WestPavrPower 600 Cab/n Hilt Drive
Greensburg, PA 15601
John L Munich Attorney
724-838-6210 Fax: 234-678-2370
November 18,2016
VIA VPS OVERNIGHT
Rosemary Chiavetta, SecretaryNOV 2 2 2016
I’A PUBLIC UTILITY COMMISSION SLCkf: fAKY'S BURLAU
Pennsylvania Public Utility Commission Commonwealth Keystone Building400 North Street, Second Floor Harrisburg, Pennsylvania 17120
Re: Letter of Notification;Hatfield-Yukon 500 kV Transmission Line Loop to Rhodes Lane Substation Project;Docket No.
Dear Secretary Chiavetta:
Enclosed for filing on behalf of West Penn Power Company is an original and one (1) copy of a Letter of Notification requesting approval to construct the above-referenced electric transmission line project. This Letter of Notification is filed pursuant to the Commission’s regulations at 52 Pa. Code § 57.72(d)(l)(vi) for proposed transmission lines two miles or less in length. Copies of this Letter of Notification have been served upon the parties as required by 52 Pa. Code §57.72 as shown on the attached Certificate of Service.
West Penn Power Company requests, to the extent possible, that the Commission review and approve the Letter of Notification on or before March 2, 2017, in order to prepare for construction to begin on or about June 1, 2017.
If you have questions pertaining to this matter do not hesitate to contact me.
Very truly yours,
Enclosures
cc: Certificate of ServicePaul Diskin - Bureau of Fixed Utility Services (via UPS)
L'1730.21
BEFORE THEPENNSYLVANIA PUBLIC UTILITY COMMISSION
LETTER OF NOTIFICATION OF WEST PENN POWER COMPANY FILED PURSUANT TO 52 PA. CODE §57.72 57 SUBCHAPTER G FOR THE HATFIELD- YUKON 500 KV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT IN SOUTH HUNTINGDON TOWNSHIP, WESTMORELAND COUNTY, PENNSYLVANIA
N0V 2 2 2016
PA P'JGUC •btCK
UTILITY COMMISSIONtfL'K'iA'J
Docket No.:
LETTER OF NOTIFICATION FILING FOR THE HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
To the Pennsylvania Public Utility Commission:
West Penn Power Company (“West Penn”), a FirstEnergy company, requests that the
Pennsylvania Public Utility Commission (“Commission”) approve a Letter of Notification
(“LON”) for the siting and construction of a high voltage transmission line under two miles in
length. In support of its LON West Penn submits as follows:
1. Pursuant to 52 Pa. Code §57.72 (d)(l)(vi) West Penn submits this LON requesting
that the Commission approve the proposed construction of the Hatfield-Yukon 500 kV
Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). West Penn requests
that the Commission approve this LON on or before March 2,2017, to meet the required in-service
date of November 1,2017 as described herein. The construction of the Transmission Line loop
will require the installation of two (2) new 3-pole steel dead-end loop structures in order to connect
the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation,
creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line
circuits. The Project is needed to provide 500 kV electric connection to the 940 MW natural gas
fired combined cycle generation plant proposed by Tenaska Pennsylvania Partners, L.L.C.
1
2. West Penn provides electric transmission service to retail customers in
Pennsylvania and is subject to the Commission’s regulation of the siting of transmission lines.
The address of West Penn’s principal business office is:
West Penn Power Company 800 Cabin Hill Drive Greensburg, PA 15601
3. This Letter of Notification filing consists of the following:
• Letter of Notification
• Exhibit No. 1 - General Location of Project
• Exhibit No. 2 - General Layout of the Project
• Exhibit No. 3 - 3-Pole Steel Dead-end Loop Structure on Concrete
Foundations
• Certificate of Service
4. The attorney representing West Penn in this matter authorized to receive notices
and communications on its behalf is:
John L. Munsch FirstEnergy Service Company 800 Cabin Hill Drive Greensburg, PA 15601 (724) 838-6210 Attorney ID #31489 [email protected]
5. West Penn also requests that a copy of all notices and communications regarding
this matter be sent to:
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company 76 S. Main Street,Akron, OH 44308 (330) 761-4473
2
6. The Project will be located in South Huntingdon Township, Westmoreland County,
approximately 0.4 mile east of the intersection of Dutch Hollow Road and Interstate 70 Highway.
