A2-1 BIDDING REQUIREMENTS ADDENDUM NO. 3 January 6, 2017 METRO WEST FIRE PROTECTION DISTRICT 17065 MANCHESTER ROAD WILDWOOD, MO 63040 FGM ARCHITECTS INC. 10 SOUTH BROADWAY, SUITE 1150 ST. LOUIS, MISSOURI 63102 PHONE: 314.439.1601 TO: PROSPECTIVE BIDDERS SUBJECT: Metro West House #2 Renovation and Addition 1000 New Ballwin Road Ballwin, Missouri 63021 FGM Project No.: 16-2227.01 This addendum forms a part of the contract documents and modifies the original bidding documents dated December 1, 2016. Acknowledge receipt of this addendum in space provided on Bid Form. Failure to do so may subject bidders to disqualification. GENERAL 1. The Owner has already selected the Vendor and Products to be installed under this renovation project. The chosen Access Control manufacturer is Lenel and the product is OnGuard ADV, no substitutions allowed. The Video Surveillance system is Avigilon, no substitutions allowed. The Metro West Fire Protection District has also chosen Tech Electronics Inc. as its Integration Partner. Please contact Todd Jirsa ([email protected] or 314-951-1745) for pricing and coordination. MANUAL 1. SECTION TABLE OF CONTENTS ADD Section 08 52 00 – Aluminum Clad Wood Windows (attached) ADD Section 10 28 00 – Toilet, Bath, and Laundry Accessories (attached) 2. SECTION 081416 – Wood Doors REVISE paragraph 2.1, subparagraph B to Book Match. 3. SECTION 22 13 19 – Sanitary Waste Piping Specialties - Revised 2.4 Oil Interceptors to read the following: A. Sand/Oil Interceptor (OI-1): 1. Manufacturers: Subject to compliance with requirements, provide products by one of the following of equal: a) Mifab – Model MI-SO 2. Type: Fabricated interceptor for separating and removing light oil and sand from wastewater. 3. Body Material: Steel.

WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

  • Upload
    vucong

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

A2-1

BIDDING REQUIREMENTSADDENDUM NO. 3

January 6, 2017

METRO WEST FIRE PROTECTION DISTRICT17065 MANCHESTER ROADWILDWOOD, MO 63040

FGM ARCHITECTS INC.10 SOUTH BROADWAY, SUITE 1150ST. LOUIS, MISSOURI 63102PHONE: 314.439.1601

TO: PROSPECTIVE BIDDERS

SUBJECT: Metro West House #2Renovation and Addition1000 New Ballwin RoadBallwin, Missouri 63021FGM Project No.: 16-2227.01

This addendum forms a part of the contract documents and modifies the original biddingdocuments dated December 1, 2016. Acknowledge receipt of this addendum in spaceprovided on Bid Form. Failure to do so may subject bidders to disqualification.

GENERAL1. The Owner has already selected the Vendor and Products to be installed under this

renovation project. The chosen Access Control manufacturer is Lenel and the product isOnGuard ADV, no substitutions allowed. The Video Surveillance system is Avigilon, nosubstitutions allowed. The Metro West Fire Protection District has also chosen Tech ElectronicsInc. as its Integration Partner. Please contact Todd Jirsa ([email protected] or314-951-1745) for pricing and coordination.

MANUAL

1. SECTION TABLE OF CONTENTSADD Section 08 52 00 – Aluminum Clad Wood Windows (attached)ADD Section 10 28 00 – Toilet, Bath, and Laundry Accessories (attached)

2. SECTION 081416 – Wood DoorsREVISE paragraph 2.1, subparagraph B to Book Match.

3. SECTION 22 13 19 – Sanitary Waste Piping Specialties- Revised 2.4 Oil Interceptors to read the following: A. Sand/Oil Interceptor (OI-1):

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following of equal:

a) Mifab – Model MI-SO2. Type: Fabricated interceptor for separating and removing light oil and sand

from wastewater.3. Body Material: Steel.

Page 2: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

A2-2

4. Interior Lining: Not required.5. Inlet and Outlet Size: 4 inches.6. Size: 100 Gal7. End Connections: Hub.8. Covers: Cast-iron, heavy-duty loading. Refer to detail on plans.

DRAWINGS

1. SHEET G1.0.2:- Code Clarification: Existing CMU wall between Apparatus Bay 100 and Living Area is 1 HR fire rated.Install Fire Caulk and seal all new and existing penetrations.

2. SHEET AD1.0.0:- REVISE keynote “D1” to READ: “DEMO/REMOVE EXISTING FLOOR FINISH AND WALL BASE IN ITSENTIRETY. FIELD VERIFY EXISTING CONDITIONS”

3. SHEET A2.3.0:- REVISE Door 106-B door frame type to S1.- REVISE Door 113-A & 113-B door type to N.- REVISE Door Schedule Remark #1 to INCLUDE: “MODEL: ELIASON PG-500. COLOR: TBD AND HOLLOWMETAL DOOR FRAME”

4. SHEET 3.1.0:- Elevation G16 ADD note to aluminum signage to READ: FABRICATE & INSTALL INDIVIDUALLY FORMEDINTERNALLY ILLUMINATED HALO-LIT 2” DEEP CHANNEL NUMBER AND EMBLEM.

CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE CUSTOM COLOR (TBD) CLEARLEXAN BACK PLATE.

ILLUMINATION: WHITE LED MODULES MOUNTED INSIDE NUMBER/EMBLEM ON CLEAR BACK PLATE ASREQ’D. FOR EVERN ILLUMINATION CAST ONTO WALL.

POWER: 120v CIRCUIT TO SIGN BY ELECTRICAL CONTRACTOR. SEE ELECTRICAL DRAWINGS.

INSTALLATION: NUMBER AND EMBLEM TO STAND OFF WALL 1” NON-CORROSIVE MECHANICAL FASTNERSINTO STUD WALL.

5. SHEET 3.3.2:- Tectum in Hose Tower to be 1 ½”.

6. SHEET 5.1.0:- Toilet Rooms 108 & 109: Ceramic Tile Walls to 4’ A.F.F. Install aluminum Schluter trim on top of tile.

7. SHEET A1.1.0 AND SHEET A5.1.0:- REVISE keynote “A6” to READ: “24”X24” WALL MOUNTED GEAR GRID LOCKERS” (attached)

8. SHEET A2.2.0:- REVISE P-type “P-1” to READ “P-2” (attached)- REVISE P-type “P-2” to READ “P-3” (attached)- ADD P-type “P-5” (attached)

9. Sheet P0.1:- REVISE Trim for SH-1 and SH-2 (attached)- ADD SH-3 to the schedule (attached)- REVISE OI-1 to be combination sand and oil interceptor (attached)

Page 3: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

A2-3

10. Sheet P1.1:- REVISE shower fixtures for second floor to be SH-3 (attached)- REVISE Keyed note number 2 to READ: “ 3” vent up through roof” (attached)

11. Sheet E1.0:- REVISE Keyed Note #1 to READ: “INTERCEPT EXISTING 2 ½” FIBER CONDUIT, ON WEST SIDE OF DRIVE

FROM CHARTER PULL BOX. PROVIDE NEW 2 ½” CONDUIT FROM INTERCEPT POINT TO EXISTING ITROOM. COORDINATE WITH CHARTER FOR REMOVAL AND NEW FIBER SERVICE.” (attached)

- REMOVE Keyed Note #1 at pull box shown south of pavilion and ADD Keyed Note #7 at thislocation. (attached)

- REVISE Keyed Note #3 to read, “PROVIDE NEW TYPE “SA” LIGHT FIXTURE AT THIS LOCATION. FIXTURETO RE-USE EXISTING CIRCUIT AT THIS LOCATION.” (attached)

- ADD Keyed Note #7 (attached)- ADD Keyed Note #8 (attached)- ADD Keyed Note #9 (attached)- ADD Keyed Note #6 to Detail #6 (attached)- ADD fan and lighting controls at pavilion (attached)

12. Sheet E2.0:- ADD Keyed Note #10 (attached)- ADD Junction box in Hose Tower 102 for signage power (attached)

13. Sheet E3.0:- REVISE Keyed Note #4 (attached)- ADD Main Door Controller Location (attached)- ADD (3) dedicated receptacles in Exercise 112 for equipment (attached)

14. Sheet E5.0:- ADD Secure Door Detail (attached)- REVISE Keyed Note #7 (attached)- REMOVE electric latches and Request to Exit devices from secure doors (attached)

15. Sheet E8.1:- REMOVE reference to Alternate #4 from Fixture Type “SA” description

16. Sheet E8.2:- MODIFY label for circuit #2 in Panel L1 schedule to include FCU-11.- MODIFY label for circuit #31 in Panel L1 schedule to include FCU-12.- MODIFY label for circuit #19 in Panel L2 schedule to read “RH-1, RH-2”- MODIFY label for circuit #8 in Panel L2 schedule to read “RH-3, RH-4”- ADD Junction box with power for Hose Tower Exterior Signage.

