EASTER LAKE DETENTION BASIN IMPROVEMENTS What are the Easter Lake Detention Basins? What are the Issues? What are the Improvements? Detention Basins Detention Basin Watershed Easter Lake Watershed Create deeper sediment capture areas (forebay) to improve water quality and maintenance. Remove sediment and restore original pond depths. Steepen banks below the water to reduce algae. Provide taller grass buffer around the shoreline to reduce goose traffic and filter stormwater. Work with the Easter Lake dredging project to further improve water quality over the long-term! Shallow areas allow algae to form which reduces water quality. At 25% full, Basins need to be cleaned to improve sediment capture and water quality. Basins not as effective at improving Easter Lake water quality as they could be. BENEFITS Capture sediment before it flows into Easter Lake. Detain stormwater and reduce flows downstream. Provide natural features for neighborhood and regional trail system. Owned by City and Constructed 10-20 years ago. Detention Basins receive over 20% of Easter Lake’s Watershed. EXISTING DETENTION BASIN IMPROVED DETENTION BASIN N Temporary Flood Storage Permanent Pool 25% Full of Sediment Plant Wider Grass Buffer Steepen Banks Remove Sediment Algae and Surface Vegetation

What are the Issues? - WordPress.com · Check dam Forebay Berm Marsh zones Forebay located at middle left side of wetland. Berms and check dams separate the forebay from the marsh

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: What are the Issues? - WordPress.com · Check dam Forebay Berm Marsh zones Forebay located at middle left side of wetland. Berms and check dams separate the forebay from the marsh

EASTER LAKE DETENTION BASIN IMPROVEMENTS

What are the Easter Lake Detention Basins?

What are the Issues?

What are the Improvements?

Detention BasinsDetention Basin WatershedEaster Lake Watershed

• Create deeper sediment capture areas (forebay) to improvewater quality and maintenance.

• Remove sediment and restore original pond depths.

• Steepen banks below the water to reduce algae.

• Provide taller grass buffer around the shoreline to reduce goosetraffic and filter stormwater.

• Work with the Easter Lake dredging project to further improvewater quality over the long-term!

• Shallow areas allow algaeto form which reduces waterquality.

• At 25% full, Basins needto be cleaned to improvesediment capture and waterquality.

• Basins not as effective atimproving Easter Lake waterquality as they could be.

BENEFITS• Capture sediment before it

flows into Easter Lake.• Detain stormwater and

reduce flows downstream.• Provide natural features for

neighborhood and regionaltrail system.

• Owned by City and Constructed 10-20 years ago.

• Detention Basins receive over 20% of EasterLake’s Watershed.

EXISTING DETENTION BASIN IMPROVED DETENTION BASIN

N

Temporary Flood Storage

Permanent Pool

25% Full of Sediment

Plant Wider Grass Buffer

Steepen Banks Remove Sediment

Algae and Surface

Vegetation