    WORK PROGRAMME OF THE MET SECTION

    MARCH 2007

    Monthly revision at the internal meeting of the MET Section held around

    the 15th of each month

    Dated: 05 April 2007 (final version)

    Officer responsible for s specific item indicated in colour:black = OT

    red = RR

    blue = NH

    Symbols used to indicate the status of the next milestone:

    C = completed

    P = expected to be completed by the deadline

    D = delayed

    Note 1.Tasks highlighted to be completed by the forthcoming monthly meeting;Note 2.Reasons for delayed milestones are included.

    Review of the progress on 5 April 2007: all tasks completed as expected except for the submission of two

    articles to the ICAO Journal (reason: beyond the control of the Section).

  • 7/30/2019 Work Programme March

    2/33

    1. MET TASKS IN THE ANIP1.1 Safety-related tasksA1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Enhancement to the international airways volcano watch (IAVW) and provision of warning of radioactive debris and toxic

    (MET-8201; MET-8801)

    Group: IAVWOPSG

    ID Task Source Recent progressNext milestone, its deadline and status

    management reports from all VAAC to be

    for IAVWOPSG/3

    1. (O) oversee the implementation and operation ofIAVW and develop related SARPs and guidancematerial

    MET/02: 1/22

    F/U of IAVWOPSG/3 9/04/0

    use of PNG format to be addressed at IAV2. (O) improve the format of graphical VA advisoriesbased on proposals made at MET/02 and develop

    proposals for graphical format of SIGMET for VA

    APANPIRG 12/32;MET/02: 1/17 +

    App. H F/U of IAVWOPSG/3 9/04/0

    assessment of the usefulness to be presente

    IAVWOPSG/3

    3. (O) consider whether the smell of sulphur be acondition prompting the issuance of a special air-report

    164-10

    F/U of IAVWOPSG/3 9/04/0

    progress report to be presented for IAVWO4. (O) consider the updating of the worldwide ashencounter data base

    APANPIRG 8/27,

    IAVWOPSG 1/5,166-13 F/U of IAVWOPSG/3 9/04/0

    progress report by WMO to be presented f

    IAVWOPSG/3

    5. (O) improve models used for forecasting themovement of volcanic ash

    IAVWOPSG 2/8,

    170-12F/U of IAVWOPSG/3 9/04/0

    progress report by WMO to be presented fIAVWOPSG/3

    6. (D) monitor the development of future satellitesensors and other systems to improve detection of

    volcanic eruptions and VA clouds

    140-11;MET/02: 1/19

    F/U of IAVWOPSG/3 9/04/0

  • 7/30/2019 Work Programme March

    3/33

    - 2 -

    ID Task Source Recent progress

    Next milestone, its deadline and status

    evaluation to be presented for IAVWOPSG

    VAAC Montreal

    7. (D) complete the assessment of the usefulness ofseismic and infrasonic data from the CTBTO

    observing networks (to IAVW)

    MET/02: 1/18

    F/U of IAVWOPSG/3 9/04/0

    proposals to be presented for IAVWOPSG8.

    (D) consider including VA deposition informationin a suitable aeronautical message (primarily for

    aerodromes within range of ash)

    IAVWOPSG 1/23,166-13F/U of IAVWOPSG/3 9/04/0

    default data-sets to be presented for IAVW9. (D) consider developing eruption source parameters IAVWOPSG 1/24,166-13

    F/U of IAVWOPSG/3 9/04/0

    proposal to designate VAAC London as a

    to be presented for IAVWOPSG/3

    10 Assess and enhance, as necessary, the current

    operational procedures and notification practices onthe accidental release of radioactive material into

    the atmosphere from nuclear facilities, including

    the development of international arrangements forthe direct notification of designated ACCs by the

    IAEA

    146-1&2;

    IAVWOPSG 1/28;MET/02: 1/20 a);

    IAVWOPSG 1/31F/U of IAVWOPSG/3 9/04/0

    results from the WMO ERA to be presenteIAVWOPSG/3

    11 investigate the possibility of developinginternational arrangements for the exchange of

    information on the accidental release of toxic

    chemicals into the atmosphere

    123-4 TWP review;IAVWOPSG 1/31

    F/U of IAVWOPSG/3 9/04/0

    proposal concerning the message for toxic

    for IAVWOPSG/3

    12 study the need for a message format for the

    provision to aircraft of information on radioactive

    and hazardous materials accidentally released intothe atmosphere

    146-1&2 &

    MET/02: 1/20 b);

    IAVWOPSG 1/32 F/U of IAVWOPSG/3 9/04/0

    report for IAVWOPSG/313 assess the need to provide information on solarradiation storms and other bio-hazards

    MET/02: 1/20 c);IAVWOPSG 1/33

    F/U of IAVWOPSG/3 9/04/0

  • 7/30/2019 Work Programme March

    4/33

    - 3 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Amendment of the content of tropical cyclone advisories to meet requirements of aircraft operations

    (MET-0401)

    Group: None (graphical advisories to be coordinated with METLINKSG)

    ID Task Source Recent progress

    Next milestone, its deadline and status

    Amendment 741. develop the format and content of the tropical cycloneadvisories issued by TCAC and SIGMETs for tropical

    cyclones issued by MWO

    APANPIRG 14/42;

    165-5Proposal to WMO TCP

    WP for the WMO TCACcoordination meeting

    1/09/0

    1/10/0

    None2. with regard to tropical cyclone advisories in graphicalformat, study the

    1. representation of advisory information; and2. need for

    a. horizontal extent of gale-forcewinds;

    b. frequent CB clouds

    AN-WP/7257,146-12 (not explicit)

    AN-WP/7569,

    155-9 (not explicit)

    Proposal to WMO TCPWP for the WMO TCAC

    coordination meeting

    1/09/01/10/0

  • 7/30/2019 Work Programme March

    5/33

    - 4 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Implementation of QMS for the provision of MET service to international air navigation

    (MET-0102)

    Group: None

    ID Task Source Recent progress

    Next milestone, its deadline and status

    Amendment 72 (recommended practices1. develop a proposal to amend Annex 3 to upgrade theprovisions related to quality management systems to

