WLTP-E-Lab Sub GroupProgress report
WLTP-DTP-E-LabProc-094
Leader: Per Ohlund / Kazuki Kobayashi
Lab process-EV meeting in Brussels Face to Face meeting was held on 16th and 17th
of May in Brussels. Open issues were discussed. Shorten test procedure for BEV Utility factor RCB correction Break off criteria gtr text and so on.
Item
NoIssue Solution Status Vehicle
7 Criteria for end of charging
The state of charge after charging shall not be less than that before CD test. Specific tolerance may be allowed based on further investigation.
Closed.
gtr text should be considered
PEV
OVC-HEV
14 RCB correction window
(next page)
L+M :+/- 1.5%
L+M+H: +/-1.0%
L;M+H+exH:+/-0.5%
Closed NOVC-HEV
OVC-HEV
19 Calculation method of CD to CS break off criteria
Based on Cycle energy demand
Criteria should be 3 or 4 %.
Almost Closed
3 or 4 % will be decided later.
OVC-HEV
Open issues of E-lab sub group
Driving cycle [/]
Fully Charged
Recharging
Ch
arg
ing
Con
dit
ion
[A
h]
Recharge
Test n
(transient)
soak
ΔE0 ΔE1
19
7
Item
NoIssue Solution Status Vehicle
14 RCB correction window
L+M :+/- 1.5%
L+M+H: +/-1.0%
L;M+H+exH:+/-0.5%
of Energy content of the consumed fuel
Closed OVC-HEV
(CS test)
NOVC-HEV
∆R
CB
(A
h)
CycleStart End
⊿RCB during test
StartWithin window
=>No correction
RCB correction window
70 90
22
34
120 135
Class3
Class2
Class1
L3+M3+H3 (+ExH3)(ver.5.3)
L3+M3+H3(ver.5.1)
L2+M2+L2 L2+M2+H2
L1+M1+L1L1+L1+L1
L2+M2+H2(+ExH2)PMR
Maximum speed
Japan proposed to use Maximum speed in R68 .Maximum speed means:For electric vehicle, the highest average value of the speed, which the vehicle can maintain twice over distance of 1 km.
All electric vehicle shall be Class 3.
Item
NoIssue Solution Status Vehicle
21 Vehicle classification PMR:All electric vehicle shall be Class 3.
Max speed: To be discussed
PMR: Closed
Max Speed: Open
PEV
OVC-HEV
NOVC-HEV
Further discussion is necessary to finalize vehicle classification.
Phone meeting will be held after GRPE.
Item
NoIssue Solution Status Vehicle
22 Shorten test procedure
Japan prepared 2 options. Almost Closed PEV
Option 1:Calcuration method for Each phase range
Japan proposed to calculate each phase range from total WLTC result
=>Written in gtr with square bracket.
Option 2:Shorten test procedure proposed by Japan
=>To be considered in WLTP Phase 2
Item
NoIssue Solution Status Vehicle
24 Methodology to make Utility factor
Regional Utility Factor
For WLTP Phase 1
Global harmonized UF should be considered Phase 2.
Closed OVC-HEV
26 Number of Utility factor
Regional Utility Factor
For WLTP Phase 1
Global harmonized UF should be considered Phase 2.
Closed OVC-HEV