WORK PROGRAMME OF THE MET SECTION
MARCH 2007
Monthly revision at the internal meeting of the MET Section held around
the 15th of each month
Dated: 05 April 2007 (final version)
Officer responsible for s specific item indicated in colour:black = OT
red = RR
blue = NH
Symbols used to indicate the status of the next milestone:
C = completed
P = expected to be completed by the deadline
D = delayed
Note 1.Tasks highlighted to be completed by the forthcoming monthly meeting;Note 2.Reasons for delayed milestones are included.
Review of the progress on 5 April 2007: all tasks completed as expected except for the submission of two
articles to the ICAO Journal (reason: beyond the control of the Section).
7/30/2019 Work Programme March
2/33
1. MET TASKS IN THE ANIP1.1 Safety-related tasksA1-SMP.4 Response to Hazards to airports, ATM and flight safety
Enhancement to the international airways volcano watch (IAVW) and provision of warning of radioactive debris and toxic
(MET-8201; MET-8801)
Group: IAVWOPSG
ID Task Source Recent progressNext milestone, its deadline and status
management reports from all VAAC to be
for IAVWOPSG/3
1. (O) oversee the implementation and operation ofIAVW and develop related SARPs and guidancematerial
MET/02: 1/22
F/U of IAVWOPSG/3 9/04/0
use of PNG format to be addressed at IAV2. (O) improve the format of graphical VA advisoriesbased on proposals made at MET/02 and develop
proposals for graphical format of SIGMET for VA
APANPIRG 12/32;MET/02: 1/17 +
App. H F/U of IAVWOPSG/3 9/04/0
assessment of the usefulness to be presente
IAVWOPSG/3
3. (O) consider whether the smell of sulphur be acondition prompting the issuance of a special air-report
164-10
F/U of IAVWOPSG/3 9/04/0
progress report to be presented for IAVWO4. (O) consider the updating of the worldwide ashencounter data base
APANPIRG 8/27,
IAVWOPSG 1/5,166-13 F/U of IAVWOPSG/3 9/04/0
progress report by WMO to be presented f
IAVWOPSG/3
5. (O) improve models used for forecasting themovement of volcanic ash
IAVWOPSG 2/8,
170-12F/U of IAVWOPSG/3 9/04/0
progress report by WMO to be presented fIAVWOPSG/3
6. (D) monitor the development of future satellitesensors and other systems to improve detection of
volcanic eruptions and VA clouds
140-11;MET/02: 1/19
F/U of IAVWOPSG/3 9/04/0
7/30/2019 Work Programme March
3/33
- 2 -
ID Task Source Recent progress
Next milestone, its deadline and status
evaluation to be presented for IAVWOPSG
VAAC Montreal
7. (D) complete the assessment of the usefulness ofseismic and infrasonic data from the CTBTO
observing networks (to IAVW)
MET/02: 1/18
F/U of IAVWOPSG/3 9/04/0
proposals to be presented for IAVWOPSG8.
(D) consider including VA deposition informationin a suitable aeronautical message (primarily for
aerodromes within range of ash)
IAVWOPSG 1/23,166-13F/U of IAVWOPSG/3 9/04/0
default data-sets to be presented for IAVW9. (D) consider developing eruption source parameters IAVWOPSG 1/24,166-13
F/U of IAVWOPSG/3 9/04/0
proposal to designate VAAC London as a
to be presented for IAVWOPSG/3
10 Assess and enhance, as necessary, the current
operational procedures and notification practices onthe accidental release of radioactive material into
the atmosphere from nuclear facilities, including
the development of international arrangements forthe direct notification of designated ACCs by the
IAEA
146-1&2;
IAVWOPSG 1/28;MET/02: 1/20 a);
IAVWOPSG 1/31F/U of IAVWOPSG/3 9/04/0
results from the WMO ERA to be presenteIAVWOPSG/3
11 investigate the possibility of developinginternational arrangements for the exchange of
information on the accidental release of toxic
chemicals into the atmosphere
123-4 TWP review;IAVWOPSG 1/31
F/U of IAVWOPSG/3 9/04/0
proposal concerning the message for toxic
for IAVWOPSG/3
12 study the need for a message format for the
provision to aircraft of information on radioactive
and hazardous materials accidentally released intothe atmosphere
146-1&2 &
MET/02: 1/20 b);
IAVWOPSG 1/32 F/U of IAVWOPSG/3 9/04/0
report for IAVWOPSG/313 assess the need to provide information on solarradiation storms and other bio-hazards
MET/02: 1/20 c);IAVWOPSG 1/33
F/U of IAVWOPSG/3 9/04/0
7/30/2019 Work Programme March
4/33
- 3 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Amendment of the content of tropical cyclone advisories to meet requirements of aircraft operations
(MET-0401)
Group: None (graphical advisories to be coordinated with METLINKSG)
ID Task Source Recent progress
Next milestone, its deadline and status
Amendment 741. develop the format and content of the tropical cycloneadvisories issued by TCAC and SIGMETs for tropical
cyclones issued by MWO
APANPIRG 14/42;
165-5Proposal to WMO TCP
WP for the WMO TCACcoordination meeting
1/09/0
1/10/0
None2. with regard to tropical cyclone advisories in graphicalformat, study the
1. representation of advisory information; and2. need for
a. horizontal extent of gale-forcewinds;
b. frequent CB clouds
AN-WP/7257,146-12 (not explicit)
AN-WP/7569,
155-9 (not explicit)
Proposal to WMO TCPWP for the WMO TCAC
coordination meeting
1/09/01/10/0
7/30/2019 Work Programme March
5/33
- 4 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Implementation of QMS for the provision of MET service to international air navigation
(MET-0102)
Group: None
ID Task Source Recent progress
Next milestone, its deadline and status
Amendment 72 (recommended practices1. develop a proposal to amend Annex 3 to upgrade theprovisions related to quality management systems to
Standards
EANPG 39/11 a);148-14
inclusion of the proposal in
WP for the SMS
15/11/0
editing completed by WMO2. develop a joint ICAO/WMO guidance material onquality management systems for the provision of
meteorological services for international air
navigation
MET/02: 4/3
approval of non-simultaneous
distribution
issuance of the manual
14/03/0
15/06/0
7/30/2019 Work Programme March
6/33
- 5 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Enhancements to uplink downlink and cross-link of meteorological information
(MET-9101; MET-9301; one sub-task from MET-9601)
Group: METLINKSG
ID Task Source Recent progress
Next milestone, its deadline and status
wind quality flag in Amendment 721. study the need for the inclusion of additionalmeteorological parameters (e.g. icing) in the MET
information data block of the ADS report
154-2 TWP Review
SN for METLINKSG/10 15/11/07
None2. study the variation (error) in wind speed and directionas a function of the speed, roll angle and pitch of the
aircraft
166-10 TWPReview
SN for METLINKSG/10 15/11/07
new task3.
