WHIRLPOOL CORPORATION ▪ CONFIDENTIAL ■ 1
WHIRLPOOL AMANA OPERATIONS
■ 1
LDP Intern Presentation
December 2015
Line 50LB Assembly
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
INTRODUCTION
Name: Haley DudleySchool Attending: Iowa State UniversityMajor, Year: Mechanical Engineering, JuniorExpected Graduation Date: December 2017Department Assignment: 50# IceMentor Name: Jarrad Lehman Manager Name: Sean Conway
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
● Skin Schedule● Paint Schedule● Door Foam Schedule● Joel’s Schedule
○ 18” grills○ 18” rails○ New and old water lines○ Pumps
JOBS & ASSIGNMENTS
■ 3
DAILY LINE SCHEDULING OTHERS
RESPONSIBILITY/ TIME MANAGEMENTGOOGLE SHEETSSK
ILLS
GO
ALS
QUALITY ENGINEERINGSAFETY ENGINEERING
MEET 50# METRICS MAINTENANCE IMPROVEMENTSSAFETY IMPROVEMENTS
● Hipot Testing for E-Checks● Maintaining Water Softener● Work Orders● Wish Audits
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
SUPERVISOR EXPERIENCE
■ 4
LABOR LINE SUPPORT
CAL FAILURES
MAINTENANCE MATERIALS
● check vacation board
● check with team leaders
● assign plant utilities
● answer and-ons
● assist team leaders with problems
● look over defect with quality tech
● walk the line
● call when machine needs worked on
● call if parts are running low
● calculate how long until we run out of parts when parts have not been shipped or arrived
COMMUNICATIONQUALITY
MEET 50# METRICS
SKIL
LSG
OA
LS
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
MAJOR PROJECTS
■ 5
PROBLEM SOLVING
SAFETY IMPROVEMENTS
1 DRAIN HOSE
LEANAUTOCAD
COMMUNICATION TEAMWORKQUALITY ENGINEERING
ORGANIZATION TIME REDUCTION
QUALITY IMPROVEMENTS
FTY IMPROVEMENT
2 WORK CELL 3 CART SLEEVES
4 2ND SHIFT
● Design new drain hoses for RTS
● Materials● Improvements
● Design new cart sleeves for cabinet sides, doors, tops, and skins
● Vendor
SKIL
LSG
OA
LS
● Team● Initial Job● Collaboration
● Redesign work cell for optimal use
● Improvements
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
PROBLEM
1 DRAIN HOSE
■ 6
SAFETY
3 people cut hand due to tight fit
SOLUTION
MATERIALS
magnet attached to Flexform hose allows loose fit
RESULTS
No injuries and reduced 12.9s/row
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
2 WORK CELL
■ 7
ORGANIZATION AND TIME
1. 3 different colors of grills and only holds 3 totes so totes are being stacked and set on floor
2. eps boxes were on the floor and cardboard was on separate smaller rack
3. cleaning supplies on rack
PRO
BLE
MSO
LUTI
ON
1 2 3
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
3 CART SLEEVES
■ 8
PROBLEM
QUALITY
materials touching causing scratches and dents
SOLUTION
VENDOR
plastic sleeve with 3 carpeted slots
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
3 CART SLEEVES
■ 9
PROBLEM
QUALITY
materials touching causing scratches and dents
SOLUTION
VENDOR
plastic sleeve with a divider that sits back
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
4 SECOND SHIFT
TEAM INITIAL JOB:REPAIR RUNNER COLLABORATION
● Leo Rangel● Xue Bai● Connor
Ramstead● Stephen Moore
● Check for repeating defects
● Notify team leader● Fix problem if team
leader is unable to● Maintain the hour by
hour board
● Check for repeating defects before repair bay
● Fix problem immediately
● Tollgate area/process audit
● Maintain the hour by hour board
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
4 SECOND SHIFTSeptember 2015 October 2015
November 2015 FTY
higher and more consistent
problems fixed:● Foamed in air vents● Wrong hinges● Scratches on cabinet● Foamed in amp block
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
BENEFITS OF CO-OP EXPERIENCE
■ 12
SKILLS ACHIEVEMENTS
● Communication was used when being in the supervisor role, working with vendors, and helping operators
● Time management was important when scheduling for the line and working on multiple projects at a time
● Problem Solving was used daily but especially when working on big projects
● Quality Engineering skills grew tremendously when working on line 7
● Safety Engineering skills developed when doing wish audits
● Lean knowledge increased when re-designing work cells
● AutoCad and Google sheets were used daily with projects and scheduling
● Meeting 50# metrics● Maintenance improvements were
achieved by maintaining the water softener and doing hipot testing
● Safety improvements were achieved by the new drain hoses and from wish audits
● Organization improved once the new racks were installed
● Time was saved after drain hoses and new racks were installed
● Quality improvements were made on line 7 by fixing foamed in air vents, scratches, and hinges
● FTY improvements on line 7 for 2nd shift
● Cost savings of $11,300 for removal of edge guards
WHIRLPOOL CORPORATION ▪ CONFIDENTIAL
CO-OP EXPERIENCE AT AMANA OPERATIONS
STRENGTHS
● Volunteer/training opportunities● Leadership opportunities● High responsibility
OPPORTUNITIES
● Ready to use computers● Easier hiring process