9
1. summary 25/8 RESEARCH + DESIGN toronto / new york [email protected] : 25 8 S.C.A.F.fold self contained adaptable at S.C.A.F.FOLD UNIT DEPLOYMENT expand unfold units brought in from scaffolding structure unfolds units expand and configure future development future development units configured, utilities connected and residents begin moving in. : 25 8 . . S.C.A.F.FOLD: Self Contained Adaptable Flat-FOLD[able]. The S .C.A.F.FOLD system i s a comprehensive provi- sional housing + recovery strategy. The system uses a combination of a t ransforming truck chassis and expandable units to create provisional housing erected over existing city s treets. This standardization of components facilitates the transportation of units while deployment over the streets provides access to infrastructure such as utilities and public transporta- tion

What If NYC.....Competition

Embed Size (px)

DESCRIPTION

Winning entry to NYC's post-disaster provisional housing competition

Citation preview

1. summary 2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

S.C.A.F.FOLD

UNITDEPLOYMENT

expand

unfold

units brought in from

scaffolding structure unfolds

units expand and configure

futur

e dev

elopm

ent

futur

e dev

elopm

ent

units configured, utilities connected andresidents begin moving in.

:25 8

..S.C.A.F.FOLD: Self Contained Adaptable Flat-FOLD[able].The S .C.A.F.FOLD system i s a comprehensive provi-sional housing + recovery strategy. The system uses acombination of a t ransforming truck chassis andexpandable units to create provisional housing erectedover existing city s treets. This standardization ofcomponents facilitates the transportation of unitswhile deployment over the streets provides access toinfrastructure such as utilities and public transporta-tion

25 825 8

Streets

Open Space

Highways

Unbuilt Space

Land Cleared

Water

limited area and need to keep open space for community use and activities.

quality of environment is low and need to rethink the use of infrastructure post-disaster.

private land and space is desired to develop post-disaster.

private land and redevelopment pressures.

disconnected from major public transportation and existing public amenities.

area needed to house 18,000 people is available while allowing for land to be redeveloped. keeps open space

available and highway to be reinvisioned.

-

+

:25 8

2. preparation 2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

1. Once the storm has cleared, construction machinery and PierContainers are brought i n to help clear debris from m ajorroadways.

2. Debris is deposited into containers and filled withconcrete. Containers are then sealed to be a ir tight preventingany possible environmental contamination. T his processeliminates the costly need to ship refuse to a dump site.

3. Structural piles create a secure connection to the seabed and provide lateral bracing for the new pier

4. Units are transported to the shore and a ligned on axis withmajor roadways. P ier Containers are then stacked vertically tocreate a new dock.

5. As the quay extends farther in the water it becomes a landingground f or l arger cargo ships t hat contain supplies andS.C.A.F.FOLD unit

UNIT

ASSI

GNME

NTS

LEAS

E SIG

NING

UNIT

ORIEN

TATIO

N

EGISTERED

FAMILIES MOVE INTO THEIR UNITS.

PRE R

FAMI

LY IN

TERV

IEW

ASSE

SSME

NT O

F NEE

DS

EGISTEREDUN R

IN FIELD REGISTRATIONFOR NOT EVACUATED.

FAMI

LIES

EVAC

UATE

TO S

HELT

ERS

CATE

GORY

4 HU

RRIC

ANE

PRE-REGISTIONTHROUGH ENERGYPROVIDER

:25 8

3. deployment

DEPLOYMENTS.C.A.F.FOLD was designed to be quickly deployable using industry standard shipping container s izes and hydraulics to m inimizemanual labor. During the recovery process, roadways are always the first t hing t o be c leared o f debris. This fact enablesS.C.A.F.FOLD to deploy faster than any other housing system anderect sooner since it does not need cleared land to set up.

Once streets have been cleared of debris S.C.A.F.FOLD is hauled to the site 1

Base units are secured. Chassis begins to elevate and slide open. 4

S.C.A.F.FOLD is detached from the truck and maneuvered to the site by using gyroscopic wheels located on each of the legs.With 360 degree motion the electrically powered wheels are able to navigate without heavy machinery and can be operated by a single individual.

2

Units are hinged along the Chassis and use hydraulics to rotate 90 degrees and attach to an adjacent Chassis. 3

5. Structural beam is installed along the tops of the units tocreate a truss system.. 5

6. Additional units can be attached using portable cranes. Uponcompletion, rotate 180 degrees assist w ith construction onadjacent building sites.