    Standards

    EANPG 39/11 a);148-14

    inclusion of the proposal in

    WP for the SMS

    15/11/0

    editing completed by WMO2. develop a joint ICAO/WMO guidance material onquality management systems for the provision of

    meteorological services for international air

    navigation

    MET/02: 4/3

    approval of non-simultaneous

    distribution

    issuance of the manual

    14/03/0

    15/06/0

  • 7/30/2019 Work Programme March

    6/33

    - 5 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Enhancements to uplink downlink and cross-link of meteorological information

    (MET-9101; MET-9301; one sub-task from MET-9601)

    Group: METLINKSG

    ID Task Source Recent progress

    Next milestone, its deadline and status

    wind quality flag in Amendment 721. study the need for the inclusion of additionalmeteorological parameters (e.g. icing) in the MET

    information data block of the ADS report

    154-2 TWP Review

    SN for METLINKSG/10 15/11/07

    None2. study the variation (error) in wind speed and directionas a function of the speed, roll angle and pitch of the

    aircraft

    166-10 TWPReview

    SN for METLINKSG/10 15/11/07

    new task3.

    consider, for low-level wind shear warningapplication, extending the provision of automated

    aircraft observations toa) cover the approach phase of flight; and

    b) increase the resolution during the climb-

    out and approach phases when the aircraft isbetween runway level and 500 m above that

    level

    APANPIRG 16/50,171-7SN for METLINKSG/10 15/11/07

    new task4. consider the need for routine voice reports 175-.endorsement by ANC

    SN (UK, US) for

    METLINKSG/10

    15/06/07

    15/11/07

    None5. develop specifications for products to be available inthe cockpit and the necessary guidance for the

    presentation of products to be uplinked

    142-7

    guidance

    SN for METLINKSG/10

    15/10/07

    15/11/07

    feasibility through ADS-B proven6. monitor the development of a system (cross-link) totransmit information on hazardous weather

    phenomena from one aircraft to other aircraft

    concerned

    154-2 TWP Review

    SN for METLINKSG/10

    assessment by ASP

    15/11/07

    15/06/08

  • 7/30/2019 Work Programme March

    7/33

    - 6 -

    ID Task Source Recent progress

    Next milestone, its deadline and status

    enabling clauses to be developed7. re-assess the requirements for uplink ofmeteorological information during terminal

    operations

    154-2 TWP Review

    SN for METLINKSG/10 15/11/07

    no need for codes other than BUFR iden8. study the most appropriate code to be used for theuplink of meteorological information to aircraft

    MET/02: 1/9

    SN for METLINKSG/10 15/11/07

    all templates (except for that for TC SIGincluded in Amendment 74

    9. develop the template and display characteristics forgraphical SIGMET messages

    163-8 TWP Review

    Proposal to WMO TCPWP to the WMO TCAC

    coordination meeting

    1/09/071/10/09

    new task10. amend the template for aerodrome warnings to

    include the surface wind direction

    APANPIRG 16/49,

    171-7SN for the

    METLINKSG/10

    15/11/07

  • 7/30/2019 Work Programme March

    8/33

    - 7 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Improvement of turbulence reporting and warnings and their transmission to aircraft in flight

    (MET-9801)

    Group: METLINKSG

    ID Task Source Recent progress

    Next milestone, its deadline and status

    progress report at the WAFSOPSG/311. develop improved forecast algorithms for turbulence,making maximum use of the global EDR data and

    improved model resolution, for direct operational use

    in SIGMET messages

    MET/02: 1/10;

    progress depends on the

    results to be presented for

    WAFSOPSG/4

    15/11/07

    progress report at METLINKSG/912. develop an operational requirement for the issuance

    of automated turbulence warnings in theapproach/landing and take-off/climb out corridors

    based upon automated turbulence data downlinked

    from aircraft and/or ground-based remote sensing

    equipment

    148-7 TWP Review

    SN (HK, China) for

    METLINKSG/10

    15/11/07

    progress report at METLINKSG/9: met

    proven for ADS-B

    13. determine the feasibility of relaying information on

    severe turbulence detected by one aircraft

    automatically to other aircraft in the vicinity

    148-7 TWP Review

    SN for METLINKSG/10

    assessment by the ASP

    15/11/07

    15/06/08

    Amendment 74new task related to approach/take-off

    14. validate, verify and, if necessary, fine-tune turbulencereporting based on EDR; study the applicability of the

    EDR metric for reporting turbulence during

    approach/take off (and develop guidance, asnecessary)

    166-10 TWP review;APANPIRG 17/45,

    174-2SN for METLINKSG/10 15/11/07

  • 7/30/2019 Work Programme March

    9/33

    - 8 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Improvement of the content and issuance of SIGMET to meet the evolving needs of flight operations

    (MET-9801)

    Group: (METWSG)

    ID Task Source Recent progressNext milestone, its deadline and status

    new task1. study of methods to improve the implementation ofthe issuance of SIGMET

    175-

    endorsement by the ANC

    SN for METWSG/1

    15/06/07

    15/08/07

    provisions in Amendment 71, 72 and 742. develop a set of quantitative criteria to be included inAnnex 3 for the threshold intensity of the weather

    phenomena to prompt the issuance of SIGMET

    messages

    LIM MID Rec 4/7

    SN for METWSG/1 15/08/07

    BUFR tables completed by WMO CBS

    DR & C

    3. assist in the development of decoding and encodingsoftware for BUFR-coded SIGMET and develop

    related guidance material in coordination with

    interested provider States and WMO

    153-8

    SN for METWSG/1 15/08/07

    new task4. amend the template for SIGMET and AIRMET toallow only the use of a closed line of coordinates,

    location indicators of waypoints or aerodromes todescribe the area of phenomena in a

    SIGMET/AIRMET

    EANPG 48/39,

    175-

    SN for METWSG 15/08/07

  • 7/30/2019 Work Programme March

    10/33

    - 9 -

    A1-SMP.4 Response to Hazards to airports, ATM and flight safety

    Enhancement of wind shear warnings and alerts

    (MET-6201)