Respectfully,

Jerrod Joggerst, AIAProject Architect

Page 4: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

A2-4

This addendum consists of (4 pages)

Attachments: Current Plan Holders List from Custom Blueprint & Supply (1 page)Section 08 52 00 – Aluminum Clad Wood Windows (7 pages)Section 10 28 00 – Toilet, Bath, and Laundry Accessories (5 pages)Section 22 13 19 – Sanitary Waste Piping Specialties (11 pages)Contractor RFI Questions (8 pages)

Drawings:Sheets (12 pages)SHEET RA0.0.1-1 (11x17)SHEET RA2.2.0-1 (11X17)SHEET RA5.1.0-1 (8 1/2x11)SHEET RA5.1.1-1 (8 1/2x11)

SHEET RP0.1.2 (11x17)SHEET RP1.1.2 (8 1/2x11)

SHEET RE1.0.1 (11x17)SHEET RE1.0.2 (8 1/2x11)SHEET RE2.0.1 (8 1/2x11)SHEET RE3.0.2 (11x17)SHEET RE5.0.1 (8 1/2x11)SHEET RE5.0.2 (11x17)

Page 5: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

Met

ro W

est

Fire

Pro

tect

ion

Dis

tric

t H

ou

se #

2FG

M

Re

gist

ere

d P

lan

ho

lde

rs L

ist

Bid

der

's C

om

pan

yR

epre

sen

tati

veem

ail a

dd

ress

off

ice

ph

on

em

ob

ile p

ho

ne

Gen

eral

Co

ntr

acto

rs

Layn

eco

Co

nst

ruct

ion

Ser

vice

s /

LCS

Stev

e La

yne

Mat

t K

eati

ng

Slay

ne@

LCSC

on

stru

ct.c

om

;

Mat

tKe

atin

g@LC

SCo

nst

ruct

.co

m

63

6-2

94

-62

45

63

6-7

34

-69

68

Wri

ght

Co

nst

ruct

ion

Ther

esa

Hilb

old

t

Bri

an G

ucc

ion

e

Thilb

old

t@W

righ

tCo

nst

ruct

.co

m;

Bgu

ccio

ne@

Wri

ghtC

on

stru

ct.c

om

63

6-2

20

-68

50

Lam

b C

on

stru

ctio

nD

ann

y La

mb

Dla

mb

@La

mb

Co

nst

ruct

ion

co.c

om

63

6-2

40

-79

07

J.E.

Fo

ste

rD

on

na

JFo

ste

r@JE

Fost

er.

com

31

4-8

42

-33

00

JW F

ulle

r C

on

stru

ctio

nJo

shJw

hit

e@JW

Fulle

r.co

m3

14

-64

4-0

10

0

Law

lor

Co

nst

ruct

ion

Jere

my

Wo

od

jbw

@la

wlo

rco

rp.c

om

63

6-5

84

-32

06

Un

ited

Co

nst

ruct

ion

Din

o P

.D

ino

P@

Un

ited

Co

nst

.co

m3

14

-43

4-9

69

0

Joh

n K

alic

ak C

on

stru

ctio

nB

ren

da

kalic

ak@

sbcg

lob

al.n

et3

14

-65

2-2

35

5

Sub

con

trac

tors

an

d S

up

plie

rs

Co

cos

Plu

mb

ing

Bill

Co

cos

WYC

oco

s@C

oco

sPlu

mb

ing.

com

31

4-6

31

-26

88

Nee

d p

rin

ted

do

cum

ents

? P

leas

e

con

tact

Cu

sto

m B

lue

pri

nt

at

31

4.2

31

.44

00

Page 6: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-1

SECTION 08 52 00 – ALUMINUM CLAD WOOD WINDOWS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and SupplementaryConditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes aluminum-clad wood windows.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1. Review and finalize construction schedule and verify availability of materials,Installer's personnel, equipment, and facilities needed to make progress and avoiddelays.

2. Review, discuss, and coordinate the interrelationship of wood windows withother exterior wall components. Include provisions for anchoring, flashing,weeping, sealing perimeters, and protecting finishes.

3. Review and discuss the sequence of work required to construct a watertight andweathertight exterior building envelope.

4. Inspect and discuss the condition of substrate and other preparatory workperformed by other trades.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, glazing and fabricationmethods, dimensions of individual components and profiles, hardware, andfinishes for wood windows.

B. Shop Drawings: For wood windows.

1. Include plans, elevations, sections, hardware, accessories, insect screens,operational clearances, and details of installation, including anchor, flashing, andsealant installation.

C. Samples: For each exposed product and for each color specified, 2 by 4 inches in size.

D. Samples for Initial Selection: For units with factory-applied finishes.

Page 7: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-2

1. Include Samples of hardware and accessories involving color selection.

E. Samples for Verification: For wood windows and components required, prepared onSamples of size indicated below:

1. Exposed Finishes: 2 by 4 inches.2. Exposed Hardware: Full-size units.

F. Product Schedule: For wood windows. Use same designations indicated on Drawings.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Product Test Reports: For each type of wood window, for tests performed by aqualified testing agency.

C. Field quality-control reports.

D. Sample Warranties: For manufacturer's warranties.

1.6 QUALITY ASSURANCE

A. window manufacturer for installation of units required for this Project.

B. Mockups: Build mockups to verify selections made under Sample submittals, todemonstrate aesthetic effects, and to set quality standards for materials and execution.

1. Build mockup of typical wall area as shown on Drawings.2. Approval of mockups does not constitute approval of deviations from the

Contract Documents contained in mockups unless Architect specifically approvessuch deviations in writing.

3. Subject to compliance with requirements, approved mockups may become part ofthe completed Work if undisturbed at time of Substantial Completion.

1.7 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to repair or replace wood windows thatfail in materials or workmanship within specified warranty period.

1. Failures include, but are not limited to, the following:

a. Failure to meet performance requirements.b. Structural failures including excessive deflection, water leakage, and air

infiltration.c. Faulty operation of movable sash and hardware.d. Deterioration of materials and finishes beyond normal weathering.e. Failure of insulating glass.

Page 8: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-3

2. Warranty Period:

a. Window: 10 years from date of Substantial Completion.b. Glazing Units: 20 years from date of Substantial Completion.c. Aluminum-Cladding Finish: 20 years from date of Substantial

Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations: Obtain wood windows from single source from singlemanufacturer.

2.2 WOOD WINDOWS

A. Aluminum-Clad Wood Windows:

1. Basis-of-Design Product: Subject to compliance with requirements, provideMarvin Windows and Doors “Casemaster” or comparable product by one of thefollowing:

a. Kolbe & Kolbe Millwork Company, Inc.b. Pella Corporation.

B. Operating Types: Provide the following operating types in locations indicated onDrawings:

1. Casement: Project out.2. Awning: Project out.

C. Frames and Sashes: Fine-grained wood lumber complying withAAMA/WDMA/CSA 101/I.S.2/A440; kiln dried to a moisture content of not morethan 12 percent at time of fabrication; free of visible finger joints, blue stain, knots,pitch pockets, and surface checks larger than 1/32 inch deep by 2 inches wide;water-repellent preservative treated.

1. Exterior Finish: Aluminum-clad wood.

a. Aluminum Finish: Two-Coat Fluoropolymer): Manufacturer's standardtwo-coat, thermocured system consisting of fluoropolymer color topcoatcontaining not less than 70 percent polyvinylidene fluoride resin byweight). Prepare, pretreat, and apply coating to exposed metal surfaces tocomply with AAMA 2605.

b. Color: As selected by Architect from manufacturer's full range.

2. Interior Finish: Manufacturer's standard factory-prime coat.

D. Insulating-Glass Units: ASTM E 2190, certified through IGCC as complying with

Page 9: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-4

requirements of IGCC

1. Glass: ASTM C 1036, Type 1, Class 1, q3.

A. Tint: Clear.B. Kind: Fully Tempered.

2. Filling: Fill space between glass lites with air.3. Low-E Coating: Sputtered on second surface.

E. Hardware, General: Provide manufacturer's standard hardware fabricated fromaluminum, stainless steel, carbon steel complying with AAMA 907, or othercorrosion-resistant material compatible with adjacent materials; designed to smoothlyoperate, tightly close, and securely lock windows, and sized to accommodate sashweight and dimensions.

1. Exposed Hardware Color and Finish: As selected by Architect frommanufacturer's full range.

F. Projected Window Hardware:

1. Gear-Type Rotary Operators: Complying with AAMA 901 when testedaccording to ASTM E 405, Method A. Provide operators that function withoutrequiring the removal of interior screens or using screen wickets.

a. Type and Style: As selected by Architect from manufacturer's full range oftypes and styles.

2. Hinges: Manufacturer's standard type for sash weight and size indicated.3. Single-Handle Locking System: Operates positive-acting arms that pull sash into

locked position. Provide one arm on sashes up to 29 inches tall and two arms ontaller sashes.

4. Limit Devices: Concealed support arms with adjustable, limited, hold-open limitdevices designed to restrict sash opening.

a. Limit clear opening to 6 inches for ventilation; with custodial key release.

G. Weather Stripping: Provide full-perimeter weather stripping for each operable sashunless otherwise indicated.

2.3 INSECT SCREENS

A. General: Fabricate insect screens to integrate with window frame. Provide screen foreach operable exterior sash. Screen wickets are not permitted.

1. Type and Location: Full, inside for project out sashes.

B. Aluminum Wire Fabric: 18-by-16 mesh of 0.011-inch- diameter, coated aluminumwire.

Page 10: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-5

1. Wire-Fabric Finish: Black.

C. Aluminum Frames: Manufacturers standard aluminum alloy, complying with SMA1004 or SMA 1201.

2.4 FABRICATION

A. Fabricate wood windows in sizes indicated. Include a complete system for installingand anchoring windows.

B. Glaze wood windows in the factory.

C. Weather strip each operable sash to provide weathertight installation.

D. Mullions: Provide mullions and cover plates, matching window units, complete withanchors for support to structure and installation of window units. Allow for erectiontolerances and provide for movement of window units due to thermal expansion andbuilding deflections. Provide mullions and cover plates capable of withstanding designwind loads of window units.

E. Window Assemblies: Provide operating units in configuration indicated. Providewindow frames, sashes, hardware, and other trim and components necessary for acomplete, secure, and weathertight installation, including the following:

1. Angled mullion posts with interior and exterior trim.2. Angled interior and exterior extension and trim.3. Clear pine or birch head and seat boards.4. Top and bottom plywood platforms.5. Exterior head and sill casings and trim.6. Support brackets.

