Upload
vobao
View
220
Download
1
Embed Size (px)
Citation preview
15
1 23-
22
23
Attach the black chain guides to the top of the
track and attach the connectors to the bottom
of the track exactly as shown.
Be sure to push the connectors on firmly until they “click”.
16
1 25- Always join this end of the track to the previous track piece first, then connect the rest of the track to the tower.
25
24
Always connect the track top side to top side
throughout the build.
23x1
IMPORTANT: Attach all the chain links
in the same direction.
3939
3939
3939
3939
39
38
x9
x10x8
38
39
40
38
39