    Group: WISTSG / (METWSG)

    ID Task Source Recent progressNext milestone, its deadline and status

    wind shear alerts in Amendment 741. develop provisions for inclusion in Annex 3 andguidance material for the observing and reportinglow-level wind shear

    AN-Conf/8;

    129-8;APANPIRG 17/44 consider updating wind-

    shear posters based on

    those prepared by Hong

    Kong, China

    SN for WISTSG/3

    15/07/07

    15/08/07

    None2. study the need for the development of criteria for theprovision of warnings for rotor zones in the terminalarea

    EANPG 32/23;

    132-13SN for WISTSG/3 15/08/07

    new task3. consider the need to provide information on low-leveltemperature inversion either in a specific warning or

    in the supplementary information appended to localreports and METAR/SPECI

    EANPG 47/32;

    172-11

    SN for WISTSG/3 15/08/07

    new task4. consider developing the necessary provisions thatwould enable the detection of low-level windshear

    affecting aircraft operations along approach and take-

    off paths, and including new abbreviations forheadwind gain and headwind loss in Table A6-3

    and Doc 8400

    APANPIRG 17/50;

    174-2

    SN for WISTSG/3 15/08/07

  • 7/30/2019 Work Programme March

    11/33

    - 10 -

    1.2 Efficiency-related tasksD2-INF MET Meteorological information

    Implementation of, and enhancements to, the World Area Forecast System(MET-8202; one sub-task from MET-9101 and MET-9801)

    Group: WAFSOPSG

    ID Task Source Recent progress

    Next milestone, its deadline and status

    management reports presented atWAFSOPSG/3

    1. oversee the implementation and operation of theWAFS; develop related SARPs and guidance material

    MET/02: 1/6161-12

    WP for WAFSOPSG/4 1/01/08

    report by the WAFC Provider State at

    WAFSOPSG/3

    2. review the need for improvements in spatial andtemporal resolution of WAFS forecasts in the GRIB

    code form

    129-21;

    NAT SPG 40/4

    WAFSOPSG 3/17

    174-1WP (IATA) for

    WAFSOPSG/4

    1/01/08

    lead time to be advanced to 16-17 hour

    2008

    3. study the feasibility (and advisability) of increasing thelead time for issuance of SIGWX forecasts

    MET/02: 1/4

    161-12

    WP for WAFSOPSG/4 1/01/08

    report on operational trials at WAFSO4. develop improved forecast algorithms and WAFSoutput products for icing and convective cloudsmaking use of improved model resolution

    MET/02: 1/10

    161-12WAFSOPSG 3/17

    174-1

    WP for WAFSOPSG/4 1/01/08

    replacement of SWM by WAFS outpu

    endorsed at WAFSOPSG/2

    5. optimize the future requirement for WAFS SWMforecasts

    WAFSOPSG 1/26;

    165-9

    WP for WAFSOPSG/4 1/01/08

    6. consider the migration to the GRIB2 code form WAFSOPSG 1/22 &1/27;

    165-9 WP for WAFSOPSG/4 1/01/08

    7. improve the visualization of WAFS forecasts in flight WAFSOPSG 3/13 b) new task

  • 7/30/2019 Work Programme March

    12/33

    - 11 -

    ID Task Source Recent progress

    Next milestone, its deadline and status

    documentation by

    a) studying ways and means to ensure that themost relevant WAFS forecasts be presented in

    terms of space and time, in particular to meet the

    needs for long-haul flights; andb) assessing the need, in the legend box of flight

    documentation, for the name of the centre

    supplying the WAFS forecast to the end user, in

    view of ensuring traceability

    & 3/19;

    174-1

    WP for WAFSOPSG/4 1/01/08

    none (reports cannot yet be distinguish

    voice reports)

    8. develop procedures for the quality control ofmeteorological information included in the ADSmessages, including the ways and means of providing

    the necessary feed-back to the operators concerned

    MET/02: 1/7;

    161-12

    WP for WAFSOPSG/4 1/01/08

    report on operational trials at WAFSO9. develop improved forecast algorithms and WAFSoutput products for turbulence, making maximum useof the global EDR data and improved model

    resolution, for direct operational use in WAFS

    forecasts

    MET/02: 1/10;

    161-12WP for WAFSOPSG/4 1/01/08

  • 7/30/2019 Work Programme March

    13/33

    - 12 -

    Group: SADISOPSG

    ID Task Source Recent progress

    Next milestone and its deadline

    Updates at SADISOPSG/111.

    develop and maintain the SADIS broadcast content,schedule and priorities, including WAFS forecasts and

    OPMET information, and any other data agreed fortransmission

    143-5;149/18

    (TOR) WP for SADISOPSG/12 5/04/07

    continuous coordination with the PIRG

    concerned

    2. organize the flow of OPMET message traffic throughSADIS gateway to SADIS node based on OPMETexchange systems in the AFI, ASIA, EUR and MID

    Regions and OPMET message traffic relayed from the

    ISCS broadcast (in coordination with EANPG,APANPIRG, APIRG and MIDANPIRG CNS/MET

    sub-groups)

    143-5;

    149/18(TOR) WP for SADISOPSG/12 5/04/07

    continuous coordination with EUR BM3. establish monitoring of OPMET information broadcaston the SADIS and back-up functions for the SADIS

    (in coordination with EUR BMG)

    143-5;149/18

    (TOR) WP for SADISOPSG/12 5/04/07

    data-base oriented Annex 1 developed4. maintain, update and extend, as necessary, the SADISUser Guide, including the SADIS OPMET

    information requirement table in Annex 1 (in

    coordination with EUR BMG and SADIS ProviderState concerning Annexes 2 and 3)

    EANPG 37/20

    WP for SADISOPSG/12 3/04/07

    information provided at SADISOPSG/5. issue an annual management report and a statement ofSADIS operational efficacy and update the SADIS

    inventory (SADISOPSG Operational Efficacy

    Assessment Team, in coordination with the SADIS

    Provider State for submission to the SCRAG)