F. Complete fabrication, assembly, finishing, hardware application, and other work in thefactory to greatest extent possible. Disassemble components only as necessary forshipment and installation. Allow for scribing, trimming, and fitting at Project site.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine openings, substrates, structural support, anchorage, and conditions, withInstaller present, for compliance with requirements for installation tolerances and otherconditions affecting performance of the Work.

B. Verify rough opening dimensions, levelness of sill plate, and operational clearances.

C. Examine wall flashings, vapor retarders, water and weather barriers, and other built-incomponents to ensure weathertight window installation.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

Page 11: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-6

3.2 INSTALLATION

A. Comply with manufacturer's written instructions for installing windows, hardware,accessories, and other components. For installation procedures and requirements notaddressed in manufacturer's written instructions, comply with installation requirementsin ASTM E 2112.

B. Install windows level, plumb, square, true to line, without distortion, anchored securelyin place to structural support, and in proper relation to wall flashing and other adjacentconstruction to produce weathertight construction.

3.3 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

1. Testing and inspecting agency will interpret tests and state in each report whethertested work complies with or deviates from requirements.

B. Testing Services: Testing and inspecting of installed windows shall take place asfollows:

1. Testing Methodology: Testing of windows for air infiltration and water resistanceshall be performed according to AAMA 502.

2. Air-Infiltration Testing:

a. Test Pressure: That required to determine compliance withAAMA/WDMA/CSA 101/I.S.2/A440 performance class indicated.

b. Allowable Air-Leakage Rate: 1.5 times the applicableAAMA/WDMA/CSA 101/I.S.2/A440 rate for product type andperformance class rounded down to one decimal place.

3. Water-Resistance Testing:

a. Test Pressure: Two-thirds times test pressure required to determinecompliance with AAMA/WDMA/CSA 101/I.S.2/A440 performance gradeindicated.

b. Allowable Water Infiltration: No water penetration.

4. Testing Extent: Three windows of each type as selected by Architect and aqualified independent testing and inspecting agency. Windows shall be testedafter perimeter sealants have cured.

5. Test Reports: Prepared according to AAMA 502.

C. Windows will be considered defective if they do not pass tests and inspections.

D. Prepare test and inspection reports.

3.4 ADJUSTING, CLEANING, AND PROTECTION

A. Adjust operating sashes and hardware for a tight fit at contact points and weather

Page 12: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 ALUMINUM CLADWOOD WINDOWS

08 52 00-7

stripping for smooth operation and weathertight closure.

B. Clean exposed surfaces immediately after installing windows. Remove excess sealants,glazing materials, dirt, and other substances.

1. Keep protective films and coverings in place until final cleaning.

C. Remove and replace sashes if glass has been broken, chipped, cracked, abraded, ordamaged during construction period.

D. Protect window surfaces from contact with contaminating substances resulting fromconstruction operations. If contaminating substances do contact window surfaces,remove contaminants immediately according to manufacturer's written instructions.

END OF SECTION 08 52 00

Page 13: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00-1

SECTION 10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and SupplementaryConditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Public-use washroom accessories.2. Private-use bathroom accessories.3. Custodial accessories.4. Laundry room accessories.

1.3 COORDINATION

A. Coordinate accessory locations with other work to prevent interference with clearancesrequired for access by people with disabilities, and for proper installation, adjustment,operation, cleaning, and servicing of accessories.

B. Deliver inserts and anchoring devices set into concrete or masonry as required toprevent delaying the Work.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined inNFPA 70, by a qualified testing agency, and marked for intended location andapplication.

2.2 PUBLIC-USE WASHROOM ACCESSORIES

A. Source Limitations: Obtain public-use washroom accessories from single source fromsingle manufacturer.

B. Toilet Tissue (Roll) Dispenser:1. Manufacturers: Subject to compliance with requirements, provide products by

one of the following:2. American Specialties, Inc.; ASI Group.

Page 14: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00-2

3. Bobrick Washroom Equipment, Inc.4. Bradley Corporation.5. .6. Description: Double-roll dispenser .7. Mounting: Surface mounted.8. Capacity: Designed for 5-inch- diameter tissue rolls.9. Material and Finish: Stainless steel, No. 4 finish (satin).

C. Grab Bar Insert drawing designation:

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.c. Bradley Corporation.

2. Mounting: Flanges with exposed fasteners.3. Material: Stainless steel, 0.05 inch thick.

a. Finish: Smooth, No. 4 finish (satin) on ends and slip-resistant texture ingrip area.

4. Outside Diameter: 1-1/2 inches.5. Configuration and Length: As indicated on Drawings.

D. Mirror Unit Insert drawing designation:

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.c. Bradley Corporation.

2. Frame: Stainless-steel angle, 0.05 inch thick.

a. Corners: Manufacturer's standard.

3. Hangers: Produce rigid, tamper- and theft-resistant installation, using methodindicated below.

a. One-piece, galvanized-steel, wall-hanger device with spring-action lockingmechanism to hold mirror unit in position with no exposed screws or bolts.

b. Wall bracket of galvanized steel, equipped with concealed locking devicesrequiring a special tool to remove.

4. Size: As indicated on Drawings.

E. Coat Hook Insert drawing designation:

1. Manufacturers: Subject to compliance with requirements, provide products by

Page 15: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00-3

one of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.c. Bradley Corporation.

2. Description: Single-prong unit.3. Material and Finish: Stainless steel, No. 4 finish (satin).

2.3 PRIVATE-USE BATHROOM ACCESSORIES

A. Source Limitations: Obtain private-use bathroom accessories from single source fromsingle manufacturer.

B. Shower Curtain Rod Insert drawing designation:

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.

2. Outside Diameter: 1-1/4 inches.3. Mounting: Flanges with exposed fasteners.4. Rod Material and Finish: Stainless steel, No. 4 finish (satin).5. Flange Material and Finish: Stainless steel, No. 4 finish (satin).

C. ADA Shower Seat

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following: (Basis of Design Bradley Corporation, ADA ReversiblePhenolic Shower Seat, Model 9569)

a. Bradley Corporation

b. American Specialties, Inc.; ASI Group.c. Bobrick Washroom Equipment, Inc.

D. Robe Hook :

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.

2. Description: Single-prong unit.3. Material and Finish: Stainless steel, No. 4 finish (satin).

Page 16: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00-4

E. Towel Bar :

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.

2. Description: 3/4-inch- round tube with circular end brackets.3. Mounting: Flanges with exposed fasteners.

4. Length: Refer to drawings.5. Material and Finish: Stainless steel, No. 4 finish (satin).

2.4 CUSTODIAL ACCESSORIES

A. Source Limitations: Obtain custodial accessories from single source from singlemanufacturer.

B. Mop and Broom Holder:

1. Manufacturers: Subject to compliance with requirements, provide products byone of the following:

a. American Specialties, Inc.; ASI Group.b. Bobrick Washroom Equipment, Inc.c. Bradley Corporation.d. .

2. Description: Unit with shelf, hooks, holders, and rod suspended beneath shelf.3. Length: Refer to drawings.4. Mop/Broom Holders: Three, spring-loaded, rubber hat, cam type.5. Material and Finish: Stainless steel, No. 4 finish (satin).

a. Shelf: Not less than nominal 0.05-inch- thick stainless steel.b. Rod: Approximately 1/4-inch- diameter stainless steel.

2.5 MATERIALS

A. Stainless Steel: ASTM A 666, Type 304, 0.031-inch minimum nominal thicknessunless otherwise indicated.

B. Galvanized-Steel Sheet: ASTM A 653/A 653M, with G60 hot-dip zinc coating.

C. Galvanized-Steel Mounting Devices: ASTM A 153/A 153M, hot-dip galvanized afterfabrication.

D. Fasteners: Screws, bolts, and other devices of same material as accessory unit andtamper-and-theft resistant where exposed, and of galvanized steel where concealed.

Page 17: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-2227.01 TOILET, BATH, AND LAUNDRY ACCESSORIES 10 28 00-5

E. Mirrors: ASTM C 1503, Mirror Glazing Quality, clear-glass mirrors, nominal 6.0 mmthick.

2.6 FABRICATION

A. General: Fabricate units with tight seams and joints, and exposed edges rolled. Hangdoors and access panels with full-length, continuous hinges. Equip units for concealedanchorage and with corrosion-resistant backing plates.

B. Keys: Provide universal keys for internal access to accessories for servicing andresupplying. Provide minimum of six keys to Owner's representative.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install accessories according to manufacturers' written instructions, using fastenersappropriate to substrate indicated and recommended by unit manufacturer. Install unitslevel, plumb, and firmly anchored in locations and at heights indicated.

B. Grab Bars: Install to withstand a downward load of at least 250 lbf, when testedaccording to ASTM F 446.

3.2 ADJUSTING AND CLEANING

A. Adjust accessories for unencumbered, smooth operation. Replace damaged or defectiveitems.

B. Remove temporary labels and protective coatings.

C. Clean and polish exposed surfaces according to manufacturer's written instructions.

END OF SECTION 10 28 00

Page 18: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 1

SECTION 22 13 19 - SANITARY WASTE PIPING SPECIALTIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

B. Reference City Council Resolution in Division 1 regarding utilization of union labor work

force.

1.2 SUMMARY

A. This Section includes the following sanitary drainage piping specialties:

1. Cleanouts.

2. Floor drains.

3. Trench drains.

4. Through-penetration firestop assemblies.

5. Miscellaneous sanitary drainage piping specialties.

6. Oil interceptor.

B. Related Sections include the following:

1. Division 22 Section "Storm Drainage Piping Specialties" for trench drains for storm

water, channel drainage systems for storm water, roof drains, and catch basins.

