Westmount Place Mixed-Use Development
Transportation Impact Study
Paradigm Transportation Solutions Limited
April 2019
Project: 180289
Project Summary
Paradigm Transportation Solutions Limited
Westmount Place Mixed-Use Development Transportation Impact Study
Signatures and Seals
Signature Engineer’s Seal
Disclaimer
This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authorization of Paradigm Transportation Solutions Limited being obtained .Paradigm Transportation Solutions Limited accepts no responsibility or liability for the consequence of this document being used for a purpose other than the purposes for which it was commissioned .Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm their agreement to indemnify Paradigm Transportation Solutions Limited for all loss or damage resulting there from .Paradigm Transportation Solutions Limited accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned.
To the extent that this report is based on information supplied by other parties, Paradigm Transportation Solutions Limited accepts no liability for any loss or damage suffered by the client, whether through contract or tort, stemming from any conclusions based on data supplied by parties other than Paradigm Transportation Solutions Limited and used by Paradigm Transportation Solutions Limited in preparing this report.
Project Number 180289 April 2019 Client Contact Andrew Kent Killam Apartment REIT 3700 Kempt Road, Suite 100 Halifax NS B3K 4X8 Consultant Project Team Jim Mallett, M.A.Sc., P.Eng., PTOE Matt Brouwer, P.Eng. Stefan Hajgato, B.Eng & Mgmt., E.I.T.
Paradigm Transportation Solutions Limited 5A-150 Pinebush Road Cambridge ON N1R 8J8 p: 519.896.3163 www.ptsl.com
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page i
Executive Summary Content
Paradigm Transportation Solutions Limited (Paradigm) was retained to carry out this Transportation Impact Study (TIS) for a proposed mixed-use development located at 50 Westmount Road North, 9-15 Dietz Avenue North, and 192-216 Erb Street West in Waterloo, Ontario.
This Transportation Impact Study (TIS) includes an analysis of existing traffic conditions, a description of the proposed development, traffic forecasts for a five-year horizon from the date of full-occupancy (2031), and any recommendations required to improve future traffic conditions.
Development Concept
The subject site is located on the east side of Westmount Road North between Erb Street West and Father David Bauer Drive in Waterloo, Ontario.
The proposed development adds 1,014 high-rise residential apartment units, 48,382 square feet of office space, 30,415 square feet of retail space, and a 12,148 square feet brew pub and restaurant to the existing development. The proposed development is expected to be constructed in five (5) phases with full occupancy expected in 2026. Vehicular access is proposed via two (2) existing driveway connections to Westmount Road North, one (1) existing driveway connection to Father David Bauer Drive, one (1) existing driveway connection to Dietz Avenue North, and one (1) proposed driveway connection to Erb Street West. The proposed driveway connection to Erb Street West will only provide access to the proposed residential units of Phase 2 and Phase 3 of the development, in addition to lay-by spaces for taxis and food delivery.
The proposed driveway onto Erb Street West is proposed to be a right-in-right-out operation with the prohibitions of left-turns to be achieved through the design of the driveway entirely on-site (no centre median to be constructed on Erb Street West). This design will be achieved by angling the entering and exiting vehicles with curbs to make left-turns difficult. Sidewalk design will also be taken into account to ensure that pedestrians are crossing the driveway lanes at as close to a 90-degree angle as possible.
Conclusions
Based on the investigations carried out, it is concluded that:
Existing (2019) Traffic Conditions: The study are intersections are forecast to operate within acceptable levels of service during the weekday AM and PM peak hours under the existing horizon, with the exceptions of the northbound left-turn movement on Westmount Road North at Erb Street West, which is forecast to operate at LOS E and the 95th percentile queue length extends beyond the storage length.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page ii
2031 Background Traffic Conditions: The study are intersections are forecast to operate within acceptable levels of service during the weekday AM and PM peak hours under the 2031 Background horizon, with the exception of the northbound left-turn movement on Westmount Road North at Erb Street West, where the 95th percentile queue length is forecast to extend beyond the storage length.
Development Generated Traffic: The proposed development is estimated to generate approximately 252 vehicle trips during the AM peak hour and approximately 325 vehicles trips during the PM peak hour.
2031 Total Traffic Conditions: The study area intersections are forecast to operate with similar levels of service to background traffic conditions, with the exception of the southbound movements on Dietz Avenue North at Erb Street West, which is forecast to operate at LOS E.
Remedial Measures: • Signals are not warranted at the currently unsignalized
intersections.
• An eastbound left-turn lane is warranted on Erb Street West at Dietz Avenue with 15 metres of storage is warranted under existing conditions. The storage length remains the same under 2031 Total conditions.
• Implementing a southbound right-turn lane on Dietz Avenue North at Erb Street West would improve the operations of the southbound right-turn movements under 2031 Total conditions.
Recommendations
Based on the findings of this study, the following recommendations are made:
The right-in-right-out driveway to Erb Street West be designed to minimize the possibility of left-turns and have no adverse impact on pedestrian safety.
It is recommended the Region of Waterloo consider implementing an eastbound left-turn lane at the Erb Street West and Dietz Avenue intersection, which is technically warranted by existing volumes.
Consideration be made to separating the southbound right-turn movements from the through/left-turn movements on Dietz Avenue North at Erb Street West to improve delays for the southbound right-turn movements, as a signal is not warranted at this intersection.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page iv
Contents 1 Introduction ............................................................... 1
1.1 Overview ............................................................................................. 1 1.2 Purpose and Scope ........................................................................... 1
2 Existing Conditions .................................................. 3
2.1 Road Network ..................................................................................... 3 2.2 Transit Service ................................................................................... 5 2.2.1 Existing Transit Service ....................................................................... 5 2.2.3 Future Transit Service .......................................................................... 7 2.3 Active Transportation ........................................................................ 7 2.3.1 Pedestrian Facilities ............................................................................. 7 2.3.2 Cycling Facilities .................................................................................. 7 2.4 Traffic Volumes .................................................................................. 8 2.5 Traffic Operations ............................................................................ 12
3 Development Concept ............................................ 16
3.1 Development Description ................................................................ 16 3.2 Development Trip Generation ......................................................... 18 3.2.1 Mode Split .......................................................................................... 18 3.2.2 Internal Capture ................................................................................. 18 3.2.3 Pass-By Trips ..................................................................................... 18 3.2.4 Estimated Site Generated Trips ......................................................... 19 3.3 Development Trip Distribution and Assignment .......................... 19
4 Evaluation of Future Traffic Conditions ................ 23
4.1 2031 Background Traffic Growth ................................................... 23 4.1.1 Background Traffic ............................................................................. 23 4.2 2031 Background Traffic Operations ............................................. 26 4.3 2031 Total Traffic Operations ......................................................... 29
5 Remedial Measures ................................................. 34
5.1 Left-Turn Lane Warrants ................................................................. 34 5.2 Signal Warrants ................................................................................ 34 5.3 Southbound Right-Turn Lane at Erb Street and Dietz Avenue .... 34
6 Conclusions and Recommendations .................... 38
6.1 Conclusions ..................................................................................... 38 6.2 Recommendations ........................................................................... 38
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page v
Appendices Appendix A Existing Count Data Appendix B Existing Traffic Operational Conditions Appendix C Internal Capture Appendix D New and Passby Trip Assignment Appendix E 2031 Background Traffic Operational Conditions Appendix F 2031 Total Traffic Operational Conditions Appendix H OTM Signal Warrants
Figures Figure 1.1: Location of Subject Site ........................................................ 2 Figure 2.1: Existing Lane Configuration and Traffic Control ................ 4 Figure 2.2: Existing Transit Network ....................................................... 6 Figure 2.3: Cycling Facilities .................................................................... 9 Figure 2.4: Existing Traffic Volumes – AM Peak Hour ......................... 10 Figure 2.5: Existing Traffic Volumes – PM Peak Hour ......................... 11 Figure 3.1: Site Concept Plan ................................................................. 17 Figure 3.2: Site Generated Traffic Volumes – AM Peak Hour ............. 21 Figure 3.3: Site Generated Traffic Volumes – PM Peak Hour .............. 22 Figure 4.1: 2031 Background Forecast Traffic Volumes – AM Peak
Hour ....................................................................................... 24 Figure 4.2: 2031 Background Forecast Traffic Volumes – PM Peak
Hour ....................................................................................... 25 Figure 4.3: 2031 Total Forecast Traffic Volumes – AM Peak Hour ..... 30 Figure 4.4: 2031 Total Forecast Traffic Volumes – PM Peak Hour ..... 31 Figure 5.1: Left-turn Lane Warrant Westbound Father David Bauer
Drive ...................................................................................... 36 Figure 5.2: Left-turn Lane Warrant Eastbound Erb Street West ......... 37
Tables Table 2.1: Existing Traffic Operations – AM Peak Hour ..................... 14 Table 2.2: Existing Traffic Operations – PM Peak Hour ..................... 15 Table 3.1: Trip Generation .................................................................... 19 Table 3.2: Passby Trip Calculations .................................................... 19 Table 3.3: Estimated Trip Distribution ................................................. 20 Table 4.1: 2031 Background Traffic Operations – AM Peak Hour ..... 27 Table 4.2: 2031 Background Traffic Operations – PM Peak Hour ..... 28 Table 4.3: 2031 Total Traffic Operations – AM peak Hour ................. 32 Table 4.4: 2031 Total Traffic Operations – PM Peak Hour ................. 33 Table 5.1: 2031 Total PM Peak Hour – Erb & Dietz Operations with
Southbound Right-Turn Lane ............................................. 35
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 1
1 Introduction 1.1 Overview
Paradigm Transportation Solutions Limited (Paradigm) was retained to carry out this Transportation Impact Study (TIS) for a proposed mixed-use development located at 50 Westmount Road North, 9-15 Dietz Avenue North, and 192-216 Erb Street West in Waterloo, Ontario. Figure 1.1 details the subject development location.
1.2 Purpose and Scope
The purpose of this report is to identify and assess the potential traffic impact resulting from the proposed development. The scope of the study, developed in consultation with Region of Waterloo and City of Waterloo staff in December 2018, includes:
Assessment of the current traffic and site conditions within the study area;
Estimates of background traffic growth;
Estimates of additional traffic generated by the subject site;
Analyses of the impact of the future traffic on the surrounding road network; and
Recommendations necessary to mitigate the site generated traffic in a satisfactory manner.
Based on pre-study consultation, the following intersections were identified for investigation in this study:
Westmount Road North and Erb Street West; Westmount Road North and Father David Bauer Drive; Erb Street West and Dietz Avenue North Two (2) Existing Driveway Connections to Westmount Road North;
Existing Driveway Connection to Father David Bauer Drive; Existing Driveway Connection to Dietz Avenue North; and Proposed Driveway Connection to Erb Street West.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 2
Figure 1.1: Location of Subject Site
Location of Subject SiteFigure 1.1Westmount Place Mixed-Use Development TIS
180289
Subject Site
NTSImage Source: Google Earth
Study Area
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 3
2 Existing Conditions This section documents current traffic conditions, operational deficiencies, and constraints experienced by the public travelling at the intersections within the study area. The operational deficiencies and constraints identified at this stage will be fundamental to the process of defining the required remedial measures.
2.1 Road Network
The main roadways near the subject site considered in assessing the traffic impacts of the development include:
Westmount Road North is a north-south regional arterial1 road with a four-lane urban cross-section. No cycling infrastructure is currently present along this roadway. The Region has identified bike lanes within the study area as apart of the recommended cycling network2;
Erb Street West is an east-west regional arterial road with a four-lane urban cross-section. Designated on-road cycling lanes are provided west of Westmount Road North. No cycling infrastructure is currently present to the east of Westmount Road North; however, the Region has identified future bike lanes as apart of the recommended cycling network;
Father David Bauer Drive is an east-west minor collector road with a two-lane urban cross-section. Designated on-road cycling lanes are provided on both sides of the roadway within the study area; and
Dietz Avenue North is a north-south local road with a two-lane urban cross-section. No cycling infrastructure is currently present along this roadway.
A posted speed limit of 50 kilometres per hour (km/h) is present throughout the study area. Sidewalks are provided on both sides of all study area roads.
Figure 2.1 details the existing lane configurations and traffic control at the study area intersections.
1 City of Waterloo Official Plan – Road Classification System Schedule ‘E’ 2 Walk Cycle Waterloo Region February 2014
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 4
Figure 2.1: Existing Lane Configuration and Traffic Control
Existing Lane Configuration and Traffic Control
Figure 2.1Westmount Place Mixed-Use Development TIS180289
Subject Site
NTSImage Source: Google Earth
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 5
2.2 Transit Service
2.2.1 Existing Transit Service
Grand River Transit (GRT) currently operates five (5) routes within the study area. The transit routes include:
Route 5 Erb operates along Erb Street West from the Boardwalk to Bridgeport. The route operates on weekdays (5:47AM to 12:08AM) with headways of approximately 30 minutes. Saturday service (6:07AM to 12:28AM) operates with headways of approximately 30 minutes and Sunday/Holiday service (9:50AM to 6:21PM) with approximately 45-minute headways;
Route 202 iXpress University operates along University Avenue and Erb Street West from Conestoga Mall to the Boardwalk. The route operates on weekdays (5:55AM to 12:33AM) with headways of approximately 10 minutes. Saturday service (6:25AM to 12:30AM) operates with headways of approximately 30 minutes and Sunday/Holiday service (7:50AM to 12:25AM) operates with approximately 30 minutes headways;
Route 8 University/Fairview operates along Westmount Road from Fairway Station to University Avenue and King Street. The route operates on weekdays (5:40AM to 12:40AM) with headways of approximately 10 minutes. Saturday service (5:50AM to 12:40AM) operates with headways of approximately 30 minutes and Sunday/Holiday service (7:35AM to 12:40AM) operates with approximately 30 minutes headways;
Route 12 Westmount operates along Westmount Road from Conestoga Mall to Fairview Park. The route operates on weekdays (5:15AM to 1:21AM) with headways of approximately 30 minutes. Saturday service (6:45AM to 1:21AM) operates with headways of approximately 30 minutes and Sunday/Holiday service (8:00AM to 1:21AM) operates with approximately 30 minutes headways; and
Route 92 University Loop operates along University Avenue and Columbia from Laurier University to the University of Waterloo. The route operates on weekdays (7:47AM to 5:46PM) with headways of approximately 15 minutes. No Saturday or Sunday/Holiday service. This route operates from early September until late April excluding two weeks around Christmas.
All routes have stops directly fronting the subject development. Figure 2.2 illustrates the existing transit network.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 6
Figure 2.2: Existing Transit Network
Existing Transit NetworkFigure 2.2Westmount Place Mixed-Use Development TIS
180289
NTSImage Source: Grand River Transit
Subject Site
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 7
2.2.3 Future Transit Service
As the new ION Light Rail Transit (LRT) is nearly constructed in Kitchener and Waterloo, the future bus routes near the subject development were reviewed. Nearby future bus routes include3:
Route 5 Erb, which has no planned changes from 2018; Route 12 Westmount, where in the study area, is a consolidation of
Routes 8 and 12; and Route 202 University iXpress, which has no planned changes from
2018.
It is noted that the closest future ION station is greater than 800 metres walking distance from the subject development, thus future ION routes were not reviewed in this study. However, the three routes noted above have stops at nearby ION stations (Uptown Waterloo stations or University stations), which will allow for convenient transfer to the ION service.
2.3 Active Transportation
2.3.1 Pedestrian Facilities
Pedestrian sidewalks are provided along both sides of all study area roadways. Crosswalks, pedestrian push buttons, and indicators are provided for all approaches at signalized intersections within the study area.
The subject site is located within walking distance of numerous retail and recreational opportunities, including the existing portion of the Westmount Place development and the Waterloo Memorial Recreation Complex. The University of Waterloo provides for a range of destinations for prospective residents of the proposed development that are within convenient walking distance for pedestrians.
2.3.2 Cycling Facilities
The City’s cycling infrastructure consists of on-street and off-street facilities. On-street facilities comprise bicycle lanes, signed bicycle routes, and paved shoulders. Off-street facilities are in the form multi-use trails or informal trails.
The Region’s Active Transportation Master Plan identifies several cycling facilities on the study area roadways. Erb Street West currently operates with bicycle lanes west of Westmount Road North. Father David Bauer Drive operates with on-road bicycle lanes and is labelled as an Area Municipal Cycling Facility.
3 https://www.grt.ca/en/about-grt/bus-service-changes-ion.aspx
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 8
A review of the Region’s Active Transportation Master Plan indicates the addition of bike lanes on Westmount Road North and Erb Street West within the study area in the future.
Figure 2.3 illustrates the existing and proposed cycling network within the study area.
2.4 Traffic Volumes
Figure 2.4 and Figure 2.5 displays the existing AM and PM weekday peak hour turning movement traffic volumes collected in March 2019.