    SADISOPSG 1/4 ,1/8 and 2/3 b)

    WP for SADISOPSG/12 3/04/07

    ASHTAM included in SADIS in 20066. collect and distribute AIS information on SADIS SADISOPSG/3 draftconclusion endorsed

    by the PIRGsconcerned

    WP for SADISOPSG/12 3/04/07

    report at SADISOPSG/117. monitor, report on and propose technologicaldevelopments having an impact on the SADIS

    (SADISOPSG Technological Developments Team)

    SADISOPSG 3/13

    WP for SADISOPSG/12 5/04/07

  • 7/30/2019 Work Programme March

    14/33

    - 13 -

    ID Task Source Recent progress

    Next milestone and its deadline

    report at SADISOPSG/118. maintain SADIS Gateway Function (SADISOPSGGateway Development Team, in co-ordination withthe BMG)

    EANPG 38/33

    endorsed by thePIRGs concerned WP for SADISOPSG/12 5/04/07

    update at SADISOPSG/119. update the SADIS Strategic Assessment Tablesincluding a 5-year outlook (SADISOPSG StrategicAssessment Team)

    SADISOPSG 2/9

    WP for SADISOPSG/12 5/04/07

    None10. study the potential impact of the introduction of

    BUFR-coded METAR/SPECI and TAF on the SADIS

    gateway operations

    SADISOPSG 9/13

    WP for SADISOPSG/12 5/04/07

  • 7/30/2019 Work Programme March

    15/33

    - 14 -

    D2-INF MET Meteorological information

    Enhancements to the observing and forecasting of meteorological conditions at the aerodrome and in the terminal area

    (MET-9206 and MET-0403)

    Group: AMOSSG

    ID Task Source Recent progress

    Next milestone and its deadline

    Amendment 74; recommended practices ag

    principle, to be upgraded

    1. review the requirements for meteorologicalobservations at aerodromes in light of the

    capability of automated weather observing systems

    to meet these requirements

    EANPG 40/26;

    151-6

    report of an ad hoc group

    SN for AMOSSG/07

    15/12/07

    15/03/08

    None2. review the requirements for remote-sensingequipment to monitor weather in the terminal area

    130-11 TWP

    Review

    SN for AMOSSG/07 15/03/08

    Amendment 743. review the requirements for present and recentweather phenomena in meteorological reports

    MET/02: 2/3

    SN for AMOSSG/07 15/03/08

    Amendment 74; agreed, in principle, to be e

    for local reports at AMOSSG/06

    4. study the expansion of the use of meteorologicalinformation from fully automatic observing

    systems to encompass operational hours

    MET/02: 2/3

    SN for AMOSSG/07 15/03/08

    agreed, in principle, for inclusion in Annex

    AMOSSG/06

    5. study the effect of gusts on the calculation ofcrosswind and tailwind components

    EANPG 44/17;

    163-5

    SN for AMOSSG/07 15/03/08

    agreed, in principle, for inclusion in Annex

    AMOSSG/06

    6. review the requirement for the inclusion ofminimum visibility whenever less than 5000metres

    EANPG 47/33;

    172-11 SN for AMOSSG/07 15/03/08

    agreed, in principle, for inclusion in Annex AMOSSG/06

    7. review the requirements for refining the reportingincrements of height of cloud base in local routine

    and special reports

    EANPG 47/34;172-11

    SN for AMOSSG/07 15/03/08

  • 7/30/2019 Work Programme March

    16/33

    - 15 -

    ID Task Source Recent progress

    Next milestone and its deadline

    new task8. study the classification of automatic observationsbacked-up by a human observer

    173-6

    SN for AMOSSG/07 15/03/08

    new task9. study the desirability of upgrading the provisionrelated to SPECI criteria (in Appendix 3, 2.3.2) toa Standard

    173-6

    SN for AMOSSG/07 15/03/08

    new task10 review the requirements for the indication of

    direction of minimum visibility when it cannot be

    identified using eight compass points

    173-6

    SN for the AMOSSG/07 15/03/08

    new task11 review the requirements for the accuracy for the

    observation of present weather phenomena forinclusion in Attachment A

    173-6

    SN for AMOSSG/07 15/03/08

    new task12 study the update rate of wind informationdisplayed for ATC

    EANPG 48/43,175-

    SN for AMOSSG/07 15/03/08

    new task13 review the requirements for the inclusion of

    multiple visibility values in ATIS

    EANPG 48/44,

    175-SN for AMOSSG/07 15/03/08

    First edition issued in November 200614 maintain the manual on the use of automatic

    meteorological observing systems at aerodromes

    MET/02: 2/2

    Input from AMOSSG

    SN for AMOSSG/07

    30/04/07

    15/03/08

    new task (reformulation of an existing task)15 review the requirements for aligning guidance in

    Attachment B related to operationally related

    accuracy of forecasts to the TAF amendment

    criteria

    173-6

    SN for AMOSSG/07 15/03/08

    None16. study the accuracy required for precipitation

    forecasts in Attachment B

    136-18

    SN (IATA) for AMOSSG/07 15/03/08

    17. review the requirements for clarifying when a 173-6 new task

  • 7/30/2019 Work Programme March

    17/33

    - 16 -

    ID Task Source Recent progress

    Next milestone and its deadline

    newly issued TAF cancel TAF previously issued

    for the same place and for the same period of

    validity, or part thereof

    SN for AMOSSG/07 15/03/08

    new task18. study the the use of VV/// in TAF 173-6

    SN for AMOSSG/07 15/03/08

    progress report at METG/1619. monitor States' progress in forecasting RVR toassist improvement in airport capacity

    COM/MET/82;141-2,

    EANPG 48/41 SN for AMOSSG/07 15/03/08

  • 7/30/2019 Work Programme March

    18/33

    - 17 -

    D2-INF MET Meteorological information

    Assurance of a uniform global approach for the implementation of BUFR-coded OPMET messages through, inter alia, the i

    (MET-0101)

