The Challenge The team needed to provide quantities of clay sufficient for building the wall and the 600mm thick liner on the base. They were also required to provide storage capacity at 0.25m increments in RL, and to produce contour plans for scheduling the construction and issuing instructions to the contractor. A separate model was required for each contour slice at 0.25m intervals in order for the engineers could produce plans to aid the construction timeline. The Solution Task 1 - Wall volumes were created using (Volumes >Tin to tin by height range) and selecting polygon Task 2 - Base volumes were created using (Volumes >Tin to tin by height range) and selecting polygon Task 3 - Storage Calculations were created using Volumes > Exact > Storage calculations The contours were created at 0.25m increments. 12d Solutions Pty Ltd PO Box 351 Narrabeen NSW 2101 Australia © 2019 12d Solutions Pty Ltd. 12d Model and the 12d logo are trademarks of 12d Solutions Pty Ltd. Project Summary This project involved the construction of a tailings dam for a silver mine project in central NSW. Wonawinta Tailings Dam Contours had to be renamed as their RL using (User>Miscellaneous>R to Z>Set contour names from contour levels) With (Utilities>A to G>Change), and using a filter to select only certain string names, the contours were split into their own model. Contour lines for each 0.25m RL were printed on a pdf with tailing dam chainages and a grid so operators could locate themselves. Result Infinity Surveysuse of 12d Model on this project allowed them to fulfil, and indeed even exceed, client expectations. Infinity Surveys Pty Ltd James Gianatti CLIENT: Cobar Consolidated Resources SCOPE: Construction of a tailings dam for a silver mine project in Central NSW. 12d DIMENSIONS: Mining Volumetrics For more information To find out more about how you can create better designs faster with the 12d Model solution for civil engineering design, visit www.12d.com. CASE STUDY Australasia: Sydney P: [email protected] M: +61 2 9970 7117

Wonawinta Tailings James Gianatti Dam - Civil Engineering · Infinity Surveys’ use of 12d Model on this project allowed them to fulfil, and indeed even exceed, client expectations

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wonawinta Tailings James Gianatti Dam - Civil Engineering · Infinity Surveys’ use of 12d Model on this project allowed them to fulfil, and indeed even exceed, client expectations

The Challenge

The team needed to provide quantities of clay sufficient for building the wall and the 600mm thick liner on the base. They were also required to provide storage capacity at 0.25m increments in RL, and to produce contour plans for scheduling the construction and issuing instructions to the contractor.

A separate model was required for each contour slice at 0.25m intervals in order for the engineers could produce plans to aid the construction timeline.

The Solution

Task 1 - Wall volumes were created using (Volumes >Tin to tin by height range) and selecting polygon

Task 2 - Base volumes were created using (Volumes >Tin to tin by height range) and selecting polygon

Task 3 - Storage Calculations were created using Volumes > Exact > Storage calculations

The contours were created at 0.25m increments.

12d Solutions Pty Ltd PO Box 351 Narrabeen NSW 2101 Australia

© 2019 12d Solutions Pty Ltd. 12d Model and the 12d logo are trademarks of 12d Solutions Pty Ltd.

Project Summary

This project involved the construction of a tailings dam for a silver mine project in central NSW.

Wonawinta Tailings Dam

Contours had to be renamed as their RL using

(User>Miscellaneous>R to Z>Set contour names from contour levels)

With (Utilities>A to G>Change), and using a filter to select only certain string names, the contours were split into their own model.

Contour lines for each 0.25m RL were printed on a pdf with tailing dam chainages and a grid so operators could locate themselves.

Result

Infinity Surveys’ use of 12d Model on this project allowed them to fulfil, and indeed even exceed, client expectations.

Infinity Surveys Pty Ltd James Gianatti

CLIENT: Cobar Consolidated Resources

SCOPE:

Construction of a tailings dam for a silver mine project in Central NSW.

12d DIMENSIONS:

• Mining

• Volumetrics

For more information

To find out more about how you can create

better designs faster with the 12d Model

solution for civil engineering design, visit

www.12d.com.

CASE STUDY

Australasia: Sydney

P: [email protected]

M: +61 2 9970 7117

Page 2: Wonawinta Tailings James Gianatti Dam - Civil Engineering · Infinity Surveys’ use of 12d Model on this project allowed them to fulfil, and indeed even exceed, client expectations

Australasia: Sydney

P: [email protected]

M: +61 2 9970 7117

12d Solutions Pty Ltd

PO Box 351 Narrabeen

NSW 2101 Australia

© 2019 12d Solutions Pty Ltd