What is Goliath up to and how can David benefit from it?

What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

What is Goliath up to and how

can David benefit from it?

Page 2: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Introduction

• Utility WRA

• Scalability

• Reduce cost

Page 3: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Typical Project

80 MW 40 x 2.0 MW Turbines 3 x 60m masts 1 x 80 m masts

Page 4: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

So you’ve got your data…

•60 m mast: $20-40k installed/tower •80 m mast : $80-100k installed/tower •Routine maintenance: $5-10k/year/tower •Corrective maintenance: $5-10k/year/tower •Communication: $1k/year/tower •60 m decommission: $ 5-10k •80 m decommission: $10-30k

Total tower costs over 5 years: ~$425k Cost per MW=$5.3k

You can go cheaper, but you have to be lucky or good.

Page 5: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

…but what it is worth?

• Data processing • $1-2k/tower/year

• Assessments • Informative

• Verification

• 1 / year?

• $5-30k per

• Total for project: ~$130k

• Cost/MW: $ 1.6k

Don’t collect it, if you can’t maintain and analyze it!

Page 6: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

It can be scaled down effectively…

• 80 MW: $555k • 4 masts • 5 years • 5 studies

• 20 MW: $139k • 2 masts • 2 years • 1 study

• 5 MW: $35k • 1 mast • 1 year • 1 study

0

100

200

300

400

500

600

0 50 100

Tho

usa

nd

$

Namplate MW

WRA BUDGET

Total

Data

Analysis

Must spend every penny wisely.

Page 7: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

…but it rarely is.

• Lacking expertise

• Need solid planning

• No clear goals

• Scope creep

• No budget for ongoing costs

• Bad or no advice

• Penny wise and pound foolish

It is better to do a small thing well than a big thing poorly.

Page 8: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

How low can you go?

0

5

10

15

20

25

30

35

40

0 1 2 3 4 5 6

Tho

usa

nd

$

Nameplate MW

WRA BUDGET

Total

Data

Analysis

Page 9: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

When the party is over…

•60 m mast: $20-40k installed/tower •80 m mast : $80-100k installed/tower •Routine maintenance: $5-10k/year/tower •Corrective maintenance: $5-10k/year/tower •Communication: $1k/year/tower •60 m decommission: $ 5-10k •80 m decommission: $10-30k

Total tower costs over 5 years: ~$425k Cost per MW=$5.3k

You can go cheaper, but you have to be lucky or good.

Page 10: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

…somebody has to clean up

•Two options •Carefully decommission and stored •Cut it down •Difference is ~$5k

•How many 10 m masts can you get from a 60 m tower? •20 m? •30 m? •What modifications are necessary?

Page 11: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Challenges remain

•Late to the party •Installers want to hold towers •Installation •Shipping •Economies of scale •Gov’t funds buying used equipment? •Need cooperation from manufacturer

Page 12: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Is desperate too strong?

Page 13: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Sensors are consistent

Part Quantity (per kit)

#40C anemometer or similar (used Part) 1

#200p wind vane or similar (used part) 1

1.53m or similar boom (used Part) 2

25' 2C Sensor Cable (used) 1

25' 3C Sensor Cable (used) 1

Ideal SS 6X500 Clamp (new) 2

Number 5 15 100 200

Unit Cost $300 $200 $75 $70

Total $1,500 $3,000 $7,500 $14,000

Delivery ASAP ASAP End of 2013 End of 2014

Page 14: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Summary

• “Optics” are fantastic

• Needs proof of concept

• Many unanswered questions

Page 15: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Questions?

Chris Nuckols

[email protected]

Phone: (712) 577-1825

Thank You

Page 16: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Optimize early and often

Best times to optimize?

• Define project area

• Major milestones

• “Final” layout

• Now

Because optimization is so cheap compared to the potential value, ROI is always high.

Page 17: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

weaknesses

• Just a tool

• Only as good as data

• Butterfly effect

• Potential for overestimation

• Perfect can be the enemy of good

Page 18: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

Work in progress

• $/MWh

• Calculation vs. rule of thumb

• Early and often

• ROI

• Requires expertise

Page 19: What is Goliath up to and how can David benefit from it?...Delivery ASAP ASAP End of 2013 End of 2014. ReGenerate Summary • “Optics” are fantastic • Needs proof of concept

ReGenerate

What’s it worth?

• Improve project

• Lower Uncertainty

• Financing

• Comfort

• Is it worth it?

Don’t collect it, if you can’t maintain and analyze it!