Upload
simran-kaur
View
703
Download
17
Embed Size (px)
Citation preview
SAP AG 2003, Title of Presentation, Speaker Name / 1
Agenda
Solution Overview
Introduction
Example
Frontend
Content
Supply Network Collaboration
Planning
Procurement
Manufacturing
Order Fulfillment
Inventory Management
SC Cost Related KPIs
SAP AG 2003, Title of Presentation, Speaker Name / 2
SCOR KPIs in Manufacturing
Capacity Utilization
Make Cycle Time
Build Cycle Time
Total Build Time
Machine Wait Time
Ratio of Actual to Theoretical Cycle Time
Schedule Achievement
Production Plan Adherence
Unit Cost
Yield
SAP AG 2003, Title of Presentation, Speaker Name / 3
Business Content for Production
Production Monitoring order information on header and operation level detailed confirmation information available capacity, capacity requirements downtimes goods receipt material consumption, deviations leadtimes, executiontimes by order, work center order status
Quality Management results of quality tests Information from quality management: inspection lots,
notifications, notification items
SAP AG 2003, Title of Presentation, Speaker Name / 4
Business Content in Production (R/3 PP)
Plan/Actual Comparison
Oder/Material View
Period-Specific Oder/Material
View
0PP_C01 0PP_C02
2lIS_04_P_MATNR
Production Schedule,
Order Confirmation,
Plan/Target/Actual date for Order Open/Release/Start/Deliver
Production Leadtimes,
Goods Receipt, Number of Production Oders.
0PP_C10
Status of Manufacturing
Orders
0PP_C14
Manufacturing Monitoring
Material View From PP/PP-PI
SAP AG 2003, Title of Presentation, Speaker Name / 5
Plan/Actual Comparison
Operation/Work center View
Period-Specific Operation/Work
center View
0PP_C03 0PP_C04
2LIS_04_P_ARBPL
Production Schedule for Opertaion/Work center,
Confirmation for Operation,
Production Leadtimes for Operation,
Capacity Requirements for each work center,
Available Capacity for each Work Center
0PP_WCCP
Business Content in Production (R/3 PP)
0PP_C13
Capacity Load Utilization
(Distribution Capacity between different
Working Days)
Work Center View from PP/PP-PI
PP (PI) Work Center Capacity
SAP AG 2003, Title of Presentation, Speaker Name / 6
Period-Specific Material
Consumption
0PP_C06
2LIS_04_P_COMP Reserved Material Components,
Actual withdrawn Material Components,
0PP_C05
Plan/Actual Comparison Material
consumption
Business Content in Production (R/3 PP)
Component View from PP/PP-PI
SAP AG 2003, Title of Presentation, Speaker Name / 7
Business Content for Production (R/3 PP)
2LIS_04_P_MATNR
0PP_DS15
0PP_DS01
Plan/Actual Comparison of
Material
Collective Order
Material View From PP/PP-PI
Production Order Level
Collective Order Level
Production schedule,
Order Confirmation,
Production Leadtimes,
Goods Receipt,
Start date for Collective orders,
End date for Collective orders,
Number of collective orders
SAP AG 2003, Title of Presentation, Speaker Name / 8
Business Content for Production (R/3 PP)
0PP_O01
Goods Being Processed (Quantity)
2LIS_04_P_COMP2LIS_04_P_ARBPL
Work Center View from PP/PP-PI
Cpmponent View from PP/PP-PI
Manufacturing Order,
Maximum WIP Factor for different operations,
Maximum WIP Factor for withdrawn material
components.
0PP_C02
Manufacturing Order,
Maximum WIP Factor ,
WIP Quantity.
Period-Specific Oder/Material View
SAP AG 2003, Title of Presentation, Speaker Name / 9
Business Content for Production (R/3 PP)
0PP_DS03
Goods Being Processed (Value)
0CO_OM_OPA_6
Internal Orders:Actual Costs using delta
Extraction
CO Orders,
Posting date,
Amounts
0PP_C02
Manufacturing Order,
WIP (Value)
Period-Specific Oder/Material View
Internal orders (CO orders),
Posting date,
Amounts,
SAP AG 2003, Title of Presentation, Speaker Name / 10
Business Content, Repetitive Manufacturing (R/3 PP)
0PP_C07 0PP_C08
Repetitve Manufacturing/Goods
Receipt
Repetitive Manufacturing Material Consumption
2LIS_04_PE_MATNR 2LIS_04_PE_COMP
Goods Receipts in Repetitive Manufacturing
Material Consumption in Repetitive Manufacturing
Production version, Material, actual scrap and goods
receipt
Production version, Material, Components, Requirements
quantity and withdrawn quantity
SAP AG 2003, Title of Presentation, Speaker Name / 11
Extract data for order based APO applications Information on Live Cache order net View into the future Planning versions (different parameters, algorithms) One active planning version linked with execution system Planning version as characteristic for all transactional data
Upload: Snapshot scenario Decision on point of time for upload necessary:
e.g. after optimization run Label upload: name of snapshot as characteristic No delta update
Business Content for Production Planning and Detailed Scheduling (APO PP/DS)
SAP AG 2003, Title of Presentation, Speaker Name / 12
Business Content for Production Planning and Detailed Scheduling (APO PP/DS)
Resource and operation data
