3
S l4lScenic Dr. (501)538-4449 Hot Springs, AR seaward 18gmai1.com 71913 CaiiWaitl API 1169 #69889 Experience July 2017 - January 2018 - Southern Co. / AGL - Chief Inspector for the installation of 10 miles of 8" pipeline in SE GA. May 2017 - June 2017 - Williams/Transco/ Atlantic Sunrise Flow Reversal Project at Station 170 in VA. Utility/Environmental Inspector. >January 2016 - October 2016 - EQT Mid -Stream - Chief Inspector during the site build, mechanical build and start-up of the Plasma Compressor Station in Clarington, OH. This station was outfitted with two Solar Taurus T70 turbines. >June 2015 - Dec. 2015 - Chief Inspector - Planning and constructability reviews for of the EQT Plasma Compressor Station to be built in Clarington, OH. >April - May 2015 -Chief Inspector for the installation of a new Aux Cooler at EQT's Hartson Station. This was a very small project so we had but 1 welding inspector and 1 electrical inspector that reported to me with all issues needing resolution. >July 2014 to present - Chief Inspector. Managed all inspection activities with all of the project inspectors reporting directly to me for final resolution to all drawing, code or specification issues at the inspector's level. We oversaw the building of EQT's Blacksville Station Expansion in WV. This included two CAT 6000 series engines and Ariel Compressors with all infrastructure to include electrical and instrumentation. 10.20 13 - March 2014- Project Manager - Venable's Construction, LLC. Managed all facets of the installation of 89.3 miles of a 12" products line for Plains AAPL. 10.20 12 - 09.20 13- Construction Manager - Alliance Pipeline - Tioga Compressor Station and Sherwood Regulator Station. Both sites were in northwest North Dakota through the winter. Managed all activities at both sites to include but not limited to all inspection tasks, schedules, financials, quality and all sub- contractors. 2011 2012- Construction/Technical Manager - The Shaw Group - Manage all facets of technical portions of Entergy's EPU

Williams/Transco/0104.nccdn.net/1_5/301/140/1e1/WARD---2019.pdf · SeniorConstructionconsultantforSantaBarbara,CAsegmentof theAll-AmericanPipeline.(160miles-36") ShellPhenol3Project-DeerPark,TX

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Williams/Transco/0104.nccdn.net/1_5/301/140/1e1/WARD---2019.pdf · SeniorConstructionconsultantforSantaBarbara,CAsegmentof theAll-AmericanPipeline.(160miles-36") ShellPhenol3Project-DeerPark,TX

S

l4lScenic Dr. (501)538-4449Hot Springs, AR seaward 18gmai1.com71913

CaiiWaitl API 1169 #69889

Experience July 2017 - January 2018 - Southern Co. / AGL - ChiefInspector for the installation of 10 miles of 8" pipeline in SE GA.

May 2017 - June 2017 - Williams/Transco/ Atlantic SunriseFlow Reversal Project at Station 170 in VA. Utility/EnvironmentalInspector.

>January 2016 - October 2016 - EQT Mid-Stream - ChiefInspector during the site build, mechanical build and start-up ofthe Plasma Compressor Station in Clarington, OH. This stationwas outfitted with two Solar Taurus T70 turbines.>June 2015 - Dec. 2015 - Chief Inspector - Planning andconstructability reviews for of the EQT Plasma CompressorStation to be built in Clarington, OH.>April - May 2015 -Chief Inspector for the installation of a newAux Cooler at EQT's Hartson Station. This was a very smallproject so we had but 1 welding inspector and 1 electricalinspector that reported to me with all issues needing resolution.>July 2014 to present - Chief Inspector. Managed all inspectionactivities with all of the project inspectors reporting directly to mefor final resolution to all drawing, code or specification issues atthe inspector's level. We oversaw the building of EQT's BlacksvilleStation Expansion in WV. This included two CAT 6000 seriesengines and Ariel Compressors with all infrastructure to includeelectrical and instrumentation.