General Description of the Proposed Project:
7. The Project will extend a loop from the existing Hatfield-Yukon 500 kV
transmission line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the
Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. Two
(2) new 3-pole steel loop structures will be installed within the new, cleared right-of-way
(“ROW”). The new 3-pole steel loop structures will be approximately 105-122 feet in height and
will be installed on concrete foundations. A topographic map of the area showing the location of
the Project is attached as Exhibit 1. The general layout of the Project is provided in Exhibit 2.
The new 500 kV structures are depicted in Exhibit 3.
8. The Project will be conducted within the easement area acquired by Tenaska
Pennsylvania Partners, L.L.C. (“Tenaska”) on said property in South Huntingdon Township. All
necessary property rights for the Project have been acquired by Tenaska. Since this is an Option
to Build project, Tenaska will assign its easement rights to West Penn after the facilities are built.
Additionally, Tenaska is responsible for securing all the applicable permits to support the Project
construction.
The Project, which is approximately 530 feet (0.1 mile) long, is under two miles in length
for the purpose of Section 57.72(d)(l)(vi) of the Commission’s regulations that allows a LON in
lieu of a full siting application.
9. Attached hereto as Exhibits 1 through 3, and made part hereof, are:
3
• Exhibit 1 shows the general location of the Project on a map which is a partial
copy of the United States Geologic Survey, Westmoreland County, Fayette
County, PA Quadrangle; 40079-B6.
• Exhibit 2 shows the general layout of the Project.
• Exhibit 3 shows the configuration for the 500 kV structure.
Statement of Need:
10. As part of its construction of the 940 MW natural gas fired combined cycle
generation plant, Tenaska Pennsylvania Partners, L.L.C. is building a new interconnection
substation, named the Rhodes Lane Substation, to be owned after completion by West Penn, near
Smithton Borough, in South Huntingdon Township, Westmoreland County, Pennsylvania. The
proposed Project by West Penn will construct a new 500 kV transmission line loop to the existing
Hatfield-Yukon 500 kV Transmission Line to the West Penn’s new Rhodes Lane Substation and
ultimately provides the Tenaska generation plant’s connection the transmission grid. PJM and
FirstEnergy Transmission Planning evaluated the generation addition. Results of the PJM and
FirstEnergy analysis are documented on the PJM website for queue projects T174 and AB1-106.
Safety Considerations:
12. Design, construction, and operation of the Project will meet or exceed the
requirements specified in the latest revision of the National Electric Safety Code (“NESC”) and
all applicable safety standards established by the Occupational Safety and Health Administration
(“OSHA”). All work shall be done in accordance with NESC, OSHA, and any applicable local,
state or federal requirements.
4
Construction Schedule:
13. The proposed construction commencement date of the Project is June 1,2017.
The proposed in-service date of the Project is November 1,2017.
Estimated Construction Cost:
14. The total cost for the transmission facility work associated with the Project is
estimated to be $5,584,000, to be paid by developer Tenaska Pennsylvania Partners, L.L.C.
Filing Date:
15. This Letter of Notification Filing is filed with the Commission on the date shown on
the filing letter.
Certificate of Service:
16. A copy of this LON will be served by certified mail upon those who are entitled to
receive a copy of an application or notice of filing an application as set forth in 52 Pa. Code §57.74,
in accordance with the provisions of 52 Pa. Code §57.72(d)(3), and as shown on the attached
Certificate of Service.
WHEREFORE West Penn Power Company respectfully requests that the Pennsylvania
Public Utility Commission review and approve this Letter of Notification.
