WOO/LUC-75-30.70/0.00
PID 93592MATCHMAKER EVENT
ODOT PROJECT 190108Michael Stormer, P.E., Project Manager
Layth Istefan, P.E., District Construction Engineer
Lisa Washington, Northwest Regional Outreach Manager
Mike Gramza, P.E., Capital Programs Administrator
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
2 |
WOO/LUC-75-30.70/0.00
PID 93592
PROJECT 180277
KEY PROJECT DATES
• Project Sale - February 21, 2019
• Project Award - March 11, 2019
• Estimated Completion Date - July 31, 2023
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
3 |
PROJECT OVERVIEW – SOUTH END
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
4 |
PROJECT OVERVIEW – NORTH END
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
5 |
MAJOR WORK ON PROJECTo Section 1 – South of Wales Road:
o Widening sub-standard shoulders and replacing deteriorating pavement.
o No change to the existing right-of-way or IR-75 centerline alignment.
o Section 2 – North of Wales Road:
o Correct deficient northbound sight distance and ramp deficiencies at Miami Street and South Avenue.
o Correct horizontal sight distance on IR-75 mainline north of Wales Rd.
o Correct railroad clearance, poor deck conditions and maintenance issues with Maumee River/Norfolk-
Southern Railroad/ South Ave Bridge.
o The above changes will require new road alignments.
o Right-of-way will be required near the South Ave and Miami Street interchanges
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
6 |
MAJOR WORK ON PROJECTo Construction Specifics
o Building of a more gradual curve of IR-75 between Wales Road and Miami Street.
o The IR-75 mainline spanning the Maumee River/Norfolk Southern Railroad/South Ave will be shifted 55 ft
to the west.
o The Miami St Interchange will utilize a diamond design with standard spacing between ramp intersections
on Miami St.
o The South Avenue entrance ramp to Southbound IR-75 will be rebuilt to current design standards.
o Addition of auxiliary lanes between Wales Rd and Miami St, and between Miami St and South Ave on IR-75
to improve operation.
o Installation of Noise Walls where warranted.
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
7 |
SUMMARY OF PROJECT MATERIALS
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
o Option Bid for mainline– Asphalt or Concreteo 53,000 CY of Asphalt Base, 9,000 CY of Asphalt Concrete Surface, 10,000 CY of
Asphalt Concrete Intermediate.
o or
o 203,000 SY of 13.5” Non-reinforced Concrete pavement, Class QC1 W/QA/QC
o 47,000 SY of Cement Stabilization
o 5,500 FT of Curb
o 9,000 FT of Single-Slope Concrete Barrier
o 8,400,000 LB Reinforcing Steel
8 |
SUMMARY OF PROJECT MATERIALS
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
Misc. Work
o 91,000 SF of MSE Walls
o 108,000 SF of Noise Walls
o Vandal Fence
o 10,500 SF of Sidewalk
o Highway lighting
o Sewer work
o Traffic Signals
9 |
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
DBE Goal – 12%
o Contains the Proposal Note 013-Disadvantaged
Business Enterprise (DBE) Utilization Plan and
Good Faith Efforts updated 04/20/2018
o All bidders shall submit a DBE Utilization Plan at
the time of bid
10 |
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2
o The plan should set forth specific information
demonstrating how bidder will achieve DBE Goal
o Identify DBE Certified firms:
http://www.dot.state.oh.us/Divisions/ODI/SDBE/
Pages/DBE-Directory.aspx
11 |
QUESTIONS
Last updated 1/16/2019
PID 93592 WOO/LUC-75-30.70/0.00 - ODOT District 2