Why Oh Y ?HS2 -- grand projet, great

delusion or national network ?Jonathan Tyler

Passenger Transport Networks, YORK

Institute of Railway Studies and Transport History

National Railway Museum / University of York

1 June 2011

Page 2: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and
Page 3: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Why I’m sitting on the fence [1]• as a long-time environmentalist

I hold to a radical critique ofhigh capitalism / the presumption of globalisation / the concept of eternal growth / hyper-mobility

• but transition to a less mobile society will take time

• and we need excellent public transport

Page 4: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

why I’m sitting on the fence [2]

• demand for rail travel is growing strongly and rail’s mode share is rising

• there are some difficult capacity issues• significant sections of the infrastructure

are of poor quality• the pattern of services requires overhaul

>> high-speed rail could bepart of the solution

Page 5: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

The case for the grand projet [1]• capacity is at a premium on WCML

and will become so on MML and ECML• expanding capacity by rebuilding the

existing railway is out of the question• the nation therefore needs new

railway on fine new alignments• if doing that then we should build a

high-speed line using the best available technology – indeed, a 400 km/h railway

Page 6: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

the case for the grand projet [2]

• maximises economic benefits (shorter journey times, enlarged markets)

• the best route to serve major centres, relieve the main lines and capture traffic from other modes is the ‘Y’

• the new railway will release capacity on the ‘classic’ railway for growth in commuting, regional travel and freight

Page 7: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

“a truly national high speed rail network for the whole of Britain”

Programme for GovernmentMay 2010

Page 8: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and
Page 9: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

It’s a beautiful concept, but

DOUBTS

My involvement >• long-time advocate of better

timetabling• Greengauge 21 – use of WCML post-HS2• timetabling support for critics• Arup – advice to eastern regional bodies

Page 10: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Doubts [1]

• is capacity really (going to be) tight ?

- timetabling- operating practices, performance

regime- size of trains- load factors and the fares system- peak hours (should we query the economics ?)

- the Friday evening phenomenon- growth assumptions

Page 11: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

doubts [2]

•rebuilding

- legitimate argument against total rebuilds

- but not against location-specific projects

•new railways

- an HS network not a necessary outcome- incremental alternatives

Page 12: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

doubts [3]

• is ultra-high-speed technology appropriate in Britain ?

- relatively short distances- implications of straight alignments- no point without long runs, hence

omission of calls at intermediate stations

- risk from extended building timescale- no assessment of < 400 km/h options ?

Page 13: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

doubts [4]

•economic benefits

- evaluation depends on possibly-obsolete classical models

- is ever-increasing mobility credible, sustainable ?

- is forecasting way into future sound ?- tendency to favour large conurbations

Page 14: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

doubts [5]

•the ‘Y’ configuration

- small number of stations- stations not in city centres

•capacity release on classic railway

- not as great as claimed ?- benefits of commuting and freight ?

Page 15: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

so you might reasonably

conclude that I’m falling off

the fence onto the ‘no’

side

Page 16: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Great delusion(s) ?that• we need a ‘transformational’ project

rather than incremental change• a project which will not be completed

until 2026 is relevant to problems now• running Scotland <> London in 3½h

in 2033 is a serious means of curtailing flying

• a scheme which is merely carbon-neutral helps to achieve carbon-reduction targets

Page 17: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

great delusion(s) ? [continued]

that• high-speed lines serving few stations

make sense in a multi-centric country• centre-city stations separately located

from existing stations will diffuse benefits

• ex-urban stations are acceptable• capacity will exist for every aspiration

to be satisfied

this last issue is vital and unacknowledged

Page 18: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

The capacity delusion [1]

• trains / hour- Tokaido : 14- RFF / SNCF : 13, rising to 15- study for Greengauge : 16.6- under ERTMS 3, in theory : 18- eddy-current brakes, calculated risk :

19.2- HS2 Ltd : 10 / 14 / 18

Page 19: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

the capacity delusion [2]

• now look at the aspirations

• and at the reality

Page 20: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

distribution of paths [peak hour]

aspir-

ations

HS2 Ltd

single

trains

portions

Scotland 2 2 2 2 x ½Newcastle … York 1-2 2 -- --Yorkshire + E.Midlands

6 4 4 6 x ½

Manchester 3-4 4 3 4other North West 3-4 2 3 4 x ½Birmingham 4 4 4 4Europe via HS1 4 see

quote

-- --Heathrow 4 -- --

TOTAL 27-30

18 16 14

Page 21: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

“Further work is being done to determine which of the above

services might serve Heathrow and which might run on to mainland Europe”

Department for Transport / HS2 Ltd, February 2011

Page 22: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

The capacity delusion – the problems

• planning must not assume a techno-fix• somehow we have to decide priorities• no credible basis for HS1 or Heathrow links• infrastructure decisions, eg. E.Mids, portions• Newcastle and York not served by HS2• complicates capacity release on classic lines• not just HS2 core but also LDHS-J <> WTOE-J• regulation and competition

Page 23: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

can we put the pieces together again ?

Page 24: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Why oh Y are we in this mess ?• keeping up with Japanese, French, …

(politicians + railway enthusiasts)• alternative to Heathrow expansion• models of economic growth• regional interests – links with London• DfT and Network Rail forecasts• fashionable sustainability arguments (freight)• engineers’ excitement about the perfect

railway• no understanding of strategic timetabling• route plans > secrecy > no debate on

principles

Page 25: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Above all :no strategic plan for public transportlast of my three perspectives :

the case for a national network• does Britain need milch-cow /

minimum-subsidy franchises or a public transport network to ensure sustainable mobility ?

• do we want competing operators or an integrated system ?

• has McNulty ignored this ?

Page 26: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

What does a high-quality, integrated and genuinely-sustainable system of public transport require us to do ?• change planning objectives• abandon competition in the market• accept desirability of central planning• tender concessions for service delivery• plan and timetable comprehensively

(HS2 started from wrong place)

Page 27: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

modal-splittargets

national standards of service-qualityand connectivity

modellingroute-specific

demand

organisations,budgets

timetabling,operationsplanning

infrastructureplan

toward an excellent system of public transport

data,scenarios

Page 28: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

Where does this leave High Speed Rail ?• conceivably with a significant role, where- an increment of capacity is essential- existing inter-urban route devious, slow

[eg. Leeds … Sheffield, Leeds … Manchester]• but NOT 400 km/h, NOT ex-urban

stations, NOT separate network• more like German than French model>> incremental change

Page 29: Why Oh Y ? HS2 -- grand projet, great delusion or national network ? Jonathan Tyler Passenger Transport Networks, YORK Institute of Railway Studies and

conscious that I may be the little boy pointing out the emperor’s nakedness, but my criticism is of the present ‘Y’ plan for HS2, not of high-speed railways