Appendix A contains the detailed traffic counts for study area intersections.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 9
Figure 2.3: Cycling Facilities
Cycling FacilitiesFigure 2.3Westmount Place Mixed-Use Development TIS
180289
NTSImage Source: Region of Waterloo
Subject Site
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 10
Figure 2.4: Existing Traffic Volumes – AM Peak Hour
Existing Traffic Volumes AM Peak Hour
Figure 2.4Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
3
11 7
0
118
4
Wes
tmo
un
t R
oad
Private Driveway
718
988
100
1
884
882
890
795
725
885
978
196
304
11
195
199 21
732
928
36
390
1228 153 985
814
122
746
60
261
653
992
53 489
111 93
235
410 62
812
0
2
14
735
890
697
17 31
154
1 869
2 19
28
873
11
717
715
17
17
29
5 671
206
5
37
0
216
307 275 282
32
4 7
985
375 375
0
0
0 0
0
375
985 985
22
2110
3
414
997 34 970
946
3 3 15
17
88
13 1 9
51
359
375 4
23
Dri
vew
ay A
Dri
vew
ay E
Wes
tmo
un
t R
oad
Die
tz A
ven
ue
No
rth
Westcourt Place
3
6
2 1
14
13
98 5
14
53
17
61
15
7 83
17
154
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 11
Figure 2.5: Existing Traffic Volumes – PM Peak Hour
Existing Traffic Volumes PM Peak Hour
Figure 2.5Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
1
72
16
Wes
tmo
un
t R
oad
Private Driveway
4
82
11
25 8
745
1056 8
763
11
77210
56
0 29
7 673 113
12
18
131 6
1110 28
901
22
3 616
410
273
582
46
587 562
4 0
884 21 854
635 94 587 587 0 587 571
1085 143 883 884 884 884
141
836
131 69
0
Die
tz A
ven
ue
No
rth
1117
118
752
19
Dri
vew
ay E
1108
0 73 1 36
26
671 0 807
0 110
7
113 117 4
89 171 15
1012 40 3 5
0
730
42
23 162
121
13
1033 79
139
19
4
16 753
72
13
15
Wes
tmo
un
t R
oad
1097
Dri
vew
ay A
22
841
28
1112
869
37 14 226 256 243 256
54 65 324 327 9 321
Westcourt Place 25 10
13
150 246
13 312
1188
1013
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 12
2.5 Traffic Operations
Intersection level of service (LOS) is a recognized method of quantifying the average delay experienced by drivers at intersections. It is based on the delay experienced by individual vehicles executing the various movements. The delay is related to the number of vehicles intending to make a particular movement, compared to the estimated capacity for that movement. The capacity is based on a number of criteria related to the opposing traffic flows and intersection geometry.
The highest possible rating is LOS A, under which the average total delay is equal or less than 10.0 seconds per vehicle. When the average delay exceeds 80 seconds for signalized intersections, 50 seconds for unsignalized intersections or when the volume to capacity ratio is greater than 1.0, the movement is classed as LOS F and remedial measures are usually implemented, if they are feasible. LOS E is usually used as a guideline for the determination of road improvement needs on through lanes, while LOS F may be acceptable for left-turn movements at peak times, depending on delays.
The level of service conditions on the existing road network have been assessed using Synchro 9. Movements are considered critical under the following conditions4:
Overall Level of Service E or F (i.e. average control delay per vehicle greater than 55 seconds) for signalized intersections;
Overall Level of Service E or F (i.e. average control delay per vehicle greater than 35 seconds) for unsignalized intersections;
The average control delay for individual movements is greater that 55 seconds;
Estimated 95th percentile queue length for an exclusive movement exceeds the available storage space;
Estimated 95th percentile queue length for an individual movement will block an existing access; and
Exclusive turning lanes are inaccessible because of queue lengths in adjacent through lanes.
Table 2.1 and Table 2.2 summarizes the existing intersection operations. The entries in the table indicating the AM and PM peak hour level of service (LOS), volume to capacity ratios (V/C), and 95th percentile queues experienced. All study area intersections are forecast to operate within acceptable levels, except for the following:
4 Region of Waterloo Transportation Impact Study Guidelines 2014
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 13
Westmount Road North & Erb Street West
The queue length for the northbound left-turn lane extends beyond the current available storage length during the AM and PM peak hours; and
The northbound left-turn movement operates at LOS E (v/c = 0.99) during the PM peak hour.
Appendix B contains the detailed Synchro 9 reports.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 14
TABLE 2.1: EXISTING TRAFFIC OPERATIONS – AM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < D > D < D B C A B > B A A > A A
Delay < 43 > 43 < 51 14 22 9 10 > 10 5 3 > 3 9
V/C < 0.42 > < 0.32 0.52 0.02 0.42 > 0.40 0.26 >
95th < 22 > < 20 19 3 72 > 16 24 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 50 - 9 - > 25 - >
LOS A > A A A A B A B
Delay 0 > 0 8 0 1 13 10 11
V/C 0.18 > 0.02 0.11 0.01 0.01
95th 0 > 0 0 0 0
Storage - > 80 - - -
Avail. - > 80 - - -
LOS B A A A > A A A A
Delay 13 9 10 0 > 0 9 0 0
V/C 0.00 0.02 0.34 > 0.02 0.21
95th 0 1 0 > 1 0
Storage - - - > 13 -
Avail. - - - > 13 -
LOS < B > B B A > B A A > A A A > A
Delay < 14 > 14 15 10 > 12 9 0 > 0 10 0 > 1
V/C < 0.03 > 0.04 0.02 > 0.00 0.34 > 0.04 0.27 >
95th < 1 > 1 0 > 0 0 > 1 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 29 - >
LOS B C > C C C A B C D > D C C A C C
Delay 17 33 > 31 21 26 2 19 24 37 > 35 32 29 1 27 30
V/C 0.31 0.82 > 0.35 0.21 0.17 0.40 0.76 > 0.57 0.43 0.11
95th 30 134 > 14 30 3 30 110 > 29 62 0
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 100 - > 46 - 27 -10 - > 26 - 50
LOS < A > A < A > A < B > B < B > B
Delay < 1 > 0 < 0 > 0 < 13 > 13 < 12 > 12
V/C < 0.29 > < 0.14 > < 0.05 > < 0.04 >
95th < 1 > < 0 > < 1 > < 1 >
LOS A > A < A A A > A
Delay 9 > 9 < 7 7 0 > 0
V/C 0.01 > < 0.06 0.00 >
95th 0 > < 2 0 >
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
AM
Pea
k H
ou
r
Erb Street West & Dietz Avenue
NorthTWSC
Dietz Avenue North & Driveway
DTWSC
Westmount Road & Driveway C /
Private DrivewayTWSC
TCSWestmount Road & Erb Street West
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
OV
ER
AL
L
Father David Bauer Drive & Driveway A
TWSC
Westmount Road & Driveway B
TWSC
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 15
TABLE 2.2: EXISTING TRAFFIC OPERATIONS – PM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < C > C < D B C A A > A A A > A A
Delay < 27 > 27 < 53 12 22 8 9 > 9 5 4 > 4 9
V/C < 0.21 > < 0.48 0.61 0.05 0.38 > 0.31 0.40 >
95th < 13 > < 31 23 5 63 > 14 50 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 39 - 7 - > 26 - >
LOS A > A A A A B A B
Delay 0 > 0 8 0 0 13 10 11
V/C 0.15 > 0.01 0.18 0.03 0.02
95th 0 > 0 0 1 0
Storage - > 80 - - -
Avail. - > 80 - - -
LOS B B B A > A A A A
Delay 15 10 11 0 > 0 9 0 1
V/C 0.06 0.17 0.29 > 0.09 0.30
95th 2 5 0 > 2 0
Storage - - - > 13 -
Avail. - - - > 11 -
LOS < B > B C A > B B A > A A A > A
Delay < 15 > 15 17 9 > 13 10 0 > 0 9 0 > 0
V/C < 0.06 > 0.22 0.09 > 0.01 0.26 > 0.04 0.40 >
95th < 2 > 7 2 > 0 0 > 1 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 29 - >
LOS C C > C C C A C E C > D C D A C C
Delay 22 27 > 26 25 32 1 29 79 31 > 45 20 37 6 31 33
V/C 0.36 0.50 > 0.48 0.57 0.12 0.99 0.56 > 0.41 0.74 0.28
95th 22 61 > 32 88 0 104 82 > 29 113 13
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 108 - > 29 - 30 -84 - > 26 - 37
LOS < A > A < A > A < B > B < C > C
Delay < 0 > 0 < 1 > 0 < 13 > 13 < 24 > 24
V/C < 0.17 > < 0.25 > < 0.05 > < 0.37 >
95th < 0 > < 1 > < 1 > < 13 >
LOS A > A < A A A > A
Delay 9 > 9 < 5 5 0 > 0
V/C 0.11 > < 0.01 0.00 >
95th 3 > < 0 0 >
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
OV
ER
AL
L
PM
Pea
k H
ou
r
Erb Street West & Dietz Avenue
NorthTWSC
Dietz Avenue North & Driveway
DTWSC
Westmount Road & Driveway C /
Private Driveway
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
Westmount Road & Erb Street West
TWSC
TCS
Father David Bauer Drive & Driveway A
Westmount Road & Driveway B
TWSC
TWSC
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 16
3 Development Concept 3.1 Development Description
The subject site is located on the east side of Westmount Road North between Erb Street West and Father David Bauer Drive in Waterloo, Ontario.
The proposed development adds 1,014 high-rise residential apartment units, 48,382 square feet of office space, 30,415 square feet of retail space, and a 12,148 square feet brew pub and restaurant to the existing development. The proposed development is expected to be constructed in five (5) phases with full occupancy expected in 2026. Vehicular access is proposed via two (2) existing driveway connections to Westmount Road North, one (1) existing driveway connection to Father David Bauer Drive, one (1) existing driveway connection to Dietz Avenue North, and one (1) proposed driveway connection to Erb Street West. The proposed driveway connection to Erb Street West will only provide access to the proposed residential units of Phase 2 and Phase 3 of the development, in addition to lay-by spaces for taxis and food delivery.
The proposed driveway onto Erb Street West is proposed to be a right-in-right-out operation with the prohibitions of left-turns to be achieved through the design of the driveway entirely on-site (no centre median to be constructed on Erb Street West). This design will be achieved by angling the entering and exiting vehicles with curbs to make left-turns difficult. Sidewalk design will also be taken into account to ensure that pedestrians are crossing the driveway lanes at as close to a 90 degree angle as possible.
Figure 3.1 shows the development concept.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 17
Figure 3.1: Site Concept Plan
Site
Con
cept
Pla
nFi
gure
3.1
Wes
tmou
nt P
lace
Mix
ed-U
se D
evel
opm
ent T
IS18
0289
NTS
Driv
eway
A
Driv
eway
B
Driv
eway
C
Driv
eway
D
Driv
eway
E
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 18
3.2 Development Trip Generation
The following Institute of Transportation Engineers (ITE) Trip Generation5 Land Use Codes were used to estimate the site’s trip generation:
LUC 222 (Multifamily Housing (High-Rise)); LUC 710 (General Office Building); LUC 820 (Shopping Centre); and LUC 932 (High-Turnover (Sit Down) Restaurant).
3.2.1 Mode Split
There are multiple non-auto methods of travelling to and from the subject development such as walking, taxi, public transportation, or cycling. A mode split can be used to represent the fraction of trips that are made by non-auto methods of transportation. The Region of Waterloo confirmed a 25% mode split expected by the proposed development, thus 75% of trips to and from the proposed development are expected to be made by automobiles.
3.2.2 Internal Capture
In a multi-use development where more than one land use exists on a single real-estate development, trips can be made between land uses without using the off-site road network and are referred to as Internal Capture Trips, and the calculation methods are outlined in the ITE Trip Generation Handbook6. The capture of trips internal to the site has the net effect of reducing vehicular trip generation between the development site and the off-site road network.
The detailed internal capture tables and diagrams can be found in Appendix C.
3.2.3 Pass-By Trips
Certain commercial uses are known to divert passing vehicles to patronize a development, rather than drawing patrons from outside the study area. These vehicles would be travelling on study area roads regardless if the development exists. These are called pass-by trips, and ITE provides average pass-by rates for select land uses6. The ITE provide pass-by rates for the following land uses in the proposed development:
LUC 820 (Shopping Centre) –34% during the PM peak hour; and
5 Trip Generation Manual - Tenth Edition, Institute of Transportation Engineers, Washington D.C., 2017
6 Trip Generation Handbook – Third Edition, Institute of Transportation Engineers, Washington D.C., 2017
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 19
LUC 932 (High-Turnover (Sit Down) Restaurant) – 43% during the PM peak hour.
3.2.4 Estimated Site Generated Trips
Table 3.1 summarizes the existing and full build-out trip generation estimates. As shown, the proposed development is forecast to generate approximately 252 vehicle trips during the AM peak hour and 325 vehicle trips during the PM peak hour after factoring mode split, internal capture, and pass-by trip reductions exclusive of the vehicle trips currently generated by the existing development. Pass-by trip calculations are shown in Table 3.2. As the brew pub was expected to not operate during the AM peak hour, no trips are expected to be generated by the restaurant land use during that time.
TABLE 3.1: TRIP GENERATION
TABLE 3.2: PASSBY TRIP CALCULATIONS
3.3 Development Trip Distribution and Assignment
Table 3.3 summarizes the estimated trip distribution for site generated traffic. The distribution was developed using the 2016 Transportation Tomorrow
Rate per Unit
In Out TotalRate per Unit
In Out Total
222: Multifamily Housing (High Rise) 1,014 Units Formula 0.29 71 226 297 0.35 216 138 354
710: General Office BuildingTotal 258,364 GFA Formula 1.04 232 38 270 1.09 45 236 281
Existing 209,982 GFA Formula 1.07 193 31 224 1.10 37 194 231
New 48,382 GFA 39 7 46 8 42 50
820: Shopping CenterTotal 148,712 GFA Formula 1.52 140 86 226 4.90 350 379 729
Existing 118,295 GFA Formula 1.78 131 80 211 5.20 295 320 615
New 30,417 GFA 9 6 15 55 59 114932: High-Turnover (Sit-Down) Restaurant
Total 12,148 GFA Rate 9.77 74 45 119
Existing - GFA Rate 9.77 0 0 0
New 12,148 GFA Rate 74 45 119Total Net Trips 119 239 358 353 284 637
Mode Split 25% 30 60 90 25% 88 71 159Internal Capture 5 12 16 95 58 153
Total New Trips 85 167 252 169 156 325Percent Reduction 29% 30% 30% 52% 45% 49%
Land Use Units/GFA (ft2) Formula or Rate
AM Peak Hour PM Peak Hour
% In Out Total % In Out Total
9 6 15 55 59 1140% 0 0 0 34% 19 19 39
74 45 11943% 26 26 51
0 0 0 45 45 90Pass-By Trips
Total Pass-By
AM Peak Hour PM Peak Hour
820: Shopping Center
Pass-By Trips
932: High-Turnover (Sit-Down) Restaurant
Land Use
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 20
Survey7 (TTS) data for the zone containing the subject site. Figure 3.2 details the total forecast site-generated traffic. New trips and pass-by trips generated by the development are shown separately in Appendix D.
TABLE 3.3: ESTIMATED TRIP DISTRIBUTION
Figure 3.2 and Figure 3.3 illustrates the site-generated traffic volumes for the AM and PM peak hours, respectively.
7 Transportation Tomorrow Survey 2016, University of Toronto Data Management Group https://dmg.utoronto.ca
Travel Direction Inbound AM Outbound AM Inbound PM Outbound PMNorth via Westmount 15% 20% 20% 10%East via Father David Bauer 0% 0% 5% 5%East via Erb 45% 65% 55% 50%West via Erb 25% 5% 15% 30%South via Westmount 15% 10% 5% 5%
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 21
Figure 3.2: Site Generated Traffic Volumes – AM Peak Hour
Site Generated Traffic Volumes AM Peak Hour
Figure 3.2Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
0
0 0
16 0
12 0
15 109
10
0 7 5
20 5
0 0
26 0 38
22 12 20 20 0 20 20
9 14 27 27 10 26
4 0 104 16
7 16 22
2 2 5
6
17 0
9 17 108
25 16 3131 0
0D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad 9 10
8
25 31
Dri
vew
ay E
0
0
0 0 25
108
0 9 38 31
0 0 31 108
0
Private Driveway
0 0 6
29
0 0
0
29 0
6
29
6 0
29
6 0
0
0 0
0
0
0
0
Wes
tmo
un
t R
oad 6
Dri
vew
ay A 7
29 4
6
29
0
0 29 0
7
4
13
33
Westcourt Place
0 6 7
4
0
0
0 0 7 7 0 0
0
0 0 4 4
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 22
Figure 3.3: Site Generated Traffic Volumes – PM Peak Hour
Site Generated Traffic Volumes PM Peak Hour
Figure 3.3Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
0
0 0
5 0
4 0
12 56
10
0 2 2
15 3
0 0
63 0 71
16 6 15 15 0 15 15
34 4 45 45 24 63
11 0 53
19
28 39 52
6 1 3
13
21 0
10 21 64
21 39 3131 0
0D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad 10 64
21 31
Dri
vew
ay E
0
0
0 -20
41
64
0 35 64 31
0 0 76 64
0
Private Driveway
0 -25
35
29
0 0
0
9 0
10
9
10 0
9
10 0
0
0 0
0
5
4
0
Wes
tmo
un
t R
oad 10
Dri
vew
ay A
23
9 7
10
9
0
0 8 1
18
3
27
11
Westcourt Place
0 9 18
3
0
6
0 0 19 19 1 5
1
0 1 4 4
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 23
4 Evaluation of Future Traffic Conditions The assessment of the future traffic conditions contained in this section includes the future traffic forecasts as well as the level of service analysis.
