Wind Power Generator System Northern Power System Waitsfield, VT ACCOMPLISHMENTS ¨ Has designed and installed a prototype direct drive wind turbine at the NSF Anartica McMurdo Station COMMERCIALIZATION ¨ The results of the Phase II work has attracted the attention of the Department of Energy (DOE) and the National Science Foundation for application in small villages throughout Northern Alaska. Consequently, the DOE has given a contract to Northern for $600K to build an advanced generator for the system. In addition, the DOE is expected to issue a series of Phase III contracts for over $3M to design, build, and test several prototypes specifically for Alaskan conditions GOVERNMENT/SCIENCE APPLICATIONS ¨ Prototype installations of wind turbine in Alaskan Village or Kotzebue is progressing INNOVATION Development of a wind power system for the generator of electricity which must operate under extreme environmental conditions such as those encountered at the South Pole or in the Martian atmosphere Small Business Technology Transfer Ames Research Center SS# 2-017-Contacts: Gary Norton NPS - (802) 497- 2955 NASA-Michael Flynn - (650) 604-1163 Wind Power Generator 1992 SBIR Phase 2; NAS2-14244

Wind Power Generator System Northern Power System Waitsfield, VT

Embed Size (px)

DESCRIPTION

ACCOMPLISHMENTS Has designed and installed a prototype direct drive wind turbine at the NSF Anartica McMurdo Station COMMERCIALIZATION - PowerPoint PPT Presentation

Citation preview

Page 1: Wind Power Generator System  Northern Power System Waitsfield, VT

Wind Power Generator System Northern Power System

Waitsfield, VT

ACCOMPLISHMENTS

¨ Has designed and installed a prototype direct drive wind turbine at the NSF Anartica McMurdo Station

COMMERCIALIZATION¨ The results of the Phase II work has attracted the

attention of the Department of Energy (DOE) and the National Science Foundation for application in small villages throughout Northern Alaska. Consequently, the DOE has given a contract to Northern for $600K to build an advanced generator for the system. In addition, the DOE is expected to issue a series of Phase III contracts for over $3M to design, build, and test several prototypes specifically for Alaskan conditions

GOVERNMENT/SCIENCE APPLICATIONS¨ Prototype installations of wind turbine in Alaskan

Village or Kotzebue is progressing

INNOVATIONDevelopment of a wind power system for the generator of electricity which must operate under extreme environmental conditions such as those encountered at the South Pole or in the Martian atmosphere

SmallBusinessTechnologyTransfer

Ames Research CenterSS# 2-017-Contacts: Gary Norton NPS - (802) 497-2955NASA-Michael Flynn - (650) 604-1163

Wind Power Generator

1992 SBIR Phase 2; NAS2-14244