consider, for low-level wind shear warningapplication, extending the provision of automated
aircraft observations toa) cover the approach phase of flight; and
b) increase the resolution during the climb-
out and approach phases when the aircraft isbetween runway level and 500 m above that
level
APANPIRG 16/50,171-7SN for METLINKSG/10 15/11/07
new task4. consider the need for routine voice reports 175-.endorsement by ANC
SN (UK, US) for
METLINKSG/10
15/06/07
15/11/07
None5. develop specifications for products to be available inthe cockpit and the necessary guidance for the
presentation of products to be uplinked
142-7
guidance
SN for METLINKSG/10
15/10/07
15/11/07
feasibility through ADS-B proven6. monitor the development of a system (cross-link) totransmit information on hazardous weather
phenomena from one aircraft to other aircraft
concerned
154-2 TWP Review
SN for METLINKSG/10
assessment by ASP
15/11/07
15/06/08
7/30/2019 Work Programme March
7/33
- 6 -
ID Task Source Recent progress
Next milestone, its deadline and status
enabling clauses to be developed7. re-assess the requirements for uplink ofmeteorological information during terminal
operations
154-2 TWP Review
SN for METLINKSG/10 15/11/07
no need for codes other than BUFR iden8. study the most appropriate code to be used for theuplink of meteorological information to aircraft
MET/02: 1/9
SN for METLINKSG/10 15/11/07
all templates (except for that for TC SIGincluded in Amendment 74
9. develop the template and display characteristics forgraphical SIGMET messages
163-8 TWP Review
Proposal to WMO TCPWP to the WMO TCAC
coordination meeting
1/09/071/10/09
new task10. amend the template for aerodrome warnings to
include the surface wind direction
APANPIRG 16/49,
171-7SN for the
METLINKSG/10
15/11/07
7/30/2019 Work Programme March
8/33
- 7 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Improvement of turbulence reporting and warnings and their transmission to aircraft in flight
(MET-9801)
Group: METLINKSG
ID Task Source Recent progress
Next milestone, its deadline and status
progress report at the WAFSOPSG/311. develop improved forecast algorithms for turbulence,making maximum use of the global EDR data and
improved model resolution, for direct operational use
in SIGMET messages
MET/02: 1/10;
progress depends on the
results to be presented for
WAFSOPSG/4
15/11/07
progress report at METLINKSG/912. develop an operational requirement for the issuance
of automated turbulence warnings in theapproach/landing and take-off/climb out corridors
based upon automated turbulence data downlinked
from aircraft and/or ground-based remote sensing
equipment
148-7 TWP Review
SN (HK, China) for
METLINKSG/10
15/11/07
progress report at METLINKSG/9: met
proven for ADS-B
13. determine the feasibility of relaying information on
severe turbulence detected by one aircraft
automatically to other aircraft in the vicinity
148-7 TWP Review
SN for METLINKSG/10
assessment by the ASP
15/11/07
15/06/08
Amendment 74new task related to approach/take-off
14. validate, verify and, if necessary, fine-tune turbulencereporting based on EDR; study the applicability of the
EDR metric for reporting turbulence during
approach/take off (and develop guidance, asnecessary)
166-10 TWP review;APANPIRG 17/45,
174-2SN for METLINKSG/10 15/11/07
7/30/2019 Work Programme March
9/33
- 8 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Improvement of the content and issuance of SIGMET to meet the evolving needs of flight operations
(MET-9801)
Group: (METWSG)
ID Task Source Recent progressNext milestone, its deadline and status
new task1. study of methods to improve the implementation ofthe issuance of SIGMET
175-
endorsement by the ANC
SN for METWSG/1
15/06/07
15/08/07
provisions in Amendment 71, 72 and 742. develop a set of quantitative criteria to be included inAnnex 3 for the threshold intensity of the weather
phenomena to prompt the issuance of SIGMET
messages
LIM MID Rec 4/7
SN for METWSG/1 15/08/07
BUFR tables completed by WMO CBS
DR & C
3. assist in the development of decoding and encodingsoftware for BUFR-coded SIGMET and develop
related guidance material in coordination with
interested provider States and WMO
153-8
SN for METWSG/1 15/08/07
