Upload
susanna-conley
View
223
Download
10
Embed Size (px)
Citation preview
WIGOS IMPLEMENTATION AT NATIONAL LEVEL IN CÔTE D’IVOIRE
Daouda KONATEDirecteur de la Météorologie [email protected]
CG-17 25 May – 12 June 2015Genève Switzerland
*OUTLINE
1.Introduction
2.National Observations Network
3.Implementatin activities
4.Conclusion
1. National Observation Network
Type de stations QTEAutomatic OR
Manualfunction
alComments
SYNOPTIC 16 8 AWS, 8 Manuel 13
CLIMATOLOGICAL/AGROMETEO 22 Manuel 18
RAINFALL 183 Manuel 120
RADIO SOUNDINGS ( ASECNA) 2 2 21 in Abidjan and the 2nd in Man
(West)
Current Network
Type de stations Qte Automatic OR Manual
Partners
SYNOPTIC 6 Automatic University Felix Houphouët Boigny/NMS
CLIMATOLOGICAL 8 Automatic WASCAL project
CLIMATOLOGICAL/AGROMETEO 70 Automatic Ministry of Agriculture /NMS
Projects 2015-2016
1. Observations Network
• • •
• •
•
synoptic
• climatology
WASCAL stations
Partners network
Main partners domains Number of stations
ASECNA Aviation met 1 AWS, 2 upper air
CNRA (research) Agromet, rainfall 27 agromet
ANADER (national agency for the development of agriculture)
agrometeorology 100 farmers raingauges
CRO (center of research in oceanography)
oceanograghy 9 topography level, 2 buoy, 1 maregraphy, 1 laboratory
IHH (hydrology) hydrology 173 hydrology station
CIAPOL (center of pollution)
air and water quality 85 station for air and sea quality
MINISTRY OF AGRICULTURE
agrometeorology 1 sattellite reception
•
•
•
•
• •
•
•
•
• •
•
• • • •
• •
•
•
•
•
•
•
•
•
•
•
• •
•
• •
• • • • • • • •
◊ ◊
♂
♂
CMS ASECNACNRACRO
Partners network
2. WIGOS Implementation activities
ACTIVITES MENEES
STATUS
WIGOS/WIS focals points
Focals points WIGOS and WIS designated
Governance of WIGOS
- WIGOS Team created in the NMS with an action plan - National Working Group (W-NWG) established- National Governance Structure (W-NGS) established
Partners Identification
• 8 main partners(hydrology, agriculture, environment, océanography, aviation) have been identified and sensitized
• One form questionnaire information on the network is established and analyzed
• The focus points of the partner structures identified for W-NWG and W-NGS
• Other partners have been identified
WMO Sub Regional workshop on WIGOS (november, 2014 –Abidjan)
• Development of the Regional Implementation Plan• Training of national focal points
Actions Status
Organization of the workshop to launch the national WIGOS Project (16 to 17 December 2014 with the support of WMO)
8 participation of key partners and a WMO expert Each partner presented its network (difficulties,
projects, challenges) The launch of a consultation on the state of art of
stations (MND -PNCC -GIZ) - Choosing a secondment consultantImplementation Plan for WIGOS Ivory Coast has been developedA 2015 work program was adopted for each group
Strengthening of national Observations Network
• Acquisition of 8 (2014)• Mercury barometer have been replaced by electronic
barometer (Minamata Agreement)• Wind systems installed in all stations
MoU with partners to strengthen the network (future)
• 8 stations will be install by WASCAL project• 6 stations (by University)+ 80 stations (by Ministry of
Agriculture)
Reinforcement of Data base system
• Acquisition of CLIDATA system and et CLIMSOFT system (2015)
1st meeting of W-NWG (April 30th, 2015)
• Assessment of the implementation plan • Interministerial legal Act have been elaborated for
WIGOS project • The data based of the 8 main partners have been
presented • Implementation Budget • Others partners identified
Others partners
•CIDT, IVOIRE COTON: partners with some stations in the cotton field• University: in the University, the laboratories of atmosphere research have stations• SAPH: industries in palm oil,•National program of Climate change (PNCC)• MoU Signed with the Maritime Port of Abidjan and maritime Port of San pedro
3. Actions ongoing
• Natonal Wigos Budget
• Identification et sensitization of others partners
• Signing the Interministerial Act
• Hire the consultant for the state of the art of all the
national network
• Standardization process of the network
• Interconnecting of all network (NMS – partners ) -
OSCAR
• Assessment of the network (NMS+partners )
• Linking WIGOS national with GFCS national
THANK YOU
Comments! QUESTIONS?