15
1 Deleni Wind Farm 46,2 MW CONSTANTA COUNTY ROMANIA November 2014

Wind Farm 42 MW Deleni November 2014

Embed Size (px)

Citation preview

Page 1: Wind Farm 42 MW Deleni November 2014

1

Deleni Wind Farm

46,2 MW

CONSTANTA COUNTY

ROMANIA

November 2014

Page 2: Wind Farm 42 MW Deleni November 2014

2

46,2 MW Deleni Wind Farm

Location

Page 3: Wind Farm 42 MW Deleni November 2014

3

46,2 MW Deleni Wind Farm

Aeolian map of Romania and project location

Page 4: Wind Farm 42 MW Deleni November 2014

46,2 MW Deleni Wind Farm

The climate is mild-continental with main winds coming from NE. The proximity to the

continental Russia generates strong winds during the winter (Crivatul) and constant winds

during the summer time. 4

Page 5: Wind Farm 42 MW Deleni November 2014

5

46,2 MW Deleni Wind Farm

Google view

Page 6: Wind Farm 42 MW Deleni November 2014

46,2 MW Deleni Wind Farm

The Wind Park is located in the

southern part of Dobrogea Region,

well known for many wind farms

already constructed in this area.

Dobrogea region is considered one of

the best areas in Romania for

developing Wind Energy Projects due

to the constant winds and proximity

to the Black Sea.

A big advantage of Deleni Wind

Farm is the proximity to Constanta

Port – abt.45 km and to highway A2 -

20km, direct and easy access from

National Road DJ307 and close to

110kV line;

6

Page 7: Wind Farm 42 MW Deleni November 2014

7

46,2 MW Deleni Wind Farm Zonal Plan & Connection to the Grid

Page 8: Wind Farm 42 MW Deleni November 2014

8

46,2 MW Deleni Wind Farm

Page 9: Wind Farm 42 MW Deleni November 2014

9

46,2 MW Deleni Wind Farm

Page 10: Wind Farm 42 MW Deleni November 2014

10

46,2 MW Deleni Wind Farm

WIND Wind Resource in Constanta Area has been analyzed by using a Mesoscale

Meteorological Modeling (MASS) COUPLED WITH A Microscale Wind Resource Modeling (Wind Map)

The wind data presented in this proposal is a correlation of five measurement points of Dobrogea Region over de past years.

The average wind speed is around 7,2 m/s at 80 m hub high.

Wind Load = 2.873 h (conservative result)

Wind measurements started in May 2011.

Own Mast of 86 meter height, on park location.

The Company owns 7,34 ha of land necessary for 14 turbines positions as

well as the 46,2 MW Wind Farm Project authorizations.

The owner wants to sell the entire package (company + land + project) by

means of SPA.

Ownership land documentation is checked and complete, registered in the

Land Registry (CF).

Page 11: Wind Farm 42 MW Deleni November 2014

11

46,2 MW Deleni Wind Farm

Page 12: Wind Farm 42 MW Deleni November 2014

12

46,2 MW Deleni Wind Farm ROMANIAN NATIONAL ELECTRICAL GRID

Page 13: Wind Farm 42 MW Deleni November 2014

13

46,2 MW Deleni Wind Farm

The project has obtained ALL THE AUTHORIZATIONS requested by both phases

PUZ (zonal plan) & DTAC/AC (building permit), through the relative Urban Certificates, permits issued by competent local & national authorities, including Aeronautical Authority, Intern Affairs Ministry, Transgaz, Ministry of Defense, Transelectrica, Bridges & Roads National Authority & many others.

The project has completed ALL THE ENVIRONMENTAL PROCEDURE, obtaining

Final Approval from the National Authority for Environmental Protection.

The Environmental Monitoring is still continuing, according to the law.

Deleni Wind Park SOLUTION STUDY has been made by Tractebel (GDF Suez),

providing connection to the 110 KW Grid owned by ENEL and the Wind Park Micro

sitting has been approved by Transelectrica (National Electric Grid Owner) & Enel.

The PROJECT IS READY TO BUILD - Construction Authorization / Building Permit

no. 17/24.04.2013. – copy below.

Page 14: Wind Farm 42 MW Deleni November 2014

14

46,2 MW Deleni Wind Farm

DETAILS & RECAP:

Location: DELENI, Constanta County - Romania

Access: National Road DN3, 20 km from Highway A2

Total surface in property: 7,34 ha, covering 14 WTG, platforms and access.

Land documentation: ready and complete, registrated in the Land Register (CF)

Distance to the grid connection: abt. 7,5 km

Electrical connection type: LEA 110 kV

Project documentation complete: Urban Certification for both PUZ & AC,, Environment, technical sheets obtained for water supply, communication, telephony, electric supply, gas, human health, Ministry of Intern Affaires, Ministry of Defence, Translectrica, Transgaz, Geotechnical study, lifting surveying, Romanian Civil Aeronautical Authority.

Ready to build.

Electrical Project will be adjusted with the Wind Tower Generators chosen by the Final Investor. This aspect will include a Solution Study update and a new Grid Connection Permit.

Page 15: Wind Farm 42 MW Deleni November 2014

15

46,2 MW Deleni Wind Farm Legal Due Diligence effected & completed on July 19, 2013,

by Boscolo&Partners ,Buchares, member of Morison International Group.