new task4. amend the template for SIGMET and AIRMET toallow only the use of a closed line of coordinates,
location indicators of waypoints or aerodromes todescribe the area of phenomena in a
SIGMET/AIRMET
EANPG 48/39,
175-
SN for METWSG 15/08/07
7/30/2019 Work Programme March
10/33
- 9 -
A1-SMP.4 Response to Hazards to airports, ATM and flight safety
Enhancement of wind shear warnings and alerts
(MET-6201)
Group: WISTSG / (METWSG)
ID Task Source Recent progressNext milestone, its deadline and status
wind shear alerts in Amendment 741. develop provisions for inclusion in Annex 3 andguidance material for the observing and reportinglow-level wind shear
AN-Conf/8;
129-8;APANPIRG 17/44 consider updating wind-
shear posters based on
those prepared by Hong
Kong, China
SN for WISTSG/3
15/07/07
15/08/07
None2. study the need for the development of criteria for theprovision of warnings for rotor zones in the terminalarea
EANPG 32/23;
132-13SN for WISTSG/3 15/08/07
new task3. consider the need to provide information on low-leveltemperature inversion either in a specific warning or
in the supplementary information appended to localreports and METAR/SPECI
EANPG 47/32;
172-11
SN for WISTSG/3 15/08/07
new task4. consider developing the necessary provisions thatwould enable the detection of low-level windshear
affecting aircraft operations along approach and take-
off paths, and including new abbreviations forheadwind gain and headwind loss in Table A6-3
and Doc 8400
APANPIRG 17/50;
174-2
SN for WISTSG/3 15/08/07
7/30/2019 Work Programme March
11/33
- 10 -
1.2 Efficiency-related tasksD2-INF MET Meteorological information
Implementation of, and enhancements to, the World Area Forecast System(MET-8202; one sub-task from MET-9101 and MET-9801)
Group: WAFSOPSG
ID Task Source Recent progress
Next milestone, its deadline and status
management reports presented atWAFSOPSG/3
1. oversee the implementation and operation of theWAFS; develop related SARPs and guidance material
MET/02: 1/6161-12
WP for WAFSOPSG/4 1/01/08
report by the WAFC Provider State at
WAFSOPSG/3
2. review the need for improvements in spatial andtemporal resolution of WAFS forecasts in the GRIB
code form
129-21;
NAT SPG 40/4
WAFSOPSG 3/17
174-1WP (IATA) for
WAFSOPSG/4
1/01/08
lead time to be advanced to 16-17 hour
2008
3. study the feasibility (and advisability) of increasing thelead time for issuance of SIGWX forecasts
MET/02: 1/4
161-12
WP for WAFSOPSG/4 1/01/08
report on operational trials at WAFSO4. develop improved forecast algorithms and WAFSoutput products for icing and convective cloudsmaking use of improved model resolution
MET/02: 1/10
161-12WAFSOPSG 3/17
174-1
WP for WAFSOPSG/4 1/01/08
replacement of SWM by WAFS outpu
endorsed at WAFSOPSG/2
5. optimize the future requirement for WAFS SWMforecasts
WAFSOPSG 1/26;
165-9
WP for WAFSOPSG/4 1/01/08
6. consider the migration to the GRIB2 code form WAFSOPSG 1/22 &1/27;
165-9 WP for WAFSOPSG/4 1/01/08
7. improve the visualization of WAFS forecasts in flight WAFSOPSG 3/13 b) new task
7/30/2019 Work Programme March
12/33
- 11 -
ID Task Source Recent progress
Next milestone, its deadline and status
documentation by
a) studying ways and means to ensure that themost relevant WAFS forecasts be presented in
terms of space and time, in particular to meet the
needs for long-haul flights; andb) assessing the need, in the legend box of flight
documentation, for the name of the centre
supplying the WAFS forecast to the end user, in
view of ensuring traceability
& 3/19;
174-1
WP for WAFSOPSG/4 1/01/08
none (reports cannot yet be distinguish
voice reports)
8. develop procedures for the quality control ofmeteorological information included in the ADSmessages, including the ways and means of providing
the necessary feed-back to the operators concerned
MET/02: 1/7;
161-12
WP for WAFSOPSG/4 1/01/08
report on operational trials at WAFSO9. develop improved forecast algorithms and WAFSoutput products for turbulence, making maximum useof the global EDR data and improved model
resolution, for direct operational use in WAFS
forecasts
MET/02: 1/10;
161-12WP for WAFSOPSG/4 1/01/08
7/30/2019 Work Programme March
13/33
- 12 -
Group: SADISOPSG
ID Task Source Recent progress
Next milestone and its deadline
Updates at SADISOPSG/111.