4.1 2031 Background Traffic Growth
4.1.1 Background Traffic
A horizon of five years from full occupancy (Year 2031) has been assessed. The likely future traffic volumes are estimated to consist of:
Increased non-site traffic (generalized background road traffic growth); and
Traffic generated by the subject site.
During pre-study consultations, the Region of Waterloo confirmed a generalized background growth rate of 1.0% which was applied to existing turning movements, exclusive of those entering or exiting the site, to forecast future volumes. Figure 4.1 and Figure 4.2 details the 2031 forecast background traffic volumes.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 24
Figure 4.1: 2031 Background Forecast Traffic Volumes – AM Peak Hour
2031 Background Forecast Traffic Volumes – AM Peak Hour
Figure 4.1Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
1004
1113
Westcourt Place
6 764
234 175
6 222
69 33 346 345 313 320
19 42 223 226 21 243
11
831
1011
7
814
17
17
19
17
8 905
94
32
4
Wes
tmo
un
t R
oad 82
5
Dri
vew
ay A
53
1007
2 19
28
994
11
1005
816
832 3
1011 6
Private Driveway
2 793
36
14
2 1
13 8 154 14 1
0
3 17 31 100
5
743 0 26
1129 0 100
5D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad 81
5
14
1108
103
Dri
vew
ay E
0
1 989
118 13
98
10
58
267 0 409
60 557
126 106
0 0
1398 174 1121 1121 0 1121 1135
467 71 444 427 427 427
17
297 19
924
25
1056 24
39 1104
926
139
849
68
1121 1077
3 3
427 5 471
15 1
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 25
Figure 4.2: 2031 Background Forecast Traffic Volumes – PM Peak Hour
2031 Background Forecast Traffic Volumes – PM Peak Hour
Figure 4.2Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
20
149 7
1263 32
1025 25
3 701
467
311
662
52
668 640
5 0
1006 24 972
723 107 668 668 0 668 650
1235 163 1005 1006 1006 1006
83 1 41
30
764 0 918160
951
149 79
0 0
1261 0 125
848 0 33
12 7
18D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad
1259
119
846
19
Dri
vew
ay E
4
1
8 766
72
113
13 89 171 15
28 9 113 117
11
Private Driveway
5
1152 40
82
3 6
0
831
42
1199
873
1196 9
857
1176 79
139
23 162
121
1153
171 280
15
13
22
Wes
tmo
un
t R
oad
1248
Dri
vew
ay A
22
957
28
1255
970
518 85
7
82
13
15
1352
1153
364
42 16 257 290 277 290
355
61 74 369 370 9
Westcourt Place 28
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 26
4.2 2031 Background Traffic Operations
The study area intersection operations analysis for the background traffic scenario followed the same methodology used for existing traffic conditions. The Westmount Road North and Erb Street West signalized intersection was optimized for movements splits, but no other improvements were considered.
Table 4.1 and Table 4.2 details the level of service conditions.
Similar to the existing conditions, all study area intersections are forecast to operate within acceptable levels, except for the following:
Westmount Road North & Erb Street West
The queue length for the northbound left-turn lane extends beyond the current available storage length during the AM and PM peak hours.
Appendix E contains the detailed Synchro 9 results.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 27
TABLE 4.1: 2031 BACKGROUND TRAFFIC OPERATIONS – AM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < D > D < D B C B B > B A A > A B
Delay < 43 > 43 < 52 13 22 11 16 > 16 5 3 > 4 12
V/C < 0.45 > < 0.36 0.55 0.02 0.55 > 0.44 0.30 >
95th < 24 > < 21 19 3 97 > 19 30 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 49 - 9 - > 21 - >
LOS A > A A A A B B B
Delay 0 > 0 8 0 1 13 10 11
V/C 0.20 > 0.02 0.13 0.01 0.01
95th 0 > 0 0 0 0
Storage - > 80 - - -
Avail. - > 80 - - -
LOS B A A A > A A A A
Delay 14 9 10 0 > 0 9 0 0
V/C 0.00 0.02 0.39 > 0.02 0.24
95th 0 1 0 > 1 0
Storage - - - > 13 -
Avail. - - - > 13 -
LOS < B > B C A > B A A > A A A > A
Delay < 15 > 15 15 10 > 13 9 0 > 0 10 0 > 0
V/C < 0.03 > 0.05 0.02 > 0.00 0.39 > 0.05 0.31 >
95th < 1 > 1 1 > 0 0 > 1 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 29 - >
LOS B D > D C C A B C D > D D C A C C
Delay 18 38 > 35 27 24 5 20 26 45 > 43 41 32 1 31 35
V/C 0.38 0.89 > 0.50 0.21 0.18 0.49 0.88 > 0.69 0.50 0.14
95th 35 177 > 16 31 11 33 140 > 40 71 2
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 95 - > 44 - 20 -13 - > 15 - 48
LOS < A > A < A > A < B > B < B > B
Delay < 1 > 1 < 0 > 0 < 14 > 14 < 12 > 12
V/C < 0.33 > < 0.15 > < 0.06 > < 0.05 >
95th < 1 > < 0 > < 1 > < 1 >
LOS A > A < A A A > A
Delay 9 > 9 < 7 7 0 > 0
V/C 0.01 > < 0.06 0.00 >
95th 0 > < 2 0 >
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
OV
ER
AL
L
AM
Pea
k H
ou
r
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
Father David Bauer Drive & Driveway A
TWSC
Westmount Road & Driveway B
TWSC
Westmount Road & Driveway C /
Private DrivewayTWSC
Westmount Road & Erb Street West
TCS
Erb Street West & Dietz Avenue
NorthTWSC
Dietz Avenue North & Driveway
DTWSC
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 28
TABLE 4.2: 2031 BACKGROUND TRAFFIC OPERATIONS – PM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < C > C < D B C B B > B A A > A B
Delay < 25 > 25 < 52 18 26 11 12 > 12 6 5 > 5 11
V/C < 0.21 > < 0.50 0.68 0.07 0.46 > 0.37 0.46 >
95th < 13 > < 33 34 6 87 > 17 66 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 37 - 6 - > 23 - >
LOS A > A A A A B A B
Delay 0 > 0 8 0 0 14 10 12
V/C 0.17 > 0.01 0.21 0.04 0.02
95th 0 > 0 0 1 0
Storage - > 80 - - -
Avail. - > 80 - - -
LOS C B B A > A A A A
Delay 16 11 11 0 > 0 10 0 1
V/C 0.06 0.18 0.33 > 0.09 0.35
95th 2 5 0 > 3 0
Storage - - - > 13 -
Avail. - - - > 11 -
LOS < C > C C A > B B A > A A A > A
Delay < 16 > 16 18 9 > 14 11 0 > 0 9 0 > 0
V/C < 0.08 > 0.24 0.09 > 0.01 0.30 > 0.05 0.45 >
95th < 2 > 7 2 > 0 0 > 1 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 29 - >
LOS D C > D D D A D D C > C B D A C D
Delay 46 34 > 36 46 39 1 37 53 26 > 34 19 42 7 35 36
V/C 0.68 0.63 > 0.73 0.72 0.15 0.88 0.54 > 0.46 0.82 0.31
95th 32 79 > 50 103 0 96 81 > 28 142 17
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 99 - > 10 - 30 -76 - > 27 - 33
LOS < A > A < A > A < B > B < D > D
Delay < 0 > 0 < 1 > 0 < 14 > 14 < 32 > 32
V/C < 0.19 > < 0.29 > < 0.05 > < 0.48 >
95th < 0 > < 1 > < 1 > < 20 >
LOS A > A < A A A > A
Delay 9 > 9 < 5 5 0 > 0
V/C 0.11 > < 0.01 0.00 >
95th 3 > < 0 0 >
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
PM
Pea
k H
ou
r
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
Father David Bauer Drive & Driveway A
TWSC
Erb Street West & Dietz Avenue
NorthTWSC
Dietz Avenue North & Driveway
DTWSC
Westmount Road & Driveway B
TWSC
Westmount Road & Driveway C /
Private DrivewayTWSC
Westmount Road & Erb Street West
TCS
Westbound Northbound Southbound
OV
ER
AL
L
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 29
4.3 2031 Total Traffic Operations
The study area intersection operations analyses for the future total traffic projections followed the same methodology used for existing conditions. The Westmount Road North and Erb Street West signalized intersection was optimized for movements splits, but no other improvements were considered. Figure 4.3 and Figure 4.4 details the 2031 forecast Total Traffic Volumes.
Table 4.1 and Table 4.2 details the level of service conditions.
Similar to the existing and 2031 Background conditions, all study area intersections are forecast to operate within acceptable levels, except for the following:
Westmount Road North & Erb Street West
The queue length for the northbound left-turn lane extends beyond the current available storage length during the AM and PM peak hours.
Erb Street West & Dietz Avenue North
The southbound movement operates at LOS F (v/c = 1.07) during the PM peak hour.
Appendix F contains the detailed Synchro 9 results.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 30
Figure 4.3: 2031 Total Forecast Traffic Volumes – AM Peak Hour
2031 Total Forecast Traffic Volumes AM Peak Hour
Figure 4.3Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
17
297 19
940
25
1068 24
54 1213
936
139
856
73
1141 1082
3 3
453 5 509
1420 186 1141 1141 0 1141 1155
476 85 471 454 437 453
19 1 114 74
274 16 431
62 559
131 112
17 0
752
17 134
1154 16 131
129 5
5D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad 82
4
122
1133
134
Dri
vew
ay E
1
0
1 989
143 121
3 26 69 131
13 8 185 122
6
Private Driveway
2 793
42
43
2 1
0
1023 11
822
1034
838 3
1040
820
17
17
2 19
28
179
6
7
19
Wes
tmo
un
t R
oad 83
1
Dri
vew
ay A
60
1036 15
837
1040
178 934
94
39
8
1017
1146
243
69 33 353 352 313 320
222
19 42 227 230 21
Westcourt Place
6 770
241
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 31
Figure 4.4: 2031 Total Forecast Traffic Volumes – PM Peak Hour
2031 Total Forecast Traffic Volumes PM Peak Hour
Figure 4.4Westmount Place Mixed-Use Development TIS180289
NTS
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
1379
1164
370
42 16 276 309 278 295
356
61 75 373 374 14
Westcourt Place 28 11
62
189 283
15
17
22
Wes
tmo
un
t R
oad
1258
Dri
vew
ay A
45
966
35
1265
979
518 86
5
83
31
18
840
42
1209
882
1206 9
866
1186 79
139
23 162
121
11
Private Driveway
5
1127 75
111
3 6
0
4
1
8 746
113 177
13 124 235 46
28 9 189 181
1271 21 189
869
39 6443 7
18D
ietz
Ave
nu
e N
ort
h
Wes
tmo
un
t R
oad
1269
183
867
50
Dri
vew
ay E
94 1 94
49
792 39 970166
952
152 92
21 0
1069 24 1043
739 113 683 683 0 683 665
1269 167 1050 1051 1030 1069
20
149 7
1268 32
1029 25
15 757
477
311
664
54
683 643
5 0
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 32
TABLE 4.3: 2031 TOTAL TRAFFIC OPERATIONS – AM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < D > D < D B C B B > B A A > A B
Delay < 43 > 43 < 52 13 21 12 17 > 17 6 3 > 4 12
V/C < 0.45 > < 0.36 0.56 0.02 0.57 > 0.45 0.30 >
95th < 24 > < 21 20 3 102 > 23 30 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 49 - 9 - > 17 - >
LOS A > A A A A B B B
Delay 0 > 0 8 0 1 13 10 12
V/C 0.21 > 0.02 0.13 0.02 0.01
95th 0 > 0 0 0 0
Storage - > 80 - - -
Avail. - > 80 - - -
LOS B A A A > A A A A
Delay 14 9 10 0 > 0 9 0 0
V/C 0.00 0.02 0.40 > 0.02 0.24
95th 0 1 0 > 1 0
Storage - - - > 13 -
Avail. - - - > 13 -
LOS < B > B C B > B A A > A A A > A
Delay < 15 > 15 16 10 > 12 9 0 > 0 10 0 > 1
V/C < 0.03 > 0.07 0.06 > 0.00 0.39 > 0.05 0.31 >
95th < 1 > 2 2 > 0 0 > 1 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 29 - >
LOS B D > D C C A C C D > D D C A C C
Delay 19 39 > 36 34 24 5 21 26 47 > 44 43 32 2 31 35
V/C 0.40 0.90 > 0.60 0.22 0.19 0.49 0.89 > 0.71 0.50 0.14
95th 38 180 > 22 32 11 33 143 > 43 71 2
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 92 - > 38 - 19 -13 - > 12 - 48
LOS < A > A < A > A < C > C < C > C
Delay < 1 > 1 < 0 > 0 < 15 > 15 < 19 > 19
V/C < 0.33 > < 0.17 > < 0.06 > < 0.34 >
95th < 1 > < 0 > < 2 > < 12 >
LOS A > A < A A A > A
Delay 9 > 9 < 7 7 0 > 0
V/C 0.12 > < 0.08 0.00 >
95th 3 > < 2 0 >
LOS A A A > A A A
Delay 0 0 0 > 0 10 10
V/C 0.34 0.17 > 0.02
95th 0 0 > 1
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
TWSC
AM
Pea
k H
ou
r
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
Father David Bauer Drive & Driveway A
TWSC
Westmount Road & Driveway B
TWSC
Westmount Road & Driveway C /
Private DrivewayTWSC
Westmount Road & Erb Street West
TCS
Erb Street West & Dietz Avenue
NorthTWSC
Erb Street West & Driveway E
TWSC
Dietz Avenue North & Driveway
D
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
OV
ER
AL
L
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 33
TABLE 4.4: 2031 TOTAL TRAFFIC OPERATIONS – PM PEAK HOUR
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < C > C < D B C B B > B A A > A B
Delay < 25 > 25 < 52 18 26 12 13 > 13 6 5 > 5 11
V/C < 0.21 > < 0.50 0.69 0.07 0.48 > 0.40 0.47 >
95th < 13 > < 33 35 6 92 > 19 68 >
Storage < - > < 70 - 12 - > 40 - >
Avail. < - > < 37 - 6 - > 21 - >
LOS A > A A A A B A B
Delay 0 > 0 8 0 0 14 10 12
V/C 0.18 > 0.01 0.21 0.04 0.02
95th 0 > 0 0 1 1
Storage - > 80 - - -
Avail. - > 80 - - -
LOS C B B A > A A A A
Delay 16 11 12 0 > 0 10 0 1
V/C 0.06 0.18 0.33 > 0.10 0.35
95th 2 5 0 > 3 0
Storage - - - > 13 -
Avail. - - - > 11 -
LOS < C > C C A > C B A > A A A > A
Delay < 17 > 17 22 10 > 16 11 0 > 0 10 0 > 1
V/C < 0.08 > 0.36 0.12 > 0.01 0.29 > 0.09 0.44 >
95th < 2 > 13 3 > 0 0 > 2 0 >
Storage < - > - - > 25 - > 30 - >
Avail. < - > - - > 25 - > 28 - >
LOS D C > D D D A D D C > D B D A D D
Delay 50 34 > 36 46 38 1 36 55 27 > 35 20 43 8 36 36
V/C 0.72 0.63 > 0.74 0.73 0.17 0.89 0.56 > 0.47 0.84 0.33
95th 36 80 > 50 106 2 99 84 > 29 142 19
Storage 130 - > 60 - 30 20 - > 55 - 50
Avail. 94 - > 10 - 28 -79 - > 26 - 31
LOS < A > A < A > A < B > B < F > F
Delay < 1 > 0 < 1 > 0 < 15 > 15 < 142 > 142
V/C < 0.19 > < 0.31 > < 0.06 > < 1.07 >
95th < 1 > < 1 > < 2 > < 74 >
LOS A > A < A A A > A
Delay 9 > 9 < 6 6 0 > 0
V/C 0.17 > < 0.03 0.00 >
95th 5 > < 1 0 >
LOS A A A > A B B
Delay 0 0 0 > 0 13 13
V/C 0.20 0.40 > 0.04
95th 0 0 > 1
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
Dietz Avenue North & Driveway
DTWSC
Westmount Road & Driveway B
TWSC
Westmount Road & Driveway C /
Private DrivewayTWSC
Westmount Road & Erb Street West
TCS
PM
Pea
k H
ou
r
Westmount Road & Father David Bauer Drive /
Westcourt Place
TCS
Father David Bauer Drive & Driveway A
TWSC
Erb Street West & Dietz Avenue
NorthTWSC
Erb Street West & Driveway E
TWSC
An
alys
is P
erio
d
IntersectionControl
TypeMOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
OV
ER
AL
L
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 34
5 Remedial Measures 5.1 Left-Turn Lane Warrants
Westmount Road North currently has a centre two-way left-turn lane, which serves the two driveways to the development site.