10.20 13 - March 2014- Project Manager - Venable'sConstruction, LLC. Managed all facets of the installation of 89.3miles of a 12" products line for Plains AAPL.

10.20 12 - 09.20 13- Construction Manager - Alliance Pipeline-

Tioga Compressor Station and Sherwood Regulator Station. Bothsites were in northwest North Dakota through the winter.Managed all activities at both sites to include but not limited toall inspection tasks, schedules, financials, quality and all sub-contractors.

2011 - 2012- Construction/Technical Manager - The ShawGroup - Manage all facets of technical portions of Entergy's EPU

Page 2: Williams/Transco/0104.nccdn.net/1_5/301/140/1e1/WARD---2019.pdf · SeniorConstructionconsultantforSantaBarbara,CAsegmentof theAll-AmericanPipeline.(160miles-36") ShellPhenol3Project-DeerPark,TX

RF18 at Grand Gulf Nuclear Station including but not limited toreview and approval of all heavy lifts and hauls, FARO applicationand all Phased Array UT applications and all welding includingsemi-auto and robotic.2009 - 2010 - Sr. Construction Manager - The Shaw Group -

Manage the work for the construction of twelve super pipingmodules for two new units at the VC Summer Nuclear site.AP1000 Technology. Jenkinsville, SC.

2008- 2009 - Sr. Construction Manager - The Shaw Group -

Manage all facets of a project to assemble 106 Pipe Modules andship to three different FGD sites in Maryland USA. This as onother projects included the management of the constructioninspection activities of up to 20 inspectors for all craft activities.

2005 - 2007 - - Construction Manager- CNRL - Horizon ProjectMain Pipe Rack Module - Managed the fabrication andinstallation of 235 very large modules and all pipelineinstallation, 6 inch through 36 inch in the Oil Sands in NorthernAlberta, Canada. This project had a total installed cost of $10BCA.

2001 to mid 2005 TIC-Steamboat Springs, CO - Project QAManager. Managed the day to day activity, issues resolution to allinspection performed by, at peak, 20 inspectors.

¯ Fabrication of 235 large process modules in TICs yard inEdmonton Alberta to go to Ft. McMurray, AB, Canada

¯ Hot Springs Power Project - Combined cycle power plant.(520 MW)

¯ Calpine Power Project Freeport, Texas - 4 Aux Boilers withassociated piperacks and interconnecting piping.

1999-2001 - Zachry Construction Corp. - San Antonio, TXSite Quailty Manager

Rohm & Haas - Maintenance and Small Capital projects

¯ NROC Project - FINA Steam Cracking unit. 7 millionmn/hrs. Sixty-eight person QC staff. Managed the 68inspector's daily tasks and resolved each and every issue asit arose.

197 1-1999 - Construction Manager -The SEAWARD Group - NewOrleans, LA and Bueliton, CA

Page 3: Williams/Transco/0104.nccdn.net/1_5/301/140/1e1/WARD---2019.pdf · SeniorConstructionconsultantforSantaBarbara,CAsegmentof theAll-AmericanPipeline.(160miles-36") ShellPhenol3Project-DeerPark,TX

Senior Construction consultant for Santa Barbara, CA segment ofthe All-American Pipeline. (160 miles -36")

Shell Phenol 3 Project-Deer Park, TX 1.5 million man-hours

CM - Chief Inspector on numerous OGC projects over theyears. Land based and offshore, domestic andinternationally including numerous pipelines, compressorstations, fuel depots and refineries. On several Exxonprojects I had as many as 103 inspectors reporting directlyto me.

Plant 42 (Palmdale, CA) Aviation Fuel Pipeline installation.

Education

Pacific Western Univ. - Engineering TechnologyRockhurst Univ., Effective Project Management

S&B Engineering - Project Management

Krautkramer Ultrasonics-

Shear wave weld inspection

Radiography Level II Technical Training

Certifications

Current / Past /Expired: API 1169, OSHA 10, AWS CWI (held for31 yrs.), Canadian CWB II, Sub-sea and topside, ASNT Level IIRadiographer, Level II Ultrasonic Tech. (Shear wave)