Deleni Wind Farm
46,2 MW
CONSTANTA COUNTY
ROMANIA
November 2014
2
46,2 MW Deleni Wind Farm
Location
3
46,2 MW Deleni Wind Farm
Aeolian map of Romania and project location
46,2 MW Deleni Wind Farm
The climate is mild-continental with main winds coming from NE. The proximity to the
continental Russia generates strong winds during the winter (Crivatul) and constant winds
during the summer time. 4
5
46,2 MW Deleni Wind Farm
Google view
46,2 MW Deleni Wind Farm
The Wind Park is located in the
southern part of Dobrogea Region,
well known for many wind farms
already constructed in this area.
Dobrogea region is considered one of
the best areas in Romania for
developing Wind Energy Projects due
to the constant winds and proximity
to the Black Sea.
A big advantage of Deleni Wind
Farm is the proximity to Constanta
Port – abt.45 km and to highway A2 -
20km, direct and easy access from
National Road DJ307 and close to
110kV line;
6
7
46,2 MW Deleni Wind Farm Zonal Plan & Connection to the Grid
8
46,2 MW Deleni Wind Farm
9
46,2 MW Deleni Wind Farm
10
46,2 MW Deleni Wind Farm
WIND Wind Resource in Constanta Area has been analyzed by using a Mesoscale
Meteorological Modeling (MASS) COUPLED WITH A Microscale Wind Resource Modeling (Wind Map)
The wind data presented in this proposal is a correlation of five measurement points of Dobrogea Region over de past years.
The average wind speed is around 7,2 m/s at 80 m hub high.
Wind Load = 2.873 h (conservative result)
Wind measurements started in May 2011.
Own Mast of 86 meter height, on park location.
The Company owns 7,34 ha of land necessary for 14 turbines positions as
well as the 46,2 MW Wind Farm Project authorizations.
The owner wants to sell the entire package (company + land + project) by
means of SPA.
Ownership land documentation is checked and complete, registered in the
Land Registry (CF).
11
46,2 MW Deleni Wind Farm
12
46,2 MW Deleni Wind Farm ROMANIAN NATIONAL ELECTRICAL GRID
13
46,2 MW Deleni Wind Farm
The project has obtained ALL THE AUTHORIZATIONS requested by both phases
PUZ (zonal plan) & DTAC/AC (building permit), through the relative Urban Certificates, permits issued by competent local & national authorities, including Aeronautical Authority, Intern Affairs Ministry, Transgaz, Ministry of Defense, Transelectrica, Bridges & Roads National Authority & many others.
The project has completed ALL THE ENVIRONMENTAL PROCEDURE, obtaining
Final Approval from the National Authority for Environmental Protection.
The Environmental Monitoring is still continuing, according to the law.
Deleni Wind Park SOLUTION STUDY has been made by Tractebel (GDF Suez),
providing connection to the 110 KW Grid owned by ENEL and the Wind Park Micro
sitting has been approved by Transelectrica (National Electric Grid Owner) & Enel.
The PROJECT IS READY TO BUILD - Construction Authorization / Building Permit
no. 17/24.04.2013. – copy below.
14
46,2 MW Deleni Wind Farm
DETAILS & RECAP:
Location: DELENI, Constanta County - Romania
Access: National Road DN3, 20 km from Highway A2
Total surface in property: 7,34 ha, covering 14 WTG, platforms and access.
Land documentation: ready and complete, registrated in the Land Register (CF)
Distance to the grid connection: abt. 7,5 km
Electrical connection type: LEA 110 kV
Project documentation complete: Urban Certification for both PUZ & AC,, Environment, technical sheets obtained for water supply, communication, telephony, electric supply, gas, human health, Ministry of Intern Affaires, Ministry of Defence, Translectrica, Transgaz, Geotechnical study, lifting surveying, Romanian Civil Aeronautical Authority.
Ready to build.
Electrical Project will be adjusted with the Wind Tower Generators chosen by the Final Investor. This aspect will include a Solution Study update and a new Grid Connection Permit.
15
46,2 MW Deleni Wind Farm Legal Due Diligence effected & completed on July 19, 2013,
by Boscolo&Partners ,Buchares, member of Morison International Group.