13
What do I do? Technical Resume In seismic acquisition, quality comes in first place, since it reduces cost and time of operation and optimizing the relation production/quality always maximizes the technical benefit from the returned information. 20/04/2016 AHMED A. MEGUID (M.SC. GEOPHYSICS)

What do I do

Embed Size (px)

Citation preview

Page 1: What do I do

What do I do?

Technical Resume

In seismic acquisition, quality comes in first place,

since it reduces cost and time of operation and

optimizing the relation production/quality always

maximizes the technical benefit from the returned

information.

20/04/2016

AHMED A. MEGUID (M.SC. GEOPHYSICS)

Page 2: What do I do

Index

TECHNICAL PROFILE ............................................................................................................ 2

1) Field Equipment and Material continuous checking: ........................................................ 2

2) Record follow up since pre-plotting to final data delivery: ............................................... 2

3) Data delivery preparation: ................................................................................................. 3

4) Reporting and follow-up: .................................................................................................. 3

I. SITA ©IAN VINCENT @2012............................................................................. 4

II. SMTAN2 ©IAN VINCENT @2012 ..................................................................... 5

III. COMPARELINESTAT.M ©AHMED MEGUID @2008 ................................... 6

IV. SLX2 ©IAN VINCENT @2012 ............................................................................ 6

V. SEGDSEE (FREE DISTRIBUTED) ..................................................................... 7

VI. SEISSEE (FREE DISTRIBUTED) ....................................................................... 8

PREVIOUS JOBS (2008 TO PRESENT) ................................................................................. 9

1. 2D_SEISMIC_PROGRAM_UM_AGAGA BASIN_2013 ............................................... 9

2. 0319_PETRA_BSF_VIB2D_2010 ................................................................................... 9

3. Colombia NISCOTA Program and Amazonas SPEC Program 0XXX_2D_AM-T-62 ... 9

4. 0295_ANP_2D_PARECIS .............................................................................................. 10

5. 0295_BR_3D_SUL_GUAMARE ................................................................................... 10

6. 0295_BR_3D_PALMEIRA-GUAMARE ....................................................................... 10

7. 0295_ANP_2D_PARNAÍBA .......................................................................................... 10

PHOTO GALLERY (2007 TO PRESENT) ............................................................................ 12

Page 3: What do I do

TECHNICAL PROFILE

In order to guarantee the quality of each single record, the record is treated since the very

beginning for those two parallel ways are followed (When source is Dynamite):

1) Field Equipment and Material continuous checking:

Three periodic checking processes are usually applied, according to operator

requirements, to Field Equipment and Material:

FDU daily checking test: by retrieving information out of the four daily test

records into SITA Software “Courtesy of Mr. Ian Vincent”:

a) Instrument Noise: to obtain Total Noise, DC Offset, and Sercel Noise,

b) Instrument Distortion: to obtain Total Distortion,

c) Instrument Gain/Phase: to obtain Gain Error and Phase Error, and finally,

d) Instrument Common mode: to obtain the Common Mode Rejection Ration

(CMRR).

Complete pre-startup Geophone Test: by SGT-II (or SGT-200) designed for

Sercel GS-5 and GS-10 Geophone units (commonly used worldwide). The Test

checks at once all available Geophones’ Strings to guarantee their efficiency.

Data are retrieved into SMTAN2-257 Software “Courtesy of Mr. Ian Vincent”

to obtain:

a) Noise,

b) Resistance,

c) Frequency,

d) Damping,

e) Sensitivity,

f) Distortion,

g) Impedance, and

h) Temperature.

In order to reject the defecated strings that matches out of acceptance range

determined by fabricant.

Random monthly Geophone Test: by SGT-II (or SGT-200) electing a random

sample of Geophone strings to be checked as explained previously.

If required, Megger ohmmeter tester is applied.

2) Record follow up since pre-plotting to final data delivery:

Mainly the record follow up consists in:

Page 4: What do I do

Pre-plot statistical analysis to secure matching intervals and azimuth as well as

line continuity.

Post-plot statistical analysis to secure azimuth maintenance and line continuity

and to guarantee the acceptance variation from pre-plotted position and interval.

In case of explosives, the holes’ depths are checked and registered.

Production revision is done using SLX2 software “Courtesy of Mr. Ian

Vincent”.

A quick revision is done on SEGD files using SeisSee package (free

distribuited).

After record; noise, frequency, phase, polarity, and geometry are checked to

certify whether it attends the contractual specifications or not (Processing

Software to be defined by operator).

A rejection depends on restricted demand by operator.

3) Data delivery preparation:

Once all data are accepted and a Brute Stack is presented by contractors’

technicians (also depends on operator demands), data are prepared to be

delivered to Processing Center for that we check (Headers are checked using

SeisSee free distributed software):

a) Auxiliary Files,

b) Observer Reports,

c) SPS files, and

d) SEGD files in headers format defined by operator.

Data are recorded on Digital Media agreed between operator and contractor

within last accepted version of data.

4) Reporting and follow-up:

All previous steps are always maintained easy to follow up by operator in spatial

mapping and database. And reports are issued in accordance to operator demand (could

be daily, weekly, monthly, or all).

Page 5: What do I do

I. SITA ©IAN VINCENT @2012

Figure 1. SITA Users' Interface.

Figure 2. SITA Results Interactive Window.

