16
NASHVILLE AREA MPO FY 2014-2017 TIP - ADOPTED DECEMBER 11, 2013 WILSON

WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA MPO FY 2014-2017 TIP - ADOPTED DECEMBER 11, 2013

WILSON

Page 2: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Link Beckwith interchange on I-40 to US70 via a new/widened 3 lane roadway

From I-40 to US-70/SR-24Location

Route Beckwith Road/Eastern Connector

$25,450,000.00Air Quality Status 115745.00TDOT PINNon-Exempt Project Cost

Wilson County 5.00 1072-132Regional Plan IDLengthCounty

TIP # 2008-71-038

Mt. JulietLead AgencyNew RoadImprovement Type

Beckwith Road/Eastern ConnectorProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$750,000.00$0.00$3,000,000.00$3,750,000.00U-STPCONSTRUCTION2014

$3,000,000.00$0.00$12,000,000.00$15,000,000.00U-STPCONSTRUCTION2015

REVISION HISTORY

PROJECT NOTES

1/4/13 - This project has been designed and is now at theobtaining of Right-of-Ways. The next phase will be to updateany plans that have been previously approved after ROWnegotiations are completed. We would anticipate thishappening by September 2013. After all drawings arecompleted and approved by TDOT, and the Federal HighwayAdministration, we would then go to bid on this project. Weanticipate that by Spring of 2014, that the bid would beawarded and construction began by Summer of that sameyear. Our goal would be that construction would be completedno later than 12 to 18 months after the contractor is giving thenotice to proceed.

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

177/191Page

Page 3: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Construct a multi-use path that will provide for pedestrian/bike travel between Greenhill Road and theMusic City Star terminal. Phase 2 will extend from 4th Avenue to Brookstone Blvd.

From 4th Avenue to Brookstone BlvdLocation

Route Town Center Trail

$1,473,615.00Air Quality Status 112919.01TDOT PINExempt Project Cost

Wilson County 0.70 1076-303Regional Plan IDLengthCounty

TIP # 2008-76-024

Mt. JulietLead AgencyGreenwayImprovement Type

Town Center Trail - Phase 2Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$14,188.00$0.00$56,751.00$70,939.00CMAQCONSTRUCTION2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

178/191Page

Page 4: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Reconstruct and widen from 2-lane to 4-lane

From north of SR-24 (US-70) to south of Dry Fork CreekLocation

Route SR-109

$39,700,000.00Air Quality Status 100281.02TDOT PINNon-Exempt Project Cost

Wilson County 3.60 1072-348Regional Plan IDLengthCounty

TIP # 2009-72-035

TDOTLead AgencyRoad WideningImprovement Type

SR-109 Reconstruction & WideningProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$0.00$720,000.00$2,880,000.00$3,600,000.00NHPPROW2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

179/191Page

Page 5: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Reconstruct and widen from 2-lane to 4-lane

From south of Dry Fork Creek to south of the Cumberland RiverLocation

Route SR-109

$36,500,000.00Air Quality Status 100281.03TDOT PINNon-Exempt Project Cost

Wilson County 3.50 1072-348Regional Plan IDLengthCounty

TIP # 2009-72-036

TDOTLead AgencyRoad WideningImprovement Type

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$0.00$680,000.00$2,720,000.00$3,400,000.00NHPPROW2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

180/191Page

Page 6: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Resurfacing, restoration and rehabilitation improvements of various roads in the City of Lebanon.

Various Locations within the City of LebanonLocation

Route City of Lebanon 3R Improvement Program (Grouping)

$388,853.00Air Quality Status TDOT PINExempt Project Cost

Wilson County 0.00 1072-284Regional Plan IDLengthCounty

TIP # 2010-79-005

LebanonLead AgencyResurfacingImprovement Type

City of Lebanon 3R Improvement Program(Grouping)

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$77,771.00$0.00$311,082.00$388,853.00L-STPPE, ROW,CONSTRUCTION

2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

181/191Page

Page 7: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Widen I-40 from 4 lanes to 8 lanes with High Occupancy Vehicle (HOV) lanes.

