Elk UPDS Wind Distribution Center Transportation Partners & Logistics BNSF Logistics BNSF Logistics Curtis Machine Soldier Creek 300 MW TradeWind Energy KK Wind Solutions Alltite JR Custom Metal Products Siemens Gamesa The Carlson Company Wurth Service Supply CMC Concrete Materials Co. Mackey & Sons Atkinson-EPSI Black & Veatch EDP Renewables Olsson Associates URS Corporation Prysmian/Draka Siemens Gamesa SYT USA Dayton Superior Terracon Consultants DAR Corporation Wetzel Engineering Vestas Services Fuchs Lubritech Renewable Concepts Mid-Kansas Machine Butler Ford Reno Ellis Ness Gove Finney Clark Lyon Gray Logan Barber Rice Smith Trego Pratt Cowley Sumner Jewell Clay Lane Linn Meade Rooks Scott Marion Rush Barton Rawlins Thomas Norton Phillips Riley Kearny Cloud Russell Chase Kiowa Harper Sherman Saline Wallace Decatur Morris Hamilton Graham Osage Marshall Sedgwick Morton Osborne Grant Stafford Coffey Ottawa Lincoln Allen Cheyenne Sheridan Greenwood Greeley Miami Kingman Wichita Mitchell Pawnee Brown Stevens Stanton Dickinson Labette Wilson Nemaha Seward Republic Jackson Ellsworth McPherson Haskell Hodgeman Washington Harvey Bourbon Neosho Comanche Franklin Edwards Wabaunsee Geary Crawford Pottawatomie Cherokee Anderson Jefferson Shawnee Douglas Woodson Chautauqua Montgomery Atchison Doniphan Johnson Leavenworth Wyandotte Spearville I, II, & III 250 MW FHSU 4 MW Bloom 178 MW Ensign 99 MW Kingman 200 MW Waverly 200 MW Buckeye 200 MW Marshall 74 MW Alexander 48 MW Ironwood 168 MW Iron Star 200 MW Ninnescah 200 MW Post Rock 201 MW Greensburg 12 MW Elk River 150 MW Pratt Wind 244 MW Flat Ridge 100 MW Slate Creek 150 MW Cedar Bluff 200 MW Caney River 200 MW Smoky Hills 250 MW Gray County 112 MW Meridian Way 201 MW Solomon Forks 290 MW Diamond Vista 300 MW Prairie Queen 200 MW Buffalo Dunes 250 MW Shooting Star 104 MW Cimarron Bend 400 MW Flat Ridge II 470 MW Central Plains 99 MW Western Plains 200 MW Cimarron I & II 296 MW 27 Sept 2018 Wind speed at 100 meters data layer was created by AWS Truewind using the MesoMap system and historical weather data. July 2008 Wind Resources of Kansas ® 0 20 40 60 80 10 Miles Mean Annual Wind Speed at 100 Meters Wind Speed at 100m (m/s) 4.0 - 5.5 5.5 - 6 6.0 - 6.5 6.5 - 7 7.0 - 7.5 7.5 - 8 8.0 - 8.5 8.5 - 9 9.0 - 9.5 9.5 - 12 Generation Sites Transmission Lines Wind Related Businesses Under Construction Existing 345 - KV 230 - KV 161 - KV 138 - KV 115 - KV 69 - KV Interstate Hwy Approved/Under Construction 115 KV, Approved 138 KV, Approved 345 KV, Approved 3,500 KV, Approved Operational *Routes on Approved lines are subject to change For additional information, please contact Randi Tveitaraas Jack at 785-296-7868 or [email protected]

Wind Resources of Kansas · Wind Resources of Kansas ... Ensign Wind Project (Gray Co.) NextEra Energy (NextEra) Kansas City Power & Light/GMO 98.9 2012 ... T-Mobile (160MW), Brown-Forman

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Wind Resources of Kansas · Wind Resources of Kansas ... Ensign Wind Project (Gray Co.) NextEra Energy (NextEra) Kansas City Power & Light/GMO 98.9 2012 ... T-Mobile (160MW), Brown-Forman

Elk

UPDS Wind Distribution Center

Transportation Partners & Logistics

BNSF Logistics

BNSF Logistics

Curtis Machine

Soldier Creek300 MW

TradeWind EnergyKK Wind Solutions

AlltiteJR Custom Metal ProductsSiemens GamesaThe Carlson CompanyWurth Service SupplyCMC Concrete Materials Co.