    Group: AMOSSG

    ID Task Source Recent progressNext milestone and its deadline

    Amendment 74 (bilateral exchanges)20. amend Annex 3 to allow the use of the BUFR code

    form to transmit OPMET information and specify thedetails how the information is to be presented to

    aeronautical users to ensure that the mapping is

    complete and unambiguous

    MET/02: 2/5

    EANPG 46/18;169-1 SN for AMOSSG/07 15/03/08

    initial road map at AMOSSG/5; updated

    AMOSSG/6

    21. develop guidance to achieve a uniform global

    approach to the implementation of BUFR-coded

    OPMET messages

    EANPG 45/12;

    166-5

    technical guidance from

    ACP expectedSN for AMOSSG/07

    15/06/07

    15/03/08

    new task22. consider the possible negative safety, operational and

    economic impacts of the transition plan on theaviation community and bring them to the attention of

    WMO, as necessary

    EANPG 47/27;

    172-11SN for AMOSSG/07 15/03/08

    ICAO policy (including draft amendme

    Annex 3 developed) with the assistance

    AUPISG

    23. contribute to the development and implementation of

    the ICAO policy on the use of Internet for operational

    purposes

    MET/02: 4/5 & 4/6

    SN for AMOSSG/07 15/03/08

  • 7/30/2019 Work Programme March

    19/33

    - 18 -

    D2-INF MET Meteorological information

    Enhancements to the provision of meteorological information to support ATM

    (MET-0402)

    Group: None

    ID Task Source Recent progress

    Next milestone and its deadline

    Amendment 741. develop requirements for additional meteorologicalproducts to be provided to the ATS units to support the

    global ATM, inter alia, in regard to the weather

    phenomena, including severe meteorological

    conditions, that could cause significant changes in the

    ATC procedures

    APANPIRG 14/10;165-5;

    EANPG 47/36;

    172-11;

    APANPIRG 17/43 b)

    174-2

    assessment by Secretariat

    draft amendment (PR with

    the proposal by AMOSSG)

    15/07/0

    1/10/08

    new task2. Include provisions in Annex 11 requiring that surfacewind direction in ATIS is to be provided in degrees

    magnetic

    EANPG 47/35;172-11

    draft amendment (PR withthe proposal by AMOSSG) 1/10/08

  • 7/30/2019 Work Programme March

    20/33

    2. MANAGEMENT OF MET OPERATIONS AND STUDYGROUPS

    2.1 IAVWOPSG/3 and IAVWOPSG/4 MeetingsAfter IAVWOPSG/3

    Task Means (output) Deadline & statusMeeting starting on 19 March 2007

    Make available

    final report English version of executive summary

    (ES)

    the preliminary follow-up table

    OPSG website

    Request that

    report and EN executive summary bedistributed simultaneously (Category 2)

    ES be translated in all languages by HQ

    Submission through DOC

    Draw the attention of the OPSG to the

    final report;English ES; andpreliminary follow-up table (subject to action

    to be taken by ANC)

    OPSG Memo

    Update the master lists of regional WAFS/IAVWprocedures

    In the G-drive underWAFS- and IAVWOPSG

    9/04/07 P

    Prepare report to the ANC AN-WP

    Inform Contracting States News item to ICAO

    Journal (with a photo)

    Express appreciation to the RO concerned IOM to the ICAORD

    11/04/07 P

    Present the report to the ANC Forward the updated regional provisions to RO IOM to the ICAORDs

    Make available all language versions of ES OPSG website

    Draw attention of ROs to the language versions e-mail

    24/05/07 P

    Print and distribute (Category 2) the supplement Submission through DOCMake available the updated

    follow-up table; and work programme

    OPSG website

    Draw the attention of the OPSG to the updated

    follow-up table work programme

    Confirm the dates/venue of the next meeting

    OPSG Memo

    Inform the Council Pres of the ANC Memo to

    the President of Council

    15/06/07 P

    Update the follow-up table OPSG website 15/08/07

    15/10/07

    P

    PUpdate the follow-up table OPSG websiteDraw the attention of the OPSG to the outstanding

    work in the follow-up table

    OPSG Memo

    15/12/07 P

    Update the follow-up table OPSG website 15/02/08 P

  • 7/30/2019 Work Programme March

    21/33

    - 2 -

    Before IAVWOPSG/4

    Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)

    OPSG website

    Draw the attention of the (OP)SG to the

    WP/1; call for comments IP/1

    Set the deadline for the

    submission of WPs indication of participation

    OPSG Memo

    Invite the members and permanent advisors Invitation letters

    15/03/08 P

    Prepare revised agenda (only if required) OPSG websiteOPSG Memo

    15/04/08 P

    Make available the WPs from the Provider States OPSG website

    Update the follow-up table (final version) OPSG website

    1/07/08 P

    Make available the Secretariat (Sec.) WPs

    Deal with the Conclusions addressed to theIAVWOPSG by PIRGs

    OPSG website

    Announce the completion of the Sec. WPs;Remind about the deadline for

    other WPs and the indication of participation

    OPSG Memo

    15/07/08P

    Make available WPs from (OP)SG Members OPSG website

    Prepare list of participants Appendix A to the report

    1/08/08 P

    Meeting starting on 15 September 2008

  • 7/30/2019 Work Programme March

    22/33

    - 3 -

    2.2 SADISOPSG/12 MeetingBefore SADISOPSG/12

    Task Means (output) Deadline & statusMake available the WPs from the SADIS ProviderState

    SADISOPSG website

    Update the follow-up table (final version) SADISOPSG website

    30/03/07 C

    Make available the Secretariat (Sec.) WPsPropose that the SUG be a) updated ; b) published

    only on a soft copy format

    SADISOPSG website

    Announce the completion of the Sec. WPs;

    Remind about the deadline for

    other WPs and the indication of participation

    SADISOPSG Memo

    9/04/07C

    Make available WPs from SADISOPSG Members SADISOPSG website

    Prepare list of participants Appendix A to the report

    1/05/07 P

    Meeting starting on 4 June 2007

  • 7/30/2019 Work Programme March

    23/33

    - 4 -

    After SADISOPSG/12

    Task Means (output) Deadline & statusMeeting starting on 4 June 2007

    Make available

    final report updated master lists from the report updated work programme from the report English version of executive summary

