    Scheme Identification and Action Plan

    December 2018

  • 389726 1 D Document2 Mott MacDonald

    Mott MacDonald Ground floor Royal Liver Building Pier Head Liverpool L3 1JH United Kingdom T +44 (0)151 482 9910 F +44 (0)151 236 2985 mottmac.com

    Wirral Strategic Transport Framework

    Scheme Identification and Action Plan

    December 2018

    Mott MacDonald Limited. Registered in England and Wales no. 1243967. Registered office: Mott MacDonald House, 8-10 Sydenham Road, Croydon CR0 2EE, United Kingdom

  • Mott MacDonald | Wirral Strategic Transport Framework Scheme Identification and Action Plan

    389726 | 1 | C | December 2018 https://mottmac.sharepoint.com/teams/pj-b7332/do/Strategic Transport Framework/Deliverables/Wirral Transport Pipeline Gap Analysis and Options Development Report Final Issue for approval_17_12_18_v5.docx

    Issue and Revision Record

    Revision Date Originator Checker Approver Description

    A Jun 17 CR NO CH Draft structure

    B Jul 17 KD NO CH Draft first Issue

    C Dec 18 HJ NO CH Final Issue

    Document reference: 389726 | 1 | C

    Information class: Standard

    This document is issued for the party which commissioned it and for specific purposes connected with the above-

    captioned project only. It should not be relied upon by any other party or used for any other purpose.

    We accept no responsibility for the consequences of this document being relied upon by any other party, or being

    used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied

    to us by other parties.

    This document contains confidential information and proprietary intellectual property. It should not be shown to other

    parties without consent from us and from the party which commissioned it.

    This report has been pr epared sol el y for use by the party which commissi oned it (the ‘Client’) i n connecti on with the capti oned proj ect. It should not be used for any other purpose. N o person other than the Client or any party who has expressl y agreed ter ms of r eliance with us (the ‘Reci pient(s)’) may rel y on the content, i nformati on or any vi ews expressed i n the repor t. We accept no duty of care, responsi bility or liability to any other r eci pient of thi s document. This r eport is confi denti al and contains pr opri etar y intell ectual property.

    No representati on, warranty or under taki ng, expr ess or i mplied, is made and no responsi bility or liability is accepted by us to any party other than the Cli ent or any Reci pient(s), as to the accuracy or completeness of the i nformati on contai ned i n this r eport. For the avoidance of doubt this r eport does not in any way purport to i nclude any legal , insur ance or fi nanci al advice or opi nion.

    We disclai m all and any liability whether arising i n tort or contrac t or other wise which it might otherwise have to any party other than the Cli ent or the Reci pient(s), in r espect of this report , or any infor mation attri buted to i t.

    We accept no r esponsibility for any error or omission i n the r eport which is due to an error or omission i n data, infor mation or statements supplied to us by other par ties incl udi ng the client (‘D ata’). We have not i ndependentl y verified such D ata and ha ve assumed it to be accurate, complete, reli abl e and current as of the date of such infor mation.

    Forecasts presented i n this document were pr epared usi ng Data and the report is dependent or based on D ata. Inevitabl y, some of the assumptions used to develop the for ecasts will not be realised and unantici pated events and circumstances may occur. C onsequentl y M ott MacDonal d does not guarantee or warr ant the concl usi ons contained i n the repor t as there are li kel y to be differ ences between the for ecas ts and the ac tual results and those di ffer ences may be material. Whil e we consi der that the infor mation and opini ons gi ven i n this r eport are sound all parti es must rel y on their own skill and j udgement when making use of it .

    Under no circumstances may this report or any extr act or summar y ther eof be used in connection wi th any public or pri vate securities offering i ncluding any rel ated memorandum or prospectus for any securities offering or stock exchange listing or announcement.

