WHIRLPOOL CORPORATION ▪ CONFIDENTIAL ■ 1 WHIRLPOOL AMANA OPERATIONS ■ 1 LDP Intern Presentation December 2015 Line 50LB Assembly

Whirlpool Exit Presentation

Embed Size (px)

Citation preview

Page 1: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL ■ 1

WHIRLPOOL AMANA OPERATIONS

■ 1

LDP Intern Presentation

December 2015

Line 50LB Assembly

Page 2: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

INTRODUCTION

Name: Haley DudleySchool Attending: Iowa State UniversityMajor, Year: Mechanical Engineering, JuniorExpected Graduation Date: December 2017Department Assignment: 50# IceMentor Name: Jarrad Lehman Manager Name: Sean Conway

Page 3: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

● Skin Schedule● Paint Schedule● Door Foam Schedule● Joel’s Schedule

○ 18” grills○ 18” rails○ New and old water lines○ Pumps

JOBS & ASSIGNMENTS

■ 3

DAILY LINE SCHEDULING OTHERS

RESPONSIBILITY/ TIME MANAGEMENTGOOGLE SHEETSSK

ILLS

GO

ALS

QUALITY ENGINEERINGSAFETY ENGINEERING

MEET 50# METRICS MAINTENANCE IMPROVEMENTSSAFETY IMPROVEMENTS

● Hipot Testing for E-Checks● Maintaining Water Softener● Work Orders● Wish Audits

Page 4: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

SUPERVISOR EXPERIENCE

■ 4

LABOR LINE SUPPORT

CAL FAILURES

MAINTENANCE MATERIALS

● check vacation board

● check with team leaders

● assign plant utilities

● answer and-ons

● assist team leaders with problems

● look over defect with quality tech

● walk the line

● call when machine needs worked on

● call if parts are running low

● calculate how long until we run out of parts when parts have not been shipped or arrived

COMMUNICATIONQUALITY

MEET 50# METRICS

SKIL

LSG

OA

LS

Page 5: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

MAJOR PROJECTS

■ 5

PROBLEM SOLVING

SAFETY IMPROVEMENTS

1 DRAIN HOSE

LEANAUTOCAD

COMMUNICATION TEAMWORKQUALITY ENGINEERING

ORGANIZATION TIME REDUCTION

QUALITY IMPROVEMENTS

FTY IMPROVEMENT

2 WORK CELL 3 CART SLEEVES

4 2ND SHIFT

● Design new drain hoses for RTS

● Materials● Improvements

● Design new cart sleeves for cabinet sides, doors, tops, and skins

● Vendor

SKIL

LSG

OA

LS

● Team● Initial Job● Collaboration

● Redesign work cell for optimal use

● Improvements

Page 6: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

PROBLEM

1 DRAIN HOSE

■ 6

SAFETY

3 people cut hand due to tight fit

SOLUTION

MATERIALS

magnet attached to Flexform hose allows loose fit

RESULTS

No injuries and reduced 12.9s/row

Page 7: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

2 WORK CELL

■ 7

ORGANIZATION AND TIME

1. 3 different colors of grills and only holds 3 totes so totes are being stacked and set on floor

2. eps boxes were on the floor and cardboard was on separate smaller rack

3. cleaning supplies on rack

PRO

BLE

MSO

LUTI

ON

1 2 3

Page 8: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

3 CART SLEEVES

■ 8

PROBLEM

QUALITY

materials touching causing scratches and dents

SOLUTION

VENDOR

plastic sleeve with 3 carpeted slots

Page 9: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

3 CART SLEEVES

■ 9

PROBLEM

QUALITY

materials touching causing scratches and dents

SOLUTION

VENDOR

plastic sleeve with a divider that sits back

Page 10: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

4 SECOND SHIFT

TEAM INITIAL JOB:REPAIR RUNNER COLLABORATION

● Leo Rangel● Xue Bai● Connor

Ramstead● Stephen Moore

● Check for repeating defects

● Notify team leader● Fix problem if team

leader is unable to● Maintain the hour by

hour board

● Check for repeating defects before repair bay

● Fix problem immediately

● Tollgate area/process audit

● Maintain the hour by hour board

Page 11: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

4 SECOND SHIFTSeptember 2015 October 2015

November 2015 FTY

higher and more consistent

problems fixed:● Foamed in air vents● Wrong hinges● Scratches on cabinet● Foamed in amp block

Page 12: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

BENEFITS OF CO-OP EXPERIENCE

■ 12

SKILLS ACHIEVEMENTS

● Communication was used when being in the supervisor role, working with vendors, and helping operators

● Time management was important when scheduling for the line and working on multiple projects at a time

● Problem Solving was used daily but especially when working on big projects

● Quality Engineering skills grew tremendously when working on line 7

● Safety Engineering skills developed when doing wish audits

● Lean knowledge increased when re-designing work cells

● AutoCad and Google sheets were used daily with projects and scheduling

● Meeting 50# metrics● Maintenance improvements were

achieved by maintaining the water softener and doing hipot testing

● Safety improvements were achieved by the new drain hoses and from wish audits

● Organization improved once the new racks were installed

● Time was saved after drain hoses and new racks were installed

● Quality improvements were made on line 7 by fixing foamed in air vents, scratches, and hinges

● FTY improvements on line 7 for 2nd shift

● Cost savings of $11,300 for removal of edge guards

Page 13: Whirlpool Exit Presentation

WHIRLPOOL CORPORATION ▪ CONFIDENTIAL

CO-OP EXPERIENCE AT AMANA OPERATIONS

STRENGTHS

● Volunteer/training opportunities● Leadership opportunities● High responsibility

OPPORTUNITIES

● Ready to use computers● Easier hiring process