develop and maintain the SADIS broadcast content,schedule and priorities, including WAFS forecasts and
OPMET information, and any other data agreed fortransmission
143-5;149/18
(TOR) WP for SADISOPSG/12 5/04/07
continuous coordination with the PIRG
concerned
2. organize the flow of OPMET message traffic throughSADIS gateway to SADIS node based on OPMETexchange systems in the AFI, ASIA, EUR and MID
Regions and OPMET message traffic relayed from the
ISCS broadcast (in coordination with EANPG,APANPIRG, APIRG and MIDANPIRG CNS/MET
sub-groups)
143-5;
149/18(TOR) WP for SADISOPSG/12 5/04/07
continuous coordination with EUR BM3. establish monitoring of OPMET information broadcaston the SADIS and back-up functions for the SADIS
(in coordination with EUR BMG)
143-5;149/18
(TOR) WP for SADISOPSG/12 5/04/07
data-base oriented Annex 1 developed4. maintain, update and extend, as necessary, the SADISUser Guide, including the SADIS OPMET
information requirement table in Annex 1 (in
coordination with EUR BMG and SADIS ProviderState concerning Annexes 2 and 3)
EANPG 37/20
WP for SADISOPSG/12 3/04/07
information provided at SADISOPSG/5. issue an annual management report and a statement ofSADIS operational efficacy and update the SADIS
inventory (SADISOPSG Operational Efficacy
Assessment Team, in coordination with the SADIS
Provider State for submission to the SCRAG)
SADISOPSG 1/4 ,1/8 and 2/3 b)
WP for SADISOPSG/12 3/04/07
ASHTAM included in SADIS in 20066. collect and distribute AIS information on SADIS SADISOPSG/3 draftconclusion endorsed
by the PIRGsconcerned
WP for SADISOPSG/12 3/04/07
report at SADISOPSG/117. monitor, report on and propose technologicaldevelopments having an impact on the SADIS
(SADISOPSG Technological Developments Team)
SADISOPSG 3/13
WP for SADISOPSG/12 5/04/07
7/30/2019 Work Programme March
14/33
- 13 -
ID Task Source Recent progress
Next milestone and its deadline
report at SADISOPSG/118. maintain SADIS Gateway Function (SADISOPSGGateway Development Team, in co-ordination withthe BMG)
EANPG 38/33
endorsed by thePIRGs concerned WP for SADISOPSG/12 5/04/07
update at SADISOPSG/119. update the SADIS Strategic Assessment Tablesincluding a 5-year outlook (SADISOPSG StrategicAssessment Team)
SADISOPSG 2/9
WP for SADISOPSG/12 5/04/07
None10. study the potential impact of the introduction of
BUFR-coded METAR/SPECI and TAF on the SADIS
gateway operations
SADISOPSG 9/13
WP for SADISOPSG/12 5/04/07
7/30/2019 Work Programme March
15/33
- 14 -
D2-INF MET Meteorological information
Enhancements to the observing and forecasting of meteorological conditions at the aerodrome and in the terminal area
(MET-9206 and MET-0403)
Group: AMOSSG
ID Task Source Recent progress
Next milestone and its deadline
Amendment 74; recommended practices ag
principle, to be upgraded
1. review the requirements for meteorologicalobservations at aerodromes in light of the
capability of automated weather observing systems
to meet these requirements
EANPG 40/26;
151-6
report of an ad hoc group
SN for AMOSSG/07
15/12/07
15/03/08
None2. review the requirements for remote-sensingequipment to monitor weather in the terminal area
130-11 TWP
Review
SN for AMOSSG/07 15/03/08
Amendment 743. review the requirements for present and recentweather phenomena in meteorological reports
MET/02: 2/3
SN for AMOSSG/07 15/03/08
Amendment 74; agreed, in principle, to be e
for local reports at AMOSSG/06
4. study the expansion of the use of meteorologicalinformation from fully automatic observing
systems to encompass operational hours
MET/02: 2/3
SN for AMOSSG/07 15/03/08
agreed, in principle, for inclusion in Annex
AMOSSG/06
5. study the effect of gusts on the calculation ofcrosswind and tailwind components
EANPG 44/17;
163-5
SN for AMOSSG/07 15/03/08
agreed, in principle, for inclusion in Annex
AMOSSG/06
6. review the requirement for the inclusion ofminimum visibility whenever less than 5000metres
EANPG 47/33;
172-11 SN for AMOSSG/07 15/03/08
agreed, in principle, for inclusion in Annex AMOSSG/06
7. review the requirements for refining the reportingincrements of height of cloud base in local routine
and special reports
EANPG 47/34;172-11
SN for AMOSSG/07 15/03/08
7/30/2019 Work Programme March
16/33
- 15 -
ID Task Source Recent progress
Next milestone and its deadline
new task8. study the classification of automatic observationsbacked-up by a human observer
173-6
SN for AMOSSG/07 15/03/08
new task9. study the desirability of upgrading the provisionrelated to SPECI criteria (in Appendix 3, 2.3.2) toa Standard
173-6
SN for AMOSSG/07 15/03/08
new task10 review the requirements for the indication of
direction of minimum visibility when it cannot be
identified using eight compass points
173-6
SN for the AMOSSG/07 15/03/08
new task11 review the requirements for the accuracy for the
observation of present weather phenomena forinclusion in Attachment A
173-6
SN for AMOSSG/07 15/03/08
new task12 study the update rate of wind informationdisplayed for ATC
EANPG 48/43,175-
SN for AMOSSG/07 15/03/08
new task13 review the requirements for the inclusion of
multiple visibility values in ATIS
EANPG 48/44,
175-SN for AMOSSG/07 15/03/08
First edition issued in November 200614 maintain the manual on the use of automatic
meteorological observing systems at aerodromes
MET/02: 2/2
Input from AMOSSG
SN for AMOSSG/07
30/04/07
15/03/08