1.3 DEFINITIONS

A. ABS: Acrylonitrile-butadiene-styrene plastic.

B. FOG: Fats, oils, and greases.

C. FRP: Fiberglass-reinforced plastic.

D. HDPE: High-density polyethylene plastic.

E. PE: Polyethylene plastic.

F. PP: Polypropylene plastic.

G. PVC: Polyvinyl chloride plastic.

Page 19: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 2

1.4 SUBMITTALS

A. Product Data: For each type of product indicated. Include rated capacities, operating

characteristics, and accessories for the following:

1. Oil Interceptor.

2. Drains.

3. Cleanouts.

4. Firestop assemblies.

B. Shop Drawings: Show fabrication and installation details for frost-resistant vent terminals.

1. Wiring Diagrams: Power, signal, and control wiring.

C. Manufacturer Seismic Qualification Certification: Submit certification that grease interceptors,

accessories, and components will withstand seismic forces defined in Division 22 Section

"Seismic Protection." Include the following:

1. Basis for Certification: Indicate whether withstand certification is based on actual test of

assembled components or on calculation.

a. The term "withstand" means "the unit will remain in place without separation of

any parts from the device when subjected to the seismic forces specified."

b. The term "withstand" means "the unit will remain in place without separation of

any parts from the device when subjected to the seismic forces specified and the

unit will be fully operational after the seismic event."

2. Dimensioned Outline Drawings of Equipment Unit: Identify center of gravity and locate

and describe mounting and anchorage provisions.

3. Detailed description of equipment anchorage devices on which the certification is based

and their installation requirements.

D. Field quality-control test reports.

E. Operation and Maintenance Data: For drainage piping specialties to include in emergency,

operation, and maintenance manuals.

1.5 QUALITY ASSURANCE

A. Drainage piping specialties shall bear label, stamp, or other markings of specified testing

agency.

B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70,

Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for

intended use.

C. Comply with NSF 14, "Plastics Piping Components and Related Materials," for plastic sanitary

piping specialty components.

Page 20: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 3

1.6 COORDINATION

A. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases. Concrete,

reinforcement, and formwork requirements are specified in Division 03.

B. Coordinate size and location of roof penetrations.

1.7 EXTRA MATERIALS

A. Furnish extra materials described below that match products installed and that are packaged

with protective covering for storage and identified with labels describing contents.

PART 2 - PRODUCTS

2.1 CLEANOUTS

A. Exposed Metal Cleanouts:

1. Basis-of-Design Product: Subject to compliance with requirements, provide a

comparable product by one of the following:

a. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc.

b. Watts Drainage Products Inc.

c. Sioux Chief Manufacturing Products.

2. Standard: ASME A112.36.2M for cast iron for cleanout test tee.

3. Size: Same as connected drainage piping

4. Body Material: 150 psig as required to match connected piping.

5. Closure: Countersunk or raised-head cast-iron plug.

6. Closure Plug Size: Same as or not more than one size smaller than cleanout size.

7. Closure: Stainless-steel plug with seal.

B. Metal Floor Cleanouts (FCO):

1. Basis-of-Design Product: Subject to compliance with requirements, provide a

comparable product by one of the following:

a. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc. #4000 Series.

b. Watts Drainage Products Inc.

c. Sioux Chief Manufacturing Co.

2. Standard: ASME A112.36.2M for cast-iron soil pipe with cast-iron ferrule cleanout.

3. Size: Same as connected branch.

4. Type: Cast-iron soil pipe with cast-iron ferrule.

5. Body or Ferrule: Cast iron or Stainless steel.

6. Clamping Device: Not required.

7. Outlet Connection: Inside calk or Spigot.

8. Closure: Cast-iron plug.

9. Adjustable Housing Material: Cast iron with set-screws or other device.

Page 21: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 4

10. Frame and Cover Material and Finish: Nickel-bronze, copper alloy or painted cast iron

(for FCO-1 only).

11. Frame and Cover Shape: Round.

12. Top Loading Classification: Extra Heavy or Heavy Duty.

13. Riser: ASTM A 74, Extra-Heavy or Service class, cast-iron drainage pipe fitting and

riser to cleanout.

14. Standard: ASME A112.3.1.

15. Size: Same as connected branch.

16. Housing: Stainless steel.

17. Closure: Stainless steel with seal.

18. Riser: Stainless-steel drainage pipe fitting to cleanout.

C. Cast-Iron Wall Cleanouts (WCO):

1. Basis-of-Design Product: Subject to compliance with requirements, provide a

comparable product by one of the following:

a. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc.

b. Watts Drainage Products Inc.

c. Sioux Chief Manufacturing Company.

2. Standard: ASME A112.36.2M. Include wall access.

3. Size: Same as connected drainage piping.

4. Body: Hub-and-spigot, cast-iron soil pipe T-branch or hubless, cast-iron soil pipe test tee

as required to match connected piping.

5. Closure: Countersunk or raised-head plug.

6. Closure Plug Size: Same as or not more than one size smaller than cleanout size.

7. Wall Access: Round, flat, chrome-plated brass or stainless-steel] cover plate with screw.

8. Wall Access: Round, stainless-steel wall-installation frame and cover.

D. Yard Cleanouts (YCO):

1. Basis-of-Design Product: Subject to compliance with requirements, provide a

comparable product by one of the following:

a. Sioux Chief Manufacturing Co Series #851-64i

b. Smith, Jay R. Mfg. Co.; Division of Smith Industries, Inc.

c. Watts Drainage Products Inc.

2. Standard: ASME A112.36.2M

3. Size: Same as connected branch.

4. Type: PVC pipe with Cast Iron Cover.

5. Body or Ferrule: Cast Iron.

6. Clamping Device: Set screws.

7. Outlet Connection: Push-Joint.

8. Closure: Polypro plug.

9. Adjustable Housing Material: Cast iron with set-screws or other device.

10. Frame and Cover Material and Finish: Nickel-Bronze Laminated Cast Iron

11. Frame and Cover Shape: Round.

12. Top Loading Classification: Extra Heavy or Heavy Duty.

Page 22: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 5

2.2 FLOOR DRAINS

A. Cast-Iron Floor Drains (FD-1):

1. Basis-of-Design Product: Subject to compliance with requirements, provide a

Sioux Chief 832 Series or comparable product by one of the following:

a. Sioux Chief Manufacturing Company

b. Watts Drainage Products Inc.

c. JR Smith Manufacturing Co.

2. Standard: ASME A112.6.3.

3. Pattern: Floor drain.

4. Body Material: Gray iron.

5. Seepage Flange: Required.

6. Anchor Flange: Required.

7. Clamping Device: Required.

8. Outlet: Bottom.

9. Backwater Valve: Not required.

10. Coating on Interior and Exposed Exterior Surfaces: Not required.

11. Sediment Bucket: Required per schedule.

12. Top or Strainer Material: Nickel bronze or galvanized per schedule.

13. Top of Body and Strainer Finish: Required per schedule.

14. Top Shape: Square.

15. Top Loading Classification: Varies per schedule.

16. Funnel: Not required.

17. Inlet Fitting: Gray iron, with spigot outlet, and trap-seal primer valve connection per

schedule.

18. Trap: PVC.

2.3 TRENCH DRAINS

A. Trench Drains (TD):

1. Basis-of-Design Product: Subject to compliance with requirements, provide products by

one of the following:

a. JR Smith Manufacturing Co. # 9812-MADA.

b. Zurn Plumbing Products Group; Light Commercial Operation

c. Zurn Plumbing Products Group; Specification Drainage Operation

2. Outlet: Bottom.

3. Grate Material: Refer to Details on plans.

4. Dimensions of Frame and Grate: Refer to Details on plans.

5. Top Loading Classification: Extra Heavy Duty.

Page 23: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 6

2.4 OIL INTERCEPTORS

A. Sand/Oil Interceptor (OI-1):

1. Manufacturers: Subject to compliance with requirements, provide products by one of the

following or equal:

a. Mifab – Model MI-SO

2. Type: Fabricated interceptor for separating and removing light oil and sand from

wastewater.

3. Body Material: Steel.

4. Interior Lining: Not required.

5. Inlet and Outlet Size: 4 inches.

6. Size: 100 Gal

7. End Connections: Hub.

8. Covers: Cast-iron, heavy-duty loading. Refer to detail on plans.

2.5 THROUGH-PENETRATION FIRESTOP ASSEMBLIES

A. Through-Penetration Firestop Assemblies:

1. Manufacturers: Subject to compliance with requirements, provide products by one of the

following:

a. ProSet Systems Inc.

2. Standard: UL 1479 assembly of sleeve and stack fitting with firestopping plug.

3. Size: Same as connected soil, waste, or vent stack.

4. Sleeve: Molded PVC plastic, of length to match slab thickness and with integral nailing

flange on one end for installation in cast-in-place concrete slabs.

5. Stack Fitting: ASTM A 48/A 48M, gray-iron, hubless-pattern, wye branch with neoprene

O-ring at base and gray-iron plug in thermal-release harness. Include PVC protective cap

for plug.

6. Special Coating: Corrosion resistant on interior of fittings.

2.6 MISCELLANEOUS SANITARY DRAINAGE PIPING SPECIALTIES

A. Deep-Seal Traps:

1. Description: Cast-iron or bronze casting, with inlet and outlet matching connected piping

and cleanout trap-seal primer valve connection.

2. Size: Same as connected waste piping.

a. NPS 2 (DN 50): 4-inch- (100-mm-) minimum water seal.

b. NPS 2-1/2 (DN 65) and Larger: 5-inch- (125-mm-) minimum water seal.

B. Floor-Drain, Trap-Seal Primer Fittings:

Page 24: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 7

1. Description: Cast iron, with threaded inlet and threaded or spigot outlet, and trap-seal

primer valve connection.

2. Size: Same as floor drain outlet with NPS 1/2 side inlet.

C. Sleeve Flashing Device:

1. Description: Manufactured, cast-iron fitting, with clamping device that forms sleeve for

pipe floor penetrations of floor membrane. Include galvanized-steel pipe extension in top

of fitting that will extend 1 inch above finished floor and galvanized-steel pipe extension

in bottom of fitting that will extend through floor slab.

