13
Company name appears here WHEN THE HOLES ALIGN Human Behavioral Impact on Process Safety Anowi Nnamdi Engineering Manager, Shell Companies in Nigeria Alaka Olanrewaju Senior Process Engineer, Shell Nigeria &

WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

WHEN THE HOLES ALIGN

Human Behavioral Impact on Process Safety

Anowi Nnamdi

Engineering Manager, Shell Companies in Nigeria

Alaka Olanrewaju

Senior Process Engineer, Shell Nigeria

&

Page 2: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Presentation Overview

▪ Idea in Brief

▪ Idea in Action

▪ Case Study I

▪ Case Study 2

▪ Case Study 3

▪ Conclusion and Recommendations

▪Q & A

Date Month 2016

Page 3: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Brief

▪ Process safety standards and regulations enacted over the years have been about keeping the hydrocarbons in containment, staying within facility operating

envelopes and adequately preparing equipment for maintenance and facility restart.

▪ However, situations still occur when failures in the barriers (holes) align, creating unexpected release of hazards.

▪ The industry uses various standards, codes and guidelines to manage potential process safety hazards from project initiation through facility operation and

decommissioning.

▪ At Shell, Process Safety is managed using the Asset Integrity approach comprising of three (3) facets: Design Integrity (DI), Technical Integrity (TI) and

Operating Integrity (OI) with Integrity Leadership at the core.

Page 4: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Brief – Design Integrity

Design integrity covers all the activities necessary to establish the integrity of an asset before the first hydrocarbons are produced. Consequently, an important

part of good engineering design is meeting the needs of operations and maintenance. Equally important is the communication of Operations and Maintenance

needs to the design team (two-way conversation). The key elements are:

▪ Hazards and effects management processes (HEMP) are followed so that the chosen concept or design carries residual risk that is as low as reasonably

practicable (ALARP) and tolerable.

▪ All safety-critical equipment (SCE), performance standards (PS) and maintenance routines are identified.

Page 5: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Brief – Operating Integrity

Operating integrity refers to the ingrained habit of considering potential risks from cumulative hazards, changes and dynamic events. The OI process involves:

▪ Operating all the facilities within up-to-date operating envelopes.

▪ Rationalizing and knowing how to react to alarms and using the permit-to-work systems.

▪ Clear, consistent and effective daily communications and shift handovers line.

Operating integrity centers primarily on compliance with procedures and standards.

Page 6: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Brief – Technical Integrity

Technical integrity is the safeguarding of assets through effective maintenance, inspection, repair and assurance :

▪ When projects are handed over to operations, the HSE Case must be valid and "operationalized".

▪ Competent staffs are required to assess and fix the integrity-dependent elements in existing assets, starting with SCE.

Hardware barriers must be maintained and tested on a regular basis to ensure they will perform as per the performance standards when required.

Page 7: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Brief – Integrity Leadership

Focuses on leading and role-modelling the right behavior, while also providing trainings and reinforcement of the right capabilities in the right places at the right

times

Page 8: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Idea in Action - Summary

▪ Three case studies, each focusing on one element of the Asset Integrity Methodology, were analyzed to determine the root causes of failure and breaches to

Process Safety Management.

▪ The review outcomes show that human and behavioural actions have significant impact on process safety management.

▪ This outcome is supported by the trend analysis of process safety incidents across Shell facilities between 2014 and 2017.

▪ A root cause analysis of these operating integrity related incidents revealed the need for a focused process safety leadership and a new approach to behavioral

change at the front line, as key drivers for improvement.

70%

12%

18%

UP 2014: n=51

51%

23%

26%

UP 2015: n=61

41%

41%

18%

UP 2016: n=44

50%

42%

8%

UP 2017 (end of May) n=12

Technical Integrity

Operating Integrity

Design Integrity

Page 9: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Case Study 1: F a i l u r e o f a n o v e r p r e s s u r e p r o t e c t i o n

s y s t e m o n a g a s m a n i f o l d

Date Month 2016

20

Page 10: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

C a s e S t u d y 2 : F a i l u r e o f a g a s k e t l e a d i n g t o l o s s o fc o n t a i n m e n t a t a G a s P l a n t

Date Month 2016

Page 11: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here

Case Study 3: O i l sp i l l o n a S i n g l e P o i n t M o o r i n g , S P M

s y s t e m a t a c r u d e t e r m i n a l

Date Month 2016

Page 12: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here Date Month 2016

Page 13: WHEN THE HOLES ALIGN - IChemE...Company name appears here Presentation Overview Idea in Brief Idea in Action Case Study I Case Study 2 Case Study 3 Conclusion and Recommendations Company

Company name appears here