Mackey & Sons

Atkinson-EPSI

Black & VeatchEDP RenewablesOlsson AssociatesURS Corporation

Prysmian/DrakaSiemens GamesaSYT USA

Dayton SuperiorTerracon Consultants

DAR CorporationWetzel Engineering

Vestas Services

Fuchs Lubritech

Renewable Concepts

Mid-Kansas Machine

Butler

Ford

Reno

Ellis

Ness

Gove

Finney

Clark

Lyon

Gray

Logan

Barber

Rice

Smith

Trego

Pratt

CowleySumner

Jewell

Clay

Lane

Linn

Meade

Rooks

Scott

Marion

Rush

Barton

Rawlins

Thomas

Norton Phillips

Riley

Kearny

Cloud

Russell

Chase

Kiowa

Harper

Sherman

Saline

Wallace

Decatur

Morris

Hamilton

Graham

Osage

Marshall

Sedgwick

Morton

Osborne

Grant

Stafford

Coffey

OttawaLincoln

Allen

Cheyenne

Sheridan

Greenwood

Greeley

Miami

Kingman

Wichita

Mitchell

Pawnee

Brown

Stevens

Stanton

Dickinson

Labette

Wilson

Nemaha

Seward

Republic

Jackson

Ellsworth

McPherson

Haskell

Hodgeman

Washington

Harvey

Bourbon

Neosho

Comanche

Franklin

Edwards

WabaunseeGeary

Crawford

Pottawatomie

Cherokee

Anderson

Jefferson

Shawnee

Douglas

Woodson

Chautauqua Montgomery

Atchison

Doniphan

Johnson

Leavenworth

Wyandotte

Spearville I, II, & III250 MW

FHSU4 MW

Bloom178 MW

Ensign99 MW

Kingman200 MW

Waverly200 MW

Buckeye200 MW

Marshall74 MW

Alexander48 MW

Ironwood168 MW

Iron Star200 MW

Ninnescah200 MW

Post Rock201 MW

Greensburg12 MW

Elk River150 MW

Pratt Wind244 MW

Flat Ridge100 MW

Slate Creek150 MW

Cedar Bluff200 MW

Caney River200 MW

Smoky Hills250 MW

Gray County112 MW

Meridian Way201 MW

Solomon Forks290 MW

Diamond Vista300 MW

Prairie Queen200 MW

Buffalo Dunes250 MW

Shooting Star104 MW

Cimarron Bend400 MW

Flat Ridge II470 MW

Central Plains99 MW

Western Plains200 MW

Cimarron I & II296 MW

27 Sept 2018

Wind speed at 100 meters data layer was created by AWS Truewind using the MesoMapsystem and historical weather data.July 2008

Wind Resources of Kansas®

0 20 40 60 8010

Miles

Mean Annual Wind Speed at 100 Meters

Wind Speed at 100m (m/s)

4.0 - 5.5

5.5 - 6

6.0 - 6.5

6.5 - 7

7.0 - 7.5

7.5 - 8

8.0 - 8.5

8.5 - 9

9.0 - 9.5

9.5 - 12

Generation SitesTransmission Lines

Wind Related Businesses

Under Construction

Existing345 - KV

230 - KV

161 - KV

138 - KV

115 - KV

69 - KVInterstate Hwy

Approved/Under Construction115 KV, Approved138 KV, Approved345 KV, Approved3,500 KV, Approved

Operational

*Routes on Approved lines are subject to change

For additional information, please contact Randi Tveitaraas Jack at 785-296-7868 [email protected]

Page 2: Wind Resources of Kansas · Wind Resources of Kansas ... Ensign Wind Project (Gray Co.) NextEra Energy (NextEra) Kansas City Power & Light/GMO 98.9 2012 ... T-Mobile (160MW), Brown-Forman

KANSAS COMMERCIAL WIND PROJECTS IN OPERATION

Wind Project (County) DEVELOPER (Owner) POWER PURCHASER SIZE (MW) YEAR

Gray County Wind Farm (Gray Co.) NextEra Energy (NextEra) KCP&L, Sunflower Elec Co-op 112.2 2001

Elk River Wind Facility (Butler Co.) Iberdrola (Avangrid Renewables) Empire District Electric 150 2005

Spearville Wind Energy Facility (Ford Co.) enXco/EDF Renewable Energy (KCP&L) Kansas City Power & Light 100.4 2005

Smoky Hills Wind Project (Lincoln/Ellsworth Co.) *Phase I (power sold by percentage)

TradeWind Energy LLC (Enel) Sunflower Electric (50%), Kansas City BPU (25%), Midwest Energy (25%) 100.8 2008

Smoky Hills Wind Project (Lincoln/Ellsworth Co.) *Phase II

TradeWind Energy LLC (Enel) Sunflower Electric (24MW), Midwest Energy (24MW) ,Independence Power & Light (15MW), City Utilities of Springfield (50MW), Mer-chant-SPP (35.5MW)

148.5 2008

Meridian Way Wind Farm (Cloud Co.) EDP Renewables (EDP Renewables/Axium) Empire District Electric (105MW), Westar Energy (96MW) 201 2008