    (ES)

    the follow-up table

    SADISOPSG website

    Request that

    report and EN executive summary bedistributed simultaneously (Category 2)

    ES be translated in all languages by HQ

    Submission through DOC

    Draw the attention of the SADISOPSG to the

    final report;updated work programmeEnglish ES; and follow-up table

    SADISOPSG Memo

    Draw the attention of the ICAORDs to the follow-

    up action required on conclusions addressed to:

    PIRGs and MET sub-groups (alwaysinclude the conclusion related to the

    strategic assessment table and any draftconclusion)

    States (always include the conclusionrelated to the update of the focal points)

    IOM to Regional Offices

    Forward the updated SADIS Inventory and the

    statement related to the operational efficacy to the

    Chair of the SCRAG

    IOM (2) signed by the

    Chair of SADISOPSG

    Inform Contracting States News item to ICAOJournal (with a photo)

    Express appreciation to the RO concerned IOM to the ICAORD

    15/07/07 P

    Make available French and Russian versions of ES SADISOPSG website

    Draw attention of ROs to the language versions e-mail

    Print and distribute(Category 2) the supplement Submission through DOCUpdate the follow-up table SADISOPSG website

    Draw the attention of the SADISOPSG to the

    follow-up table

    Confirm the dates/venue of the next meeting

    SADISOPSG Memo

    Inform the ANC C-19 Memo

    15/08/07 P

    Update the follow-up table SADISOPSG website 15/10/0715/12/07

    P

  • 7/30/2019 Work Programme March

    24/33

    - 5 -

    2.3 WAFSOPSG/3 and WAFSOPSG/4 MeetingAfter WAFSOPSG/3

    Task Means (output) Deadline & statusMeeting starting on 1 October 2006Update the follow-up table OPSG website 1/05/07 P

    Update the follow-up table OPSG website

    Draw the attention of the OPSG to the outstandingwork in the follow-up table

    OPSG Memo 1/07/07P

    Update the follow-up table OPSG website 1/09/07 P

    Before WAFSOPSG/4

    Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatory

    notes) and IP/1 (admin arrangements)

    OPSG website

    Draw the attention of the (OP)SG to the WP/1; call for comments IP/1

    Set the deadline for the

    submission of WPs indication of participation

    OPSG Memo

    Invite the members and permanent advisors Invitation letters

    1/09/07 P

    Prepare revised agenda (only if required) OPSG website

    OPSG Memo

    1/10/07 P

    Make available the WPs from the Provider StatesDeal with the following conclusion:

    revision of software criteria to include theprocessing and depiction of data during

    WAFC back-up in a transparent manner

    (SADISOPSG 11/18)

    OPSG website

    Update the follow-up table (final version) OPSG website

    15/12/07 P

    Make available the Secretariat (Sec.) WPsDeal with the following conclusions addressed to

    the WAFSOPSG:

    continuation of PNG-formatted SIGWXforecasts (action already completed, to besimply included in the WP) (APANPIRG

    17/34, EANPG 48/36)

    further development of WAFS OutputPerformance Indicators (APANPIRG

    17/36)

    Draft amendment to Annex 3: include TC and VAadvisories in Chapter 9 and Appendix 8

    OPSG website

    Announce the completion of the Sec. WPs;

    Remind about the deadline for

    other WPs and the indication of participation

    OPSG Memo

    1/01/07P

    Make available WPs from (OP)SG Members OPSG website

    Prepare list of participants Appendix A to the report

    15/01/07 P

    Meeting starting on 26 February 2008

  • 7/30/2019 Work Programme March

    25/33

    - 6 -

    2.4 METLIKSG/10 MeetingBefore METLINKSG/10

    Task Means (output) Deadline & status

    Develop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)

    SG website

    Draw the attention of the SG to the

    WP/1; call for comments IP/1

    Set the deadline for the

    submission of WPs indication of participation

    SG Memo

    Invite the members and permanent advisors Invitation letters

    15/8/07 P

    Prepare revised agenda (only if required) SG websiteSG Memo

    15/09/07 P

    Make available WPs in response to action agreedat the previous meeting

    SG website 1/11/07 P

    Make available the Secretariat (Sec.) WPs SG website

    Announce the completion of the Sec. WPs;

    Remind about the deadline for

    other WPs and the indication of participation

    SG Memo 15/11/07P

    Make available WPs from SG Members SG website

    Prepare list of participants Appendix A to the report

    1/01/08 P

    Meeting starting on 15 February 2008

    After METLINKSG/10

    Task Means (output) Deadline and status

    Meeting starting on 15 February 2008Make available

    final report updated work programme the follow-up table

    SG website

    Draw the attention of the SG to the

    final report;updated work programme; andfollow-up table

    SG Memo

    1/03/08 P

    Prepare an amendment proposal to Annex 3 for

    preliminary review (normally at every secondmeeting)

    AN-WP 15/03/08 P

    Present the amendment proposal to the ANC 15/05/08 P

    Draw the attention of the SG to the follow-up table

    Confirm the dates/venue of the next meetingSG Memo 15/06/08 P

    Update the follow-up table SG website 15/08/08 P

    Update the follow-up table SG website

    Draw the attention of the OPSG to the outstandingwork in the follow-up table

    SG Memo

    15/11/08 P

    Update the follow-up table SG website 15/01/09 P

  • 7/30/2019 Work Programme March

    26/33

    - 7 -

    2.5 AMOSSG/7 MeetingBefore AMOSSG/7

    Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatorynotes) and IP/1 (admin arrangements)

    SG website

    Draw the attention of the SG to the

    WP/1; call for comments IP/1

    Set the deadline for the

    submission of WPs indication of participation

    SG Memo

    Invite the members and permanent advisors Invitation letters

    15/12/07 P

    Prepare revised agenda (only if required) SG website

    SG Memo

    15/01/08 P

    Make available WPs in response to action agreed

    at the previous meeting

    SG website 1/03/08 P

    Make available the Secretariat (Sec.) WPs SG website

    Announce the completion of the Sec. WPs;