Respectfully submitted,
Date: November 18,2016 By:
Attorney forWest Penn Power Company Attorney No. 31489 800 Cabin Hill Drive Greensburg, PA 15601 (724) 838-6210
5
BEFORE THEPENNSYLVANIA PUBLIC UTILITY COMMISSION
NOV 2 2 2015
PA PUBLIC UTILITY COMMISSION SECRETARY'S BUREAU
LETTER OF NOTIFICATION OF WEST PENN POWER COMPANY FOR THE HATFIELD-YUKON 500 KV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT IN SOUTH HUNTINGDON TOWNSHIP, WESTMORELAND COUNTY, PENNSYLVANIA
Nataliya Bryksenkova states that she is an Engineer, Transmission Siting, Substation and Transmission Design, for FirstEnergy Service Company; that she is authorized to make this Verification on behalf of West Penn Power Company; and that the facts set forth in the Letter of Notification are true and correct to the best of her knowledge, information and belief. She understands that the statements herein are subject to the penalties of 18 Pa.C.S. §4904 (relating to unsworn falsification to authorities).
VERIFICATION
Date: November 18, 2016Nataliya Bryksenkova
DELORME Topo North America™ 10
I V ' ^
Iv
Orig Date: 1994 Quad Series: 7.5'
Paper Source: Topographic 1:24,000
Quad Order ID 40079-B6 Coverage:
Westmoreland County. PA Fayette County. PA
Vendor: USGS
Data use subject to license
© DeLorme Topo North America™ 10
www delorme com
Scale 1 : 24.000
1" = 2,000 Oft Data Zoom 13-0
(OXLlIaUi
“3oa:a.
oF<h~</>CD3CO
aoxa:o
CL8
gcoCO
<
>
ooin
0
1o_i
UJIt<x
>3 '«4 .4 ' n3 V Ji*a
NOV 2 2 2016
NO 0 SCALEPA PUBLIC UflUTY CO: iNiSSION
bLCki: i -‘.kv S dCkL./'.'J
.V/3&*ennPower
A FirsiEoemY Company
HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
HATFIELD-YUKON 500 kV TRANSMISSION LINE 3-POLE STEEL LOOP STRUCTURE
EXHIB 3
FirstEnergy 76 South Main StreetAkron. Ohio 44308
1-800-646-0400
November 18,2016Ms. Gina Cerilli, Chair Westmoreland County Board of Commissioners 2 N Main Street, Suite 101 Greensburg, PA 15601
Dear Commissioner Cerilli:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
1 will be glad to answer any questions concerning this matter. You can contact me at (330) 761-4473.
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINELOOP TO RHODES LANE SUBSTATION PROJECT
Sincerely,
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation DesignFirstEnergy Service Company
Attachments
FirstEnergy 76 South Main StreetAkron. Ohio 44308
1-800-64&0400
November 18,2016Mr. Ted Kopas, Vice-Chair Westmoreland County Board of Commissioners 2 N Main Street, Suite 101 Greensburg, PA 15601
Dear Commissioner Kopas:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
NOV 2 2 201bNataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
pa public u a Li r :• co,- imissiom
OLCk::. f'\Kv S. cL-kfiP.U
Attachments
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800-64&0400
November 18,2016Mr. Charles Anderson, Commissioner Secretary Westmoreland County Board of Commissioners 2 N Main Street, Suite 101 Greensburg, PA 15601
Dear Commissioner Anderson:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
76 South Main StreetAkron, Ohio 44308
1-800-6464400
November 18,2016Mr. Jason Rigone,Executive DirectorWestmoreland CountyIndustrial Development Corporation40 N Pennsylvania Ave, Fifth Floor, Suite 520Greensburg, PA 15601
Dear Mr. Rigone:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
I will be glad to answer any questions concerning this matter. You can contact me at
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
(330) 761-4473.Sincerely,
NOV 2 2 21118Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800-646-0400
November 18, 2016Mr. Eddie Troup, Chairman South Huntingdon Township Board of Supervisors 75 Supervisor Drive,West Newton, PA 15089
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
Dear Mr. Troup:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project I *
I will be glad to answer any questions concerning this matter. You can contact me at(330)761-4473.
