Upload
richard-oneal
View
216
Download
0
Embed Size (px)
DESCRIPTION
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 1.WLTP – organisational issues 2.1.DHC – test cycle development 2.2.DHC – validation phase 1 3.1DTP – measurement procedure development 3.2DTP – validation phase 2 4.Next steps 5.Miscellaneous Discussion points – agenda item 3 (a) - WLTP
Citation preview
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
62nd GRPE
agenda item 3 (a)
WLTP
WLTP secretary – Noriyuki Ichikawa
GRPE chair - Christoph Albus
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
1. WLTP – organisational issues
2.1. DHC – test cycle development
2.2. DHC – validation phase 1
3.1 DTP – measurement procedure development
3.2 DTP – validation phase 2
4. Next steps
5. Miscellaneous
Discussion points – agenda item 3 (a) - WLTP
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
1. WLTP – organisational issues
2.1. DHC – test cycle development
2.2. DHC – validation phase 1
3.1 DTP – measurement procedure development
3.2 DTP – validation phase 2
4. Next steps
5. Miscellaneous
Discussion points – agenda item 3 (a) - WLTP
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
In June 2010 (GRPE & WP.29) it was decided to proceed further under the framework of the 1998 agreement (GTR development), but to undertake a re-assessment in June 2011
It was also decided to freeze the activities of the WLTP informal group, to concentrate on the work of the sub groups DHC and DTP, and to deal with heading and coordinating issues during the proper GRPE sessions in 2011
WLTP – organisation & coordination
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
Conclusions from the last 12 month:
• Very good progress in work of the two sub groups DHC and DTP
• Lack in organisation and coordination of WLTP work
(e.g. definition of responsibilities, drafting of the gtr text, planning of validation, preparation of GRPE and WP.29 decisions, …)
WLTP – organisation & coordination
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
WLTP – organisation & coordination
Three options:
1) No change
2) Reactivation of the WLTP informal group
3) Establishment of a steering group
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
WLTP sponsor Japan (Kazuyuki Narusawa)WLTP sponsor EU (Klaus Steininger)WLTP secretary (Noriyki Ichikawa)DHC chair (Hajime Ishi, (Chris Parkin)Chris Parkin))DTP chair (Giovanni D’Urbano)OICA (William Coleman)Drafting coordinator (tbd)Validation 2 coordinator(Alessandro Marotta)GRPE chair (Christoph Albus)
WLTP – steering group - members
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
No chair – everybody can start activities and initiatives
Transparency
Preparation of WLTP documents UNECE website
Clarification of responsibilities (who, what, deadlines)
Organisation of the WLTP project process(timing, information flow, coordination)
WLTP – steering group - ToR
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
The role of DTP and DHC will not change.
The steering group should not be understood as an additional level between GRPE and DTP/DHC.
The main purpose is to supervise and support all WLTP activities and all sub groups permanently
WLTP – steering group - ToR
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
WLTP – overall structureWP.29
GRPE
DTPincl. validation 2 coordination
DHCdraftingmanager /group
steering group
5 DTP sub groups
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
Three options:
1) No change no
2) Reactivation of the WLTP informal groupno
3) Establishment of a steering group yes
Confirmation by GRPE ?
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
GRPE working & informal documents
steering group WLTP – UNECE website
drafting group WLTP – UNECE website
TFV WLTP – DHC – DTP – UNECE website
DHC DHC – UNECE website
DTP DTP – UNECE website
5 DTP subgroupscirca website (European Commission)link on UNECE website
WLTP – Documents
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
Very urgent to find a person, responsible for the coordination of the gtr drafting(including drafting of the Technical Report)
Many text modules for draft gtr already exists
Definitions – a consistant and suitable system needs to be developed
Status:European Commission is preparing a contract,but time delay because of administrative problems
WLTP – drafting coordinator (manager)
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
It was discussed by the steering group whether we need an overall coordination of validation phase 1 & 2, confirmation testing and round robin
For the time beeing it was decided that there is a need for coordination only for validation phase 2, in close cooperation with DTP group
Possible candidate is Alessandro Marotta (JRC), but final confirmation from the European Commission is outstanding
Establishment of a validation 2 task force (VTF)
WLTP – coordination of the validation process
WLTPInformal document No. GRPE-62-13(62nd GRPE, 6-10 June 2011, agenda item 3(a)
1. WLTP – organisational issues
2.1. DHC – test cycle development
2.2. DHC – validation phase 1
3.1 DTP – measurement procedure development
3.2 DTP – validation phase 2
4. Next steps
5. Miscellaneous
Discussion points – agenda item 3 (a) - WLTP