What’s Next?Galileo Services Roadmap

Álvaro Mozo, GSAGalileo Service Engineering Manager

Page 2: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Deployment and Service Provision

Initial ServicesEnhancedServices

Full Operational Capability

Slide 2

SatelliteLaunches and Commissioning

GroundInfrastructureUpgrades

Page 3: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

The Way to Improving Services

ServiceMonitoring

InfrastructureDeployment

OperationsService

Validation

Slide 3

Page 4: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Service Monitoring

Slide 4

Continuous ServiceMonitoring

Operator GRC

• Performance Data• Continuous

Improvement• Lessons Learned

Service Exploitation Reviews

Page 5: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Infrastructure Deployment

Slide 5

Launch EarlyOperations

In-Orbit

TestService

Factory Site / Non-Operational

Site / Operational

Page 6: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Operations

Slide 6

Deployment of new infrastructure

• Preparation of updatedprocedures

Hand-over of infrastructure

• OperationalValidation

Deployment in operational

• Support to themigration

• RoutineOperation

Continuous operation

Service Continuity

Page 7: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Service Validation

Slide 7

Service Targets

Measurement Campaign

• Service Monitoring• Qualification• Operational

Validation

AccreditationServiceReviews

Page 8: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

OS Service Provision Phases

Slide 8

Initial Service

• Initial Ranging Accuracy (95%) < 7m

• Initial Ranging Availability > 87%

• Full Timing Accuracy (95%) < 30 ns

• Initial Timing Availability > 87%

Enhanced Service

• Full Ranging Accuracy

• Enhanced Ranging Availability

• Enhanced Timing Availability

• Initial Positioning Service Accuracy and Availability

FOC

• Full Positioning Accuracy

• Enhanced Positioning and Timing Availability

• Navigation Message Authentication

• INAV Improvements

• OS NMA Consolidation and SiS Tests

Page 9: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

CS Service Provision Phases

9

EnhancedService

•Initial Data Dissemination Capability

•CS Provider Selection for the Initial CS High Accuracy provision

FOC

•Full CS High Accuracy Service provision

•CS Provider(s) selection for Initial CS Authentication provision

The provision of the CS High Accuracy for free is being discussed,which would mean a diversion of the current baseline withpossible impact on the above described phasing.

Page 10: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Galileo contribution to High Accuracy

• New OS signals withpromising performance• E1b, E5b, (E5a)

• E5 AltBOC

Page 11: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Galileo Commercial Service HA

• EC Implementing Decision• Galileo CS shall support HA and

Authentication

• Galileo CS support to HA• Ranging signal in E6

• Data dissemination capability in E6B

• CS Demonstrator• Live broadcast of PPP corrections

“Authenticated PPP”

Page 12: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Data Dissemination Capability

• E6B data rate around 450bps

• Benefits from former Galileo SoL design• Latency of a few seconds

• Constellation subset (“connected satellites”)

• Global coverage

• Availability under consolidation• Infrastructure deployment

• GNSS Service Centre

Page 13: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Authentication

Data

Range

AuthenticatedPosition/Time

E1 / OS-NMA

Free access

E6 Encrypted Ranging

Commercial Service

Page 14: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

SAR Service Provision Phases

14

Initial Service

•FLS : Service provision for contribution to MEOSAR Early Operational Capability (EOC)

•Initial detection and location performances over the SGC (SAR/Galileo Coverage)

EnhancedService

•FLS : Service provision for contribution to MEOSAR IOC

•Improved location performances w.r.t. to Initial Service

•Commitment on availability of the Localisation < 2km in single burst over the SGC

•RLS : Start of Service

FOC

•FLS : Service provision for contribution to MEOSAR FOC

•Service Provision relying on L-band satellites Downlink only

•Extension of SAR Ground Segment Coverage in South Indian Ocean

•Increased Ground Segment Capability to Support 2nd Generation of beacons

Page 15: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

• Galileo is delivering high quality services

• And at the same time working in the next improvements

• Challenging Service Roadmap up to 2020

• Next stop: Enhanced Services (2018)

• Service Roll-out Strategy• Joint work of Stakeholders• Monitoring, Development, Operations, Validation• Security and Service Continuity

ConclusionsConclusions

Page 16: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

NOW IT’S YOUR TURN

Slide 16

Page 17: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

100%

100%

100%

How much would you benefit from the Galileo CS features?

• High Accuracy

1. Not beneficial at all

2. Slightly beneficial

3. Beneficial

4. Fairly beneficial

5. Highly beneficial

Page 18: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

100%

100%

100%

How much would you benefit from the Galileo CS features?

• Authentication

1. Not beneficial at all

2. Slightly beneficial

3. Beneficial

4. Fairly beneficial

5. Highly beneficial

Page 19: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

100%

100%

100%

How important is the following for your application…

• Position or timing accuracy?

1. Not important at all

2. Slightly important

3. Important

4. Fairly important

5. Very important

Page 20: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

100%

100%

100%

How important is the following for your application…

• Availability

1. Not important at all

2. Slightly important

3. Important

4. Fairly important

5. Very important

Page 21: What’s Next? Galileo Services Roadmap · Deployment of new infrastructure •Preparation of updated procedures Hand-over of infrastructure •Operational Validation Deployment in

Thank you