rp-; ><.'R-'3 ?Ita: 'V.'- •••
'“r'J.is* 'ii
NOV 2 2 2016
Sincerely,
PA PIJOLiC U fll.lTY COi li'USSION bPCK;: S- toU APA’J
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
FirstEnergy. 76 South Main StreetAkron, Ohio 44308
1-800446-0400
November 18,2016Mr. William Sherbondy,SupervisorSouth Huntingdon Township Board of Supervisors 75 Supervisor Drive,West Newton, PA 15089
Dear Mr. Sherbondy:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company. Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project. I
I will be glad to answer any questions concerning this matter. You can contact me at
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
(330) 761-4473.Sincerely,
MOV 2 2 201b Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
•n/.ISSlON
Attachments
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800446-0400
November 18,2016Mr. Richard A. Gates, SupervisorSouth Huntingdon Township Board of Supervisors75 Supervisor Drive,West Newton, PA 15089
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
Dear Mr. Gates:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of die Project.
I will be glad to answer any questions concerning this matter. You can contact me at(330) 761-4473.
Sincerely,
MOV 2 2 201bNataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
76 South Main StreetAkron, Ohio 44308
1-800-646-0400
November 18,2016Mr. Victor P. Regola,Victor P. Regola and Associates South Huntingdon Township Engineer 2 Clawson Avenue,Youngwood, PA 15697
Dear Mr. Regola:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project. 1
1 will be glad to answer any questions concerning this matter. You can contact me at
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINELOOP TO RHODES LANE SUBSTATION PROJECT
(330) 761-4473.Sincerely,
NOV 2 2 2016Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
PA PUBLIC U nil TV aVii'-'lSSlON e bCk!V>'J
Attachments
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800-646-0400
Pennsylvania Department of Environmental Protection November 18,2016P.O. Box 2063Rachel Carson State Office BuildingHarrisburg, PA 17105-2063Attn: Bureau of Environmental Planning
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
To Whom It May Concern:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
I will be glad to answer any questions concerning this matter. You can contact me at (330) 761-4473.
Sincerely,
RECOVEDNOV 2 2 2H1B
pa public u fii.rr; cc, '.mission
L-CCki: 5i\Kv S- bUkii/'U
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
FirstEnerav 76 South Main StreetAkron, Ohio 44308
J-800-646-0400
November 18,2016Pennsylvania Department of Transportation Honorable Barry Schoch, P.E., Secretary c/o Office of Chief Counsel Commonwealth Keystone Building 400 North Street, 9th Floor Harrisburg, PA 17120 Attn: William J. Cressler
To Whom It May Concern:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project. I
I will be glad to answer any questions concerning this matter. You can contact me at
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
(330) 761-4473.Sincerely,
NOV 2 2 ZOiB Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
PA PUBLIC U IIU ! / <-"^SSION bifCfOl ■ ;• i' 1
Attachments
76 South Main StreetAkron, Ohio 44308
1-600-646-0400
November 18, 2016Pennsylvania Historical & Museum CommissionBureau for Historic PreservationCommonwealth Keystone Building, Second Floor400 North StreetHarrisburg, PA 17120-0053Attn: Mr. Douglas C. McLearen, Chief
To Whom It May Concern:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project
LETTER OF NOTIFICATION FILINGHATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
PA PUBLIC J i lLlTY COMMISSION USCK::Um<y S BUkEAU
NOV 2 2 2016Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800-646-0400
November 18, 2016Mr. Greg Phillips, District Manager Westmoreland Conservation District J. Roy Houston Conservation Center 218 Donohoe Road Greensburg, PA 15601
Dear Mr. Phillips:
Enclosed for your information is a copy of West Penn Power Company ’ s (“West Penn”), a FirstEnergy company. Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
LETTER OF NOTIFICATION FILINGHATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
NOV 2 2 201b Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
FirstEnergy 76 South Main StreetAkron. Ohio 44308
1-800-646-0400
This letter sent to yon as a courtesy, in accordance with the Pa PUC Rule§57.74(c)(l)(iii) NO ACTION IS REQUIRED ON YOUR PART, A COPY OF THIS LETTER HAS
BEEN SUBMITTED TO PA DEPNovember 18, 2016
Ms. Karen Kochenbach U.S. Army Corps of Engineers Pittsburgh District2200 William S. Moorhead Federal Building 1000 Liberty Avenue, Suite 2200 Pittsburgh, PA 15222
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
Dear Ms. Kochenbach:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop from the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Hatfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania. Exhibit 1 of the Letter of Notification identifies the general location of the Project.