A westbound left-turn lane on Father David Bauer Drive currently exists with a storage length of 25 metres. Using the left-turn lane warrant nomographs from the MTO Supplement of the TAC Guideline for Geometric Design, shown in Figure 5.1, it is found that a westbound left-turn lane is not warranted under 2031 Total conditions and therefore the existing westbound left-turn lane does not need to be extended.
The need for an eastbound left-turn lane on Erb Street West at Dietz Avenue was evaluated and is shown in in Figure 5.2. A left-turn lane with 15 metres of storage is warranted under Existing AM peak hour conditions, regardless of whether the subject development is built. Under 2031 Background and Total AM and PM peak hour conditions, the storage length requirement remains at 15 metres.
5.2 Signal Warrants
Unsignalized intersections can be assessed using the Ontario Traffic Manual (OTM) signal warrant guidelines8 to determine if a change in traffic control is warranted. The following intersections were assessed using the OTM signal warrants:
Erb Street West & Dietz Avenue North; and Westmount Road North & Driveway C.
Based on the warrant analysis, traffic control signals are not warranted under forecast total traffic conditions.
Appendix G contains the warrant analysis worksheets.
5.3 Southbound Right-Turn Lane at Erb Street and Dietz Avenue
Under 2031 Total conditions, the southbound movement at the Erb Street West and Dietz Avenue North intersections is forecast to operate at LOS F under the existing intersection configuration during the PM peak hour. As approximately 50% of the southbound movements in the PM peak hour are right-turn movements, the effects of separating the southbound right-turn and left-turn/through movements into two lanes was assessed using Synchro 9 under 2031 Total PM peak hour conditions. Table 5.1 compares the
8 Ontario Traffic Manual Book 12 – Traffic Signals
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 35
intersection operations of the Erb Street West and Dietz Avenue North intersection before and after implementation of a southbound right-turn lane.
TABLE 5.1: 2031 TOTAL PM PEAK HOUR – ERB & DIETZ OPERATIONS WITH SOUTHBOUND RIGHT-TURN LANE
As illustrated, implementing a southbound right-turn lane would improve the operations of the southbound movements. However, the shared southbound left-through lane will operate at LOS F with or without an additional right-turn lane. There is potential for vehicles wanting to turn left onto Erb Street West to divert to Roslin Avenue North via Sunshine Avenue, however those vehicles would still be delayed by the volumes on Erb Street West and would not provide significant time savings.
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
Lef
t
Th
rou
gh
Rig
ht
Ap
pro
ach
LOS < A > A < A > A < B > B < F > F
Delay < 1 > 0 < 1 > 0 < 15 > 15 < 142 > 142
V/C < 0.19 > < 0.31 > < 0.06 > < 1.07 >
95th < 1 > < 1 > < 2 > < 74 >
LOS < A > A < A > A < B > B < F B F
Delay < 1 > 0 < 1 > 0 < 15 > 15 < 131 14 72
V/C < 0.19 > < 0.31 > < 0.06 > < 0.88 0.19
95th < 1 > < 1 > < 2 > < 42 6
MOE - Measure of Effectiveness V/C - Volume to Capacity Ratio Avail. - Available Storage (m)
TWSC - Two-Way Stop Control 95th - 95th Percentile Queue Length > - Shared Right-Turn Lane
TCS - Traffic Control Signal Storage - Existing Storage (m) < - Shared Left-Turn Lane
LOS - Level of Service
MOE
Direction / Movement / Approach
Eastbound Westbound Northbound Southbound
Existing Configuration
Implementation of Southbound
Right-Turn Lane
Configuration
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 36
Figure 5.1: Left-turn Lane Warrant Westbound Father David Bauer Drive
Left-turn Lane WarrantWestbound Father David Bauer Drive
Figure 5.1Westmount Place Mixed-Use Development TIS180289
AM Peak Hour
PM Peak Hour
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 37
Figure 5.2: Left-turn Lane Warrant Eastbound Erb Street West
Eastbound Left-turn Lane WarrantErb Street West & Dietz Avenue North
2031 HorizonFigure 5.2Westmount Place Mixed-Use Development TIS
180289
AM Peak Hour
PM Peak Hour
2031 Total2031 Background Existing Conditions
2031 Total2031 Background Existing Conditions
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 38
6 Conclusions and Recommendations 6.1 Conclusions
Based on the investigations carried out, it is concluded that:
Existing (2019) Traffic Conditions: The study are intersections are forecast to operate within acceptable levels of service during the weekday AM and PM peak hours under the existing horizon, with the exceptions of the northbound left-turn movement on Westmount Road North at Erb Street West, which is forecast to operate at LOS E and the 95th percentile queue length extends beyond the storage length.
2031 Background Traffic Conditions: The study are intersections are forecast to operate within acceptable levels of service during the weekday AM and PM peak hours under the 2031 Background horizon, with the exception of the northbound left-turn movement on Westmount Road North at Erb Street West, where the 95th percentile queue length is forecast to extend beyond the storage length.
Development Generated Traffic: The proposed development is estimated to generate approximately 252 vehicle trips during the AM peak hour and approximately 325 vehicles trips during the PM peak hour.
2031 Total Traffic Conditions: The study area intersections are forecast to operate with similar levels of service to background traffic conditions, with the exception of the southbound movements on Dietz Avenue North at Erb Street West, which is forecast to operate at LOS E.
Remedial Measures: • Signals are not warranted at the currently unsignalized
intersections.
• An eastbound left-turn lane is warranted on Erb Street West at Dietz Avenue with 15 metres of storage is warranted under existing conditions. The storage length remains the same under 2031 Total conditions.
• Implementing a southbound right-turn lane on Dietz Avenue North at Erb Street West would improve the operations of the southbound right-turn movements under 2031 Total conditions.
6.2 Recommendations
Based on the findings of this study, the following recommendations are made:
The right-in-right-out driveway to Erb Street West be designed to minimize the possibility of left-turns and have no adverse impact on pedestrian safety.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Page 39
It is recommended the Region of Waterloo consider implementing an eastbound left-turn lane at the Erb Street West and Dietz Avenue intersection, which is technically warranted by existing volumes.
Consideration be made to separating the southbound right-turn movements from the through/left-turn movements on Dietz Avenue North at Erb Street West to improve delays for the southbound right-turn movements, as a signal is not warranted at this intersection.
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix A Existing Count Data
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Erb Street Erb Street Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:00 AM 12 52 21 0 1 85 6 26 9 0 2 41 8 89 6 1 1 104 7 36 3 0 0 46 276
7:15 AM 21 93 30 0 3 144 7 34 6 0 6 47 23 95 7 0 3 125 8 64 5 0 4 77 393
7:30 AM 27 127 61 0 2 215 7 45 6 0 2 58 21 109 17 0 3 147 13 90 10 0 5 113 533
7:45 AM 29 160 55 0 8 244 13 45 18 0 5 76 29 171 13 0 6 213 22 121 8 0 5 151 684
Hourly Total 89 432 167 0 14 688 33 150 39 0 15 222 81 464 43 1 13 589 50 311 26 0 14 387 1886
8:00 AM 37 187 63 0 7 287 9 67 22 0 11 98 25 183 18 0 5 226 30 108 8 0 7 146 757
8:15 AM 36 244 64 0 5 344 24 48 28 0 10 100 39 193 15 0 8 247 35 123 18 0 9 176 867
8:30 AM 33 183 61 0 7 277 11 51 26 0 5 88 28 189 13 0 3 230 26 145 16 0 10 187 782
8:45 AM 47 200 73 0 14 320 18 69 17 0 5 104 30 181 14 0 1 225 20 113 11 0 6 144 793
Hourly Total 153 814 261 0 33 1228 62 235 93 0 31 390 122 746 60 0 17 928 111 489 53 0 32 653 3199
9:00 AM 25 145 67 0 13 237 18 55 13 0 4 86 35 141 12 0 8 188 6 95 14 0 9 115 626
9:15 AM 34 121 49 0 15 204 17 73 10 0 5 100 40 151 14 0 4 205 15 92 16 0 8 123 632
9:30 AM 29 115 49 0 14 193 8 62 15 0 10 85 32 133 15 0 7 180 17 97 21 0 3 135 593
9:45 AM 26 111 44 0 4 181 13 67 16 0 4 96 24 155 12 0 1 191 15 90 15 0 7 120 588
Hourly Total 114 492 209 0 46 815 56 257 54 0 23 367 131 580 53 0 20 764 53 374 66 0 27 493 2439
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:30 AM 26 94 39 0 3 159 21 94 16 0 2 131 44 102 15 0 2 161 18 92 26 0 2 136 587
11:45 AM 34 113 39 0 4 186 15 81 15 0 7 111 50 124 14 0 8 188 16 98 31 0 7 145 630
Hourly Total 60 207 78 0 7 345 36 175 31 0 9 242 94 226 29 0 10 349 34 190 57 0 9 281 1217
12:00 PM 25 86 25 0 3 136 15 95 12 0 3 122 59 101 17 0 2 177 12 106 19 0 7 137 572
12:15 PM 18 99 34 0 11 151 15 76 17 0 7 108 61 104 14 0 6 179 22 79 19 0 3 120 558
12:30 PM 19 110 37 0 6 166 13 78 18 0 10 109 34 119 18 0 6 171 18 101 19 0 6 138 584
12:45 PM 26 122 48 0 9 196 11 74 18 0 9 103 40 94 10 0 6 144 27 90 13 0 6 130 573
Hourly Total 88 417 144 0 29 649 54 323 65 0 29 442 194 418 59 0 20 671 79 376 70 0 22 525 2287
1:00 PM 22 81 33 0 3 136 17 91 18 0 12 126 40 83 8 0 3 131 22 107 22 0 14 151 544
1:15 PM 21 96 32 0 11 149 18 87 18 0 6 123 47 87 11 0 8 145 14 104 18 0 9 136 553
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 43 177 65 0 14 285 35 178 36 0 18 249 87 170 19 0 11 276 36 211 40 0 23 287 1097
3:00 PM 28 99 39 0 5 166 17 106 10 0 4 133 54 98 16 0 6 168 24 126 29 0 9 179 646
3:15 PM 31 105 41 0 7 177 22 97 9 0 8 128 55 127 8 0 9 190 29 121 28 0 3 178 673
3:30 PM 41 94 26 0 7 161 21 111 17 0 3 149 66 102 14 0 5 182 25 136 32 0 6 193 685
3:45 PM 29 112 40 0 12 181 28 124 10 0 9 162 62 119 17 0 11 198 27 140 39 0 10 206 747
Hourly Total 129 410 146 0 31 685 88 438 46 0 24 572 237 446 55 0 31 738 105 523 128 0 28 756 2751
4:00 PM 33 84 37 0 13 154 23 173 15 0 8 211 71 135 11 0 8 217 27 178 35 0 13 240 822
4:15 PM 18 105 22 0 9 145 23 141 20 0 5 184 69 158 18 0 4 245 32 154 35 0 13 221 795
4:30 PM 20 106 39 0 6 165 32 145 13 0 7 190 63 131 10 0 6 204 34 197 29 0 7 260 819
4:45 PM 27 96 30 0 14 153 37 174 21 0 13 232 74 145 17 0 8 236 31 222 37 0 13 290 911
Hourly Total 98 391 128 0 42 617 115 633 69 0 33 817 277 569 56 0 26 902 124 751 136 0 46 1011 3347
5:00 PM 23 103 36 0 16 162 43 176 18 0 6 237 68 140 12 0 1 220 35 214 43 0 11 292 911
5:15 PM 24 105 26 1 17 156 31 176 17 0 10 224 68 166 7 0 6 241 31 203 32 0 4 266 887
5:30 PM 14 115 29 0 6 158 30 120 17 0 10 167 56 135 12 0 5 203 26 169 28 0 12 223 751
5:45 PM 39 141 37 0 10 217 17 131 19 0 5 167 47 118 12 0 5 177 33 148 22 0 10 203 764
Hourly Total 100 464 128 1 49 693 121 603 71 0 31 795 239 559 43 0 17 841 125 734 125 0 37 984 3313
Grand Total 874 3804 1326 1 265 6005 600 2992 504 0 213 4096 1462 4178 417 1 165 6058 717 3959 701 0 238 5377 21536
Approach % 14.6 63.3 22.1 0.0 - - 14.6 73.0 12.3 0.0 - - 24.1 69.0 6.9 0.0 - - 13.3 73.6 13.0 0.0 - - -
Total % 4.1 17.7 6.2 0.0 - 27.9 2.8 13.9 2.3 0.0 - 19.0 6.8 19.4 1.9 0.0 - 28.1 3.3 18.4 3.3 0.0 - 25.0 -
Lights 805 3720 1303 1 - 5829 596 2909 489 0 - 3994 1433 4079 412 1 - 5925 706 3867 633 0 - 5206 20954
% Lights 92.1 97.8 98.3 100.0 - 97.1 99.3 97.2 97.0 - - 97.5 98.0 97.6 98.8 100.0 - 97.8 98.5 97.7 90.3 - - 96.8 97.3
Mediums 68 81 23 0 - 172 3 77 12 0 - 92 29 98 4 0 - 131 11 88 68 0 - 167 562