new task (reformulation of an existing task)15 review the requirements for aligning guidance in
Attachment B related to operationally related
accuracy of forecasts to the TAF amendment
criteria
173-6
SN for AMOSSG/07 15/03/08
None16. study the accuracy required for precipitation
forecasts in Attachment B
136-18
SN (IATA) for AMOSSG/07 15/03/08
17. review the requirements for clarifying when a 173-6 new task
7/30/2019 Work Programme March
17/33
- 16 -
ID Task Source Recent progress
Next milestone and its deadline
newly issued TAF cancel TAF previously issued
for the same place and for the same period of
validity, or part thereof
SN for AMOSSG/07 15/03/08
new task18. study the the use of VV/// in TAF 173-6
SN for AMOSSG/07 15/03/08
progress report at METG/1619. monitor States' progress in forecasting RVR toassist improvement in airport capacity
COM/MET/82;141-2,
EANPG 48/41 SN for AMOSSG/07 15/03/08
7/30/2019 Work Programme March
18/33
- 17 -
D2-INF MET Meteorological information
Assurance of a uniform global approach for the implementation of BUFR-coded OPMET messages through, inter alia, the i
(MET-0101)
Group: AMOSSG
ID Task Source Recent progressNext milestone and its deadline
Amendment 74 (bilateral exchanges)20. amend Annex 3 to allow the use of the BUFR code
form to transmit OPMET information and specify thedetails how the information is to be presented to
aeronautical users to ensure that the mapping is
complete and unambiguous
MET/02: 2/5
EANPG 46/18;169-1 SN for AMOSSG/07 15/03/08
initial road map at AMOSSG/5; updated
AMOSSG/6
21. develop guidance to achieve a uniform global
approach to the implementation of BUFR-coded
OPMET messages
EANPG 45/12;
166-5
technical guidance from
ACP expectedSN for AMOSSG/07
15/06/07
15/03/08
new task22. consider the possible negative safety, operational and
economic impacts of the transition plan on theaviation community and bring them to the attention of
WMO, as necessary
EANPG 47/27;
172-11SN for AMOSSG/07 15/03/08
ICAO policy (including draft amendme
Annex 3 developed) with the assistance
AUPISG
23. contribute to the development and implementation of
the ICAO policy on the use of Internet for operational
purposes
MET/02: 4/5 & 4/6
SN for AMOSSG/07 15/03/08
7/30/2019 Work Programme March
19/33
- 18 -
D2-INF MET Meteorological information
Enhancements to the provision of meteorological information to support ATM
(MET-0402)
Group: None
ID Task Source Recent progress
Next milestone and its deadline
Amendment 741. develop requirements for additional meteorologicalproducts to be provided to the ATS units to support the
global ATM, inter alia, in regard to the weather
phenomena, including severe meteorological
conditions, that could cause significant changes in the
ATC procedures
APANPIRG 14/10;165-5;
EANPG 47/36;
172-11;
APANPIRG 17/43 b)
174-2
assessment by Secretariat
draft amendment (PR with
the proposal by AMOSSG)
15/07/0
1/10/08
new task2. Include provisions in Annex 11 requiring that surfacewind direction in ATIS is to be provided in degrees
magnetic
EANPG 47/35;172-11
draft amendment (PR withthe proposal by AMOSSG) 1/10/08
7/30/2019 Work Programme March
20/33
2. MANAGEMENT OF MET OPERATIONS AND STUDYGROUPS
2.1 IAVWOPSG/3 and IAVWOPSG/4 MeetingsAfter IAVWOPSG/3
Task Means (output) Deadline & statusMeeting starting on 19 March 2007
Make available
final report English version of executive summary
(ES)
the preliminary follow-up table
OPSG website
Request that
report and EN executive summary bedistributed simultaneously (Category 2)
ES be translated in all languages by HQ
Submission through DOC
Draw the attention of the OPSG to the
final report;English ES; andpreliminary follow-up table (subject to action
to be taken by ANC)
OPSG Memo
Update the master lists of regional WAFS/IAVWprocedures
In the G-drive underWAFS- and IAVWOPSG
9/04/07 P
Prepare report to the ANC AN-WP
Inform Contracting States News item to ICAO
Journal (with a photo)
Express appreciation to the RO concerned IOM to the ICAORD
11/04/07 P
Present the report to the ANC Forward the updated regional provisions to RO IOM to the ICAORDs
Make available all language versions of ES OPSG website
Draw attention of ROs to the language versions e-mail
24/05/07 P
Print and distribute (Category 2) the supplement Submission through DOCMake available the updated
follow-up table; and work programme
OPSG website
Draw the attention of the OPSG to the updated
follow-up table work programme
Confirm the dates/venue of the next meeting
OPSG Memo
Inform the Council Pres of the ANC Memo to
the President of Council
15/06/07 P
Update the follow-up table OPSG website 15/08/07
15/10/07
P
PUpdate the follow-up table OPSG websiteDraw the attention of the OPSG to the outstanding
work in the follow-up table
OPSG Memo
15/12/07 P
Update the follow-up table OPSG website 15/02/08 P
7/30/2019 Work Programme March
21/33
- 2 -
Before IAVWOPSG/4
Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)
OPSG website
Draw the attention of the (OP)SG to the
WP/1; call for comments IP/1
Set the deadline for the
submission of WPs indication of participation
OPSG Memo
Invite the members and permanent advisors Invitation letters
15/03/08 P
Prepare revised agenda (only if required) OPSG websiteOPSG Memo
15/04/08 P
Make available the WPs from the Provider States OPSG website
Update the follow-up table (final version) OPSG website
1/07/08 P
Make available the Secretariat (Sec.) WPs