From SR-109 to SR-840Location

Route I-40

$40,000,000.00Air Quality Status 115791.00TDOT PINNon-Exempt Project Cost

Wilson County 3.00 1072-214Regional Plan IDLengthCounty

TIP # 2011-72-164

TDOTLead AgencyRoad WideningImprovement Type

I-40 Widening & HOVProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$0.00$50,000.00$200,000.00$250,000.00NHPPPE-D2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

182/191Page

Page 8: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Multi-use paved trail extension from trailhead location at Hickory Ridge Road along Bartons Creek to thesouth connecting with existing and proposed schools and continues under Leeville Pike and acrossBartons Creek to McClain School.

From East of Hartmann Drive along Bartons Creek to McClain SchoolLocation

Route Cedar City Trail - Phase 5 (Bartons Creek South)

$1,576,437.00Air Quality Status 110508.01TDOT PINExempt Project Cost

Wilson County 2.00 1076-305Regional Plan IDLengthCounty

TIP # 2011-76-035

LebanonLead AgencyGreenwayImprovement Type

Cedar City Trail - Phase 5 (Bartons CreekSouth)

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$2,200.00$0.00$8,800.00$11,000.00CMAQPE-N2014

$19,800.00$0.00$79,200.00$99,000.00CMAQPE-D2014

$5,000.00$0.00$20,000.00$25,000.00CMAQROW2014

$4,900.00$0.00$19,600.00$24,500.00CMAQCONSTRUCTION2014

$255,787.00$0.00$1,023,150.00$1,278,937.00ENHCONSTRUCTION2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

183/191Page

Page 9: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Implementation of a fully functioning, reliable adaptive signal control system through the installation of amaster signal controller, wireless communication devices, and radar detection for both vehicular andbicycle (self-propelled) traffic.

Various intersections along SR-171/ Mt. Juliet RdLocation

Route

$653,000.00Air Quality Status 119203.00TDOT PINExempt Project Cost

Wilson County 1.10 1087-701Regional Plan IDLengthCounty

TIP # 2013-77-218

Mt. JulietLead AgencyITSImprovement Type

SR-171 (Mt. Juliet Road) Traffic AdaptiveSignal Control System CorridorOptimization Project

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$68,000.00$0.00$0.00$68,000.00LOCALPE-D2014

$117,000.00$0.00$468,000.00$585,000.00U-RSVCONSTRUCTION2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

184/191Page

Page 10: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Replacement of existing trees with healthy trees, installation of a raised planter/seat wall and related plantmaterial at the public square, intersection of Hwy. 70 and US 231.

Intersection of Hwy 70 and US-231Location

Route Intersection of Hwy 70 and US-231

$37,881.00Air Quality Status 105525.37TDOT PINExempt Project Cost

Wilson County 0.00 ConsistentRegional Plan IDLengthCounty

TIP # 2014-712-036

LebanonLead AgencyStreetscapingImprovement Type

Lebanon Public Square GatewayProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$7,576.00$0.00$30,305.00$37,881.00STATE(Roadscape)

CONSTRUCTION, PE-N

2014

REVISION HISTORY

PROJECT NOTES

Funding through TDOT Roadscape Program

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

185/191Page

Page 11: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Construction of a permanent multimodal commuter rail station along the existing Music City Star Rail Line.