Figure 3. FDU-428 Standard Specifications.

Page 6: What do I do

II. SMTAN2 ©IAN VINCENT @2012

Figure 4. SMTAN2 Users' Interface.

Figure 5. SMTAN2 Results Interactive Window.

Figure 6. SG-5 & SG-10 Geophones Standard Specifications.

Page 7: What do I do

III. COMPARELINESTAT.M ©AHMED MEGUID @2008

Figure 7. Input Files’ Format. Figure 8. Pre-plot Stations’ Intervals

(Red) and their deviation from

theoretical (Blue).

Figure 9. Post-plot Stations’ Intervals

(Red), their deviation from theoretical

(Blue), and difference between Pre- and

Post-plots.

Figure 10. Normal Distribution of

Positions’ difference Pre- to theoretical

(up), Pre- to Post-plot (middle), and

Post- to theoretical (down).

Figure 11. Position Difference in

Northing (Red) and Easting (Blue)

between Pre- and Post-plots.

Figure 12. Normal Distribution of

Positions’ difference in Northing

direction (up) and Easting direction

(down).

Figure 13. Pre-plot Azimuth (Red) and

its deviation from theoretical (Blue).

Figure 14. Post-Plot Real Azimuth

(Red) and Deviation form Theoretical

Azimuth (Blue).

Figure 15. Normal Distribution of

Azimuth Error.

IV. SLX2 ©IAN VINCENT @2012

With special registration to Ahmed A. Meguid.

Figure 16. SLX2 Interface.

Page 8: What do I do

Figure 17. SLX2 Interactive Window.

V. SEGDSEE (FREE DISTRIBUTED)

Figure 18. SEGDSEE Record Visualization Window.

Figure 19. SEGDSEE Header Visualization Window.

Page 9: What do I do

VI. SEISSEE (FREE DISTRIBUTED)

Page 10: What do I do

PREVIOUS JOBS (2008 TO PRESENT)

1. 2D_SEISMIC_PROGRAM_UM_AGAGA BASIN_2013

July, 2013 to February, 2014.

In Loco FAS and QC Supervisor.

1,020 km of 2D Seismic Acquisition.

Vibroseis as Source.

Responsibilities:

1. Seismic 2D data acquisition consultant for AlSudan Energia at Umm Agaga

Basin, Kordofan, D. R. of Sudan.

2. Field Acquisition Supervisor (FAS).

3. Data QC Supervisor.

4. Technical Auditor of Seismic Crew.

2. 0319_PETRA_BSF_VIB2D_2010

November, 2010 to November, 2012

In Loco FAS and QC Supervisor.

21,000 km of 2D Crocked Lines Seismic Acquisition.

Vibroseis as Source.

Responsibilities:

1. Seismic 2D data acquisition consultant for Petra Energia at São Francisco

Basin, Minas Gerais, F. R. of Brazil.

2. Field Acquisition Supervisor (FAS).

3. Data QC Supervisor.

4. Technical Auditor of Seismic Crew.

5. Seismic 2D/3C data acquisition consultant for Petra Energia at São Francisco

Basin, Minas Gerais, F. R. of Brazil.

3. Colombia NISCOTA Program and Amazonas SPEC Program 0XXX_2D_AM-T-62

June, 2010 to November, 2010.

Independent Consultant

CGGVeritas.

Responsibilities:

1. Jungle Scouting Specialist (Colombia, Peru, and Brazil.

2. Software Support.

3. QC Training specialist (Colombia Subsidiary).

Page 11: What do I do

4. 0295_ANP_2D_PARECIS

February, 2008 to June, 2010

Chief QC and Data Manager

1,472 km of 2D Seismic Acquisition.

Dynamite as Source.

Responsibilities:

1. Seismic Data Manager of Crew #295.

2. Client/Crew Technical Relations.

3. QC Chief of Seismic Crew #295.

4. Acquisition and Processing Specialist of Potential Methods.

5. Project Reporter.

5. 0295_BR_3D_SUL_GUAMARE

August, 2008 to July, 2009

Chief QC and Data Manager

126.290 km² of 3D Seismic Acquisition.

Dynamite as Source.

Responsibilities:

1. Seismic Data Manager of Crew #295.

2. Client/Crew Technical Relations.

3. QC Chief of Seismic Crew #295.

4. Acquisition and Processing Specialist of Potential Methods.

5. Project Reporter.

6. 0295_BR_3D_PALMEIRA-GUAMARE

August, 2008 to May, 2009

Chief QC and Data Manager

80.290 km² of 3D Seismic Acquisition.

Dynamite as Source.

Responsibilities:

1. Seismic Data Manager of Crew #295.

2. Client/Crew Technical Relations.

3. QC Chief of Seismic Crew #295.

4. Acquisition and Processing Specialist of Potential Methods.

5. Project Reporter.

7. 0295_ANP_2D_PARNAÍBA

February, 2008 to July, 2009

Chief QC and Data Manager

Page 12: What do I do

1,595.200 km of 2D Seismic Acquisition.

Dynamite as Source.

Responsibilities:

1. Seismic Data Manager of Crew #295.

2. Client/Crew Technical Relations.

3. QC Chief of Seismic Crew #295.

4. Acquisition and Processing Specialist of Potential Methods.

5. Project Reporter.

Page 13: What do I do