    Remind about the deadline for

    other WPs and the indication of participation

    SG Memo 15/03/08P

    Make available WPs from SG Members SG website

    Prepare list of participants Appendix A to the report

    1/05/08 P

    Meeting starting on 15 June 2008

    After AMOSSG/7

    Task Means (output) Deadline & statusMeeting starting on 15 June 2008

    Make available

    final report updated work programme the follow-up table

    SG website

    Draw the attention of the SG to the

    final report;updated work programme; andfollow-up table

    SG Memo

    1/07/08 P

    Prepare an amendment proposal to Annex 3 for

    preliminary review (normally at every second

    meeting)

    AN-WP 15/07/08 P

    Present the amendment proposal to the ANC

    1/10/08 PDraw the attention of the SG to the follow-up table

    Confirm the dates/venue of the next meeting

    SG Memo 15/10/08 P

    Update the follow-up table SG website 15/12/08 P

    Update the follow-up table SG website

    Draw the attention of the OPSG to the outstanding

    work in the follow-up table

    SG Memo

    15/03/09 P

    Update the follow-up table SG website 15/05/09 P

  • 7/30/2019 Work Programme March

    27/33

    - 8 -

    2.6 METWSG/1 MeetingBefore METWG/1

    Task Means (output) Deadline & statusDevelop WP/1 (provisional agenda, explanatory

    notes) and IP/1 (admin arrangements)

    SG website

    Draw the attention of the SG to the

    WP/1; call for comments IP/1

    Set the deadline for the

    submission of WPs indication of participation

    SG Memo

    Invite the members and permanent advisors Invitation letters

    15/07/07 P

    Prepare revised agenda (only if required) SG website

    SG Memo

    1/08/07 P

    Make available the Secretariat (Sec.) WPs SG website

    Announce the completion of the Sec. WPs;Remind about the deadline for

    other WPs and the indication of participation

    SG Memo 15/08/07P

    Make available WPs from SG Members SG website

    Prepare list of participants Appendix A to the report

    1/10/07 P

    Meeting starting on 15 November 2007

    After METWG/1

    Task Means (output) Deadline & statusMeeting starting on 15 November 2007

    Make available

    final report updated work programme the follow-up table

    SG website

    Draw the attention of the SG to the

    final report;updated work programme; andfollow-up table

    SG Memo

    1/12/07 P

    Prepare an amendment proposal to Annex 3 for

    preliminary review (normally at every secondmeeting)

    AN-WP 15/12/07 P

    Present the amendment proposal to the ANC 15/02/08 P

    Draw the attention of the SG to the follow-up table

    Confirm the dates/venue of the next meeting

    SG Memo 15/03/08 P

    Update the follow-up table SG website 15/05/08 PUpdate the follow-up table SG website

    Draw the attention of the OPSG to the outstanding

    work in the follow-up table

    SG Memo

    15/08/08 P

    Update the follow-up table SG website 15/10/08 P

  • 7/30/2019 Work Programme March

    28/33

    - 9 -

    3. DOCUMENTATION3.1 ANC-WPProcessing of Amendment 75 to Annex 3

    Element Next milestoneSession

    No. Origin of the proposal Action Deadline &

    status

    ANC-177

    (winter 2008)

    1. Secretariat, with the assistance of theMETWSG

    prepare draft AN-WP 15/12/07 P

    2. WAFSOPSG/4 Meeting (alsoincludes non-SARPs)

    prepare draft AN-WP 1/04/08 PANC-178

    (spring 2008)

    3. Secretariat, with the assistance of theMETLINKSG, including the proposal

    related to tropical cyclones

    prepare draft AN-WP 15/03/08 P

    4. IAVWOPSG/4 Meeting (alsoincludes non-SARPs)

    prepare draft AN-WP 15/10/08 PANC-179

    (autumn 2008)

    5. Secretariat, with the assistance of theAMOSSG; including the proposal

    related to MET information to

    support ATM

    prepare draft AN-WP 15/07/08 P

    Other AN-WP

    Next milestoneSession Subject

    Action Deadline &

    statusReport of IAVWOPSG/3 Meeting prepare draft AN-WP 11/04/07 P

    Reorganization of the work of AMOSSG and

    WISTSG

    prepare initial plan

    prepare first draftprepare draft AN-WP

    15/03/07

    30/03/075/04/07

    C

    CC

    ANC-175

    (spring 2007)

    Briefing on GRIB and BUFR and other MET

    issues

    finalize the brief 10/04/07 P

    3.2 WP for WMO MeetingsNext milestoneMeeting Subject

    Action Deadline &

    statusCBS/CAeM

    Ad hoc ET on

    migration

    Issues related to the migration from the ICAO

    perspective

    Prepare draft WP 26/03/07 C

    3.3 Articles for the ICAO Journal 2007Subject & author Issue Deadline & status

    Wind shear; Keohan (US) April 2007 15/03/07 C

    VAAC Buenos Aires; Flores (Argentina) April 2007 30/03/07 D

    MET service in a developing state; Mlaki (Tanzania) April 2007 30/03/07 D

  • 7/30/2019 Work Programme March

    29/33

    - 10 -

    4. CORRESPONDENCE4.1 Follow-up letters in response to PIRG meetings

    PIRG Meeting Follow-up letters to(in response to following conclusions) DeadlineEANPG/48 (2006) WMO (Conclusion 48/42) 30/05/07

    GREPECAS/14 (2007) 1/12/07

    MIDANPIRG/10 (2007) 1/12/07

    APANPIRG/18 (2007) 2008

    EANPG/49 (2007) 2008

    APIRG/16 (2007) 2008

    4.2 SL an other lettersOrigin Letter to. Deadline

    Draft Amendment 75 Contracting States 31/12/08

  • 7/30/2019 Work Programme March

    30/33

    - 11 -

    5. AMENDMENTS TO ICAO AND WMO PROVISIONS5.1 MET ManualsManual (edition; compatible

    with Amendment )