% Mediums 7.8 2.1 1.7 0.0 - 2.9 0.5 2.6 2.4 - - 2.2 2.0 2.3 1.0 0.0 - 2.2 1.5 2.2 9.7 - - 3.1 2.6
Articulated Trucks 0 2 0 0 - 2 1 4 3 0 - 8 0 0 1 0 - 1 0 4 0 0 - 4 15
% ArticulatedTrucks 0.0 0.1 0.0 0.0 - 0.0 0.2 0.1 0.6 - - 0.2 0.0 0.0 0.2 0.0 - 0.0 0.0 0.1 0.0 - - 0.1 0.1
Bicycles on Road 1 1 0 0 - 2 0 2 0 0 - 2 0 1 0 0 - 1 0 0 0 0 - 0 5
% Bicycles onRoad 0.1 0.0 0.0 0.0 - 0.0 0.0 0.1 0.0 - - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 1 - - - - - 2 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.5 - - - - - 1.2 - - - - - 0.0 - -
Pedestrians - - - - 265 - - - - - 212 - - - - - 163 - - - - - 238 - -
% Pedestrians - - - - 100.0 - - - - - 99.5 - - - - - 98.8 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
5373 5206 10579
178 167 345
3 4 7
2 0 2
0 0 0
5556 5377 10933
633 3867 706 0 0
68 88 11 0 0
0 4 0 0 0
0 0 0 0 0
0 0 0 0 238
701 3959 717 0 238R T L U P
49380 1 3 96
4838
Out
40960 2 8 92
3994
In
90340 3 11
188
8832
Total
Erb S
treet [E]
R 504 0 0 3 12489
T2992
0 2 4 772909
L 600 0 0 1 3 596
U 0 0 0 0 0 0
P 213213 0 0 0 0
5767 5925 11692
114 131 245
5 1 6
0 1 1
0 0 0
5886 6058 11944Out In Total
Westmount Road [S]
U L T R P
1 1433 4079 412 0
0 29 98 4 0
0 0 0 1 0
0 0 1 0 0
0 0 0 0 165
1 1462 4178 417 165
Erb
Stre
et [W
] Tota
l
1080
5
346 6 4 0
1116
1
In
5829
172 2 2 0
6005
Out
4976
174 4 2 0
5156
1 0 0 0 0 1 U
805
68 0 1 0 874 L
3720 81 2 1 0
3804 T
1303 23 0 0 0
1326 R
0 0 0 0 265
265 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (8:00 AM)
Start Time
Erb Street Erb Street Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
8:00 AM 37 187 63 0 7 287 9 67 22 0 11 98 25 183 18 0 5 226 30 108 8 0 7 146 757
8:15 AM 36 244 64 0 5 344 24 48 28 0 10 100 39 193 15 0 8 247 35 123 18 0 9 176 867
8:30 AM 33 183 61 0 7 277 11 51 26 0 5 88 28 189 13 0 3 230 26 145 16 0 10 187 782
8:45 AM 47 200 73 0 14 320 18 69 17 0 5 104 30 181 14 0 1 225 20 113 11 0 6 144 793
Total 153 814 261 0 33 1228 62 235 93 0 31 390 122 746 60 0 17 928 111 489 53 0 32 653 3199
Approach % 12.5 66.3 21.3 0.0 - - 15.9 60.3 23.8 0.0 - - 13.1 80.4 6.5 0.0 - - 17.0 74.9 8.1 0.0 - - -
Total % 4.8 25.4 8.2 0.0 - 38.4 1.9 7.3 2.9 0.0 - 12.2 3.8 23.3 1.9 0.0 - 29.0 3.5 15.3 1.7 0.0 - 20.4 -
PHF 0.814 0.834 0.894 0.000 - 0.892 0.646 0.851 0.830 0.000 - 0.938 0.782 0.966 0.833 0.000 - 0.939 0.793 0.843 0.736 0.000 - 0.873 0.922
Lights 142 793 258 0 - 1193 61 220 89 0 - 370 119 728 60 0 - 907 108 473 41 0 - 622 3092
% Lights 92.8 97.4 98.9 - - 97.1 98.4 93.6 95.7 - - 94.9 97.5 97.6 100.0 - - 97.7 97.3 96.7 77.4 - - 95.3 96.7
Mediums 11 19 3 0 - 33 1 15 3 0 - 19 3 18 0 0 - 21 3 15 12 0 - 30 103
% Mediums 7.2 2.3 1.1 - - 2.7 1.6 6.4 3.2 - - 4.9 2.5 2.4 0.0 - - 2.3 2.7 3.1 22.6 - - 4.6 3.2
Articulated Trucks 0 1 0 0 - 1 0 0 1 0 - 1 0 0 0 0 - 0 0 1 0 0 - 1 3
% ArticulatedTrucks 0.0 0.1 0.0 - - 0.1 0.0 0.0 1.1 - - 0.3 0.0 0.0 0.0 - - 0.0 0.0 0.2 0.0 - - 0.2 0.1
Bicycles on Road 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 0.1 0.0 - - 0.1 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 1 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 3.2 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 33 - - - - - 30 - - - - - 17 - - - - - 32 - -
% Pedestrians - - - - 100.0 - - - - - 96.8 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 8:00 AMEnding At03/07/2019 9:00 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
959 622 1581
32 30 62
1 1 2
0 0 0
0 0 0
992 653 1645
41 473 108 0 0
12 15 3 0 0
0 1 0 0 0
0 0 0 0 0
0 0 0 0 32
53 489 111 0 32R T L U P
985 0 1 1 22
961
Out
390 0 0 1 19
370
In
13750 1 2 41
1331
Total
Erb S
treet [E]
R 93 0 0 1 3 89
T 235 0 0 0 15220
L 62 0 0 0 1 61
U 0 0 0 0 0 0
P 31 31 0 0 0 0
792 907 1699
19 21 40
1 0 1
0 0 0
0 0 0
812 928 1740Out In Total
Westmount Road [S]
U L T R P
0 119 728 60 0
0 3 18 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 17
0 122 746 60 17
Erb
Stre
et [W
] Tota
l
1573 63 1 1 0
1638
In
1193 33 1 1 0
1228
Out
380
30 0 0 0 410
0 0 0 0 0 0 U
142
11 0 0 0 153 L
793
19 1 1 0 814 T
258 3 0 0 0 261 R
0 0 0 0 33 33 P
Turning Movement Peak Hour Data Plot (8:00 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:30 AM)
Start Time
Erb Street Erb Street Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
11:30 AM 26 94 39 0 3 159 21 94 16 0 2 131 44 102 15 0 2 161 18 92 26 0 2 136 587
11:45 AM 34 113 39 0 4 186 15 81 15 0 7 111 50 124 14 0 8 188 16 98 31 0 7 145 630
12:00 PM 25 86 25 0 3 136 15 95 12 0 3 122 59 101 17 0 2 177 12 106 19 0 7 137 572
12:15 PM 18 99 34 0 11 151 15 76 17 0 7 108 61 104 14 0 6 179 22 79 19 0 3 120 558
Total 103 392 137 0 21 632 66 346 60 0 19 472 214 431 60 0 18 705 68 375 95 0 19 538 2347
Approach % 16.3 62.0 21.7 0.0 - - 14.0 73.3 12.7 0.0 - - 30.4 61.1 8.5 0.0 - - 12.6 69.7 17.7 0.0 - - -
Total % 4.4 16.7 5.8 0.0 - 26.9 2.8 14.7 2.6 0.0 - 20.1 9.1 18.4 2.6 0.0 - 30.0 2.9 16.0 4.0 0.0 - 22.9 -
PHF 0.757 0.867 0.878 0.000 - 0.849 0.786 0.911 0.882 0.000 - 0.901 0.877 0.869 0.882 0.000 - 0.938 0.773 0.884 0.766 0.000 - 0.928 0.931
Lights 96 386 135 0 - 617 66 335 57 0 - 458 212 421 58 0 - 691 66 367 88 0 - 521 2287
% Lights 93.2 98.5 98.5 - - 97.6 100.0 96.8 95.0 - - 97.0 99.1 97.7 96.7 - - 98.0 97.1 97.9 92.6 - - 96.8 97.4
Mediums 7 6 2 0 - 15 0 11 3 0 - 14 2 9 1 0 - 12 2 7 7 0 - 16 57
% Mediums 6.8 1.5 1.5 - - 2.4 0.0 3.2 5.0 - - 3.0 0.9 2.1 1.7 - - 1.7 2.9 1.9 7.4 - - 3.0 2.4
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 1 0 - 1 0 1 0 0 - 1 2
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 1.7 - - 0.1 0.0 0.3 0.0 - - 0.2 0.1
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 1 0 0 - 1 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.2 0.0 - - 0.1 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 21 - - - - - 19 - - - - - 18 - - - - - 19 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:30 AMEnding At03/07/2019 12:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
574 521 1095
19 16 35
0 1 1
1 0 1
0 0 0
594 538 1132
88 367 66 0 0
7 7 2 0 0
0 1 0 0 0
0 0 0 0 0
0 0 0 0 19
95 375 68 0 19R T L U P
520 0 0 1 9 510
Out
472 0 0 0 14
458
In
992 0 0 1 23
968
Total
Erb S
treet [E]
R 60 0 0 0 3 57
T 346 0 0 0 11335
L 66 0 0 0 0 66
U 0 0 0 0 0 0
P 19 19 0 0 0 0
568 691 1259
9 12 21
1 1 2
0 1 1
0 0 0
578 705 1283Out In Total
Westmount Road [S]
U L T R P
0 212 421 58 0
0 2 9 1 0
0 0 0 1 0
0 0 1 0 0
0 0 0 0 18
0 214 431 60 18
Erb
Stre
et [W
] Tota
l
1252 35 0 0 0
1287
In 617
15 0 0 0 632
Out
635
20 0 0 0 655
0 0 0 0 0 0 U
96 7 0 0 0 103 L
386 6 0 0 0 392 T
135 2 0 0 0 137 R
0 0 0 0 21 21 P
Turning Movement Peak Hour Data Plot (11:30 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (4:30 PM)
Start Time
Erb Street Erb Street Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
4:30 PM 20 106 39 0 6 165 32 145 13 0 7 190 63 131 10 0 6 204 34 197 29 0 7 260 819
4:45 PM 27 96 30 0 14 153 37 174 21 0 13 232 74 145 17 0 8 236 31 222 37 0 13 290 911
5:00 PM 23 103 36 0 16 162 43 176 18 0 6 237 68 140 12 0 1 220 35 214 43 0 11 292 911
5:15 PM 24 105 26 1 17 156 31 176 17 0 10 224 68 166 7 0 6 241 31 203 32 0 4 266 887
Total 94 410 131 1 53 636 143 671 69 0 36 883 273 582 46 0 21 901 131 836 141 0 35 1108 3528
Approach % 14.8 64.5 20.6 0.2 - - 16.2 76.0 7.8 0.0 - - 30.3 64.6 5.1 0.0 - - 11.8 75.5 12.7 0.0 - - -
Total % 2.7 11.6 3.7 0.0 - 18.0 4.1 19.0 2.0 0.0 - 25.0 7.7 16.5 1.3 0.0 - 25.5 3.7 23.7 4.0 0.0 - 31.4 -
PHF 0.870 0.967 0.840 0.250 - 0.964 0.831 0.953 0.821 0.000 - 0.931 0.922 0.877 0.676 0.000 - 0.935 0.936 0.941 0.820 0.000 - 0.949 0.968
Lights 86 403 131 1 - 621 143 665 67 0 - 875 272 573 46 0 - 891 128 827 130 0 - 1085 3472
% Lights 91.5 98.3 100.0 100.0 - 97.6 100.0 99.1 97.1 - - 99.1 99.6 98.5 100.0 - - 98.9 97.7 98.9 92.2 - - 97.9 98.4
Mediums 8 7 0 0 - 15 0 5 2 0 - 7 1 9 0 0 - 10 3 9 11 0 - 23 55
% Mediums 8.5 1.7 0.0 0.0 - 2.4 0.0 0.7 2.9 - - 0.8 0.4 1.5 0.0 - - 1.1 2.3 1.1 7.8 - - 2.1 1.6
Articulated Trucks 0 0 0 0 - 0 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 1
% ArticulatedTrucks 0.0 0.0 0.0 0.0 - 0.0 0.0 0.1 0.0 - - 0.1 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Bicycles onRoad 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 53 - - - - - 36 - - - - - 21 - - - - - 35 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 4:30 PMEnding At03/07/2019 5:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
726 1085 1811
19 23 42
0 0 0
0 0 0
0 0 0
745 1108 1853
130 827 128 0 0
11 9 3 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 35
141 836 131 0 35R T L U P
587 0 0 0 10
577
Out
883 0 0 1 7 875
In
14700 0 1 17
1452
Total
Erb S
treet [E]
R 69 0 0 0 2 67
T 671 0 0 1 5 665
L 143 0 0 0 0 143
U 0 0 0 0 0 0
P 36 36 0 0 0 0
1101 891 1992
9 10 19
0 0 0
0 0 0
0 0 0
1110 901 2011Out In Total
Westmount Road [S]
U L T R P
0 272 573 46 0
0 1 9 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 21
0 273 582 46 21
Erb
Stre
et [W
] Tota
l
1689 32 1 0 0
1722
In 621
15 0 0 0 636
Out
1068 17 1 0 0
1086
1 0 0 0 0 1 U
86 8 0 0 0 94 L
403 7 0 0 0 410 T
131 0 0 0 0 131 R
0 0 0 0 53 53 P
Turning Movement Peak Hour Data Plot (4:30 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Erb StreetSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Father David Bauer Drive Westcourt Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:00 AM 2 1 3 0 0 6 4 0 14 0 0 18 2 97 5 0 2 104 12 45 1 0 0 58 186
7:15 AM 5 2 3 0 2 10 6 0 14 0 0 20 0 85 10 0 3 95 15 88 2 0 0 105 230
7:30 AM 6 0 2 0 2 8 6 1 16 0 0 23 1 104 14 0 2 119 26 123 2 0 0 151 301
7:45 AM 7 2 1 0 1 10 10 0 21 0 0 31 1 164 23 0 4 188 45 160 1 0 0 206 435
Hourly Total 20 5 9 0 5 34 26 1 65 0 0 92 4 450 52 0 11 506 98 416 6 0 0 520 1152
8:00 AM 5 4 5 0 6 14 5 1 37 0 1 43 3 205 18 0 7 226 45 162 2 0 1 209 492
8:15 AM 8 5 3 0 5 16 11 3 41 0 2 55 0 227 17 0 2 244 58 181 1 0 1 240 555
8:30 AM 6 3 5 0 7 14 14 1 32 0 1 47 2 191 20 0 7 213 48 177 1 0 0 226 500
8:45 AM 10 3 4 0 2 17 7 0 44 0 3 51 2 172 28 0 2 202 55 151 1 0 2 207 477
Hourly Total 29 15 17 0 20 61 37 5 154 0 7 196 7 795 83 0 18 885 206 671 5 0 4 882 2024
9:00 AM 4 1 7 0 3 12 13 1 36 0 2 50 5 129 22 0 3 156 33 115 4 0 0 152 370
9:15 AM 5 2 4 0 2 11 13 3 24 0 0 40 3 163 24 0 4 190 34 123 4 0 0 161 402
9:30 AM 6 1 4 0 3 11 14 1 31 0 13 46 3 148 12 0 4 163 37 120 3 0 0 160 380
9:45 AM 10 3 1 0 2 14 8 0 35 0 3 43 2 151 24 0 10 177 32 116 4 0 0 152 386
Hourly Total 25 7 16 0 10 48 48 5 126 0 18 179 13 591 82 0 21 686 136 474 15 0 0 625 1538
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:30 AM 5 1 2 0 1 8 17 1 34 0 4 52 2 110 18 0 8 130 27 112 14 0 0 153 343
11:45 AM 3 2 5 0 1 10 17 1 36 0 11 54 1 141 22 0 10 164 22 111 4 0 0 137 365
Hourly Total 8 3 7 0 2 18 34 2 70 0 15 106 3 251 40 0 18 294 49 223 18 0 0 290 708
12:00 PM 7 2 3 0 5 12 16 1 41 0 5 58 4 117 18 0 5 139 30 106 6 0 2 142 351
12:15 PM 5 1 3 0 10 9 10 2 29 0 11 41 3 124 11 0 11 138 22 120 9 0 1 151 339
12:30 PM 4 1 5 0 7 10 13 3 29 0 13 45 0 127 13 0 12 140 23 127 4 0 1 154 349
12:45 PM 3 1 5 0 1 9 8 1 42 0 14 51 3 138 18 0 7 159 26 106 4 0 0 136 355
Hourly Total 19 5 16 0 23 40 47 7 141 0 43 195 10 506 60 0 35 576 101 459 23 0 4 583 1394
1:00 PM 7 2 3 0 1 12 15 1 27 0 15 43 6 105 18 0 0 129 27 131 5 0 0 163 347
1:15 PM 5 2 3 0 0 10 10 0 30 0 8 40 8 98 14 0 8 120 20 124 6 0 0 150 320
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 12 4 6 0 1 22 25 1 57 0 23 83 14 203 32 0 8 249 47 255 11 0 0 313 667
