Validation phase 2 result ItemsValidation resultsConclusion Time after Range test until start of charging. Current proposal within [30 minutes] 30 minutes is too short.Within 2 hours (same as ISO) Order of CD and CS test There is no impact.Order of test should be flexible. RCB correction Regulated pollutant (NOx,HC,CO,PM,PN) There is no impactRegulated pollutant should not be corrected RCB correction Additional pollutant There is no impactAdditional pollutant should not be corrected. Closed
Citation preview
WLTP-E-Lab Sub GroupProgress report
WLTP-DTP-E-LabProc-081
Leader: Per Ohlund / Kazuki Kobayashi
Lab proc EV group Meetings• 6th of November, phone meeting Japan reported validation phase 2 result • 15th of November F to F meeting in
Brussels.• Validation phase 2 result was reported by
ACEA. • Open issues were discussed. Some of open issues were closed.• 9th of January ,phone meeting Discussed some open issues and proposal
Validation phase 2 resultItems Validation results Conclusion
Time after Range test until start of charging .Current proposal within [30 minutes]
30 minutes is too short. Within 2 hours(same as ISO)
Order of CD and CS test
There is no impact. Order of test should be flexible.
RCB correctionRegulated pollutant(NOx,HC,CO,PM,PN)
There is no impact Regulated pollutant should not be corrected
RCB correctionAdditional pollutant
There is no impact Additional pollutant should not be corrected.
Closed
Closed
Closed
Closed
Validation phase 2 resultItems Validation results Conclusion
RCB correction windowCurrent proposal Within 1 %
To be analyzed VP2 result.
To be discussed at beginning of March.
Vehicle classificationCurrent proposal30 minute maximum power
30 minutes power is not appreciate ?
To be discussed at beginning of March.
Break off criteria for Range testJapanese proposal4sec and within 15secstop
VP2 were conducted by 4sec.According to test result, deceleration within 15 sec is dangerous at high speed.
To be discussed at beginning of March.
TBD
TBD
TBD
70 90
22
34
120 135
Class3
Class2
Class1
L+M+H (+ExH)(ver.5.3)
L+M+H(ver.5.1)
L+M+L(ver.5.1)
L+M+H
L+M+LL+L+L
L+M+H (+ExH)
Vehicle classification for BEV
•Revision of PMR ⇒ Current PMR * coefficient X % for BEV ?
•Definition of Power & Speed: 30min max power/30min max speed
•Is “out of scope” necessary for the vehicle that cannot keep the target speed tolerance of Low phase ?
•The information for the customer regarding driving range that measured by different test cycle shall be considered.
•OVC-HEV,NOVC-HEV has same issues.
Matters of concern
PMR
Maximum speed
Validation phase 2 resultItems Validation results Conclusion
CD to CS mode break off clitella.
Japan proposed the criteria based on fuel consumption.
To be discussed at beginning of March
Break time between cycleCurrent :10minutes
Proposal is too short.Especially diesel vehicle needs at least 40 min.
Not only E-Lab->MCTF
TBD
TBD
Open issuesItems Proposal Conclusion
Run in mileage.BEV 300 km
OVC HEV and NOVC HEV should be same as ICE vehicle.3000-10000km
Agreed
Soak conditionForced cooling
Not allow forced cooling conditionBecause electrified vehicle performance does not depends on water and oil temperature.
To be discussed at beginning of March
Utility Factor ACEA will propose a calculation method.
To be discussed at beginning of March
Closed
TBD
TBD
Open issuesItems Proposal Conclusion
Mode construction Japan propose to conduct 4 phase testCounterproposal for BEVConsider shorten test procedure for EV range test.Counterproposal for OVC HEVTo be discussed with data base.
To be discussed at beginning of March
TBD
CD CS CD CS CD CS CD CS CD CS CD CS CD CS CD CS
ICE
BEV ● ● ● ●
OVC-HEV(PHEV) ● ● - ● ● - ● ● - ● ● -
Cold HotL M H EX-H
Cold Hot Cold HotCold Hot
-● ● - ●- ● -
Base test matrix
Based on the idea to measure the emission and fuel economy (or CO2) by each phase, ● marked cold & hot tests will be necessary for each type of vehicles.
Confirmation test• Shorten test procedure for BEV range test.
• Calculation method for each phase range by complete WLTC.
• CD to CS break off criteria confirmation
• RCB correction window confirmation
• Soak condition with charging
• Break time between the cycle
To be prepared “Confirmation item list and action plan” until March.
DRAFT
Road map2012 Jan Feb Mar Apr May Jun Jul Aug Oct Nov Dec
Meetings
E-lab action
Confirmation test
Ad-hoc GRPE
66th GRPE
65th GRPE
DTP
gtr Ver1
Closed open
issuesReflect
Still open issues
Prepare test parameter
gtr Ver2
Ad-hoc WLTP
gtr Ver3 gtr final