    Amendment details Deadline

    Doc 8896, Manual ofAeronautical Meteorological

    Practice

    (7th edition, 2006, A 73)

    Align with Amendment 74Include guidance on:

    frequency of update of SIGMET SIGMET where the TC centre is located in another FIR

    (i.e. issue SIGMET for TS)

    difficult cases (examples)(APANPIRG 16/46 refers)

    the use of AMOS at aerodromes where topography andcomplex climatology are factors

    the interpretation of existing 6.1.2 in cases where anamended TAF is issued before the validity time of the

    subsequent forecast the combined use of GAMET and graphical area

    forecasts for low-level flights during the same flight

    a reference to Doc 9161 concerning the cost recoveryof synoptic stations

    (173-6)

    template for the ADS message

    15/09/07

    Doc 9328,Manual of Runway

    Visual Range Observing and

    Reporting Practices(3rd edition, 2005, A 73)

    Align with Amendment 74 22/05/07

    Alignment with Amendment 73 completed; forwarded to the ED

    (11/2004)

    2007Doc 9377, Manual on

    Coordination between Air

    Traffic Services, Aero-nautical Information Services

    and Aeronautical

    Meteorological Services

    (2nd edition, 2001, A 71)

    Align with Amendment 74 15/11/07

    Alignment with Amendment 73 completed; forwarded to the ED

    (10/2004)

    04/07Doc 9691, Manual on

    Volcanic Ash, Radioactive

    Material and Toxic Chemical

    Clouds

    (1st edition, 2001, A 71)

    Align with Amendment 74;

    Include an example of

    an early notification from the IAEA related toradioactive clouds

    (App. H of IAVWOPSG/1)

    15/06/07

    Doc 9766, Handbook on the

    International AirwaysVolcano Watch (IAVW)

    Operational Procedures and

    Contact List

    (up-to-date on the web)

    Align with Amendment 74;

    Include guidance on the use of the narrow line feature in volcanic ash

    advisories in high latitudes

    (173-6)

    15/06/07

  • 7/30/2019 Work Programme March

    31/33

    - 12 -

    Doc 9817, Manual on Low-

    Level Wind Shear

    (1st edition, 2005, A 73)

    Align with Amendment 74;

    Include guidance on

    how to determine in accordance with localarrangements whether wind shear is a factor at an

    aerodrome

    the roles of wind shear warnings and wind shearalerts(173-6)

    based on the input from Italy received on 15/12/2005(perhaps as an appendix)

    based on the input received from the US FAA

    15/07/07

    Doc 9837, Manual onAutomatic Meteorological

    Observing Systems at

    Aerodromes

    (1st edition, 2006, A 73)

    Align with Amendment 74 taking into account the comments by

    the AMOSSG

    15/06/07

    Doc 9873,Manual on Quality

    Management System

    (1st edition, being prepared,

    A 73)

    New ICAO/WMO joint manual completed; to be forwarded to

    the ED after the Secretary Generals approval of non-

    simultaneous distribution

    2007

    SADIS User Guide

    (up-to-date on the web)

    Align with Amendment 74 15/08/07

    5.2 Editorials to be included in Amendment 75 to Annex 3Chapter (origin) Detail Deadline

    (Element)

    Titles of Appendix 4 andAppendix 6

    Indicate that the template for special air-reports to be uplinked isin Appendix 6

    15/03/08(3)

  • 7/30/2019 Work Programme March

    32/33

    - 13 -

    6. MEETINGS6.1 Regional meetingsMeeting Attendance (funding) Place and venue

    APANPRIG: CNS/MET SG/11 Bangkok, 07/07

    APANPIRG/18 Bangkok, 3-7/09/07

    APIRG: METSG/8

    APIRG/16 Nairobi, 11/07

    EANPG: METG/17 Paris, 07/07

    EANPG/49 Paris, 27-29/11/07

    GREPECAS: AERMETSG SG/9

    GREPECAS/14 San Jose, 16-20/04/07

    MIDANPIRG: CNS/MET SG/8 2008

    MIDANPIRG/10 Doha, 15-19/04/07

    NATSPG/43 Paris, 12-15/06/07

    6.2 Regional seminars/workshopsMeeting Attendance (funding) Place and venue

    Briefing of new RO/MET Dakar OT, RR, NH, BO (RO) Montreal, 28-31/05/2007

    ASIA/PAC SIGMET seminar Bangkok, 11-13/07/07

    EUR seminar on QMS (estern part) TBD TBD

    EUR workshop on the impact of MET on the

    ATM systems

    TBD

    6.3 Operations groupsMeeting Attendance (funding) Place and venue

    IAVWOPSG/3 RR (M/07

    COS) Bangkok, 19-23/03/07SADISOPSG/12 OT (M/07 S8K) Bangkok, 4-6/06/07

    WAFSOPSG/4 OT (M/08 COS) Cairo, 26-28/02/08

    6.4 Panels and study groupsMeeting Attendance (funding) Place and venue

    WISTSG/3 or METWSG/1 RR (NA) Montreal, 11/07

    METLINKSG/10 NH (NA) Montreal, 02/08

    AMOSSG/7 NH (NA) Montreal, 06/08

    ANSEP/7 OT (NA) Montreal, 2008

    6.5 WMO MeetingsMeeting Attendance (funding) Place and venue

    CAeM ET on new terminal forecasts RR (M/07SCR) Hong Kong, 12-16/03/07

    4th International Workshop on VA RR (M/07SCR) New Zealand, 26-30/03/07

    CAeM/CBS ad-hoc ET on the use of BUFR or

    XML

    OT (M/07SCR) Geneva, 12-13/04/07

    CBS ET on DR & C and migration OT (M/07 SCR) Darmstadt 17-21/04/07

    WMO Congress OT (M/07SCR) Geneva, 7-18/05/07

    CAeM Management Group OT (M/07SCR) Geneva, 10/07

  • 7/30/2019 Work Programme March

    33/33

    - 14 -