2. Size: As required for close fit to riser or stack piping.

D. Stack Flashing Fittings:

1. Description: Counterflashing-type, cast-iron fitting, with bottom recess for terminating

roof membrane, and with threaded or hub top for extending vent pipe.

2. Size: Same as connected stack vent or vent stack.

E. Expansion Joints:

1. Standard: ASME A112.21.2M.

2. Body: Cast iron with bronze sleeve, packing, and gland.

3. End Connections: Matching connected piping.

4. Size: Same as connected soil, waste, or vent piping.

2.7 FLASHING MATERIALS

A. Lead Sheet: ASTM B 749, Type L51121, copper bearing, with the following minimum weights

and thicknesses, unless otherwise indicated:

1. General Use: 4.0-lb/sq. ft. (20-kg/sq. m), 0.0625-inch (1.6-mm) thickness.

2. Vent Pipe Flashing: 3.0-lb/sq. ft. (15-kg/sq. m), 0.0469-inch (1.2-mm) thickness.

3. Burning: 6-lb/sq. ft. (30-kg/sq. m), 0.0938-inch (2.4-mm) thickness.

B. Copper Sheet: ASTM B 152/B 152M, of the following minimum weights and thicknesses,

unless otherwise indicated:

1. General Applications: 12 oz./sq. ft. (3.7 kg/sq. m or 0.41-mm thickness).

2. Vent Pipe Flashing: 8 oz./sq. ft. (2.5 kg/sq. m or 0.27-mm thickness).

C. Zinc-Coated Steel Sheet: ASTM A 653/A 653M, with 0.20 percent copper content and 0.04-

inch (1.01-mm) minimum thickness, unless otherwise indicated. Include G90 (Z275) hot-dip

galvanized, mill-phosphatized finish for painting if indicated.

D. Elastic Membrane Sheet: ASTM D 4068, flexible, chlorinated polyethylene, 40-mil (1.01-mm)

minimum thickness.

E. Fasteners: Metal compatible with material and substrate being fastened.

F. Metal Accessories: Sheet metal strips, clamps, anchoring devices, and similar accessory units

required for installation; matching or compatible with material being installed.

Page 25: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 8

G. Solder: ASTM B 32, lead-free alloy.

H. Bituminous Coating: SSPC-Paint 12, solvent-type, bituminous mastic.

2.8 MOTORS

A. General requirements for motors are specified in Division 22 Section "Common Motor

Requirements for Plumbing Equipment."

1. Motor Sizes: Minimum size as indicated. If not indicated, large enough so driven load

will not require motor to operate in service factor range above 1.0.

2. Controllers, Electrical Devices, and Wiring: Electrical devices and connections are

specified in Division 26 Sections.

PART 3 - EXECUTION

3.1 CONCRETE BASES

A. Anchor oil interceptors to concrete bases.

1. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated,

install dowel rods on 19-inch centers around full perimeter of base.

2. For installed equipment, install epoxy-coated anchor bolts that extend through concrete

base and anchor into structural concrete floor.

3. Place and secure anchorage devices. Use setting drawings, templates, diagrams,

instructions, and directions furnished with items to be imbedded.

4. Install anchor bolts to elevations required for proper attachment to supported equipment.

5. Concrete base construction requirements are specified in Division 22 Section "Common

Work Results for Plumbing."

6. Cast-in-place concrete materials and placement requirements are specified in Division 03.

3.2 INSTALLATION

A. Refer to Division 22 Section "Common Work Results for Plumbing" for piping joining

materials, joint construction, and basic installation requirements.

B. Install cleanouts in aboveground piping and building drain piping according to the following,

unless otherwise indicated:

1. Size same as drainage piping up to NPS 4. Use NPS 4 for larger drainage piping unless

larger cleanout is indicated.

2. Locate at each change in direction of piping greater than 45 degrees.

3. Locate at minimum intervals of 50 feet for piping NPS 4 and smaller and 100 feet for

larger piping.

4. Locate at base of each vertical soil and waste stack.

C. For floor cleanouts for piping below floors, install cleanout deck plates with top flush with

finished floor.

Page 26: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 9

D. For cleanouts located in concealed piping, install cleanout wall access covers, of types

indicated, with frame and cover flush with finished wall.

E. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with

finished floor, unless otherwise indicated.

1. Position floor drains for easy access and maintenance.

2. Set floor drains below elevation of surrounding finished floor to allow floor drainage.

Set with grates depressed according to the following drainage area radii:

a. Radius, 30 Inches or Less: Equivalent to 1 percent slope, but not less than 1/4-inch

total depression.

3. Install floor-drain flashing collar or flange so no leakage occurs between drain and

adjoining flooring. Maintain integrity of waterproof membranes where penetrated.

4. Install individual traps for floor drains connected to sanitary building drain, unless

otherwise indicated.

F. Install trench drains at low points of surface areas to be drained. Set grates of drains flush with

finished surface, unless otherwise indicated.

G. Install roof flashing assemblies on sanitary stack vents and vent stacks that extend through roof.

H. Install flashing fittings on sanitary stack vents and vent stacks that extend through roof.

I. Install through-penetration firestop assemblies in plastic conductors and stacks at floor

penetrations.

J. Install deep-seal traps on floor drains and other waste outlets, where noted.

K. Install floor-drain, trap-seal primer fittings on inlet to floor drains that require trap-seal primer

connection.

1. Exception: Fitting may be omitted if trap has trap-seal primer connection.

2. Size: Same as floor drain inlet.

L. Install air-gap fittings on draining-type backflow preventers and on indirect-waste piping

discharge into sanitary drainage system.

M. Install sleeve flashing device with each riser and stack passing through floors with waterproof

membrane.

N. Install expansion joints on vertical stacks and conductors. Position expansion joints for easy

access and maintenance.

O. Install oil interceptors, including trapping, venting, and flow-control fitting, according to

authorities having jurisdiction and with clear space for servicing.

P. Install traps on plumbing specialty drain outlets. Omit traps on indirect wastes unless trap is

indicated.

Page 27: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 10

Q. Install escutcheons at wall, floor, and ceiling penetrations in exposed finished locations and

within cabinets and millwork. Use deep-pattern escutcheons if required to conceal protruding

pipe fittings.

3.3 CONNECTIONS

A. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate

general arrangement of piping, fittings, and specialties.

B. Install piping adjacent to equipment to allow service and maintenance.

C. Oil Interceptors: Connect inlet, outlet, vent, and piping to unit; flow-control fitting and vent to

unit inlet piping. Allow for manual oil draw-off.

D. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical

Systems."

E. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors

and Cables."

3.4 FLASHING INSTALLATION

A. Fabricate flashing from single piece unless large pans, sumps, or other drainage shapes are

required. Join flashing according to the following if required:

1. Lead Sheets: Burn joints of lead sheets 6.0-lb/sq. ft. 0.0938-inch thickness or thicker.

Solder joints of lead sheets 4.0-lb/sq. ft. 0.0625-inch thickness or thinner.

2. Copper Sheets: Solder joints of copper sheets.

B. Install sheet flashing on pipes, sleeves, and specialties passing through or embedded in floors

and roofs with waterproof membrane.

1. Pipe Flashing: Sleeve type, matching pipe size, with minimum length of 10 inches, and

skirt or flange extending at least 8 inches around pipe.

2. Sleeve Flashing: Flat sheet, with skirt or flange extending at least 8 inches around sleeve.

3. Embedded Specialty Flashing: Flat sheet, with skirt or flange extending at least 8 inches

around specialty.

C. Set flashing on floors and roofs in solid coating of bituminous cement.

D. Secure flashing into sleeve and specialty clamping ring or device.

E. Install flashing for piping passing through roofs with counterflashing or commercially made

flashing fittings, according to Division 07 Section "Sheet Metal Flashing and Trim."

F. Extend flashing up vent pipe passing through roofs and turn down into pipe, or secure flashing

into cast-iron sleeve having calking recess.

G. Fabricate and install flashing and pans, sumps, and other drainage shapes.

Page 28: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

16-22271.01 SANITARY WASTE PIPING SPECIALTIES 22 13 19 - 11

3.5 LABELING AND IDENTIFYING

A. Equipment Nameplates and Signs: Install engraved plastic-laminate equipment nameplate or

sign on or near each of the following:

1. Oil interceptors.

B. Distinguish among multiple units, inform operator of operational requirements, indicate safety

and emergency precautions, and warn of hazards and improper operations, in addition to

identifying unit. Nameplates and signs are specified in Division 22 Section "Identification for

Plumbing Piping and Equipment."

3.6 FIELD QUALITY CONTROL

A. Tests and Inspections:

1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest

until no leaks exist.

2. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and

equipment.

3.7 PROTECTION

A. Protect drains during remainder of construction period to avoid clogging with dirt or debris and

to prevent damage from traffic or construction work. Damaged drainage grates shall be

replaced.

B. Place plugs in ends of uncompleted piping at end of each day or when work stops.

END OF SECTION 22 13 19

Page 29: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

EXISTING

TRAINING TOWER

NEW BALLWIN ROAD

CASTLEWOOD ROAD

CA

ST

LE

WO

OD

RO

AD

PR

OP

ER

TY

LIN

E

PROPERTY LINE

EXISTING BUILDING

LOCATION OF OWNER PROVIDED AND INSTALLED

TEMPORARY HOUSING AND OWNER PROVIDED

AND INSTALLED COVERED WALK WAY

THIS AREA NO LONGER

TO BE USED FOR

TEMPORARY HOUSING

13

13

NOTE: PLAN KEYNOTES AND CALLOUTS REMOVED FROM THIS PLAN FOR CLARITY

PR

OFESSIO

NA

L D

ESIG

N F

IRM

- M

O #

000

311

ST. L

OU

ISO

AK

BRO

OK

FG

MA

RC

HIT

EC

TSD

RA

WN

DA

TE

JO

B N

O.

