Work Package 3 Harmonisation of basic data

Vukovar, 13th of December, 2012

Page 2: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Info WPL;

OBJECTIVE of WP 3;

ACTIVITIES;– EXPECTED RESULTS

AGENDA

Page 3: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Work Package Leader

Claudiu DUTU,

– AFDJ Galati – ROMANIA;• WPL for next 2 years;

Page 4: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

OBJECTIVE for WP3

to find a common approach to harmonise the basic data;

– Hydrology;

– Hydrography;

– Waterway maintenance.

Page 5: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Activities within WP3

Act. 3.1 Common approach regarding water level information & forecasts;

Act. 3.2 Harmonisation of shallow section information;

Act. 3.3 Pilot for marking plans

Page 6: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

ACT. 3.1 Common approach regarding water level information & forecasts

Report on common Quality of service for water level information;

Report about harmonisation of water level forecast;

Concept for water gauge monitoring;

Concept to improve the national water level information

Page 7: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

HU – server for WLI, workstation WLI, network management and UPS WLI;

RO – Danube, automatic tide gauges (2 pieces), soft

WLI;– Danube Black Sea Canal – automatic tide

gauge stations (2 pieces), soft WLI;

RS – automatic tide gauges stations (2 pieces)

Results Act 3.1

Page 8: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Act. 3.2 Harmonisation of shallow section information

Status quo report on shallow section information;

Concept for common quality of service for displaying shallow section information;

Page 9: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Agreement about Content and format1. River bank lines;

2. Limits of the fairway;

3. Signalization…

4. Minimum depths

5. Date of the survey

6. background

Information on FIS Portal….

Results Act. 3.2

Page 10: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Act. 3.3 Pilot for marking plans

Status quo report on current procedures for marking plans;

Concept including technical specification and system architecture for common marking plan database;

Page 11: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

RO – ship / shore application MP; BG – ship / shore application MP; HR – ship / shore application MP; RS – server MP + centralized application;

Results Act. 3.3

Page 12: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Concept – Master Database

Page 13: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

PP - Component

Page 14: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Structure

ship software application

– introducing / updating field common elements;

shore software application

– collecting / introducing updates liked with centralized server;

Centralized server– synchronizing all common stretch and presenting (web

presentation) the signalization status; – Automatic emailing to the skippers / linked to FIS Portal…etc.

Page 15: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

WP3

Page 16: Work Package 3 Harmonisation of basic data Vukovar, 13 th of December, 2012

Thank you for your attention!