Flat Ridge Wind Farm (Barber Co.) BP Wind Energy (BP Wind/Westar) Westar Energy 100 2009

Central Plains Wind Farm (Wichita Co.) RES America Dev. Inc./Westar (Westar) Westar Energy 99 2009

Greensburg Wind Farm (Kiowa Co.) John Deere Renewables (Exelon Wind) Kansas Power Pool/Town of Greensburg 12.5 2010

Spearville Wind Energy Facility (Ford Co.) EDF Renewable Energy (KCP&L) Kansas City Power & Light 48 2011

Caney River Wind Farm (Elk Co.) TradeWind Energy LLC (Enel GNPA, Gulf Pacific Power) Tennessee Valley Authority 199.8 2012

Post Rock Wind Farm (Lincoln/Ellsworth Co.) Hilliard/Wind Capital Group (Pattern Energy) Westar 201 2012

Ironwood Wind Farm (Ford Co.) Infinity Wind (Duke Energy, Sumitomo) Westar 167.9 2012

Cimarron I Wind Project (Gray Co.) CPV Renewable Energy (NextEra Energy) Tennessee Valley Authority 165.6 2012

Cimarron II Wind Project (Gray Co.) CPV Renewable Energy (Duke Energy, Sumitomo) Kansas City Power & Light 131.1 2012

Shooting Star Wind Project (Kiowa Co.) Clipper/Infinity Wind (ExGen Renewables Partners, John Hancock Life Insurance)

Sunflower Electric 104 2012

Flat Ridge 2 Wind Farm(Kingman, Barber, Harper, Sumner Co.)

BP Wind Energy (BP Wind/SEMPRA) Associated Electric Co-op (310MW), Swepco (109MW), Arkansas Electric Co-op (51MW) 470 2012

Spearville III (Ford Co.) EDF Renewable Energy (Blackrock/EDF/Eurus) Kansas City Power & Light 100.8 2012

Ensign Wind Project (Gray Co.) NextEra Energy (NextEra) Kansas City Power & Light/GMO 98.9 2012

Buffalo Dunes (Finney, Grant, Haskell Co.) TradeWind Energy LLC (Enel GNPA, EFS Buffalo Dunes) Alabama Power 249.75 2013

Fort Hays State University (Ellis County) Harvest the Wind Network (FHSU) Fort Hays State University 4 2013

Alexander (Rush Co.) Own Energy/EDF Renewable Energy (NJR Clean Energy Ventures) KC-BPU (25MW); Yahoo! (23MW) 48.3 2015

Buckeye (Ellis Co.) Invenergy (Invenergy) Lincoln Electric (100MW) 200 2015

Cedar Bluff (Ness/Trego) NextEra Energy (NextEra) Westar 200 2015

Slate Creek (Sumner Co.) EDF Renewable Energy (EDF/Axium) Great Plains Energy 150 2015

Waverly Wind Farm (Coffey Co.) EDP Renewables (EDP Renewables/Axium) KCP&L 199 2015

Ninnescah (Pratt Co.) NextEra Energy (NextEra) Westar 200 2016

Kingman Wind Energy Center (Kingman Co.) NextEra Energy (NextEra) Westar 200 2016

Marshall Energy (Marshall Co.) RPM Access LLC/BHE Renwables (BHE Renewables) MJMEUC (20MW), KMEA (7MW), Kansas Power Pool, Independence P&L 74 2016

Western Plains (Ford Co.) Infinity Renewables (Westar) Westar 280 2017

Cimarron Bend (Clark Co.) Tradewind Energy/Enel GPNA (Enel/GE Energy Services) BPU (200MW), Google(200MW) 400 2017

Bloom Wind Farm (Ford/Clark Co.) Capital Power (Capital Power) Allianz Risk Transfer, Resold to Microsoft 178 2017

TOTAL INSTALLED 5094.55

KANSAS COMMERCIAL WIND PROJECTS UNDER CONSTRUCTION

Iron Star (Ford Co.) Infinity Renewables/ENGIE MJMEUC 200

Solomon Forks (Thomas Co.) Infinity Renewables/ENGIE Target (100MW), T-Mobile (160MW), Brown-Forman Corp (30MW) 290

Pratt Wind Energy Center (Pratt Co.) NextEra Energy Great Plains Energy 244

Prairie Queen (Allen Co.) EDP Renewables Great Plains Energy 200

Diamond Vista (Marion, Dickinson Co.) TradeWind Energy/Enel Kohler (100MW), City Utilities of Springfield (100MW) Tri-County Electric Co-op (84MW) 300

Soldier Creek (Nemaha Co.) NextEra Energy (NextEra) Westar Energy Renewables Direct Tariff Customers 300

TOTAL UNDER CONSTRUCTION 1534