3:00 PM 4 2 2 0 5 8 18 3 43 0 9 64 2 120 23 0 8 145 22 144 6 0 1 172 389
3:15 PM 3 1 5 1 3 10 19 4 24 0 2 47 3 138 20 0 8 161 24 151 4 0 2 179 397
3:30 PM 5 0 5 0 5 10 13 2 28 0 5 43 4 149 26 0 19 179 17 149 8 0 1 174 406
3:45 PM 9 3 4 0 4 16 17 2 31 0 5 50 2 155 18 0 8 175 37 188 7 0 1 232 473
Hourly Total 21 6 16 1 17 44 67 11 126 0 21 204 11 562 87 0 43 660 100 632 25 0 5 757 1665
4:00 PM 11 1 7 0 9 19 25 5 41 0 18 71 7 177 15 0 12 199 39 197 8 0 4 244 533
4:15 PM 6 2 3 0 4 11 16 2 60 0 7 78 4 175 21 0 18 200 44 217 7 0 0 268 557
4:30 PM 3 0 6 0 3 9 13 5 55 0 14 73 4 159 17 0 13 180 40 233 7 0 3 280 542
4:45 PM 5 1 4 0 3 10 15 4 62 0 9 81 5 176 16 0 19 197 41 279 6 0 0 326 614
Hourly Total 25 4 20 0 19 49 69 16 218 0 48 303 20 687 69 0 62 776 164 926 28 0 7 1118 2246
5:00 PM 1 1 6 0 2 8 20 2 74 0 11 96 5 200 24 0 13 229 36 246 6 0 1 288 621
5:15 PM 5 2 3 0 12 10 17 2 55 0 13 74 2 218 15 0 17 235 33 255 6 0 1 294 613
5:30 PM 4 0 7 0 3 11 18 0 62 0 15 80 4 166 12 0 13 182 34 210 9 0 2 253 526
5:45 PM 9 4 2 0 6 15 18 13 54 0 10 85 8 142 25 0 19 175 52 195 6 0 1 253 528
Hourly Total 19 7 18 0 23 44 73 17 245 0 49 335 19 726 76 0 62 821 155 906 27 0 5 1088 2288
Grand Total 178 56 125 1 120 360 426 65 1202 0 224 1693 101 4771 581 0 278 5453 1056 4962 158 0 25 6176 13682
Approach % 49.4 15.6 34.7 0.3 - - 25.2 3.8 71.0 0.0 - - 1.9 87.5 10.7 0.0 - - 17.1 80.3 2.6 0.0 - - -
Total % 1.3 0.4 0.9 0.0 - 2.6 3.1 0.5 8.8 0.0 - 12.4 0.7 34.9 4.2 0.0 - 39.9 7.7 36.3 1.2 0.0 - 45.1 -
Lights 178 53 123 1 - 355 423 64 1187 0 - 1674 100 4599 555 0 - 5254 1035 4800 154 0 - 5989 13272
% Lights 100.0 94.6 98.4 100.0 - 98.6 99.3 98.5 98.8 - - 98.9 99.0 96.4 95.5 - - 96.4 98.0 96.7 97.5 - - 97.0 97.0
Mediums 0 1 2 0 - 3 3 0 11 0 - 14 1 170 24 0 - 195 18 156 4 0 - 178 390
% Mediums 0.0 1.8 1.6 0.0 - 0.8 0.7 0.0 0.9 - - 0.8 1.0 3.6 4.1 - - 3.6 1.7 3.1 2.5 - - 2.9 2.9
Articulated Trucks 0 0 0 0 - 0 0 0 4 0 - 4 0 1 2 0 - 3 2 6 0 0 - 8 15
% ArticulatedTrucks 0.0 0.0 0.0 0.0 - 0.0 0.0 0.0 0.3 - - 0.2 0.0 0.0 0.3 - - 0.1 0.2 0.1 0.0 - - 0.1 0.1
Bicycles on Road 0 2 0 0 - 2 0 1 0 0 - 1 0 1 0 0 - 1 1 0 0 0 - 1 5
% Bicycles onRoad 0.0 3.6 0.0 0.0 - 0.6 0.0 1.5 0.0 - - 0.1 0.0 0.0 0.0 - - 0.0 0.1 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 1 - - - - - 1 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.4 - - - - - 0.4 - - - - - 0.0 - -
Pedestrians - - - - 120 - - - - - 223 - - - - - 277 - - - - - 25 - -
% Pedestrians - - - - 100.0 - - - - - 99.6 - - - - - 99.6 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
5964 5989 11953
181 178 359
5 8 13
1 1 2
0 0 0
6151 6176 12327
154 4800 1035 0 0
4 156 18 0 0
0 6 2 0 0
0 0 1 0 0
0 0 0 0 25
158 4962 1056 0 25R T L U P
16930 3 4 43
1643
Out
16930 1 4 14
1674
In
33860 4 8 57
3317
Total
Westcourt P
lace [E]
R1202
0 0 4 111187
T 65 0 1 0 0 64
L 426 0 0 0 3 423
U 0 0 0 0 0 0
P 224224 0 0 0 0
5346 5254 10600
161 195 356
6 3 9
0 1 1
0 0 0
5513 5453 10966Out In Total
Westmount Road [S]
U L T R P
0 100 4599 555 0
0 1 170 24 0
0 0 1 2 0
0 0 1 0 0
0 0 0 0 278
0 101 4771 581 278
Fath
er D
avid
Bau
er D
rive
[
Tota
l
674 8 0 3 0 685
In 355 3 0 2 0 360
Out
319 5 0 1 0 325
1 0 0 0 0 1 U
178 0 0 0 0 178 L
53 1 0 2 0 56 T
123 2 0 0 0 125 R
0 0 0 0 120
120 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (8:00 AM)
Start Time
Father David Bauer Drive Westcourt Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
8:00 AM 5 4 5 0 6 14 5 1 37 0 1 43 3 205 18 0 7 226 45 162 2 0 1 209 492
8:15 AM 8 5 3 0 5 16 11 3 41 0 2 55 0 227 17 0 2 244 58 181 1 0 1 240 555
8:30 AM 6 3 5 0 7 14 14 1 32 0 1 47 2 191 20 0 7 213 48 177 1 0 0 226 500
8:45 AM 10 3 4 0 2 17 7 0 44 0 3 51 2 172 28 0 2 202 55 151 1 0 2 207 477
Total 29 15 17 0 20 61 37 5 154 0 7 196 7 795 83 0 18 885 206 671 5 0 4 882 2024
Approach % 47.5 24.6 27.9 0.0 - - 18.9 2.6 78.6 0.0 - - 0.8 89.8 9.4 0.0 - - 23.4 76.1 0.6 0.0 - - -
Total % 1.4 0.7 0.8 0.0 - 3.0 1.8 0.2 7.6 0.0 - 9.7 0.3 39.3 4.1 0.0 - 43.7 10.2 33.2 0.2 0.0 - 43.6 -
PHF 0.725 0.750 0.850 0.000 - 0.897 0.661 0.417 0.875 0.000 - 0.891 0.583 0.876 0.741 0.000 - 0.907 0.888 0.927 0.625 0.000 - 0.919 0.912
Lights 29 13 16 0 - 58 37 5 151 0 - 193 6 764 78 0 - 848 202 642 4 0 - 848 1947
% Lights 100.0 86.7 94.1 - - 95.1 100.0 100.0 98.1 - - 98.5 85.7 96.1 94.0 - - 95.8 98.1 95.7 80.0 - - 96.1 96.2
Mediums 0 1 1 0 - 2 0 0 3 0 - 3 1 30 5 0 - 36 3 28 1 0 - 32 73
% Mediums 0.0 6.7 5.9 - - 3.3 0.0 0.0 1.9 - - 1.5 14.3 3.8 6.0 - - 4.1 1.5 4.2 20.0 - - 3.6 3.6
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 1 0 0 - 1 0 1 0 0 - 1 2
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.1 0.0 - - 0.1 0.0 0.1 0.0 - - 0.1 0.1
Bicycles on Road 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 1 0 0 0 - 1 2
% Bicycles onRoad 0.0 6.7 0.0 - - 1.6 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.5 0.0 0.0 - - 0.1 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 20 - - - - - 7 - - - - - 18 - - - - - 4 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 8:00 AMEnding At03/07/2019 9:00 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
944 848 1792
33 32 65
1 1 2
0 1 1
0 0 0
978 882 1860
4 642 202 0 0
1 28 3 0 0
0 1 0 0 0
0 0 1 0 0
0 0 0 0 4
5 671 206 0 4R T L U P
304 0 2 0 9 293
Out
196 0 0 0 3 193
In
500 0 2 0 12
486
Total
Westcourt P
lace [E]
R 154 0 0 0 3 151
T 5 0 0 0 0 5
L 37 0 0 0 0 37
U 0 0 0 0 0 0
P 7 7 0 0 0 0
695 848 1543
29 36 65
1 1 2
0 0 0
0 0 0
725 885 1610Out In Total
Westmount Road [S]
U L T R P
0 6 764 78 0
0 1 30 5 0
0 0 1 0 0
0 0 0 0 0
0 0 0 0 18
0 7 795 83 18
Fath
er D
avid
Bau
er D
rive
[
Tota
l
73 4 0 1 0 78
In 58 2 0 1 0 61
Out 15 2 0 0 0 17
0 0 0 0 0 0 U
29 0 0 0 0 29 L
13 1 0 1 0 15 T
16 1 0 0 0 17 R
0 0 0 0 20 20 P
Turning Movement Peak Hour Data Plot (8:00 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:45 AM)
Start Time
Father David Bauer Drive Westcourt Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
11:45 AM 3 2 5 0 1 10 17 1 36 0 11 54 1 141 22 0 10 164 22 111 4 0 0 137 365
12:00 PM 7 2 3 0 5 12 16 1 41 0 5 58 4 117 18 0 5 139 30 106 6 0 2 142 351
12:15 PM 5 1 3 0 10 9 10 2 29 0 11 41 3 124 11 0 11 138 22 120 9 0 1 151 339
12:30 PM 4 1 5 0 7 10 13 3 29 0 13 45 0 127 13 0 12 140 23 127 4 0 1 154 349
Total 19 6 16 0 23 41 56 7 135 0 40 198 8 509 64 0 38 581 97 464 23 0 4 584 1404
Approach % 46.3 14.6 39.0 0.0 - - 28.3 3.5 68.2 0.0 - - 1.4 87.6 11.0 0.0 - - 16.6 79.5 3.9 0.0 - - -
Total % 1.4 0.4 1.1 0.0 - 2.9 4.0 0.5 9.6 0.0 - 14.1 0.6 36.3 4.6 0.0 - 41.4 6.9 33.0 1.6 0.0 - 41.6 -
PHF 0.679 0.750 0.800 0.000 - 0.854 0.824 0.583 0.823 0.000 - 0.853 0.500 0.902 0.727 0.000 - 0.886 0.808 0.913 0.639 0.000 - 0.948 0.962
Lights 19 6 16 0 - 41 56 7 134 0 - 197 8 490 61 0 - 559 95 452 23 0 - 570 1367
% Lights 100.0 100.0 100.0 - - 100.0 100.0 100.0 99.3 - - 99.5 100.0 96.3 95.3 - - 96.2 97.9 97.4 100.0 - - 97.6 97.4
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 0 19 3 0 - 22 2 12 0 0 - 14 36
% Mediums 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 3.7 4.7 - - 3.8 2.1 2.6 0.0 - - 2.4 2.6
Articulated Trucks 0 0 0 0 - 0 0 0 1 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 1
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.7 - - 0.5 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Bicycles onRoad 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 23 - - - - - 40 - - - - - 38 - - - - - 4 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:45 AMEnding At03/07/2019 12:45 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
643 570 1213
19 14 33
1 0 1
0 0 0
0 0 0
663 584 1247
23 452 95 0 0
0 12 2 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 4
23 464 97 0 4R T L U P
167 0 0 0 5 162
Out
198 0 0 1 0 197
In
365 0 0 1 5 359
Total
Westcourt P
lace [E]
R 135 0 0 1 0 134
T 7 0 0 0 0 7
L 56 0 0 0 0 56
U 0 0 0 0 0 0
P 40 40 0 0 0 0
524 559 1083
12 22 34
0 0 0
0 0 0
0 0 0
536 581 1117Out In Total
Westmount Road [S]
U L T R P
0 8 490 61 0
0 0 19 3 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 38
0 8 509 64 38
Fath
er D
avid
Bau
er D
rive
[
Tota
l
79 0 0 0 0 79
In 41 0 0 0 0 41
Out 38 0 0 0 0 38
0 0 0 0 0 0 U
19 0 0 0 0 19 L
6 0 0 0 0 6 T
16 0 0 0 0 16 R
0 0 0 0 23 23 P
Turning Movement Peak Hour Data Plot (11:45 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (4:30 PM)
Start Time
Father David Bauer Drive Westcourt Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
4:30 PM 3 0 6 0 3 9 13 5 55 0 14 73 4 159 17 0 13 180 40 233 7 0 3 280 542
4:45 PM 5 1 4 0 3 10 15 4 62 0 9 81 5 176 16 0 19 197 41 279 6 0 0 326 614
5:00 PM 1 1 6 0 2 8 20 2 74 0 11 96 5 200 24 0 13 229 36 246 6 0 1 288 621
5:15 PM 5 2 3 0 12 10 17 2 55 0 13 74 2 218 15 0 17 235 33 255 6 0 1 294 613
Total 14 4 19 0 20 37 65 13 246 0 47 324 16 753 72 0 62 841 150 1013 25 0 5 1188 2390
Approach % 37.8 10.8 51.4 0.0 - - 20.1 4.0 75.9 0.0 - - 1.9 89.5 8.6 0.0 - - 12.6 85.3 2.1 0.0 - - -
Total % 0.6 0.2 0.8 0.0 - 1.5 2.7 0.5 10.3 0.0 - 13.6 0.7 31.5 3.0 0.0 - 35.2 6.3 42.4 1.0 0.0 - 49.7 -
PHF 0.700 0.500 0.792 0.000 - 0.925 0.813 0.650 0.831 0.000 - 0.844 0.800 0.864 0.750 0.000 - 0.895 0.915 0.908 0.893 0.000 - 0.911 0.962
Lights 14 3 19 0 - 36 65 13 246 0 - 324 16 734 69 0 - 819 149 993 25 0 - 1167 2346
% Lights 100.0 75.0 100.0 - - 97.3 100.0 100.0 100.0 - - 100.0 100.0 97.5 95.8 - - 97.4 99.3 98.0 100.0 - - 98.2 98.2
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 0 19 3 0 - 22 1 20 0 0 - 21 43
% Mediums 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 2.5 4.2 - - 2.6 0.7 2.0 0.0 - - 1.8 1.8
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 25.0 0.0 - - 2.7 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 20 - - - - - 47 - - - - - 62 - - - - - 5 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 4:30 PMEnding At03/07/2019 5:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
994 1167 2161
19 21 40
0 0 0
0 0 0
0 0 0
1013 1188 2201
25 993 149 0 0
0 20 1 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 5
25 1013 150 0 5R T L U P
226 0 1 0 4 221
Out
324 0 0 0 0 324
In
550 0 1 0 4 545
Total
Westcourt P
lace [E]
R 246 0 0 0 0 246
T 13 0 0 0 0 13
L 65 0 0 0 0 65
U 0 0 0 0 0 0
P 47 47 0 0 0 0
1077 819 1896
20 22 42
0 0 0
0 0 0
0 0 0
1097 841 1938Out In Total
Westmount Road [S]
U L T R P
0 16 734 69 0
0 0 19 3 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 62
0 16 753 72 62
Fath
er D
avid
Bau
er D
rive
[
Tota
l
90 0 0 1 0 91
In 36 0 0 1 0 37
Out 54 0 0 0 0 54
0 0 0 0 0 0 U
14 0 0 0 0 14 L
3 0 0 1 0 4 T
19 0 0 0 0 19 R
0 0 0 0 20 20 P
Turning Movement Peak Hour Data Plot (4:30 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Westmount Road & Father DavidBauer DriveSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Erb Street Erb Street Dietz Avenue North Dietz Avenue North
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:00 AM 5 62 0 0 1 67 0 36 3 0 2 39 0 1 0 0 1 1 1 0 2 0 2 3 110
7:15 AM 2 101 0 0 1 103 0 44 15 0 0 59 0 1 1 0 0 2 1 0 1 0 1 2 166
7:30 AM 12 143 0 0 2 155 1 57 4 0 0 62 1 0 2 0 3 3 1 0 0 0 0 1 221
7:45 AM 9 187 1 0 1 197 0 75 24 0 0 99 0 0 4 0 1 4 1 0 2 0 5 3 303
Hourly Total 28 493 1 0 5 522 1 212 46 0 2 259 1 2 7 0 5 10 4 0 5 0 8 9 800
8:00 AM 7 230 1 0 2 238 0 84 13 0 0 97 0 0 2 0 0 2 1 0 2 0 4 3 340
8:15 AM 7 285 10 0 3 302 1 89 16 0 1 106 1 2 5 0 0 8 1 1 5 0 6 7 423
