1
WISBECH ACCESS STRATEGY Phase 1 EH1: Elm High Road/A47 Roundabout Key points to the scheme The scheme looks to deliver: A positive impact on A47 journey time reliability A positive impact upon the A1101 with improved north/south traffic flows at the roundabout Improve access to/from the A47 Maximised use of existing infrastructure in the new layout A positive impact upon the local environment Improve the potential for sustainable transport provision Why? The existing northbound and southbound approaches to the Elm High Road / A47 roundabout have been identified as areas where traffic congestion can form , especially at peak times of the day. Whats the plan? Improve the existing roundabout and approaches to increase capacity of the junction and improve performance and safety. Install dedicated turning lanes on Elm High Road (A1101) Improvement existing pedestrian crossings at the junction An interim scheme before more significant improvements are made in the next phase of the Wisbech Access Strategy

WISBECH ACCESS STRATEGY Phase 1 EH1: Elm High Road/A47 ... · WISBECH ACCESS STRATEGY Phase 1 EH1: Elm High Road/A47 Roundabout Key points to the scheme The scheme looks to deliver:

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WISBECH ACCESS STRATEGY Phase 1 EH1: Elm High Road/A47 ... · WISBECH ACCESS STRATEGY Phase 1 EH1: Elm High Road/A47 Roundabout Key points to the scheme The scheme looks to deliver:

WISBECH ACCESS STRATEGY Phase 1

EH1: Elm High Road/A47 Roundabout

Key points to the scheme

The scheme looks to deliver:

A positive impact on A47 journey time reliability

A positive impact upon the A1101 with improved north/south traffic flows at the

roundabout

Improve access to/from the A47

Maximised use of existing infrastructure in the new layout

A positive impact upon the local environment

Improve the potential for sustainable transport provision

Why?

The existing northbound and southbound approaches to the Elm High Road / A47

roundabout have been identified as areas where traffic congestion can form ,

especially at peak times of the day.

What’s the plan?

Improve the existing roundabout and approaches to increase capacity of the junction

and improve performance and safety.

Install dedicated turning lanes on Elm High Road (A1101)

Improvement existing pedestrian crossings at the junction

An interim scheme before more significant improvements are made in the next phase

of the Wisbech Access Strategy