Music City Star Line @ Hamilton SpringsLocation

Route Hamilton Springs Station Construction

$2,000,000.00Air Quality Status TDOT PINExempt Project Cost

Wilson County 0.00 ConsistentRegional Plan IDLengthCounty

TIP # 2014-75-021

RTALead AgencyTransit CapitalImprovement Type

Hamilton Springs Station ConstructionProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$32,000.00$0.00$128,000.00$160,000.00U-STPPE-D, PE-N2014

$368,000.00$0.00$1,472,000.00$1,840,000.00U-RSVCONSTRUCTION2015

REVISION HISTORY

PROJECT NOTES

1/24/13 - The City of Lebanon currently has over twenty activegrants. Some of our active grants are COPS grant, AirportTerminal Construction grant, Permobile-FIDP, Permobile-SIA,JAG grants, Waste Water Treatment Plant, and TDOTRoadscapes. All of the grants must receive Council approvalhttp://hamiltonspringsstation.com/wp-content/uploads/2011/10/Lebanon-Resolution.pdf. At the timethe grant is awarded, a group of accounts is set up to capturethe revenues and expenditures. Once the money is spent, thegrant accountant tracks the grant and reports to the variousagencies on a quarterly basis. This is a coordinated effortbetween the various departments. At year end, all the grantsare audited by external auditors for compliance. A copy of theaudit is available upon request.

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

186/191Page

Page 12: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Construct a multi-use path that will provide for pedestrian / bike travel between Greenhill Road and theMusic City Star Train Station. Phase 3 will extend from Brookstone Blvd to Greenhill Road.

From Brookstone Blvd to Greenhill Rd.Location

Route Town Center Trail - Phase

$2,693,750.00Air Quality Status TDOT PINExempt Project Cost

Wilson County 1.00 1076-303Regional Plan IDLengthCounty

TIP # 2014-76-017

Mt. JulietLead AgencyGreenwayImprovement Type

Town Center Trail - Phase 3Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$75,000.00$0.00$0.00$75,000.00LOCALPE2014

$164,976.00$0.00$659,904.00$824,880.00U-RSVCONSTRUCTION2014

REVISION HISTORY

PROJECT NOTES

1/4/13 - This project has been designed and the first phase iscomplete. The next phase will be to update any plans thathave been previously approved after ROW negotiations arecompleted. We would anticipate this happening by April 2013.After all drawings are completed and approved by TDOT, andthe Federal Highway Administration, we would then go to bidon this project. We anticipate that by Summer of 2013. Afterthat the bid would be awarded and construction began by Fallof that same year. Our goal would be that construction wouldbe completed no later than 12 to 18 months after thecontractor is giving the notice to proceed.

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

187/191Page

Page 13: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Construction of sidewalk, utility relocation, and ROW acquisition near Walter J. Baird Middle School.

Walter J. Baird Middle School - Greenwood Ext. and W Forrest Ave.Location

Route Greenwood Ext. and W Forrest Ave.

$215,330.00Air Quality Status 114385.00TDOT PINExempt Project Cost

Wilson County 0.40 ConsistentRegional Plan IDLengthCounty

TIP # 2014-76-033

LebanonLead AgencySidewalksImprovement Type

Walter J. Baird Middle School - Phase IIProject Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$0.00$0.00$215,330.00$215,330.00SRTSPE, ROW,CONSTRUCTION

2014

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

188/191Page

Page 14: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

1/2/13 -1 month from award of grant- Send out any necessaryRFP's/RFQ's for lighting interchange lighting and way-finding/signage design.3 months from award of grant- Obtain servicesof qualified professionals and begin design and permittingwork.4 months from award of grant- seek additional input fromthe Joint Economic Development Board of Wilson County,other governmental agencies such as the County RoadCommission and Lebanon Public Works, localcommunitymembers, and business interests along the S.R.840 corridor.5 months from award of grant- Insure necessarydesign approvals are received from the State of Tennesseeand other interested agencies. Send out request for bids.6months from award of grant- Select appropriate bid and awardproject6.5 months from award of grant- Hold pre-construction/pre-installation conference with necessaryparties.7 months from award of grant- Begin construction/installation in earnest\10 months from award of grant-complete major work and seek approval and necessarypermitting or authorization for operation. Make necessaryadjustments or corrections to project.12 month from award ofgrant- project completion declared.To our knowledge, WilsonCounty has not undertaken a lighting and way-finding projectof this magnitude. However, we have undertaken otherinfrastructureprojects such as sewer construction in theGladeville community, major school construction projects, andbridge/ road construction projects throughout Wilson Countywith success and on-time. Additionally, this is proposed tooccur along a State Route. We in Wilson County would not beopposed to having oversight by the State of Tennessee onsuch a project. That being said, we are willing to undertakedirect oversight of the project if necessary.