8:30 AM 11 205 5 0 1 221 0 83 16 0 1 99 2 0 4 0 0 6 4 0 3 0 0 7 333
8:45 AM 9 226 1 0 1 236 3 103 6 0 3 112 0 1 4 0 1 5 3 0 3 0 3 6 359
Hourly Total 34 946 17 0 7 997 4 359 51 0 5 414 3 3 15 0 1 21 9 1 13 0 13 23 1455
9:00 AM 4 161 0 0 0 165 6 87 8 0 1 101 0 0 4 0 2 4 1 0 1 0 1 2 272
9:15 AM 2 160 1 0 0 163 1 90 6 0 1 97 0 0 3 0 0 3 4 0 3 0 3 7 270
9:30 AM 4 149 2 0 3 155 1 84 5 0 1 90 0 2 5 0 3 7 0 0 3 0 2 3 255
9:45 AM 1 133 0 0 0 134 2 94 4 0 0 100 0 2 6 0 1 8 2 0 3 0 3 5 247
Hourly Total 11 603 3 0 3 617 10 355 23 0 3 388 0 4 18 0 6 22 7 0 10 0 9 17 1044
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:30 AM 2 121 2 0 0 125 4 127 3 0 0 134 1 1 3 0 0 5 8 2 3 0 1 13 277
11:45 AM 4 134 0 0 0 138 1 126 4 0 0 131 0 0 2 0 2 2 5 0 4 0 7 9 280
Hourly Total 6 255 2 0 0 263 5 253 7 0 0 265 1 1 5 0 2 7 13 2 7 0 8 22 557
12:00 PM 2 111 0 0 1 113 5 100 3 0 0 108 1 0 2 0 2 3 4 0 8 0 3 12 236
12:15 PM 2 142 1 1 0 146 0 99 2 0 0 101 1 0 2 0 3 3 1 0 3 0 3 4 254
12:30 PM 5 129 1 0 1 135 1 108 5 0 0 114 1 0 2 0 0 3 3 1 5 0 8 9 261
12:45 PM 2 144 2 0 0 148 1 96 3 0 0 100 1 0 5 0 1 6 1 2 5 0 1 8 262
Hourly Total 11 526 4 1 2 542 7 403 13 0 0 423 4 0 11 0 6 15 9 3 21 0 15 33 1013
1:00 PM 1 116 1 0 0 118 3 104 1 0 1 108 3 0 4 0 3 7 1 0 1 0 3 2 235
1:15 PM 2 117 1 0 0 120 1 111 0 0 0 112 0 0 2 0 4 2 1 1 9 0 2 11 245
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 3 233 2 0 0 238 4 215 1 0 1 220 3 0 6 0 7 9 2 1 10 0 5 13 480
3:00 PM 2 138 5 0 1 145 3 130 2 0 0 135 0 1 3 0 1 4 9 0 8 0 4 17 301
3:15 PM 1 143 0 0 1 144 1 124 4 0 0 129 1 0 1 0 4 2 10 0 5 0 4 15 290
3:30 PM 2 128 1 0 1 131 1 145 2 0 0 148 1 0 1 0 0 2 10 0 9 0 3 19 300
3:45 PM 5 139 1 0 1 145 3 137 0 0 0 140 1 0 4 0 3 5 11 1 19 0 1 31 321
Hourly Total 10 548 7 0 4 565 8 536 8 0 0 552 3 1 9 0 8 13 40 1 41 0 12 82 1212
4:00 PM 1 130 2 0 0 133 2 191 3 0 2 196 0 0 4 0 2 4 15 0 20 0 7 35 368
4:15 PM 3 132 4 0 0 139 4 166 5 0 0 175 1 0 0 0 1 1 10 0 25 0 1 35 350
4:30 PM 2 149 1 0 0 152 2 192 6 0 1 200 1 0 4 0 1 5 10 1 17 0 2 28 385
4:45 PM 0 130 2 0 1 132 6 215 3 0 0 224 2 0 2 0 2 4 14 0 17 0 3 31 391
Hourly Total 6 541 9 0 1 556 14 764 17 0 3 795 4 0 10 0 6 14 49 1 79 0 13 129 1494
5:00 PM 1 137 3 0 2 141 4 196 2 0 2 202 1 0 5 0 4 6 8 0 25 0 5 33 382
5:15 PM 0 146 0 0 2 146 9 204 4 0 0 217 0 0 7 0 4 7 4 0 14 0 2 18 388
5:30 PM 3 141 3 0 1 147 4 168 2 0 1 174 0 0 3 0 3 3 4 0 11 0 2 15 339
5:45 PM 2 158 2 0 3 162 5 146 0 0 0 151 1 1 5 0 3 7 5 1 4 0 2 10 330
Hourly Total 6 582 8 0 8 596 22 714 8 0 3 744 2 1 20 0 14 23 21 1 54 0 11 76 1439
Grand Total 115 4727 53 1 30 4896 75 3811 174 0 17 4060 21 12 101 0 55 134 154 10 240 0 94 404 9494
Approach % 2.3 96.5 1.1 0.0 - - 1.8 93.9 4.3 0.0 - - 15.7 9.0 75.4 0.0 - - 38.1 2.5 59.4 0.0 - - -
Total % 1.2 49.8 0.6 0.0 - 51.6 0.8 40.1 1.8 0.0 - 42.8 0.2 0.1 1.1 0.0 - 1.4 1.6 0.1 2.5 0.0 - 4.3 -
Lights 115 4631 50 1 - 4797 74 3708 160 0 - 3942 21 12 101 0 - 134 153 10 239 0 - 402 9275
% Lights 100.0 98.0 94.3 100.0 - 98.0 98.7 97.3 92.0 - - 97.1 100.0 100.0 100.0 - - 100.0 99.4 100.0 99.6 - - 99.5 97.7
Mediums 0 90 1 0 - 91 1 92 14 0 - 107 0 0 0 0 - 0 1 0 0 0 - 1 199
% Mediums 0.0 1.9 1.9 0.0 - 1.9 1.3 2.4 8.0 - - 2.6 0.0 0.0 0.0 - - 0.0 0.6 0.0 0.0 - - 0.2 2.1
Articulated Trucks 0 3 0 0 - 3 0 8 0 0 - 8 0 0 0 0 - 0 0 0 0 0 - 0 11
% ArticulatedTrucks 0.0 0.1 0.0 0.0 - 0.1 0.0 0.2 0.0 - - 0.2 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles on Road 0 3 2 0 - 5 0 3 0 0 - 3 0 0 0 0 - 0 0 0 1 0 - 1 9
% Bicycles onRoad 0.0 0.1 3.8 0.0 - 0.1 0.0 0.1 0.0 - - 0.1 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.4 - - 0.2 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 2 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 3.6 - - - - - 0.0 - -
Pedestrians - - - - 30 - - - - - 17 - - - - - 53 - - - - - 94 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 96.4 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue North [N]
Out In Total
287 402 689
14 1 15
0 0 0
0 1 1
0 0 0
301 404 705
239 10 153 0 0
0 0 1 0 0
0 0 0 0 0
1 0 0 0 0
0 0 0 0 94
240 10 154 0 94R T L U P
49820 3 3 91
4885
Out
40600 3 8 107
3942
In
90420 6 11
198
8827
Total
Erb S
treet [E]
R 174 0 0 0 14160
T3811
0 3 8 923708
L 75 0 0 0 1 74
U 0 0 0 0 0 0
P 17 17 0 0 0 0
134 134 268
2 0 2
0 0 0
2 0 2
0 0 0
138 134 272Out In Total
Dietz Avenue North [S]
U L T R P
0 21 12 101 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 55
0 21 12 101 55
Erb
Stre
et [W
] Tota
l
8766
183
11 9 0
8969
In
4797 91 3 5 0
4896
Out
3969 92 8 4 0
4073
1 0 0 0 0 1 U
115 0 0 0 0 115 L
4631 90 3 3 0
4727 T
50 1 0 2 0 53 R
0 0 0 0 30 30 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (8:00 AM)
Start Time
Erb Street Erb Street Dietz Avenue North Dietz Avenue North
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
8:00 AM 7 230 1 0 2 238 0 84 13 0 0 97 0 0 2 0 0 2 1 0 2 0 4 3 340
8:15 AM 7 285 10 0 3 302 1 89 16 0 1 106 1 2 5 0 0 8 1 1 5 0 6 7 423
8:30 AM 11 205 5 0 1 221 0 83 16 0 1 99 2 0 4 0 0 6 4 0 3 0 0 7 333
8:45 AM 9 226 1 0 1 236 3 103 6 0 3 112 0 1 4 0 1 5 3 0 3 0 3 6 359
Total 34 946 17 0 7 997 4 359 51 0 5 414 3 3 15 0 1 21 9 1 13 0 13 23 1455
Approach % 3.4 94.9 1.7 0.0 - - 1.0 86.7 12.3 0.0 - - 14.3 14.3 71.4 0.0 - - 39.1 4.3 56.5 0.0 - - -
Total % 2.3 65.0 1.2 0.0 - 68.5 0.3 24.7 3.5 0.0 - 28.5 0.2 0.2 1.0 0.0 - 1.4 0.6 0.1 0.9 0.0 - 1.6 -
PHF 0.773 0.830 0.425 0.000 - 0.825 0.333 0.871 0.797 0.000 - 0.924 0.375 0.375 0.750 0.000 - 0.656 0.563 0.250 0.650 0.000 - 0.821 0.860
Lights 34 922 16 0 - 972 4 339 48 0 - 391 3 3 15 0 - 21 9 1 13 0 - 23 1407
% Lights 100.0 97.5 94.1 - - 97.5 100.0 94.4 94.1 - - 94.4 100.0 100.0 100.0 - - 100.0 100.0 100.0 100.0 - - 100.0 96.7
Mediums 0 22 0 0 - 22 0 19 3 0 - 22 0 0 0 0 - 0 0 0 0 0 - 0 44
% Mediums 0.0 2.3 0.0 - - 2.2 0.0 5.3 5.9 - - 5.3 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 3.0
Articulated Trucks 0 1 0 0 - 1 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 2
% ArticulatedTrucks 0.0 0.1 0.0 - - 0.1 0.0 0.3 0.0 - - 0.2 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles on Road 0 1 1 0 - 2 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 2
% Bicycles onRoad 0.0 0.1 5.9 - - 0.2 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 7 - - - - - 5 - - - - - 1 - - - - - 13 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 8:00 AMEnding At03/07/2019 9:00 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue North [N]
Out In Total
85 23 108
3 0 3
0 0 0
0 0 0
0 0 0
88 23 111
13 1 9 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 13
13 1 9 0 13R T L U P
970 0 1 1 22
946
Out
414 0 0 1 22
391
In
13840 1 2 44
1337
Total
Erb S
treet [E]
R 51 0 0 0 3 48
T 359 0 0 1 19339
L 4 0 0 0 0 4
U 0 0 0 0 0 0
P 5 5 0 0 0 0
21 21 42
0 0 0
0 0 0
1 0 1
0 0 0
22 21 43Out In Total
Dietz Avenue North [S]
U L T R P
0 3 3 15 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 1
0 3 3 15 1
Erb
Stre
et [W
] Tota
l
1327 41 2 2 0
1372
In 972
22 1 2 0 997
Out
355
19 1 0 0 375
0 0 0 0 0 0 U
34 0 0 0 0 34 L
922
22 1 1 0 946 T
16 0 0 1 0 17 R
0 0 0 0 7 7 P
Turning Movement Peak Hour Data Plot (8:00 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:30 AM)
Start Time
Erb Street Erb Street Dietz Avenue North Dietz Avenue North
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
11:30 AM 2 121 2 0 0 125 4 127 3 0 0 134 1 1 3 0 0 5 8 2 3 0 1 13 277
11:45 AM 4 134 0 0 0 138 1 126 4 0 0 131 0 0 2 0 2 2 5 0 4 0 7 9 280
12:00 PM 2 111 0 0 1 113 5 100 3 0 0 108 1 0 2 0 2 3 4 0 8 0 3 12 236
12:15 PM 2 142 1 1 0 146 0 99 2 0 0 101 1 0 2 0 3 3 1 0 3 0 3 4 254
Total 10 508 3 1 1 522 10 452 12 0 0 474 3 1 9 0 7 13 18 2 18 0 14 38 1047
Approach % 1.9 97.3 0.6 0.2 - - 2.1 95.4 2.5 0.0 - - 23.1 7.7 69.2 0.0 - - 47.4 5.3 47.4 0.0 - - -
Total % 1.0 48.5 0.3 0.1 - 49.9 1.0 43.2 1.1 0.0 - 45.3 0.3 0.1 0.9 0.0 - 1.2 1.7 0.2 1.7 0.0 - 3.6 -
PHF 0.625 0.894 0.375 0.250 - 0.894 0.500 0.890 0.750 0.000 - 0.884 0.750 0.250 0.750 0.000 - 0.650 0.563 0.250 0.563 0.000 - 0.731 0.935
Lights 10 499 3 1 - 513 10 438 12 0 - 460 3 1 9 0 - 13 17 2 18 0 - 37 1023
% Lights 100.0 98.2 100.0 100.0 - 98.3 100.0 96.9 100.0 - - 97.0 100.0 100.0 100.0 - - 100.0 94.4 100.0 100.0 - - 97.4 97.7
Mediums 0 7 0 0 - 7 0 14 0 0 - 14 0 0 0 0 - 0 1 0 0 0 - 1 22
% Mediums 0.0 1.4 0.0 0.0 - 1.3 0.0 3.1 0.0 - - 3.0 0.0 0.0 0.0 - - 0.0 5.6 0.0 0.0 - - 2.6 2.1
Articulated Trucks 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% ArticulatedTrucks 0.0 0.2 0.0 0.0 - 0.2 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles on Road 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 0.2 0.0 0.0 - 0.2 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - - - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 1 - - - - - 0 - - - - - 7 - - - - - 14 - -
% Pedestrians - - - - 100.0 - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:30 AMEnding At03/07/2019 12:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue North [N]
Out In Total
23 37 60
0 1 1
0 0 0
0 0 0
0 0 0
23 38 61
18 2 17 0 0
0 0 1 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 14
18 2 18 0 14R T L U P
535 0 1 1 8 525
Out
474 0 0 0 14
460
In
10090 1 1 22
985
Total
Erb S
treet [E]
R 12 0 0 0 0 12
T 452 0 0 0 14438
L 10 0 0 0 0 10
U 0 0 0 0 0 0
P 0 0 0 0 0 0
15 13 28
0 0 0
0 0 0
0 0 0
0 0 0
15 13 28Out In Total
Dietz Avenue North [S]
U L T R P
0 3 1 9 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 7
0 3 1 9 7
Erb
Stre
et [W
] Tota
l
973
21 1 1 0 996
In 513 7 1 1 0 522
Out
460
14 0 0 0 474
1 0 0 0 0 1 U
10 0 0 0 0 10 L
499 7 1 1 0 508 T
3 0 0 0 0 3 R
0 0 0 0 1 1 P
Turning Movement Peak Hour Data Plot (11:30 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (4:30 PM)
Start Time
Erb Street Erb Street Dietz Avenue North Dietz Avenue North
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
4:30 PM 2 149 1 0 0 152 2 192 6 0 1 200 1 0 4 0 1 5 10 1 17 0 2 28 385
4:45 PM 0 130 2 0 1 132 6 215 3 0 0 224 2 0 2 0 2 4 14 0 17 0 3 31 391
5:00 PM 1 137 3 0 2 141 4 196 2 0 2 202 1 0 5 0 4 6 8 0 25 0 5 33 382
5:15 PM 0 146 0 0 2 146 9 204 4 0 0 217 0 0 7 0 4 7 4 0 14 0 2 18 388
Total 3 562 6 0 5 571 21 807 15 0 3 843 4 0 18 0 11 22 36 1 73 0 12 110 1546
Approach % 0.5 98.4 1.1 0.0 - - 2.5 95.7 1.8 0.0 - - 18.2 0.0 81.8 0.0 - - 32.7 0.9 66.4 0.0 - - -
Total % 0.2 36.4 0.4 0.0 - 36.9 1.4 52.2 1.0 0.0 - 54.5 0.3 0.0 1.2 0.0 - 1.4 2.3 0.1 4.7 0.0 - 7.1 -
PHF 0.375 0.943 0.500 0.000 - 0.939 0.583 0.938 0.625 0.000 - 0.941 0.500 0.000 0.643 0.000 - 0.786 0.643 0.250 0.730 0.000 - 0.833 0.988
Lights 3 552 5 0 - 560 21 800 12 0 - 833 4 0 18 0 - 22 36 1 73 0 - 110 1525
% Lights 100.0 98.2 83.3 - - 98.1 100.0 99.1 80.0 - - 98.8 100.0 - 100.0 - - 100.0 100.0 100.0 100.0 - - 100.0 98.6
Mediums 0 10 0 0 - 10 0 6 3 0 - 9 0 0 0 0 - 0 0 0 0 0 - 0 19
% Mediums 0.0 1.8 0.0 - - 1.8 0.0 0.7 20.0 - - 1.1 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 1.2
Articulated Trucks 0 0 0 0 - 0 0 1 0 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 1
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.1 0.0 - - 0.1 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles on Road 0 0 1 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 0.0 16.7 - - 0.2 0.0 0.0 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 5 - - - - - 3 - - - - - 11 - - - - - 12 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 4:30 PMEnding At03/07/2019 5:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue North [N]