Order data (head)
0APO_C020APO_C01 0APO_C03
Order pegging data
Resource
Capacity: total, free
Capacity load: setup, production
For resource
Operation
Duration: gross, net
Quantity: original, open, yield, scrap
Status
For resource, location, main output product, PPM and operation
0APO_PPDS_OPERATION_01
Order
Lead, setup, lay, wait, WIP time
Quantity: original, open, yield, scrap
Lateness
Status and order type
For order, location, main output product, PPM
0APO_PPDS_ORDER_01
Pegging
Time gap: buffer or lateness
Quantity
For locations, products, customer, order from - order to
0APO_PPDS_RESCAPREQ_01 0APO_PPDS_PROD_CUST_01
SAP AG 2003, Title of Presentation, Speaker Name / 13
Business Content for Production Planning and Detailed Scheduling (APO PP/DS)
0APO_MC01
0APO_C020PP_C01
Plan/Actual Comparison of
Production Quantities
Order data (head)Plan/Actual Comparison Oder/Material View
Material, Plant, Production Plan
Adherence (for the case if the Planning data are only available in APO)
SAP AG 2003, Title of Presentation, Speaker Name / 14
Make Cycle Time
Calculates actual lead times for the collective orders
Includes storage durations between production steps
Drilldown to ODS for a detailed view on production orders
Calculation Start: earliest order Finish: finish of the leading order
1
23
45
Lead time
SAP AG 2003, Title of Presentation, Speaker Name / 15
Order monitoring / Workcenter Service Level
Track the state of production orders
Production order
Conversion Start Release Delivery
Production process
Workcenter 1 Workcenter 2 Workcenter 3 Workcenter 4 Workcenter 5
Inform yourself about Delivery Performance (On-time in full)
of each work center or work center group
SAP AG 2003, Title of Presentation, Speaker Name / 16
Work in Process
Inventory Work in Process (Quantity) Time-series analysis Reporting on a daily basis possible Example: Yield: 100 pc; already finally confirmed 20 pc
WIP = 100 * MAX[for all op.(act./plan or withdrawn/required)]-conf.= 100 * 0.5 – 20 = 30
Op. Actual Qty./Plan Qty.
Qty.withdrawn/Req.Qty.
10 20 / 100 = 0.2 20/100 = 0.2
20 50 / 500 = 0.1 250/500 = 0.5
30 30 / 300 = 0.1 60 / 300 = 0.2
SAP AG 2003, Title of Presentation, Speaker Name / 17
Work in Process
Inventory Work in Process (Value) Based on Work in Process derived from FI-CO (Overhead Costs) Reporting on a daily basis possible Example:
WIP on 01.03 = 100 EUR * (1 – 0 ST/100ST ) = 100 EUR
WIP on 02.03 = 500 EUR * (1 – 30 ST/100ST ) = 350 EUR
„CO-relevant„Order
Scheduled quantity
Confirmed quantity
Posting date
Value
4711 100 0 01.03 100 EUR
4711 100 30 02.03 500 EUR
PP CO
SAP AG 2003, Title of Presentation, Speaker Name / 18
Production Planning
Planning Accuracy Actual withdrawn components
Reserved components Component level APO can not be used directly
Production
Did I reach my production plans? Production Plan Adherence
How good could I plan my process? Planning Accuracy
How flexible is my production plan? Short-term flexibility
Planning Adherence Actual produced quantity
Planned quantity Order level APO can be used directly
Components Products
Components
Components
SAP AG 2003, Title of Presentation, Speaker Name / 19
Short-term Flexibility
Analyse the flexibility of your production planning
Compares number of planned with number all production orders
Architecture can handle following scenarios APO plan order replicated to R/3 Plan order derived directly from APO
SAP AG 2003, Title of Presentation, Speaker Name / 20
BW and Demand Planning
Demand Planning (DP)Sales AnalysisSales Analysis
StagingStagingStagingStaging
Historical Planned
DB Datamart
FileR/3
FileFileR/3R/3
Data MartInterface
Data MartInterface
HistoricalHistorical data
Planning results
Sales Analysis Consolidation Enrichment Multi sources
APOAPOBWBW
SAP AG 2003, Title of Presentation, Speaker Name / 21
Backorders - Definition
Back orders are orders …
that have an open quantity,
where the planned / requested delivery date is in the past
where the delivery completed indicator is not set.
SAP AG 2003, Title of Presentation, Speaker Name / 22
Backorders – Data Flow PP
2LIS_04_P_MATNR – Material view from PP/PP-PI
0PP_DS01 - Planned/actual comparison order/material view
0PP_C15 – Backlogged production orders
Daily snapshot of backorders:
Planned delivery date is overdue !!!
SAP AG 2003, Title of Presentation, Speaker Name / 23
Backorders - KPIs
KPIs on material / plant/etc:
Backorders (number of days order is overdue) -> on order level
Backorders „One Day“ (number of orders which are overdue by one day)
Backorders „7 Days“ (number of orders which are overdue by 1 to 7 days)
Backorders „30 Days“ (number of orders which are overdue by 7 to 30 days)
Backorders „more than 30 Days“ (number of orders which are overdue by more than 30 days)
Backorder Quantity: open quantity in Base Unit of Measure
Backorder Value: open value in Local currency