6

2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

The typical unit is designed for a singleindividual o r a couple within anefficient 178.5 sq.ft. spaced to set up.+ The s tandard s ized double bed i selevated 4 ’ from t he floor i n order t oprovide storage underneath.+ The bathroom doors are used asstorage and room dividers. When closed,the doors separate the bathroom f romthe rest of the unit. When open the doorsbecome walls which give privacy from thesleeping quarters and the kitchen+ The s ink services both the bathroomand k itchen, saving space and cost. Byusing s liding panels the sink can beaccessed from either side while providingprivacy from the adjacent space.+ The s tove and f ridge are ‘floating’elements that are included in the unit butcan be arranged once the unit is unfolded.+ The living quarters provide sufficientspace f or a s mall living room. Units aresupplied with a f old out couch f oradditional sleeping quarters.+ Dining is accommodated v ia a fold outtable, which doubles as a work station

2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8

Notes:

S.C.A.F.foldself contained adaptable flat

Kitchen2

Living Room 1

Loft Bedroom4

Doors w/ intgrated storage (bathroom beyond)3

Closet5

Shared Sink w/ Sliding Door6

Plywood Floor7

Fabric Sleeper Sofa8

Workstation9

8 2 6 4 571 9

4. unit rendering

3

1. F1. LOFT2. STORAGE3. WORK STATION4. KITCHEN5. WASHROOM6. DINNING7. LIVING

122

2

3

6

4

7

TYPICAL UNIT PLAN

BD

E

BACK ELEVATION

ACC

FRONT ELEVATION

A

ROOF PLAN

F

A. SOLAR PANELB. CORPORATE SPONSOR PANELC. INSULATED GLAZED PANELD. HVAC INTAKE/EXAUST PANELE. UTILITIES HOOK UPF. RAIN COLLECTOR

A

CB

SIDE ELEVATION

1. F1. LOFT2. STORAGE3. WORK STATION4. KITCHEN5. WASHROOM6. DINNING7. LIVING8. OPEN TO BELOW9. STAIR

1

122

2

1

3 4

3

5

7

6

8

9

9

LEVEL 2

LEVEL 1

1. F1. LOFT2. STORAGE3. WORK STATION4. KITCHEN5. WASHROOM6. ROLL IN SHOWER7. SHOWER BENCH

132 4

57 62

1. F1. LOFT2. STORAGE3. WORK STATION4. KITCHEN5. WASHROOM6. DINNING7. LIVING

1

1

1

37

22

56

42

2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8

exploded axon

S.C.A.F.foldself contained adaptable flat

5. technical unit dwg

exploded axon

URBAN CONFIGURATION1. Residential2. Education3. Commercial4. Community Services5. Greenspace6. Vertical Circulation

avenue

TABLE:The elevated surface created by the S.C.A.F.FOLD system, known as the ‘Table’, provides public access and communal spaces above city streets. The surface is created using a panel system similar to the ones developed to clad the units. The panels are structurally rigid, providing the support needed to span between Chassis. Their design also provides the lateral stability between adjacent Chassis structures. With interchangeable panels, the S.C.A.F.FOLD system can be modified to correspond to existing site conditions, such as trees or buildings that may project into the street or sidewalk.

Grate Panel: Used for public thoroughfare. Grating prevents rain and snow accumulationon the elevated walking surface. Grating also provides a ‘non-slip’ surface above thestreet.

Green Panel: Used to produce recreational areas for local residents. The porous surface helps reduce the amount of run off sent to sewers. Green spaces alleviate pressures on a storm water system that may be damaged from the disaster and consequently, unable to handle additional capacity.

Exhaust Panels: Used to evacuate fumes and toxins which may accumulate from theroadway below. The Panels use a fan and act as a chimney to draw pollutants away fromthe roadway and expel them away from S.C.A.F.FOLD residents. These panels are strategi-cally located in areas where fumes can not dissipate naturally.

2

3

1

5

4

6

6

street

3

1

11

1

6

2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

6.unit agg. rendering

S.C.A.F.foldself contained adaptable flat

S.C.A.FOLD: map of impacted area / unit agglomerationavenue street pier

7. unit agg. technical dwg

885’

STREET

AVENUE LOT

225’

B

110 + 230 = 340 units

Total units per typ block:

110 + 230 = 340 units 110 + 230 = 340 units

18,000 units

18,000 / 340 = 53 blocks for provisional housing18,000 / 340 = 53 blocks for provisional housing18,000 / 340 = 53 blocks for provisional housing

Units Required:

60’ (typ street width) X 225’ (typ lot length)225’ / 20’ (typ slot width) = 11 bays

11 bays x 10 units = 110 units

30’ (typ street width) X 465’ (typ lot length)465’ / 20’ (typ slot width) = 23 bays

23 bays x 10 units = 230 units

Units per typ street:

11 bays x 10 units = 110 units11 bays x 10 units = 110 units

23 bays x 10 units = 230 units 23 bays x 10 units = 230 units

B

A

A

:25 8

Housing Calculations:

BLOCK PLAN + SECTION:

SITE SELECTION:The first area cleared in any disaster is the major transpor-tation arteries. The S .C.A.F.FOLD system capitalizes on thissituation by building provisional housing in the first available space - the streets.