TITL

E

SH

EET

NO

.

PR

OJEC

T

(© 2

01

7 F

GM

Arc

hite

cts

In

c.)

AP

PR

OV

ED

CH

ICA

GO

ISSU

ED

AS

O'F

ALL

ON

RA0.

0.1-

116

-222

7.01

METR

O W

EST

FIR

E H

OU

SE #

2

REN

OV

ATI

ON

AN

D A

DD

ITIO

N

AR

CH

SIT

E P

LAN

W/ N

EW

LO

CA

TIO

N

OF T

EM

PO

RA

RY

HO

USIN

G

01/0

6/17

DJM

BK

MAD

D #3

1" = 40'-0"1 ARCHITECTURAL SITE PLAN

Page 30: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

SPECIAL FINISH (WHERE OCCURS)

MASONRY PARTITION TYPES:

STANDARD CMU FINISH BOTH SIDESP2

CMU NOMINAL THICKNESS:

CMU FINISH:

WALL REINFORCING:

HOR. JOINT REINFORCING:

CELL GROUTING:

INSULATION:

FIRE RATING:

FIRE TEST NO:

6"

SEE BELOW FOR CMU FINISH TYPES

SEE STRUCTURAL

@ 16" O.C.

SEE STRUCTURAL

NONE

SEE CODE COMPLIANCE PLANS ("G1" SERIES)

SEE CODE COMPLIANCE PLANS ("G1" SERIES) (WHERE RATED)

042000.B01

SPECIAL FINISH (WHERE OCCURS)

MASONRY PARTITION TYPES:

STANDARD CMU FINISH BOTH SIDESP3

CMU NOMINAL THICKNESS:

CMU FINISH:

WALL REINFORCING:

HOR. JOINT REINFORCING:

CELL GROUTING:

INSULATION:

FIRE RATING:

FIRE TEST NO:

8"

SEE BELOW FOR CMU FINISH TYPES

SEE STRUCTURAL

@ 16" O.C.

SEE STRUCTURAL

NONE

SEE CODE COMPLIANCE PLANS ("G1" SERIES)

SEE CODE COMPLIANCE PLANS ("G1" SERIES) (WHERE RATED)

SPECIAL FINISH (WHERE OCCURS)

MASONRY PARTITION TYPES:

STANDARD CMU FINISH BOTH SIDESP5

CMU NOMINAL THICKNESS:

CMU FINISH:

WALL REINFORCING:

HOR. JOINT REINFORCING:

CELL GROUTING:

INSULATION:

FIRE RATING:

FIRE TEST NO:

12"

SEE BELOW FOR CMU FINISH TYPES

SEE STRUCTURAL

@ 16" O.C.

SEE STRUCTURAL

NONE

SEE CODE COMPLIANCE PLANS ("G1" SERIES)

SEE CODE COMPLIANCE PLANS ("G1" SERIES) (WHERE RATED)

PR

OFESSIO

NA

L D

ESIG

N F

IRM

- M

O #

000

311

ST. L

OU

ISO

AK

BRO

OK

FG

MA

RC

HIT

EC

TSD

RA

WN

DA

TE

JO

B N

O.

TITL

E

SH

EET

NO

.

PR

OJEC

T

(© 2

01

7 F

GM

Arc

hite

cts

In

c.)

AP

PR

OV

ED

CH

ICA

GO

ISSU

ED

AS

O'F

ALL

ON

RA2.

2.0-

116

-222

7.01

METR

O W

EST

FIR

E H

OU

SE #

2

REN

OV

ATI

ON

AN

D A

DD

ITIO

N

CO

RR

EC

TED

P-T

YP

ES

01/0

6/17

DJM

BK

MAD

D #3

1 1/2" = 1'-0"P-2 PARTITION TYPE

1 1/2" = 1'-0"P-3 PARTITION TYPE

1 1/2" = 1'-0"P-5 PARTITION TYPE

Page 31: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

FD

FD

BUNKER

GEAR

106

18' -

6"

A6 TYP. OF 20

2' -

0"

4' -

7 3

/8"

4' -

8"

4' -

7"

2' -

0"

P-3 6' TO TOP OF

MASONRY WALL

A6

A6

A6

13

PROFESSIONAL DESIGN FIRM - MO 000311

ST. LOUISOAK BROOK

FGM ARCHITECTSDRAWN DATE

JOB NO.

TITLE

SHEET NO.

PROJECT

(© 2

01

6 F

GM

Arc

hite

cts

In

c.)

APPROVED

CHICAGO

ISSUED AS

O'FALLON RA5.1.0-116-2227.01

METRO WEST FIRE HOUSE #2

RENOVATION AND ADDITION

ENLARGED PLAN AT BUNKER GEAR

01/06/17DJM

BKM ADD #3

1/4" = 1'-0"

1 ENLARGED PLAN - BUILDING ADDITION

KEYNOTES - SHEET

KEY

NUMBER DESCRIPTION

A6 24”X24” WALL MOUNTED GEAR GRID LOCKERS

Page 32: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

CT-2

SS-2

CT-2

CT-1, COVE BASE

PT-1

CT-3 TYPICAL

AT (3)

SIDES

SH-1(H)

HANDICAP SHOWER

TBA-14.1(H)

FOLDING SHOWER SEAT

TBA-7.5

SHOWER GRAB BAR

SH-1

13

RA5.1.1-1

1

RESTROOM

117

RESTROOM

118

118-A

117-A

MFR: DALTILE

STYLE: PORTFOLIO

COLOR: PF08 CHOCOLATE

SIZE: 2" X 2"

CT-1a IN SHOWER

SLOPE TO DRAIN

CT-1a

CT-1a IN SHOWER

SLOPE TO DRAIN

SS-2

AT SHOWER WALLS

SS-2

AT SHOWER WALLS

NOTE: RESTROOM 117 TILE PATTERN TO MATCH

TILE PATTERN IN RESTROOM 118

1313

PROFESSIONAL DESIGN FIRM - IL # 184-000350

ST . LOUISOA K BROO K

FGM ARCHITECTSDRAWN DATE

JOB NO.

TITLE

SHEET NO.

PROJECT

(© 2

016

FG

M A

rch

ite

cts

In

c.)

APPROVED

CHI CA GO O'FALLON

ISSUED AS

RA5.1.1-1

16-2227.01

METRO WEST FIRE HOUSE #2

RENOVATION AND ADDITION

ADA SHOWER PLAN AND ELEVATIONS

01/06/17DJM

BKM ADD #3

1/4" = 1'-0"1 ADA SHOWER ELEV.

1/4" = 1'-0"2 ENLARGED PLAN @ RESTROOMS

NOTE: CT-1a TO BE USED IN SHOWERS ON THE FIRST FLOOR SHOWERS

SECOND FLOOR SHOWERS TO REMAIN TERRAZZO SHOWER BASES

13

Page 33: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

WATER WATER

MARK DESCRIPTION

PLUMBING FIXTURE/EQUIPMENT SCHEDULE

HOTREMARKS

COLDVENTWASTE

CONNECTION SCHEDULE

MANUFACTURERNUMBER

MODEL

OI-1 SAND/OIL INTERCEPTOR 4" 3" - - 100 GALLON HOLDING CAPACITY, SAND AND OIL INTERCEPTOR

COMBINTATION STEEL BASIN; UNDERGROUND; VOLUME BASED ON

MANUFACTURER'S RECOMMENDATION & UNIFORM PLUMBING CODE.

MIFAB MI-SO-0

SH-1 SHOWER - - - - SEE ARCHITECTURAL DRAWINGS FOR TILE FINISH.N/A

- - 1/2" 1/2"

2.5 GALLONS PER MINUTE

TRIM MOEN

N/A

8375

SH-2 SHOWER - - - - SEE ARCHITECTURAL DRAWINGS FOR TILE FINISH.N/A

- - 1/2" 1/2"

ADA; 2.5 GALLONS PER MINUTE

TRIM MOEN

N/A

8342

3

3

NOTES:

3 INSTALL WITH TD-1. SEE FLOOR PLAN FOR DRAIN LOCATIONS.

2.5 GALLONS PER MINUTE8375

SH-3 SHOWER 2" 2" - - 60"x30" TERRAZZO SHOWER BASE.ACORN

ENGINEERING

COMPANY

- - 1/2" 1/2"TRIM MOEN

SBR-6036-3F

ST. L

OU

ISO

AK

BRO

OK

FG

MA

RC

HIT

EC

TSD

RA

WN

DA

TE

JO

B N

O.

TITL

E

SH

EET

NO

.

PR

OJE

CT

( © 2

016

FG

M A

rch

ite

cts

In

c.)

AP

PR

OV

ED

CH

ICA

GO

ISSU

ED

AS

O'F

ALL

ON

Mis

sou

ri S

tate

Ce

rtific

ate

of

Au

tho

rity

#0

00311

RP0.1.2

16-2

227.

01

FIR

E H

OU

SE #

2 R

EN

OV

ATIO

N A

ND

AD

DIT

ION

SY

MB

OLS,

NO

TES,

SC

HED

ULES &

AB

BR

EV

IATIO

NS

01/0

5/17

DEV

DEL

AD

DE

ND

UM

#3

3

3

Page 34: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

OB-2

MSB-1

SH-3

WC-2

WC-2

SH-3

LAV-2

FD-1

FD-1

FD-1

1" HW

1 1/2" CW

1" CW

1" HW

1" CW

1" CW

1" HW

1" CW

1" HW

1" CW

1" HW

1" CW

3"

V

2" V

15

9

9

16

17

12

12

22

2" V

3" V

1" HW

1 1/2" CW

1 1/2" V

1" CW

2"

V

3"

V

1 1

/2"

V

LAV-2

Missouri State Certificate of Authority #000311

ST. LOUISOAK BROOK

FGM ARCHITECTS DRAWN DATE

JOB NO.