Deal with the Conclusions addressed to theIAVWOPSG by PIRGs
OPSG website
Announce the completion of the Sec. WPs;Remind about the deadline for
other WPs and the indication of participation
OPSG Memo
15/07/08P
Make available WPs from (OP)SG Members OPSG website
Prepare list of participants Appendix A to the report
1/08/08 P
Meeting starting on 15 September 2008
7/30/2019 Work Programme March
22/33
- 3 -
2.2 SADISOPSG/12 MeetingBefore SADISOPSG/12
Task Means (output) Deadline & statusMake available the WPs from the SADIS ProviderState
SADISOPSG website
Update the follow-up table (final version) SADISOPSG website
30/03/07 C
Make available the Secretariat (Sec.) WPsPropose that the SUG be a) updated ; b) published
only on a soft copy format
SADISOPSG website
Announce the completion of the Sec. WPs;
Remind about the deadline for
other WPs and the indication of participation
SADISOPSG Memo
9/04/07C
Make available WPs from SADISOPSG Members SADISOPSG website
Prepare list of participants Appendix A to the report
1/05/07 P
Meeting starting on 4 June 2007
7/30/2019 Work Programme March
23/33
- 4 -
After SADISOPSG/12
Task Means (output) Deadline & statusMeeting starting on 4 June 2007
Make available
final report updated master lists from the report updated work programme from the report English version of executive summary
(ES)
the follow-up table
SADISOPSG website
Request that
report and EN executive summary bedistributed simultaneously (Category 2)
ES be translated in all languages by HQ
Submission through DOC
Draw the attention of the SADISOPSG to the
final report;updated work programmeEnglish ES; and follow-up table
SADISOPSG Memo
Draw the attention of the ICAORDs to the follow-
up action required on conclusions addressed to:
PIRGs and MET sub-groups (alwaysinclude the conclusion related to the
strategic assessment table and any draftconclusion)
States (always include the conclusionrelated to the update of the focal points)
IOM to Regional Offices
Forward the updated SADIS Inventory and the
statement related to the operational efficacy to the
Chair of the SCRAG
IOM (2) signed by the
Chair of SADISOPSG
Inform Contracting States News item to ICAOJournal (with a photo)
Express appreciation to the RO concerned IOM to the ICAORD
15/07/07 P
Make available French and Russian versions of ES SADISOPSG website
Draw attention of ROs to the language versions e-mail
Print and distribute(Category 2) the supplement Submission through DOCUpdate the follow-up table SADISOPSG website
Draw the attention of the SADISOPSG to the
follow-up table
Confirm the dates/venue of the next meeting
SADISOPSG Memo
Inform the ANC C-19 Memo
15/08/07 P
Update the follow-up table SADISOPSG website 15/10/0715/12/07
P
7/30/2019 Work Programme March
24/33
- 5 -
2.3 WAFSOPSG/3 and WAFSOPSG/4 MeetingAfter WAFSOPSG/3
Task Means (output) Deadline & statusMeeting starting on 1 October 2006Update the follow-up table OPSG website 1/05/07 P
Update the follow-up table OPSG website
Draw the attention of the OPSG to the outstandingwork in the follow-up table
OPSG Memo 1/07/07P
Update the follow-up table OPSG website 1/09/07 P
Before WAFSOPSG/4
Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatory
notes) and IP/1 (admin arrangements)
OPSG website
Draw the attention of the (OP)SG to the WP/1; call for comments IP/1
Set the deadline for the
submission of WPs indication of participation
OPSG Memo
Invite the members and permanent advisors Invitation letters
1/09/07 P
Prepare revised agenda (only if required) OPSG website
OPSG Memo
1/10/07 P
Make available the WPs from the Provider StatesDeal with the following conclusion:
revision of software criteria to include theprocessing and depiction of data during
WAFC back-up in a transparent manner
(SADISOPSG 11/18)
OPSG website
Update the follow-up table (final version) OPSG website
15/12/07 P
Make available the Secretariat (Sec.) WPsDeal with the following conclusions addressed to
the WAFSOPSG:
continuation of PNG-formatted SIGWXforecasts (action already completed, to besimply included in the WP) (APANPIRG
17/34, EANPG 48/36)
further development of WAFS OutputPerformance Indicators (APANPIRG
17/36)
Draft amendment to Annex 3: include TC and VAadvisories in Chapter 9 and Appendix 8
OPSG website
Announce the completion of the Sec. WPs;
Remind about the deadline for
other WPs and the indication of participation
OPSG Memo
1/01/07P
Make available WPs from (OP)SG Members OPSG website
Prepare list of participants Appendix A to the report
15/01/07 P
Meeting starting on 26 February 2008
7/30/2019 Work Programme March
25/33
- 6 -
2.4 METLIKSG/10 MeetingBefore METLINKSG/10
Task Means (output) Deadline & status
Develop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)
SG website
Draw the attention of the SG to the
WP/1; call for comments IP/1
Set the deadline for the
submission of WPs indication of participation
SG Memo
Invite the members and permanent advisors Invitation letters
15/8/07 P
Prepare revised agenda (only if required) SG websiteSG Memo
15/09/07 P
Make available WPs in response to action agreedat the previous meeting
SG website 1/11/07 P
Make available the Secretariat (Sec.) WPs SG website
Announce the completion of the Sec. WPs;
Remind about the deadline for
other WPs and the indication of participation
SG Memo 15/11/07P
Make available WPs from SG Members SG website
Prepare list of participants Appendix A to the report
1/01/08 P