+ Building over the street expedites the return of residentssince roadways are cleared first.+ By building over the roadway, adjacent sites slated for newconstruction remain free. This enables s ites to beginconstruction more quickly since residents do not have to bedisplaced in order to gain access to the site.+ Utilities are generally l ocated under roadways. W ith itsproximity to the road, the S .C.A.F.FOLD system i s able toengage existing infrastructure if needed.+ With residents living over and beside the street, they have immediate access to shuttle buses, subways and publictransportation.+ Residents are able to remain within the proximity of theiroriginal neighborhoods i nstead of congregating i nprovisional housing camps.

8. deconstruction

DECONSTRUCTIONThe success of the S.C.A.F.FOLD system is in its expeditiousdeployment a s well a s its s trategic deconstruction a ndre-use. S.C.A.F.FOLD can easily be scaled up or down as thedemand d ictates. The i ndividual units a ll the system to bedecommissioned sequentially as permanent housing comesonline.

Decommissioned units are sent back to ships to be stored forredeployment

Some decommissioned units are purchased by local businessto house small commercial operations on the pier.

Units are evaluated and d amaged p anels are removed.Frames are retrofitted with new in lines with the needs of thenext mission.

Tables o n southern shore lines c an be kept a nd developedinto an elevated linear park. Areas enable pedestrian access between piers and provide a spectacular vantage point of thewater.

Tables i ntegrate i nto the urban infrastructure b y reusingSolar Panels removed f rom residential units. S olar panelsare able to contribute back to the City grid provide renew-able energy

The wharf first constructed in the Site Preparation phase isup graded t o provide a pedestrian friendly surface. S itebecomes a new social gathering place for area residents

Green spaces provide porous surfaces to reduce surfacerunoff. Adjacent buildings are able to drain down spouts intoremediation ponds along park.

Global Coalition for Provisional Housing Worldwide flood related disaster risk zonesInland expansion due to increased hurricane incidencecompounded by global mean sea level riseUnited Nations Inter Governmental Panel on Climate Chage

Global S.C.A.F.fold Distribution Centers

Network of distribution among partnering relief organizations

2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

9. project description 2 5 / 8 R E S E A R C H + D E S I G Ntoronto / new york

[email protected]:25 8S.C.A.F.foldself contained adaptable flat

Through the use of existing technologies, S .C.A.F.FOLD is able tocreate portable and adaptable provisional housing that is quicklyand efficiently deployed in the aftermath of any natural disaster.The effectiveness of this system is due to three main characteris-tics:

SPEED: Standard ISO container sizing is used to efficiently deployunits. Using the latest technology, housing is deployed faster sinceassembly requires limited labor and site preparation. This enablesthe system to be used after ANY natural disaster in ANY location.

ADAPTABILITY: The i ndependently adjustable legs o f the chassisenable the units to be elevated above the ground and enable thestructure to conforming to uneven terrain or land that may still beflooded. Housing units are comprised of interchangeable cladding panels which enable customization of components and the abilityto retro-fit the frames to meet the needs of redeployment. Panelcomponents enable multiple configurations of units which ensurethe housing can accommodate a wide variety of family types andprograms comfortably.

SUSTAINABILITY: Units are designed to be self-contained and canoperate independent of city utilities and provide tools to minimize their impact on the environment.

Sustainability i ncludes t he ability to re-use t he provisionalhousing t hrough redeployment. The s turdy construction andability to re-tool the units enables them to be re-deployed w ithupdated technology when the need occurs.

FO[RE] PRINCIPLES OF RECOVERY:

Re-Move: Debris left f rom t he a ftermath is collected andhermetically sealed within specialized shipping containers. Thesecontainers are then deposited within the adjacent body of water tocreate a loading pier, which is used to receive arriving cargo.

Re-Habitat: Return residents to t heir neighborhoods to re-establish communities + businesses.

Re-Tool: As permanent housing i s constructed, S .C.A.F.FOLDunits can be decommissioned and re-used. By using a panelizedcladding system, damaged components can b e removed andupgraded to meet the requirements of the next mission.

Re-Distribute: The E mergency Events Database [EM-DAT] hasshown a steady increase in natural disasters over the last 20-30 years and recorded over 400 natural disasters worldwide in 2007alone . W ith a w idespread demand f or provisional housing, t heability to quickly redistribute emergency resources is essential. Inaddition, t he universality o f the S.C.A.F.FOLD system a llows itscosts and benefits to be distributed on a global scale