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Design and installation of interchange lighting; and way findingsignage at the approaches to thisinterchange directing Freight Traffic with specific industrial destinations along SR-840 to the CouchvillePike Exit (one Exit South) and Central Pike/HWV 109 Exit (one Exit North) where the primary freightaccess for these industrial establishments is located.

SR-840 at Stewarts Ferry PikeLocation

Route Stewarts Ferry Pike/State Route 840 Interchange lighting and signage project

$350,000.00Air Quality Status TDOT PINExempt Project Cost

Wilson County 0.00 ConsistentRegional Plan IDLengthCounty

TIP # 2014-77-016

Wilson CountyLead AgencySignage/WayfindingImprovement Type

Stewarts Ferry Pike/State Route 840Interchange lighting and signage project

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$25,000.00$0.00$100,000.00$125,000.00U-STPPE-D2014

$62,500.00$0.00$250,000.00$312,500.00U-RSVCONSTRUCTION2015

REVISION HISTORY

PROJECT NOTES

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

189/191Page

Page 15: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

1/2/13 -1 month from award of grant- Send out any necessaryRFP's/RFQ's for lighting interchange lighting and way-finding/signage design.3 months from award of grant- Obtain servicesof qualified professionals and begin design and permittingwork.4 months from award of grant- seek additional input fromthe Joint Economic Development Board of Wilson County,other governmental agencies such as the County RoadCommission and Lebanon Public Works, localcommunitymembers, and business interests along the S.R.840 corridor.5 months from award of grant- Insure necessarydesign approvals are received from the State of Tennesseeand other interested agencies. Send out request for bids.6months from award of grant- Select appropriate bid and awardproject6.5 months from award of grant- Hold pre-construction/pre-installation conference with necessaryparties.7 months from award of grant- Begin construction/installation in earnest\10 months from award of grant-complete major work and seek approval and necessarypermitting or authorization for operation. Make necessaryadjustments or corrections to project.12 month from award ofgrant- project completion declared.To our knowledge, WilsonCounty has not undertaken a lighting and way-finding projectof this magnitude. However, we have undertaken otherinfrastructureprojects such as sewer construction in theGladeville community, major school construction projects, andbridge/ road construction projects throughout Wilson Countywith success and on-time. Additionally, this is proposed tooccur along a State Route. We in Wilson County would not beopposed to having oversight by the State of Tennessee onsuch a project. That being said, we are willing to undertakedirect oversight of the project if necessary.

Printed on

Nashville Area Metropolitan Planning Organization

Wednesday, December 11, 2013

Transportation Improvement Program for FYs 2014-2017

190/191Page

Page 16: WILSON - Nashville, Tennesseenashvillempotest.nashville.gov/docs/TIP/2014_2017/... · Transportation Improvement Program for FYs 2014-2017 Project Description Reconstruct and widen

NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for FYs 2014-2017

Project Description Install Interchange Lighting.

I-40 at Mt. Juliet RoadLocation

Route Interchange Lighting on I-40 at Mt. Juliet Road

$1,000,000.00Air Quality Status TDOT PINExempt Project Cost

Wilson County 0.00 ConsistentRegional Plan IDLengthCounty

TIP # 2014-79-018

Mt. JulietLead AgencySafetyImprovement Type

Interchange Lighting on I-40 at Mt. JulietRoad

Project Name

Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year

$100,000.00$0.00$0.00$100,000.00LOCALPE-D2014

$760,000.00$0.00$140,000.00$900,000.00U-RSVCONSTRUCTION2014

REVISION HISTORY