I will be glad to answer any questions concerning this matter. You can contact me at (330) 761-4473.
r—d
hCU
NOV 2 2 2016
Sincerely,
R'-\ PUBLIC jriU'V SSIOMi1
Attachments
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
FirstEnergy 76 South Main StreetAkron, Ohio 44308
1-800-646-0400
November 18,2016Mr. Steven K. Bender PartnerDentons US LLP303 Peachtree Street, NE, Suite 5300 Atlanta, GA 30308-3265
LETTER OF NOTIFICATION FILING HATFIELD-YUKON 500 kV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT
Dear Mr. Bender:
Enclosed for your information is a copy of West Penn Power Company’s (“West Penn”), a FirstEnergy company, Letter of Notification for the proposed Hatfield-Yukon 500 kV Transmission Line Extensions to Rhodes Lane Substation Project (“Project”). The Letter of Notification is provided pursuant to the regulations of the Pennsylvania Public Utility Commission at has been developed in the format described in Commission regulations at 52 Pa. Code §57.72(d).
West Penn has identified the need to extend a loop fiom the existing Hatfield-Yukon 500 kV Transmission Line approximately 530 feet (0.1 mile) to the Rhodes Lane Substation creating the Halfield-Rhodes Lane 500 kV and Rhodes Lane-Yukon 500 kV Transmission Line circuits. The construction includes installation of two (2) new 3-pole steel deadend loop structures on concrete foundations in order to connect the existing Hatfield-Yukon 500 kV Transmission Line to the new Rhodes Lane Substation. The entire Project is located in South Huntingdon Township, Westmoreland County, Pennsylvania, Exhibit 1 of the Letter of Notification identifies the general location of the Project.
I will be glad to answer any questions concerning this matter. You can contact me at (330) 761-4473.
NOV 2 2 201b
PA '-'ijrjUC j ' !■ O.- I AK'
CO. HUSSION c bUKtA-O
Sincerely,
Nataliya BryksenkovaEngineerEnergy DeliveryTransmission & Substation Design FirstEnergy Service Company
Attachments
BEFORE THEPENNSYLVANIA PUBLIC UTILITY COMMISSION
NOV 2 2 2016LETTER OF NOTIFICATION OF WEST PENN POWER COMPANY FOR THE HATFIELD-YUKON 500 KV TRANSMISSION LINE LOOP TO RHODES LANE SUBSTATION PROJECT IN HUNTINGDON TOWNSHIP, WESTMORELAND COUNTY, PENNSYLVANIA
Docket No.:
P.4 PUBLIC UCILITY CO)IMISSION CCCkCfARY S BUkEAU
CERTIFICATE OF SERVICE
1 hereby certify that on this date, the parties listed below were served by certified mail, return receipt requested, a copy of the above-captioned Letter of Notification pursuant to 52 Pa. Code §57.72(d)(3), and as set forth in 52 Pa. Code §57.74(b) and (c).
