Page 1: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

What project promoters cannot

ignore about INTERREG IVB NWE

project management

Interreg Project ARBORAccelerating Renewable energies through valorisation of Biogenec Raw materials

‘Improving sustainable biomass utilisation in North West Europe’

(Verbeteren van duurzaam gebruik van biomassa in NWE’)

Page 2: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

13 Partners in 6 landen in Noor West Europa: NL (ook Universiteit Wageningen en DLV Plant), BE, UK, IR, DL, LU

Strategic initiative (= extra geld) Totaal budget: 7,3 milj. euro (Utrecht: 1 milj) (50% co-financiering) Lead Partner: Staffordshire University Looptijd project: sept 2009 - sept 2015

ARBOR:

Page 3: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

- Pyrolyse installatie bouwen (UK)- Meten energie-inhoud biomassa (UK)- Nutrientwinning uit digestaat (BE, DE)- Modellering (Lux) - Innovatieve technieken in de landbouw (Wageningen en DLV Plant)- Bermgras, droogvergisten, biogashub (PU) - enz

ARBOR: verbeteren duurzaam gebruik van biomassa in NWE

Page 4: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

1. Inzamelstructuur voor Bermgras??

2. Nieuwe techniek: droogvergisten bij composteerinrichtingen

3. Biogas Groengas + injectie in aardgasnet

4. Verschillende aanbieders biogas aansluiten op biogashub gezamenlijke opwerking + injectie

Wat gaat PU doen?

Page 5: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

- Benutting ‘afvalproduct’ voor energie

- Verwerking tot energie is lastig

- Hoge kosten inzameling en vervoer

- Veel verschillende “eigenaren”

1) Inzamelstructuur voor Bermgras

Page 6: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

Compulsory For the 2007-2013 programming

period- Innovatie

- Bij composteerinrichtingen

- Bermgras, bladafval, snoeimateriaal enz

(‘afval’ van overheden)

- Optimale benutting groenafval

- Minder geur, betere kwaliteit compost

2) Droogvergisten

Page 7: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

Voorkeursvolgorde benutting biogas:

1. Warmte (zwembad, verzorgingshuis)

2. Brandstof (auto’s, bussen ed)

3. Elektriciteit en warmte (≥ 70% benut)

4. Groengas invoeding aardgasnet

5. Elektriciteit en warmte (≤70% benut)

3) Biogas Groengas

Page 8: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

Waarom?- Beperkingen in het lokale aardgasnet- Aanleg biogasleiding duur- Opwerken biogas groengas duur- Aansluitingskosten hoog- Gedeelde kosten maken groengas

projecten sneller rendabel

4) Biogashubs

Page 9: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

- AWZI/RWZI vergisters- Mestvergisters - Co-vergisters- Industriële vergisters - Droogvergisters

Kansen voor biogas/groengas!

Page 10: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

Vergisters

Page 11: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

Co-vergister 36.000 ton

Page 12: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation
Page 13: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation
Page 14: What project promoters cannot ignore about INTERREG IVB NWE project management Interreg Project ARBOR Accelerating Renewable energies through valorisation

- Ruimte bieden aan vergistingsinitiatieven- Meedenken over benutting biogas- Rijden op groengas (auto’s, tankstation)- Duurzaam aanbesteden (groenbeheer,

wegbeheer, ov, projectontwikkeling)

Wat kunnen gemeenten doen?