TITLE

SHEET NO.

PROJECT

( © 2

016

FG

M A

rch

ite

cts

In

c.)

APPROVED

CHICAGO

ISSUED AS

O'FALLON RP1.1.2

16-2227.01

FIRE HOUSE #2 RENOVATION AND

ADDITION

SECOND FLOOR PLUMBING PLAN - NEW

01/05/17DEV

DEL

1/4" = 1'-0"

1 SECOND FLOOR PLUMBING PLAN - NEW

ADDENDUM #3

Page 35: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE
Page 36: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE
Page 37: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

DA27

D27

D27

ETR

ETRETR

ELEC.103

HOSE TOWER102

STORAGE & WORKSHOP101

D27

1

X27

3

HOSETOWER

SIGNAGE,L1-51

3

29'-6" A.F.F.

Missouri State Certificate of Authority #000311

ST. LOUISOAK BROOKFGM ARCHITECTS DRAWN DATE

JOB NO.

TITLE

SHEET NO.

PROJECT

(© 2

016

FGM

Arc

hite

cts I

nc.)

APPROVED

CHICAGO

ISSUED ASO'FALLON RE2.0.1

16-2227.01

FIRE HOUSE #2 RENOVATION ANDADDITION

LIGHTING PLAN

01/05/17TBM

BEC ADDENDUM #3

1/8" = 1'-0"1 HOSE TOWER SIGNAGE

KEYED NOTES10 PROVIDE (2) #12 AND (1)#12 GND AND 6"x6"x6" JUNCTION BOX ON

INTERIOR OF HOSE TOWER FOR EXTERIOR BACKLIT SIGNAGE. SIGNAGEWILL BE ON-OFF BY EXISTING PHOTOCELL WITH A MANUAL SWITCH TOOVERRIDE IN HOSE TOWER 102.

3

KEYED NOTES2 FIXTURE TO BE PROVIDED IF ALTERNATE BID #2 IS ACCEPTED. IF

ALTERNATE BID #2 IS NOT ACCEPTED, DO NOT PROVIDE THIS FIXTURE.3

Page 38: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

4

E3.0

DCSS

DCSS

SSAPPARATUS BAY #2

110

TOILET109

TOILET108

STORAGE110A

52,54

R/G

R/GW,WP37

W,WP37

W,WP37

W,WP39

W,WP39

TYPICAL

2

UH

14

48MDC

3

REF7

REF9

REF11

CIRCUITS HOMERUNTO PANEL L1EXERCISE

112

STAIRS113A

ETR

ETRETRETRETRETR

1A

FCU

1B

FCU

EWC29

TV49TV

49

CIRCUITS HOMERUNTO PANEL L2

+84"4

+84"4 +84"

4

17 1717

535556

3 33

ST. L

OU I

SO

AK B

R OO

KFG

MA

RCHI

TEC

T SD

RAW

ND

AT E

JOB

NO

.

TITLE

S HEE

T N

O.

PRO

JEC

T

(© 2

016

FGM

Arc

hite

cts I

nc.)

APP

ROV

ED

CHIC

AGO

I SSU

ED A

SO

'FALL

ON

Miss

ouri

Stat

e C

ertif

icat

e of

Aut

horit

y #

0003

11

RE3.

0 .2

16-2

2 27.0

1

FIRE

HO

U SE

#2 R

ENO

V ATI

ON

AN

D A

DDI T

ION

FIR S

T FL

OO

R PO

WER

01/0

5 /17

TBM

BEC

1/8" = 1'-0"1 APP. BAY #2 MASTER DOOR CONTROL

KEYED NOTES4 APPROXIMATE LOCATION OF DOOR CONTROLLER. CONTROLLER

SUPPLIED BY DOOR SUPPLIER INSTALLED BY ELECTRICALCONTRACTOR. PROVIDE (4) #10 AND (1) #10 GND IN 3/4" CONDUIT.

3

1/8" = 1'-0"2 FIRST FLOOR - POWER

KEYED NOTES18 COORDINATE FINAL LOCATION OF RECEPTACLE WITH OWNER PRIOR

TO ROUGH-IN.

3

AD

DE

ND

UM

#3

Page 39: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE
Page 40: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

4

E3.0

APPARATUS BAY #2110

STORAGE110A

4

4

6

OFFICE102

ETR

ETR

ETR

64

ST. L

OU I

SO

AK B

R OO

KFG

MA

RCHI

TEC

T SD

RAW

ND

AT E

JOB

NO

.

TITLE

S HEE

T N

O.

PRO

JEC

T

(© 2

016

FGM

Arc

hite

cts I

nc.)

APP

ROV

ED

CHIC

AGO

I SSU

ED A

SO

'FALL

ON

Mi ss

ouri

Sta

te C

erti f

icat

e o f

Aut

hor it

y #

0003

11

RE5.

0 .2

16-2

2 27.0

1

FIRE

HO

U SE

#2 R

ENO

V ATI

ON

AN

D A

DDI T

ION

FIR E

ALA

R M A

ND

AC

CES

S C

ON

TRO

L PL

AN

01/0

5 /17

TBM

BEC

1/8" = 1'-0"1 APPARATUS BAY #2 SECURE DOOR

1/8" = 1'-0"2 VESTIBULE SECURE DOOR

AD

DE

ND

UM

#3

Page 41: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE
bguccione
Typewritten Text
1-6-16
bguccione
Typewritten Text
Wright Construction
bguccione
Typewritten Text
636-220-6850
bguccione
Typewritten Text
Brian Guccione
bguccione
Typewritten Text
636-220-6855
bguccione
Typewritten Text
x
bguccione
Typewritten Text
Detail A6/A3.4.1
bguccione
Typewritten Text
Detail noted 042000-D15 shows a piece of angle flasing behind the siding. Who is
bguccione
Typewritten Text
responsible for installing this flashing? The mason or the sheet metal sub? There is
bguccione
Typewritten Text
no other masonry related work per this detail. Please Advise.
Jerrod.Joggerst
Typewriter
This work should be under the sheet metal subcontractor.
Jerrod.Joggerst
Typewriter
X
Jerrod.Joggerst
Typewriter
3
Page 42: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE
Jerrod.Joggerst
Typewriter
THE CERAMIC WALL TILE TO BE 4' TALL AND PAINTED CMU ABOVE. SEE ADDENDUM #3 FOR CLARIFICATION.
Jerrod.Joggerst
Typewriter
X
Jerrod.Joggerst
Typewriter
3
Page 43: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

1

Jerrod Joggerst

From: Jerrod JoggerstSent: Friday, January 06, 2017 3:44 PMTo: 'Dino A. Pappas'Subject: RE: Metro Firehouse #2

Dino,

See answers below in RED.

Thanks,Jerrod Joggerst, AIA

FGM ARCHITECTS

Chicago Oak Brook O'Fallon St. Louis314.439.1620314.439.1601 office314.439.1602 fax

[email protected]

FGM exists to enhance communities by creating quality environmentsü Please consider the environment before printing this email

From: Dino A. Pappas [mailto:[email protected]]Sent: Friday, January 06, 2017 10:24 AMTo: Jerrod Joggerst <[email protected]>Subject: FW: Metro Firehouse #2

Jerrod,Please see below.

Thank you,Dino

Dino A. PappasVice President/ Project ManagerUnited Construction12747 Olive Boulevard, Suite 101St. Louis, MO 63141314-434-9690 Office314-707-8118 Cell

From: Mike Manker [mailto:[email protected]]Sent: Friday, January 06, 2017 10:20 AMTo: Dino A. PappasSubject: Metro Firehouse #2

1.) doors #113A & 113B... no door type listed but gives glass types? DOOR TYPE N2.) door #106B says type NL1 frame? assuming this is SL1 frame? DOOR TYPE S1

Page 44: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

2

3.) do we or do we not include the mirrors per A1/A5.1.0? MIRRORS TO BE INCLUDED IN BID. SEEADDENDUM #3 FOR SPEC. SECTION 10 28 00 TOILET ACCESSORIES advise asap.. thx. Mike/acme Glass

Page 45: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

LAMB CONSTRUCTION

QUESTIONS ON METRO WEST HOUSE #2

1. General Demo Note #2 refers to asbestos abatement work. Has survey been done?Owner contracting? NO ABATEMENT WORK IS EXPECTED ON THIS PROJECT. IF ACM ISFOUND ON PROJECT BRING TO OWNER AND ARCHITECTS ATTENTION IMMEDIATLEY.

2. On page A0.0.1 keyed note A19 refers to moving the propane tank & gas lines.Wouldn’t the propane supplier do this work? THE PROPANE TANK AND SERVICEOUTSIDE BUILDING TO BE RELOCATED BY PROPANCE SUPPLIER.

3. On page A0.0.1 there is a note stating “Temporary Housing by Owner providefoundations as required by manufacturer.” How are we supposed to know what isrequired? Please clarify. SEE ADDENDUM #3 FOR CLARIFICATION.

4. On page A.0.0.1 there is a note that states “provide temporary covered walkwayconnected to front door/covered patio by Owner.” Does this mean we are providing thecovered walkway or the Owner. No details shown anywhere. Please clarify.SEE ADDENDUM #3 FOR CLARIFICATION.

