14
www.wirelessapplications.com 1 Early WAC 1999 WAC 2010

Wireless Applications Corp 2010 TNT2

Embed Size (px)

Citation preview

Page 1: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 1

Early WAC 1999

WAC 2010

Page 2: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 2

About Wireless Applications, Corp.:

Customized software GIS consulting services

FAA / FCC filing services High-level RF engineering

Focus on Cellular, PCS, and Broadband Wireless Industries.

A specialized and experienced team of wireless telecommunications engineers, GIS mapping experts and software developers.

Wireless Applications, Corp., web based software to expedite results at light speed.

Page 3: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 3

History and Value Proposition

Roots back into the early McCaw days, Western Wireless and VoiceStream with many other support companies.

Common theme in early days that drives our vision today:

• Build it faster. • Get more Spectrum.• More sites.• Update to latest technology…

Wireless Applications, Corp.

Dedicated to reduce redundancy and automate repeatable processes

Company offerings - three solutions1. Licensed online software applications 2. Provide Telecom Eng Services3. …blend the two.

SiteSync – Microwave Research

Page 4: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 4

Capabilities

Coupling our years of wireless experience with our GIS knowledge and expansive data warehousing, WAC has developed portfolio analysis services that are unmatched in our industry.

Analysis Using a variety of different mapping solutions from simple low-resolution coverage maps to high-end analysis with poster size output

Wireless Applications, Corp.

Data and GIS presentation Using technology and experience of importing, exporting, analyzing and mapping a multitude of data: locations, RF coverage, frequency ownership, demographic/census, FCC auction results, performance results, drive test data

RF Coverage in secondsFull RF propagation (eCoverage) model built into our web-based product

Microwave BackhaulDetailed path analysisNetworksDesign Automation (TNT2.0)

WAC Calendar 2010 PosterSending out 900+ a year !

Page 5: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 5

We are excited to share with you a Wireless Applications vision to make the complex, simple.

Microwave.

You have this. Everybody else has this.

SiteSync – Network Planning Automation

How do you compete, design?

Page 6: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 6

- What if hundreds of potential line-of-site profiles could be fully calculated with one command?

- What if a tool looked at all the existing paths and figured out which configuration built in the greatest

future resiliency ?

- What if this same tool generated networks, optimizing based on a menu of your parameters?

SiteSync – Network Planning Automation

Take advantage of our automation for huge savings of speed to market and human error reduction.

Page 7: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 7

SiteSync – Network Planning AutomationThe Network Tool (TNT2) Automates Microwave Backhaul to a whole new level.

Analyze all possible paths relative to terrain and design parameters

Optimization happens via complex algorithms to design a network for you.

Analyze, add, delete, edit design parameters, run multiple scenarios, all in a flash! (its Dirt Simple)

Game changing in fact.

Page 8: Wireless Applications Corp 2010 TNT2

- For a raw build or even a look into a old system, the initial TNT2 design starts with site dots

-Looks through user parameters of max distances, frequency, number of antenna, etc for making candidate sites and hubs.

- Run a insane amount of Line-of-Site profiles.

- For example, 200 Site dots = (200 X 199/2)=19,900. But we do BOTH DEM 30 and SRTM 30 LOS on each, that’s 39,800! How long? We run all LOS and make the entire network of 200 in about 4 minutes.

Stage 1

Page 9: Wireless Applications Corp 2010 TNT2

- Identify ALL potential paths from your list of sites.

-TNT2 runs full path calculations with clearances from fresnel of user choice.

-If a direct impact, the path is out, if within 5%, then yellow.

Might be

impacted

Full

clearance

Stage 2

Page 10: Wireless Applications Corp 2010 TNT2

Calculate and give a WAC rating system of importance to every site location. We are also able to run full Frequency Interference against existing Microwave for each ‘positive’ path.

- Each site gets multiple ratings for evaluation

- Hits and the hits of those hits are measured

- Azimuth availability (angle off each site)

- Fiber proximities (where data exists)

- Overall rankings

- Demographics

Future

- Priority to structure types, colocates

Stage 3

Page 11: Wireless Applications Corp 2010 TNT2

Pre-interference calculations, Coordination (PCN)

Run full coordination discrimination interference analysis on each the potential paths against all existing paths. This can be done on all bands.

For each potential path, interference analysis can be calculated against every existing path in that band and others. We check every possible pair which meets bandwidth requirements for interference against all the existing paths in that band.

We do this by checking discrimination angles, frequency separation and line-of-site site (mtn might be in the way) clearances. We then calculate the margin to objective and verify that it is within tolerances. We use all previously calculated averages found for the area as the “Interfering Path” parameters.

Interference to Victim

Stage 4 (optional)

Page 12: Wireless Applications Corp 2010 TNT2

Generate a potential systemAll the data from WAC ratings, the input parameters, best Hubs, best links, best sites are used to suggest a starting point network to use, we call a Scenario.

If you like the Scenario, then this entire output is also sitting in our ‘Portfolio Path Design’ area for applying a cookie cutter Microwave radio/antenna budget all at once, to all paths in that Scenario….in a Flash!

Stage 5

Check your entire link-budget outputs for hundreds of links in minutes.

Want to design each more? They are also moved to our ‘Full MW design’ section for the engineering tweaks.

Want to Coordinate and File? We are approved FCC Coordinators and have even built this section into our SiteSync tool, just tell us which paths are ready to go!

Want to look at who is already using bands in the area? Run our ‘Information About Area Paths’ link and see all existing licensed MW frequencies, their average lengths, modulations of more.

Want it? License a per user online account today, that to is Dirt Simple.

Page 13: Wireless Applications Corp 2010 TNT2

Game Changing.

SiteSync TNT2 Conclusions

-Decrease your lead time to market by producing complete designs in a flash.

-Reducing design man-hours by orders of magnitude

-Win competitive bids, via producing lighting fast, accurate, cost optimized designs

-Estimating CAPEX with assurance

-Substantial reduction of re-design efforts from failed LOS or frequency interference

-Minimize field analysis of LOS flashing due to increased confidence

-Big savings with on-line tools:

-instant availability to your staff

-no Server or PC integration and maintenance

Page 14: Wireless Applications Corp 2010 TNT2

www.wirelessapplications.com 14

Thank you from

Wireless Applications, Corp.Company Headquarters 47.610590, -122.196593 111 108th Ave. NE., Suite A160 Bellevue, WA 98004

Phone: (425)-643-5000Fax: (425)-649-5675

Email: [email protected]: www.wirelessapplications.comMobile Website: m.wirelessapplications.com/