Service by certified mail, return receipt requested, addressed as follows:
§57.74(b)(1) - The chief executive officer, the governing body and the body charged with the duty of planning land use in each city, borough, town, township, and county in which any portion of the HV line is proposed to be located:
Ms. Gina Cerilli, Chair Mr. Jason Rigone,Westmoreland County Executive DirectorBoard of Commissioners Westmoreland County2 N Main Street, Suite 101 Industrial Development CorporationGreensburg, PA 15601 40 N Pennsylvania Ave, Fifth Floor
Mr. Ted Kopas, Vice-Chair Westmoreland County Board of Commissioners
Suite 520Greensburg, PA 15601
2 N Main Street, Suite 101 Greensburg, PA 15601
Mr. Charles Anderson,
Mr. Eddie Troup, Chairman South Huntingdon Township Board, of Supervisors 75 Supervisor Drive,West Newton, PA 15089
Commissioner Secretary Westmoreland County Mr. William Sherbondy,
SupervisorSouth Huntingdon Township Board of Supervisors 75 Supervisor Drive,West Newton, PA 15089
Board of Commissioners 2 N Main Street, Suite 101 Greensburg, PA 15601
1 of 3
Mr. Richard A. Gates, Supervisor South Huntingdon Township Board of Supervisors 75 Supervisor Drive,West Newton, PA 15089
Mr. Victor P. Regola,Victor P. Regola and Associates South Huntingdon Township Engineer2 Clawson Avenue, Youngwood, PA 15697
§57.74(b)(2) - The president of the public utility, other than the applicant, in whose service territory any portion of the HV line is proposed to be located:
NOT APPLICABLE
§57.74(b)(3) - The Department of Environmental Protection:
Pennsylvania Department of Environmental Protection P.O. Box 2063Market Street State Office BuildingHarrisburg, PA 17105-2063Attn: Bureau of Environmental Planning
§57.74(c)(J)(i) - The Secretary of the Department of Transportation:
Pennsylvania Department of Transportation c/o Office of Chief Counsel Commonwealth Keystone Building 400 North Street, 9th Floor Harrisburg, PA 17120 Attn: William J. Cressler
§57.74(c)(1)(H) - The Chairman of the Historical and Museum Commission:
Pennsylvania Historical & Museum CommissionBureau for Historic PreservationCommonwealth Keystone Building, Second Floor400 North StreetHarrisburg, PA 17120-0053Attn: Mr. Douglas C. McLearen, Chief
2 of 3
§57.74(c)(l)(iii) - Other local, State or Federal agencies designated in §57.72(c)(ll):
Greensburg, PA 15601
Mr. Greg Phillips,District Manager/CEO Westmoreland County Conservation DistrictJ. Roy Houston Conservation Center 218 Donohoe Road
Ms. Karen KochenbachU.S. Anny Corps of EngineersPittsburgh District2200 William S. Moorhead FederalBuilding1000 Liberty Avenue, Suite 2200 Pittsburgh, PA 15222
§57.74(c)(l)(iv) - Known persons, corporations and other entities of record owning property within the proposed right-of-way :
Steven K. Bender PartnerDentons US LLP303 Peachtree Street, NE, Suite 5300 Atlanta, GA 30308-3265
Date: November 18,2016
Attorney I.D. No. 31489 FirstEnergy Service Company 800 Cabin Hill Drive Greensburg, PA 15601 (724) 838-6210 [email protected]
3 of 3
MAIL SERVICE CENTER 1330) 384-5179 FIRST ENERGY 76 8 MAIN 8T AKRON OH 44308-1812
1 LBS
SHIP TO:ROSEMARY CHIAVETTA, SECRETARY PENNSYLVANIA PUBLIC UTILITY COMMISS COMMONWEALTH KEYSTONE BUILDING 400 NORTH STREET, 2ND FLOORHARRISBURG PA 17120
PA 171 9-20'MliM_________ ____
UPS NEXT DAY AIRTRACKING #: 1Z BAB R50 01 6431 1037
BILLING: P/P
REF 1:NATALIYA BRYKSENKOVA/609132 REF 2:CLB
W8 18.D-34 Zabra ZP 450 81 .OA 1D/2010
@ SCI NODQ ON SfVEASI r«g«r«n| UP$ tom. M mrOci fit Umuttwtf l»«rr Wtof <ilew«0 Oy u »cl ti tonairtni #(•*« lor np&n ccattoc artcvcammofti W4»»erawnttxio,BftnakirrTiTiimniB CHwwicwXMryioUntt 810 AF 0416