Copyright 2012. DataNet Quality Systems. All rights reserved. Page 1 of 4 PROJECT PLAN PHASE AND STEP HOURS RESOURCE PHASE I: Preparation for Implementation 8.00 Plan Resources 1.50 Identify project champion 0.50 Form implementation team 1.00 1.00 0.25 Discuss resources required and timelines 0.25 Review training options 0.25 Determine system requirements 0.25 5.50 Server hardware 1.00 Client hardware (plant floor PCs) 2.00 Network hardware 1.00 Gage hardware (cables, flexports, etc.) 1.50 40.00 Database 1.00 Install database server software 0.50 Configure database server for WinSPC 0.50 Installing WinSPC 3.00 Install WinSPC on the first client station 1.00 Install WinSPC on all other client stations 2.00 Orientation for WinSPC Solutions Engineer 1.00 Plant walk through explaining processes 0.50 0.50 Onsite WinSPC Training 24.00 Setup training room 3.00 Conduct WinSPC admin training 16.00 1.00 SPC Fundamentals training 4.00 General Security and System Configuration 3.00 Define WinSPC configuration structure 1.00 Create user groups and users 0.75 Grant user permissions 0.50 0.75 Conduct Pilot 8.00 Identify pilot operation (i.e. operation 1) 0.25 Setup 1-5 parts 0.50 0.50 Setup tags 0.25 Setup blueprint images 0.25 Setup cost model 0.75 0.25 Setup 1-5 sample collection plans 0.25 Setup blueprints 0.25 Setup tag prompting 0.25 Setup device prompting 0.25 Link appropriate files to Navigator buttons 0.25 Setup devices within WinSPC 0.50 Conference Call - Project Team and Datanet Confirm project objectives and success Hardware (Allocate or Purchase) PHASE II: Installation, Training, Configuration Overview of inspection plans and SPC Conduct WinSPC operator training (group Configure language, audit trail, event log, Setup variables and attributes for each Copy setup for other operations as

WinSPC Project Plan Template

Embed Size (px)

DESCRIPTION

p

Citation preview

Project PlanPROJECT PLANPHASE AND STEPHOURSRESOURCECOMPLETE DATEPHASE I: Preparation for Implementation8.00Plan Resources1.50Identify project champion0.50Form implementation team1.00Conference Call - Project Team and Datanet Project Mgr1.00Confirm project objectives and success metrics0.25Discuss resources required and timelines0.25Review training options0.25Determine system requirements0.25Hardware (Allocate or Purchase)5.50Server hardware1.00Client hardware (plant floor PCs)2.00Network hardware1.00Gage hardware (cables, flexports, etc.)1.50PHASE II: Installation, Training, Configuration and Pilot40.00Database1.00Install database server software0.50Configure database server for WinSPC0.50Installing WinSPC3.00Install WinSPC on the first client station1.00Install WinSPC on all other client stations2.00Orientation for WinSPC Solutions Engineer1.00Plant walk through explaining processes0.50Overview of inspection plans and SPC methods0.50Onsite WinSPC Training24.00Setup training room3.00Conduct WinSPC admin training16.00Conduct WinSPC operator training (group format)1.00SPC Fundamentals training4.00General Security and System Configuration3.00Define WinSPC configuration structure1.00Create user groups and users0.75Grant user permissions0.50Configure language, audit trail, event log, etc.0.75Conduct Pilot8.00Identify pilot operation (i.e. operation 1)0.25Setup 1-5 parts0.50Setup variables and attributes for each part0.50Setup tags0.25Setup blueprint images0.25Setup cost model0.75Copy setup for other operations as appropriate0.25Setup 1-5 sample collection plans0.25Setup blueprints0.25Setup tag prompting0.25Setup device prompting0.25Link appropriate files to Navigator buttons0.25Setup devices within WinSPC0.50Setup sample plant monitor layout0.25Create lists (N, CA, AC)0.50Link (or apply) lists0.25Define alarms and triggers0.25Create control test templates0.25Link (or apply) control test templates0.25Setup sample queries and reports0.50Collect data0.50Obtain user feedback0.25Modify setup as needed0.25Collect more data to confirm modified setup0.25PHASE III: Deployment to All Other Operations80.00Operation 24.00Operation 34.00Operation 44.00Operation 54.00Operation 64.00Operation 74.00Operation 84.00Operation 94.00Operation 104.00Operation 114.00Operation 124.00Operation 134.00Operation 144.00Operation 154.00Operation 164.00Operation 174.00Operation 184.00Operation 194.00Operation 204.00Operation 214.00PHASE IV: Go Live112.00Roll out WinSPC to all stations72.00Document instructions for using WinSPC16.00Fine-tune setup based on user feedback16.00Document and share lessons learned8.00PHASE V: Ongoing MonitoringOngoingMonitor programs and usage of WinSPCOngoingReview success of WinSPC deployment at facilityOngoingReview success metrics (ongoing)OngoingTotal Hours240.00Total Days30.00