Wood to green gasoline using Carbona gasification and Topsoe TIGAS processes
Copenhagen - May 20, 2014 Jesper Højer Jensen, Haldor Topsoe
Wood to green gasoline project U.S. Department of Energy
Golden Field Office
DOE Award No. DE-EE0002874
DOE Program Manager:
Paul Grabowski
Government share: $ 25,000,000
Cost share: $ 9,388,775
Period of performance:
12/28/09 through 12/31/14
Acknowledgment & disclaimer Acknowledgment: This material is based upon work supported by the Department of Energy, Golden Field Office, under Award Number DE-EE0002874. Special thanks to the team members on this project for their contributions to this presentation:
Niels Udengaard, Project Investigator, Haldor Topsoe Inc. Jim Patel, Project Manager, Carbona/Andritz Jesper H. Jensen, Project Manager, Haldor Topsoe A/S Kip Walston, Project Manager, ConocoPhillips Pekka Jokela, Project Manager, UPM-Kymmene
Disclaimer: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.
Process flow sheet of demonstration unit
Gasifier
Tar reformer
Scrubber
Syngas compressor
Morphysorb TIGAS
Off-gas
Gasoline
Water
Wood chips
Oxygen steam
Guard bed Separator
Test overview Integrated TIGAS operation periods
Shake-down (January 2013) 56 hours
100 gal
Test #1 (March 2013) 47 hours
573 gal
Test #2 (October 2013) 194 hours
3954 gal
Test #3 (March 2014) ~ 194 hours
~ 7000 gal
Total 500 hours
12000 gal
After initial mechanical start-up issues the TIGAS synthesis section of the demonstration plant operated very well at steady
reactor temperature profiles
TIGAS gasoline testing
¡ Engine emissions testing at SwRI – Tested a 80/20 high biomass TIGAS/gasoline blend – Emission level ‘substancial similar’ to conventional
gasoline – Phillips 66 will prepare EPA application for this blend
¡ Moderate Fleet Testing (planned for spring/summer 2014) – 4 pairs of vehicles over ~ 4 months – Accumulate ~ 300,000 miles
NACE corrosion test
¡ Innospec Fuel Specialties performed corrosion evaluation of the raw TIGAS gasoline product using the NACE TM01-72 Corrosion Test.
¡ With a low treat rate of 2 ptb DCI-6A the raw TIGAS gasoline meets the typical Pipeline Specification of B+ (<5% corrosion).
¡ The actual test data showed much less corrosion corresponding to a B++ (<0.1% corrosion).
¡ A blend of the raw TIGAS gasoline and ethanol (E10 Blend) meets the B+ rating even before adding any corrosion inhibitors.
Project economics
Source: AEO2013 - Report Number DOE/EIA-0383(2013) http://www.eia.gov/forecasts/aeo/
2.50
3.50
4.50
5.50
6.50
7.50
8.50
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
Ret
ail G
asol
ine
Pric
e [$
/gal
lon]
Year
Gasoline retail price prediction – example California
Conventional Gasoline - Reference TIGAS Conventional Gasoline - High Oil Price Conventional Gasoline - Low Oil Price
Crude at $106/barrel)
Crude at $69/barrel
Crude at $155/barrel
Crude prices year 2020
Topsoe TIGAS synthesis
Gasoline
C3-C4
Water
Gasoline Synthesis
Separation
Off-gas
Synthesis Gas
from Morphysorb
MeOH/DME Synthesis
MP Steam
2H2 + CO ⇄ CH3OH 2CH3OH ⇄ CH3OCH3 + H2O
0
10
20
30
40
50
60
70
0 10 20 30 40 50 60 70 80
Pressure (bar)
Con
vers
ion
(CO
+CO
2)
0%
20%
40%
60%
80%
100%
0.5 1 1.5 2 2.5H2 / CO Ratio
mol
-%
Topsoe TIGAS synthesis
DME MeOH H2O
CO2
H2 CO
H2/CO
(60 bar ; 250ºC)