1
WLTP GTR 15
WLTP-10-34e
Monday, April 06, 2015
Report by Drafting Coordinator,Serge Dubuc
2
Summary of Drafting Subgroup Meeting, March 11-13, Brussels
Monday, April 06, 2015
WLTP-10-34e
Approximately 150 PowerPoint slides comprising open and confirmed points, expert approvals and GTR corrections were reviewed over three days.
A number of definitions were discussed, some approved immediately. It was concluded that a meeting with mass and dimensions experts led by B. Coleman will take place to clarify some open definitions.
3
Summary of Drafting Subgroup Meeting, March 11-13, Brussels
Monday, April 06, 2015
WLTP-10-34e
Of the original 150+ slides, appx. 30 were left requiring further processing, e.g.
Definitions Annex 4 Road Load (new text, road load family, text improvements, missing
terms in some equations) Annex 5 Test Equipment (improved diagrams, consistency in the use of SI units,
some paragraphs on additional pollutants) Annex 6 Test Procedure (comments from Japan on testing vehicles H and L,
regenerating systems, net heating value) Annex 7 Calculations (mass of an individual vehicle, missing explanation of terms
in some equations) Annex 8 (OVC-HEV tests, NOVC-HEV tests, utility factors)
4
Summary of Drafting Subgroup Meeting, March 11-13, Brussels
Monday, April 06, 2015
WLTP-10-34e
The content of those slides which were approved were integrated into the GTR.
Since the Brussels meeting, another 40 slides have been added to be processed.
The latest version of the GTR incorporating the results of the 3-day Brussels meeting was uploaded to the UN ECE server as: WLTP-10-04e-GTR Version 03.04.2015 This version contains all tracking changes, as they are necessary for the UN ECE
Secretariat's work
5Monday, April 06, 2015
WLTP-10-34e
For the Drafting Subgroup and its work tomorrow, three documents have been uploaded to the UN ECE server:
The GTR, version 03.04.2015 including all tracking changes.
The GTR, version 03.04.2015 incorporating all GTR corrections (see next page), and material confirmed since the first days of the GTR. As a result, many tracking change bubbles have been eliminated, making the GTR more readable. This was requested during the Brussels meeting.
The 70+ slides mentioned on the previous page.
Summary of Drafting Subgroup Meeting, March 11-13, Brussels
6
Summary of Drafting Subgroup Meeting, March 11-13, Brussels
Monday, April 06, 2015
WLTP-10-34e
Types of corrections incorporated into the GTR: elimination of "must", use of the word "will", use of
sample/samples/sampling/sampled, formatting, spelling, spacing, paragraph/equation/figure numbers were checked, use of weighing and weighting.
BTW: according to the UN ECE, "must" may not be used, only "shall". "Shall" is for obligations and "may" for options. However, the GTR uses "must" on at least one occasion. These
uses can be justified.
7
Future work
Processing those items adopted during WLTP IWG meeting 10. Processing the unfinished slides. Incorporating decisions made by the VPSD group once they have
been approved by the appropriate experts. Deciding on future Drafting Subgroup meetings:
when where
Monday, April 06, 2015
WLTP-10-34e
8
Future GTR Milestones
Monday, April 06, 2015
01.01.201601.01.2015
GRPE 71st Session, June 2015
GTR 15 Informal Document still in
progress
GRPE 72nd Session, Jan. 2016
GTR 15 Working Document to be
approved
Adoption of GTR 15 by WP.29 (WP.29
meetings always take place in March, June
and November)
GTR must reach UN ECE 12 weeks before a GRPE meeting, in this
case, no later than October 19 in order to
be approved at the January 2016 GRPE
01.01.2017
WLTP-10-34e