5. No spec given for Aluminum Clad Wood Windows. Please provide. SEE ADDENDUM #36. On page A1.1.0 keyed note A6 states “18 x 18 gear lockers salvaged from apparatus

bay.” I don’t see anything regarding this on the demo plans. There is a spec for gearlockers like we would be providing new ones. Also, the spec calls out 24 x 24. Pleaseclarify and define scope. SEE ADDENDUM #3

7. On page A1.1.1 at toilets 108 & 109 the partition types called out are P2 & P3. Thereisn’t a partition type P3 on page A2.2.0. Also, at Alternate #1 addition there are P5partition types called out. There is no partition type P5 on page A2.2.0. Please clarify.

8. On page A3.3.2 the ceiling of the hose tower is called out as 1 ½” tectum in detail A8and 2” in detail A1. Please clarify. 1 ½” TECTUM IS CORRECT. SEE ADDENDUM #3

9. On page A3.3.1 in details A1 & A12 you have keyed note 72500.A00 called out. Thatnote states “Air/Moisture Barrier-To Match Existing.” What is this supposed to be?There isn’t a spec 72500. Please clarify. TYVEK COMMERICAL BUILDING WRAP TO BEBID. CONTRACTOR TO VERIFY EXISTING MATERIAL DURING CONSTRUCTION AND NOTIFYARCHITECT OF IF DIFFERENT THAN ABOVE.

10. Page E1.0 keyed note 3 refers to Bid Alternate #4. No such alternate. Keyed note 2 onE2.0 also refers to this alternate. Please clarify. SEE ADDENDUM #3

11. Keyed note 2 missing from schedule on P1.1. Please provide. SEE ADDENDUM #3

Jerrod.Joggerst
Typewriter
SEE ADD. #3
Page 46: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

343 S. Kirkwood Road, Suite 204 Kirkwood, MO 63122 Phone: 314-725-5889

DATE: 01/04/2017 TO: Eckelkamp Electric Co. PROJECT: Metro West Fire Protection District House #2 Renovation and Addition FROM: Theodore Mondaine Questions and Items for Clarification from 12/27/16 (Responses in RED)

1. Sheet DE2.0 – In the existing Day Room, what does the symbol on the left wall represent? Is it to be removed? The symbol is a wall mounted light and is to be demoed.

2. Sheet E1.0 – Keyed note #1 calls for us to intercept a 2 ½” conduit and run new to the existing IT Room and to see sheet E4.0 for continuation. There is nothing on sheet E4.0. The reference to a continuation on sheet E4.0 has been removed in Addendum #3. The note now reads, “INTERCEPT EXISTING 2 1/2" FIBER CONDUIT, ON WEST SIDE OF DRIVE FROM CHARTER PULL BOX. PROVIDE NEW 2 1/2" CONDUIT FROM INTERCEPT POINT TO EXISTING IT ROOM. COORDINATE WITH CHARTER FOR REMOVAL AND NEW FIBER SERVICE.”

3. Sheet E1.0 – Keyed note #1 is also shown at a ground box on the East side of the property and it looks like it is for power. Please clarify if keyed note #1 is supposed to be associated with this box. Also clarify what the conduit shown is serving. Keyed note #1 is not to be associated with this box. New keyed note #7, “RECONFIGURE BRANCH CIRCUIT WIRING AND RACEWAY TO FACILITATE THE NEW PAVEMENT AND LANDSCAPE LAYOUT. PROVIDE HAND HOLES AS REQUIRED WITH TIER 15 DRIVE OVER COVERS IF LOCATED IN A VEHICLE PAVEMENT AREA.” has been added to the drawing at this location in Addendum #3.

4. Sheet E1.0 – Keyed note #6 is not on the drawing. Keyed note #6 has been added in Detail #6 on sheet E1.0 in Addendum #3.

5. Sheet E1.0 – What controls the light fixtures and ceiling fans in the Pavilion? Where would these switches be located? Controls has been added to the southernmost column in Addendum #3.

6. Sheet E2.0 – In Storage & Workshop 101 there are three (3) switches. Please clarify what fixture(s) each switch controls. This was addressed in Addendum #2, BRiC sheets are incorrectly labeled Addendum #1. The switches are 3-Way switches and they provide on-off control for light fixtures in Storage & Workshop 101.

7. Sheet E2.0 – It looks as if there needs to be 3 way and 4 way switches yet there are none shown. Please clarify if there are none required. Lighting controls has been revised and clarified in Addendum #2, BRiC sheets are incorrectly labeled Addendum #1. See attached.

8. Sheet E2.0 – In the Bunk Rooms the switches are in a square. This symbol is not shown on the Symbol Schedule. Please clarify what this symbol represents. Also these have either a B or D next to the switch. Please clarify what the B or D represents. Lighting controls has been revised and clarified in Addendum #2, BRiC sheets are incorrectly labeled Addendum #1. See attached.

9. Sheet E6.0 – Is keyed note #1 part of Alternate #1 or the base bid? Keyed note #1 is to be included in the base bid.

Page 47: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

343 S. Kirkwood Road, Suite 204 Kirkwood, MO 63122 Phone: 314-725-5889

Questions and Items for Clarification from 12/28/16 (Response in RED)

1. Sheets E3.0 and E8.2 – FCU-5 through FCU-12 are all fed from panel L1. The Panel Schedule shows FCU-5 through FCU-10 being fed by circuits 2 and 4 but there is nothing for FCU-11 and FCU-12. What circuit feeds these two pieces of equipment? FCU-11 is to be included on circuit #2. FCU-12 is to be included on circuit #31.

2. Sheets E3.0, E8.2 and MEP1.0 – Mechanical equipment RH-1 through RH-4 are to be fed from panel L2 per the Mechanical Equipment Electrical Data Schedule. If you look at the panel schedule, circuits #8 and #19 both say RH-1 but RH-2, RH-3 and RH-4 are not shown at all. There is also no circuiting shown on sheet E3.0. What circuit(s) serve this equipment? RH-1 and RH-2 are on circuit #19 in Panel L2. RH-3 and RH-4 are on circuit #8 in Panel L2. The labels have been updated in Addendum #3.

3. Sheet MEP1.0 – MAU-1 and RH-1 through RH-4 do not show any means of disconnect. Is this correct? This is correct.

4. Sheet E3.0 – Detail #3 on this sheet shows red and green lights and has a note to see E3.0. There are no red and green lights shown on sheet E3.0. Where are these lights located? These lights are located in Apparatus Bay #2 above the 3 button controllers. They are shown as a boxed R/G in Detail #1 on sheet E3.0.

5. Sheet E3.0 – Detail #3 on this sheet shows a Master Door Controller. Where is this item located? A Master Door Controller (MDC) is to be located on the west wall of Apparatus Bay #2. This has been added in Addendum #3.

6. Sheet E3.0 – Keyed note #4 says to provide 5 #12’s in a ¾” conduit. Detail #3 says #10 wire. Which wire size is to be used? Provide #10 wire. Keyed note #4 has been revised in Addendum #3.

7. Sheet E3.0 – Who provides the disconnect switch at the door opener? The disconnect switch at the door opener is provided by the door supplier.

8. Sheet E3.0 – It is not clear the amount of cables/wires to be ran from the door controller to the Master Door Control Station. Please clarify. The Master Door Control Station is a “bank”. There are (2) doors so there will be (2) controllers at this location. (5) control cables/wires are to be ran from the 3 button controller at the each door to the controllers at this location.

9. Sheet E8.1 – Details #2 and #3 are not shown on any of the drawings. Where are these items located? What panel and what circuit(s) serve this equipment? Details #2 and #3 were removed from the drawings in Addendum #2, BRiC sheets are incorrectly labeled Addendum #1.

10. Sheet E8.1 – Where is the Local Lighting Controller shown in Detail #1 located? What panel and circuit serves this item? Per General Note #2, “LOCAL LIGHTING CONTROLLERS, POWER PACKS, AND NETWORK INTERFACES SHALL BE INSTALLED ABOVE CEILING NEAR LIGHT SWITCH IN EASILY ACCESSIBLE SPACE.” Rooms where these are to be installed are shown in Lighting Control Diagram, Detail #3 on sheet RE8.1, added in Addendum #2. BRiC sheets are incorrectly labeled Addendum #1.

Page 48: WILDWOOD, MO 63040 TO: PROSPECTIVE BIDDERS 1000 … · internally illuminated halo-lit 2” deep channel number and emblem. CONSTRUCTION: ALL ALUMINUM PAINTED ACRYLIC POLY URETHANE

1

Jerrod Joggerst

From: Jerrod JoggerstSent: Friday, January 06, 2017 3:20 PMTo: '[email protected]'Subject: RE: Metro West Firehouse #2 RFI

Chris,

See answer below. This response will be part of Addendum #3 to be issued later today.Thanks,Jerrod Joggerst, AIA

FGM ARCHITECTS

Chicago Oak Brook O'Fallon St. Louis314.439.1620314.439.1601 office314.439.1602 fax

[email protected]

FGM exists to enhance communities by creating quality environmentsü Please consider the environment before printing this email

From: Chris Knapp [mailto:[email protected]]Sent: Wednesday, January 04, 2017 9:58 AMTo: Brennan Hartin <[email protected]>Subject: Metro West Firehouse #2 RFI

Hey Brennan, I had a question surrounding the wood doors for this job. The plans call for prehung doors but the specs call for apremium grade AA door. Those typically aren’t one in the same. Are they wanting prehung wood doors and woodframes or do you want me to price a standard wood door and wood or hollow metal frame? I know some of theseopenings are fire rated as well. WHERE DOORS ARE CALLED OUT TO BE WOOD DOOR AND FRAME, THEY ARE TO BE TOSTANDARD WOOD DOOR AND WOOD FRAMES. SEE 08 14 16, 2.3 AND 2.4.

Thanks, Chris

Chris Knapp / Sales Associate 11635 Lackland Road St. Louis, MO 63146

Main (314) 432-8188Website Facebook Linkedin

“We deliver your door and hardware solutions, on-time and accurate, with an uncompromising service package behind every sale.”

Please consider your responsibility to the environment before printing this e-mail.