Meeting starting on 15 February 2008
After METLINKSG/10
Task Means (output) Deadline and status
Meeting starting on 15 February 2008Make available
final report updated work programme the follow-up table
SG website
Draw the attention of the SG to the
final report;updated work programme; andfollow-up table
SG Memo
1/03/08 P
Prepare an amendment proposal to Annex 3 for
preliminary review (normally at every secondmeeting)
AN-WP 15/03/08 P
Present the amendment proposal to the ANC 15/05/08 P
Draw the attention of the SG to the follow-up table
Confirm the dates/venue of the next meetingSG Memo 15/06/08 P
Update the follow-up table SG website 15/08/08 P
Update the follow-up table SG website
Draw the attention of the OPSG to the outstandingwork in the follow-up table
SG Memo
15/11/08 P
Update the follow-up table SG website 15/01/09 P
7/30/2019 Work Programme March
26/33
- 7 -
2.5 AMOSSG/7 MeetingBefore AMOSSG/7
Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)
SG website
Draw the attention of the SG to the
WP/1; call for comments IP/1
Set the deadline for the
submission of WPs indication of participation
SG Memo
Invite the members and permanent advisors Invitation letters
15/12/07 P
Prepare revised agenda (only if required) SG website
SG Memo
15/01/08 P
Make available WPs in response to action agreed
at the previous meeting
SG website 1/03/08 P
Make available the Secretariat (Sec.) WPs SG website
Announce the completion of the Sec. WPs;
Remind about the deadline for
other WPs and the indication of participation
SG Memo 15/03/08P
Make available WPs from SG Members SG website
Prepare list of participants Appendix A to the report
1/05/08 P
Meeting starting on 15 June 2008
After AMOSSG/7
Task Means (output) Deadline & statusMeeting starting on 15 June 2008
Make available
final report updated work programme the follow-up table
SG website
Draw the attention of the SG to the
final report;updated work programme; andfollow-up table
SG Memo
1/07/08 P
Prepare an amendment proposal to Annex 3 for
preliminary review (normally at every second
meeting)
AN-WP 15/07/08 P
Present the amendment proposal to the ANC
1/10/08 PDraw the attention of the SG to the follow-up table
Confirm the dates/venue of the next meeting
SG Memo 15/10/08 P
Update the follow-up table SG website 15/12/08 P
Update the follow-up table SG website
Draw the attention of the OPSG to the outstanding
work in the follow-up table
SG Memo
15/03/09 P
Update the follow-up table SG website 15/05/09 P
7/30/2019 Work Programme March
27/33
- 8 -
2.6 METWSG/1 MeetingBefore METWG/1
Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatory
notes) and IP/1 (admin arrangements)
SG website
Draw the attention of the SG to the
WP/1; call for comments IP/1
Set the deadline for the
submission of WPs indication of participation
SG Memo
Invite the members and permanent advisors Invitation letters
15/07/07 P
Prepare revised agenda (only if required) SG website
SG Memo
1/08/07 P
Make available the Secretariat (Sec.) WPs SG website
Announce the completion of the Sec. WPs;Remind about the deadline for
other WPs and the indication of participation
SG Memo 15/08/07P
Make available WPs from SG Members SG website
Prepare list of participants Appendix A to the report
1/10/07 P
Meeting starting on 15 November 2007
After METWG/1
Task Means (output) Deadline & statusMeeting starting on 15 November 2007
Make available
final report updated work programme the follow-up table
SG website
Draw the attention of the SG to the
final report;updated work programme; andfollow-up table
SG Memo
1/12/07 P
Prepare an amendment proposal to Annex 3 for
preliminary review (normally at every secondmeeting)
AN-WP 15/12/07 P
Present the amendment proposal to the ANC 15/02/08 P
Draw the attention of the SG to the follow-up table
Confirm the dates/venue of the next meeting
SG Memo 15/03/08 P
Update the follow-up table SG website 15/05/08 PUpdate the follow-up table SG website
Draw the attention of the OPSG to the outstanding
work in the follow-up table
SG Memo
15/08/08 P
Update the follow-up table SG website 15/10/08 P
7/30/2019 Work Programme March
28/33
- 9 -
3. DOCUMENTATION3.1 ANC-WPProcessing of Amendment 75 to Annex 3
Element Next milestoneSession
No. Origin of the proposal Action Deadline &
status
ANC-177
(winter 2008)
1. Secretariat, with the assistance of theMETWSG
prepare draft AN-WP 15/12/07 P
2. WAFSOPSG/4 Meeting (alsoincludes non-SARPs)
prepare draft AN-WP 1/04/08 PANC-178
(spring 2008)
3. Secretariat, with the assistance of theMETLINKSG, including the proposal
related to tropical cyclones
prepare draft AN-WP 15/03/08 P
4. IAVWOPSG/4 Meeting (alsoincludes non-SARPs)
prepare draft AN-WP 15/10/08 PANC-179
(autumn 2008)
5. Secretariat, with the assistance of theAMOSSG; including the proposal
related to MET information to
support ATM
prepare draft AN-WP 15/07/08 P
Other AN-WP
Next milestoneSession Subject
Action Deadline &
statusReport of IAVWOPSG/3 Meeting prepare draft AN-WP 11/04/07 P
Reorganization of the work of AMOSSG and
WISTSG
prepare initial plan
prepare first draftprepare draft AN-WP
15/03/07
30/03/075/04/07
C
CC
ANC-175
(spring 2007)
Briefing on GRIB and BUFR and other MET
issues
finalize the brief 10/04/07 P
3.2 WP for WMO MeetingsNext milestoneMeeting Subject
Action Deadline &
statusCBS/CAeM
Ad hoc ET on
migration
Issues related to the migration from the ICAO
perspective