  • Mott MacDonald | Wirral Strategic Transport Framework Scheme Identification and Action Plan

    389726 | 1 | C | December 2018 https://mottmac.sharepoint.com/teams/pj-b7332/do/Strategic Transport Framework/Deliverables/Wirral Transport Pipeline Gap Analysis and Options Development Report Final Issue for approval_17_12_18_v5.docx

    Contents

    Executive summary 1

    A Strategic Transport Framework Action Plan 1

    Strategic Regeneration Framework (SRF) 2

    A41 (North) Corridor and Wirral Waters Strategic Transport Feasibility Studies 3

    Key Transport Issues in Wirral 4

    Scheme Identification and Gap Analysis 4

    Towards a Transport Strategy 13

    Next Steps 23

    1 Purpose of this report 25

    1.1 Introduction 25

    1.2 Why is a refresh needed? 26

    1.3 Methodology 26

    1.4 Report Structure 27

    2 Strategic Regeneration Framework 29

    2.1 Strategic Regeneration Framework Context 29

    2.2 Emerging Spatial Priorities 30

    2.3 Emerging Themes 33

    3 Concurrent Wirral Transport Projects 34

    3.1 A41 North Corridor and Wirral Waters Strategic Transport Feasibility Studies 34

    3.2 Wirral Transport Modelling and Benefits Calculation 34

    4 Towards a Transport Strategy 36

    4.1 Introduction 36

    4.2 A41 (North) Corridor Strategy 37

    4.3 Wirral Waters Transport Strategy 42

    4.4 Strategic Transport Framework Action Plan 49

    4.5 Remaining Sections 51

    5 Identification of key transport issues 52

    5.1 Introduction 52

    5.2 Issue Identification 52

    6 Review of Previous Wirral Transport Pipeline 70

    6.1 Introduction 70

    6.2 Scheme Pool from Previous Work 70

  • Mott MacDonald | Wirral Strategic Transport Framework Scheme Identification and Action Plan

    389726 | 1 | C | December 2018 https://mottmac.sharepoint.com/teams/pj-b7332/do/Strategic Transport Framework/Deliverables/Wirral Transport Pipeline Gap Analysis and Options Development Report Final Issue for approval_17_12_18_v5.docx

    6.3 Gap Analysis 75

    7 Recommendations for new Wirral Strategic Transport Framework schemes 79

    7.1 Introduction 79

    7.2 New Scheme Identification 79

    7.3 New Long List 81

    8 Initial Sifting and Structuring of Long List 86

    8.1 Initial Sift 86

    8.2 Structuring of Schemes 87

    9 Appraisal of Long List 93

    9.1 INSET 93

    9.2 Appraisal against City Region Criteria 93

    9.3 Appraisal Results 95

    10 Action Plan of Schemes – Forward Investment Plan for Wirral 102

    11 Future Innovation and the Impact on Wirral Strategic Transport

    Framework Action Plan 108

    11.1 Introduction 108

    11.2 Demand Responsive Transport Applications 108

    11.3 Micro-Mobility Solutions 109

    11.4 Autonomous Personal Vehicles 110

    11.5 Autonomous Mass Transit 112

    11.6 Mobility as a Service (MaaS) 113

    11.7 Conclusions 114

    12 Conclusions and Next Steps 116

    Appendices 118

    A. Previous Scheme Alignment with SRF and Wirral Priorities- Results 119

    B. Long List Structure 120

    C. INSET Results 121

    D. Proformas 122

  • Mott MacDonald | Wirral Strategic Transport Framework 1 Scheme Identification and Action Plan

    389726 | 1 | C | December 2018 https://mottmac.sharepoint.com/teams/pj-b7332/do/Strategic Transport Framework/Deliverables/Wirral Transport Pipeline Gap Analysis and Options Development Report Final Issue for approval_17_12_18_v5.docx

    Executive summary

    A Strategic Transport Framework Action Plan

    In 2016, Mott MacDonald produced (on behalf of Merseytravel and the Liverpool City Region

    District Partners) the Liverpool City Region (LCR) Transport Investment Pipeline, which covered

    Halton, Knowsley, Liverpool, Sefton, St. Helens and Wirral as well as an overarching City

    Region level pipeline undertaken for Merseytravel. This project presented a ‘pipeline’ of

    transport investments for the next 20 years in the LCR, with one pipeline for each area. The

    pipelines were intended to act as the investment framework for transport schemes to be

    developed and delivered in support of the LCR’s new strategic transport vision, A Transport

    Plan for Growth.

    Since the development of the first Wirral Transport Pipeline in 2016 Wirral Council has produced

    a number of local policy documents which set transport in the borough in the context of

    significant economic growth. A Strategic Transport Framework Action Plan is therefore required

    to enable this growth and to ensure that the transport network is fully aligned with Wirral’s

    regeneration plans / proposals.

    Wirral’s ambitious aspirations for growth are outlined within the Wirral Strategic Regeneration

    Framework (SRF) – part of Wirral’s comprehensive ‘2020 Vision’ - which sets out the priorities