheme

Page 28: WORK PROGRESS OF KERALA TOWNS UPTO JANUARY 2007. 7 Towns Scheme Sanctioned on 20 th Nov 2002

THANK YOUTHANK YOU