Prepare draft WP 26/03/07 C
3.3 Articles for the ICAO Journal 2007Subject & author Issue Deadline & status
Wind shear; Keohan (US) April 2007 15/03/07 C
VAAC Buenos Aires; Flores (Argentina) April 2007 30/03/07 D
MET service in a developing state; Mlaki (Tanzania) April 2007 30/03/07 D
7/30/2019 Work Programme March
29/33
- 10 -
4. CORRESPONDENCE4.1 Follow-up letters in response to PIRG meetings
PIRG Meeting Follow-up letters to(in response to following conclusions) DeadlineEANPG/48 (2006) WMO (Conclusion 48/42) 30/05/07
GREPECAS/14 (2007) 1/12/07
MIDANPIRG/10 (2007) 1/12/07
APANPIRG/18 (2007) 2008
EANPG/49 (2007) 2008
APIRG/16 (2007) 2008
4.2 SL an other lettersOrigin Letter to. Deadline
Draft Amendment 75 Contracting States 31/12/08
7/30/2019 Work Programme March
30/33
- 11 -
5. AMENDMENTS TO ICAO AND WMO PROVISIONS5.1 MET ManualsManual (edition; compatible
with Amendment )
Amendment details Deadline
Doc 8896, Manual ofAeronautical Meteorological
Practice
(7th edition, 2006, A 73)
Align with Amendment 74Include guidance on:
frequency of update of SIGMET SIGMET where the TC centre is located in another FIR
(i.e. issue SIGMET for TS)
difficult cases (examples)(APANPIRG 16/46 refers)
the use of AMOS at aerodromes where topography andcomplex climatology are factors
the interpretation of existing 6.1.2 in cases where anamended TAF is issued before the validity time of the
subsequent forecast the combined use of GAMET and graphical area
forecasts for low-level flights during the same flight
a reference to Doc 9161 concerning the cost recoveryof synoptic stations
(173-6)
template for the ADS message
15/09/07
Doc 9328,Manual of Runway
Visual Range Observing and
Reporting Practices(3rd edition, 2005, A 73)
Align with Amendment 74 22/05/07
Alignment with Amendment 73 completed; forwarded to the ED
(11/2004)
2007Doc 9377, Manual on
Coordination between Air
Traffic Services, Aero-nautical Information Services
and Aeronautical
Meteorological Services
(2nd edition, 2001, A 71)
Align with Amendment 74 15/11/07
Alignment with Amendment 73 completed; forwarded to the ED
(10/2004)
04/07Doc 9691, Manual on
Volcanic Ash, Radioactive
Material and Toxic Chemical
Clouds
(1st edition, 2001, A 71)
Align with Amendment 74;
Include an example of
an early notification from the IAEA related toradioactive clouds
(App. H of IAVWOPSG/1)
15/06/07
Doc 9766, Handbook on the
International AirwaysVolcano Watch (IAVW)
Operational Procedures and
Contact List
(up-to-date on the web)
Align with Amendment 74;
Include guidance on the use of the narrow line feature in volcanic ash
advisories in high latitudes
(173-6)
15/06/07
7/30/2019 Work Programme March
31/33
- 12 -
Doc 9817, Manual on Low-
Level Wind Shear
(1st edition, 2005, A 73)
Align with Amendment 74;
Include guidance on
how to determine in accordance with localarrangements whether wind shear is a factor at an
aerodrome
the roles of wind shear warnings and wind shearalerts(173-6)
based on the input from Italy received on 15/12/2005(perhaps as an appendix)
based on the input received from the US FAA
15/07/07
Doc 9837, Manual onAutomatic Meteorological
Observing Systems at
Aerodromes
(1st edition, 2006, A 73)
Align with Amendment 74 taking into account the comments by
the AMOSSG
15/06/07
Doc 9873,Manual on Quality
Management System
(1st edition, being prepared,
A 73)
New ICAO/WMO joint manual completed; to be forwarded to
the ED after the Secretary Generals approval of non-
simultaneous distribution
2007
SADIS User Guide
(up-to-date on the web)
Align with Amendment 74 15/08/07
5.2 Editorials to be included in Amendment 75 to Annex 3Chapter (origin) Detail Deadline
(Element)
Titles of Appendix 4 andAppendix 6
Indicate that the template for special air-reports to be uplinked isin Appendix 6
15/03/08(3)
7/30/2019 Work Programme March
32/33
- 13 -
6. MEETINGS6.1 Regional meetingsMeeting Attendance (funding) Place and venue
APANPRIG: CNS/MET SG/11 Bangkok, 07/07
APANPIRG/18 Bangkok, 3-7/09/07
APIRG: METSG/8
APIRG/16 Nairobi, 11/07
EANPG: METG/17 Paris, 07/07
EANPG/49 Paris, 27-29/11/07
GREPECAS: AERMETSG SG/9
GREPECAS/14 San Jose, 16-20/04/07
MIDANPIRG: CNS/MET SG/8 2008
MIDANPIRG/10 Doha, 15-19/04/07
NATSPG/43 Paris, 12-15/06/07
6.2 Regional seminars/workshopsMeeting Attendance (funding) Place and venue
Briefing of new RO/MET Dakar OT, RR, NH, BO (RO) Montreal, 28-31/05/2007
ASIA/PAC SIGMET seminar Bangkok, 11-13/07/07
EUR seminar on QMS (estern part) TBD TBD
EUR workshop on the impact of MET on the
ATM systems
TBD
6.3 Operations groupsMeeting Attendance (funding) Place and venue
IAVWOPSG/3 RR (M/07
COS) Bangkok, 19-23/03/07SADISOPSG/12 OT (M/07 S8K) Bangkok, 4-6/06/07
WAFSOPSG/4 OT (M/08 COS) Cairo, 26-28/02/08
6.4 Panels and study groupsMeeting Attendance (funding) Place and venue
WISTSG/3 or METWSG/1 RR (NA) Montreal, 11/07
METLINKSG/10 NH (NA) Montreal, 02/08
AMOSSG/7 NH (NA) Montreal, 06/08
ANSEP/7 OT (NA) Montreal, 2008
6.5 WMO MeetingsMeeting Attendance (funding) Place and venue
CAeM ET on new terminal forecasts RR (M/07SCR) Hong Kong, 12-16/03/07
4th International Workshop on VA RR (M/07SCR) New Zealand, 26-30/03/07
CAeM/CBS ad-hoc ET on the use of BUFR or
XML
OT (M/07SCR) Geneva, 12-13/04/07
CBS ET on DR & C and migration OT (M/07 SCR) Darmstadt 17-21/04/07
WMO Congress OT (M/07SCR) Geneva, 7-18/05/07
CAeM Management Group OT (M/07SCR) Geneva, 10/07
7/30/2019 Work Programme March
33/33
- 14 -