WINDMILL (NO GEARBOX): PDRSCOTT STRYCKER
KOOSHA DANESHI
IAN NELSON
WORK BREAKDOWN STRUCTURE
GANTT CHART
LEVEL TWO FUNCTIONAL DECOMPOSITION
SCHEMATIC
RISK MITIGATION PLAN
Risk Ways to Avoid Plan B
Trouble Getting Time in the Wind Tunnel
Plan Testing Days far ahead of TimeA Drill can be used in place of the rotors to
simulate wind
Generator Could Take too long to be shipped here
Call ahead and ask about shipping time.If the time is too long, then buy through
different vender
Programming Arduino (Experience Arduino Programming is Low)
Start working on the programming during the CDR
N/A
The propeller is being shared by both groups. The propeller could
also break.
If this becomes a problem, additional propellers can be manufactured in the
machine shop.N/A
Electrical ShockAll components need to be set up in a way
that electrical shock is not a possibilityHealth Insurance