Out In Total
15 110 125
3 0 3
0 0 0
0 0 0
0 0 0
18 110 128
73 1 36 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 12
73 1 36 0 12R T L U P
616 0 0 0 10
606
Out
843 0 0 1 9 833
In
14590 0 1 19
1439
Total
Erb S
treet [E]
R 15 0 0 0 3 12
T 807 0 0 1 6 800
L 21 0 0 0 0 21
U 0 0 0 0 0 0
P 3 3 0 0 0 0
27 22 49
0 0 0
0 0 0
1 0 1
0 0 0
28 22 50Out In Total
Dietz Avenue North [S]
U L T R P
0 4 0 18 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 11
0 4 0 18 11
Erb
Stre
et [W
] Tota
l
1437 16 1 1 0
1455
In 560
10 0 1 0 571
Out
877 6 1 0 0 884
0 0 0 0 0 0 U
3 0 0 0 0 3 L
552
10 0 0 0 562 T
5 0 0 1 0 6 R
0 0 0 0 5 5 P
Turning Movement Peak Hour Data Plot (4:30 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Erb Street & Dietz Avenue NorthSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Father David Bauer Drive Father David Bauer Drive Driveway 3 Westmount Place
Eastbound Westbound Northbound
Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Left Right U-Turn Peds App. Total Int. Total
7:00 AM 22 2 0 1 24 1 18 0 0 19 0 0 0 3 0 43
7:15 AM 28 2 0 0 30 0 19 0 0 19 0 1 0 1 1 50
7:30 AM 34 2 0 0 36 2 22 0 1 24 2 1 0 4 3 63
7:45 AM 56 12 0 1 68 3 32 0 0 35 4 1 0 2 5 108
Hourly Total 140 18 0 2 158 6 91 0 1 97 6 3 0 10 9 264
8:00 AM 63 7 0 2 70 3 50 0 0 53 1 2 0 2 3 126
8:15 AM 72 5 0 2 77 4 49 0 0 53 2 3 0 5 5 135
8:30 AM 70 10 0 1 80 6 39 0 0 45 0 1 0 3 1 126
8:45 AM 70 10 0 2 80 8 57 0 0 65 1 1 0 3 2 147
Hourly Total 275 32 0 7 307 21 195 0 0 216 4 7 0 13 11 534
9:00 AM 48 5 0 0 53 1 45 0 0 46 2 1 0 1 3 102
9:15 AM 63 2 0 1 65 3 39 0 1 42 0 1 0 1 1 108
9:30 AM 51 2 0 1 53 2 41 0 0 43 0 0 0 1 0 96
9:45 AM 52 3 0 0 55 1 44 0 0 45 2 0 0 2 2 102
Hourly Total 214 12 0 2 226 7 169 0 1 176 4 2 0 5 6 408
*** BREAK *** - - - - - - - - - - - - - - - -
11:30 AM 49 1 0 0 50 3 49 0 1 52 0 0 0 3 0 102
11:45 AM 42 0 0 0 42 1 49 0 0 50 2 0 0 1 2 94
Hourly Total 91 1 0 0 92 4 98 0 1 102 2 0 0 4 2 196
12:00 PM 57 0 0 0 57 0 49 0 0 49 1 0 0 0 1 107
12:15 PM 30 0 0 0 30 0 40 0 0 40 2 0 0 0 2 72
12:30 PM 23 2 0 0 25 0 28 0 0 28 2 0 0 1 2 55
12:45 PM 36 3 0 0 39 3 46 0 1 49 1 1 0 5 2 90
Hourly Total 146 5 0 0 151 3 163 0 1 166 6 1 0 6 7 324
1:00 PM 46 2 0 0 48 2 39 0 1 41 1 1 0 2 2 91
1:15 PM 35 1 0 0 36 0 38 0 0 38 1 1 0 5 2 76
*** BREAK *** - - - - - - - - - - - - - - - -
Hourly Total 81 3 0 0 84 2 77 0 1 79 2 2 0 7 4 167
3:00 PM 53 2 0 0 55 2 49 0 0 51 7 4 0 0 11 117
3:15 PM 49 1 0 0 50 0 40 0 0 40 2 1 0 4 3 93
3:30 PM 44 1 0 1 45 0 42 0 0 42 3 3 0 4 6 93
3:45 PM 62 2 0 0 64 0 49 0 0 49 3 3 0 2 6 119
Hourly Total 208 6 0 1 214 2 180 0 0 182 15 11 0 10 26 422
4:00 PM 46 3 0 3 49 1 58 0 0 59 9 3 0 1 12 120
4:15 PM 66 4 0 0 70 5 70 0 0 75 9 4 0 4 13 158
4:30 PM 56 1 0 0 57 0 63 0 0 63 7 10 0 2 17 137
4:45 PM 45 7 0 0 52 2 72 0 0 74 3 9 0 5 12 138
Hourly Total 213 15 0 3 228 8 263 0 0 271 28 26 0 12 54 553
5:00 PM 64 1 0 0 65 2 84 0 3 86 5 4 0 2 9 160
5:15 PM 51 4 0 1 55 2 75 0 0 77 4 4 0 4 8 140
5:30 PM 45 3 0 0 48 2 78 0 0 80 4 4 0 1 8 136
5:45 PM 83 5 0 0 88 3 75 0 0 78 2 1 0 1 3 169
Hourly Total 243 13 0 1 256 9 312 0 3 321 15 13 0 8 28 605
Grand Total 1611 105 0 16 1716 62 1548 0 8 1610 82 65 0 75 147 3473
Approach % 93.9 6.1 0.0 - - 3.9 96.1 0.0 - - 55.8 44.2 0.0 - - -
Total % 46.4 3.0 0.0 - 49.4 1.8 44.6 0.0 - 46.4 2.4 1.9 0.0 - 4.2 -
Lights 1569 98 0 - 1667 61 1528 0 - 1589 77 62 0 - 139 3395
% Lights 97.4 93.3 - - 97.1 98.4 98.7 - - 98.7 93.9 95.4 - - 94.6 97.8
Mediums 33 4 0 - 37 1 14 0 - 15 2 3 0 - 5 57
% Mediums 2.0 3.8 - - 2.2 1.6 0.9 - - 0.9 2.4 4.6 - - 3.4 1.6
Articulated Trucks 3 1 0 - 4 0 2 0 - 2 2 0 0 - 2 8
% Articulated Trucks 0.2 1.0 - - 0.2 0.0 0.1 - - 0.1 2.4 0.0 - - 1.4 0.2
Bicycles on Road 6 2 0 - 8 0 4 0 - 4 1 0 0 - 1 13
% Bicycles on Road 0.4 1.9 - - 0.5 0.0 0.3 - - 0.2 1.2 0.0 - - 0.7 0.4
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 1 - -
% Bicycles on Crosswalk - - - 0.0 - - - - 0.0 - - - - 1.3 - -
Pedestrians - - - 16 - - - - 8 - - - - 74 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 98.7 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
16760 6 3 36
1631
Out
16100 4 2 15
1589
In
32860 10 5 51
3220
Total
Father David B
auer Drive [E
T1548
0 4 2 141528
L 62 0 0 0 1 61
U 0 0 0 0 0 0
P 8 8 0 0 0 0
159 139 298
5 5 10
1 2 3
2 1 3
0 0 0
167 147 314Out In Total
Driveway 3 Westmount
U L R P
0 77 62 0
0 2 3 0
0 2 0 0
0 1 0 0
0 0 0 75
0 82 65 75
Fath
er D
avid
Bau
er D
rive
[
Tota
l
3272 53 8 13 0
3346
In
1667 37 4 8 0
1716
Out
1605 16 4 5 0
1630
0 0 0 0 0 0 U
1569 33 3 6 0
1611 T
98 4 1 2 0 105 R
0 0 0 0 16 16 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (8:00 AM)
Start Time
Father David Bauer Drive Father David Bauer Drive Driveway 3 Westmount Place
Eastbound Westbound Northbound
Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Left Right U-Turn Peds App. Total Int. Total
8:00 AM 63 7 0 2 70 3 50 0 0 53 1 2 0 2 3 126
8:15 AM 72 5 0 2 77 4 49 0 0 53 2 3 0 5 5 135
8:30 AM 70 10 0 1 80 6 39 0 0 45 0 1 0 3 1 126
8:45 AM 70 10 0 2 80 8 57 0 0 65 1 1 0 3 2 147
Total 275 32 0 7 307 21 195 0 0 216 4 7 0 13 11 534
Approach % 89.6 10.4 0.0 - - 9.7 90.3 0.0 - - 36.4 63.6 0.0 - - -
Total % 51.5 6.0 0.0 - 57.5 3.9 36.5 0.0 - 40.4 0.7 1.3 0.0 - 2.1 -
PHF 0.955 0.800 0.000 - 0.959 0.656 0.855 0.000 - 0.831 0.500 0.583 0.000 - 0.550 0.908
Lights 265 30 0 - 295 21 191 0 - 212 4 7 0 - 11 518
% Lights 96.4 93.8 - - 96.1 100.0 97.9 - - 98.1 100.0 100.0 - - 100.0 97.0
Mediums 7 2 0 - 9 0 3 0 - 3 0 0 0 - 0 12
% Mediums 2.5 6.3 - - 2.9 0.0 1.5 - - 1.4 0.0 0.0 - - 0.0 2.2
Articulated Trucks 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Articulated Trucks 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 3 0 0 - 3 0 1 0 - 1 0 0 0 - 0 4
% Bicycles on Road 1.1 0.0 - - 1.0 0.0 0.5 - - 0.5 0.0 0.0 - - 0.0 0.7
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - - - - - - 0.0 - -
Pedestrians - - - 7 - - - - 0 - - - - 13 - -
% Pedestrians - - - 100.0 - - - - - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 8:00 AMEnding At03/07/2019 9:00 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
282 0 3 0 7 272
Out
216 0 1 0 3 212
In
498 0 4 0 10
484
Total
Father David B
auer Drive [E
T 195 0 1 0 3 191
L 21 0 0 0 0 21
U 0 0 0 0 0 0
P 0 0 0 0 0 0
51 11 62
2 0 2
0 0 0
0 0 0
0 0 0
53 11 64Out In Total
Driveway 3 Westmount
U L R P
0 4 7 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 13
0 4 7 13
Fath
er D
avid
Bau
er D
rive
[
Tota
l
490
12 0 4 0 506
In 295 9 0 3 0 307
Out
195 3 0 1 0 199
0 0 0 0 0 0 U
265 7 0 3 0 275 T
30 2 0 0 0 32 R
0 0 0 0 7 7 P
Turning Movement Peak Hour Data Plot (8:00 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:30 AM)
Start Time
Father David Bauer Drive Father David Bauer Drive Driveway 3 Westmount Place
Eastbound Westbound Northbound
Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Left Right U-Turn Peds App. Total Int. Total
11:30 AM 49 1 0 0 50 3 49 0 1 52 0 0 0 3 0 102
11:45 AM 42 0 0 0 42 1 49 0 0 50 2 0 0 1 2 94
12:00 PM 57 0 0 0 57 0 49 0 0 49 1 0 0 0 1 107
12:15 PM 30 0 0 0 30 0 40 0 0 40 2 0 0 0 2 72
Total 178 1 0 0 179 4 187 0 1 191 5 0 0 4 5 375
Approach % 99.4 0.6 0.0 - - 2.1 97.9 0.0 - - 100.0 0.0 0.0 - - -
Total % 47.5 0.3 0.0 - 47.7 1.1 49.9 0.0 - 50.9 1.3 0.0 0.0 - 1.3 -
PHF 0.781 0.250 0.000 - 0.785 0.333 0.954 0.000 - 0.918 0.625 0.000 0.000 - 0.625 0.876
Lights 174 0 0 - 174 4 186 0 - 190 3 0 0 - 3 367
% Lights 97.8 0.0 - - 97.2 100.0 99.5 - - 99.5 60.0 - - - 60.0 97.9
Mediums 3 0 0 - 3 0 1 0 - 1 1 0 0 - 1 5
% Mediums 1.7 0.0 - - 1.7 0.0 0.5 - - 0.5 20.0 - - - 20.0 1.3
Articulated Trucks 1 1 0 - 2 0 0 0 - 0 1 0 0 - 1 3
% Articulated Trucks 0.6 100.0 - - 1.1 0.0 0.0 - - 0.0 20.0 - - - 20.0 0.8
Bicycles on Road 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Bicycles on Road 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 - - - 0.0 0.0
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - - - - - - 0.0 - - - - 0.0 - -
Pedestrians - - - 0 - - - - 1 - - - - 4 - -
% Pedestrians - - - - - - - - 100.0 - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:30 AMEnding At03/07/2019 12:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
178 0 0 1 3 174
Out
191 0 0 0 1 190
In
369 0 0 1 4 364
Total
Father David B
auer Drive [E
T 187 0 0 0 1 186
L 4 0 0 0 0 4
U 0 0 0 0 0 0
P 1 1 0 0 0 0
4 3 7
0 1 1
1 1 2
0 0 0
0 0 0
5 5 10Out In Total
Driveway 3 Westmount
U L R P
0 3 0 0
0 1 0 0
0 1 0 0
0 0 0 0
0 0 0 4
0 5 0 4
Fath
er D
avid
Bau
er D
rive
[
Tota
l
363 5 3 0 0 371
In 174 3 2 0 0 179
Out
189 2 1 0 0 192
0 0 0 0 0 0 U
174 3 1 0 0 178 T
0 0 1 0 0 1 R
0 0 0 0 0 0 P
Turning Movement Peak Hour Data Plot (11:30 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (5:00 PM)
Start Time
Father David Bauer Drive Father David Bauer Drive Driveway 3 Westmount Place
Eastbound Westbound Northbound
Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Left Right U-Turn Peds App. Total Int. Total
5:00 PM 64 1 0 0 65 2 84 0 3 86 5 4 0 2 9 160
5:15 PM 51 4 0 1 55 2 75 0 0 77 4 4 0 4 8 140
5:30 PM 45 3 0 0 48 2 78 0 0 80 4 4 0 1 8 136
5:45 PM 83 5 0 0 88 3 75 0 0 78 2 1 0 1 3 169
Total 243 13 0 1 256 9 312 0 3 321 15 13 0 8 28 605
Approach % 94.9 5.1 0.0 - - 2.8 97.2 0.0 - - 53.6 46.4 0.0 - - -
Total % 40.2 2.1 0.0 - 42.3 1.5 51.6 0.0 - 53.1 2.5 2.1 0.0 - 4.6 -
PHF 0.732 0.650 0.000 - 0.727 0.750 0.929 0.000 - 0.933 0.750 0.813 0.000 - 0.778 0.895
Lights 238 11 0 - 249 9 309 0 - 318 15 13 0 - 28 595
% Lights 97.9 84.6 - - 97.3 100.0 99.0 - - 99.1 100.0 100.0 - - 100.0 98.3
Mediums 4 1 0 - 5 0 1 0 - 1 0 0 0 - 0 6
% Mediums 1.6 7.7 - - 2.0 0.0 0.3 - - 0.3 0.0 0.0 - - 0.0 1.0
Articulated Trucks 0 0 0 - 0 0 1 0 - 1 0 0 0 - 0 1
% Articulated Trucks 0.0 0.0 - - 0.0 0.0 0.3 - - 0.3 0.0 0.0 - - 0.0 0.2
Bicycles on Road 1 1 0 - 2 0 1 0 - 1 0 0 0 - 0 3
% Bicycles on Road 0.4 7.7 - - 0.8 0.0 0.3 - - 0.3 0.0 0.0 - - 0.0 0.5
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - 0.0 - - - - 0.0 - -
Pedestrians - - - 1 - - - - 3 - - - - 8 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 5:00 PMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
256 0 1 0 4 251
Out
321 0 1 1 1 318
In
577 0 2 1 5 569
Total
Father David B
auer Drive [E
T 312 0 1 1 1 309
L 9 0 0 0 0 9
U 0 0 0 0 0 0
P 3 3 0 0 0 0
20 28 48
1 0 1
0 0 0
1 0 1
0 0 0
22 28 50Out In Total
Driveway 3 Westmount
U L R P
0 15 13 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 8
0 15 13 8
Fath
er D
avid
Bau
er D
rive
[
Tota
l
573 6 1 3 0 583
In 249 5 0 2 0 256
Out
324 1 1 1 0 327
0 0 0 0 0 0 U
238 4 0 1 0 243 T
11 1 0 1 0 13 R
0 0 0 0 1 1 P
Turning Movement Peak Hour Data Plot (5:00 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 3 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Driveway 2 Westmount Place Westmount Road Westmount Road
Westbound Northbound Southbound
Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total
7:00 AM 0 3 0 0 3 103 0 0 0 103 1 53 0 0 54 160
7:15 AM 0 3 0 1 3 94 1 0 0 95 0 95 0 0 95 193
7:30 AM 0 3 0 1 3 126 0 0 1 126 0 130 0 0 130 259
7:45 AM 1 1 0 0 2 193 3 0 1 196 5 160 0 0 165 363
Hourly Total 1 10 0 2 11 516 4 0 2 520 6 438 0 0 444 975
8:00 AM 0 5 0 2 5 208 1 0 0 209 3 161 0 0 164 378
8:15 AM 2 6 0 2 8 236 5 0 0 241 5 194 0 0 199 448
8:30 AM 0 3 0 0 3 228 2 0 0 230 4 206 0 0 210 443
8:45 AM 0 3 0 3 3 201 3 0 0 204 5 154 0 0 159 366
Hourly Total 2 17 0 7 19 873 11 0 0 884 17 715 0 0 732 1635
9:00 AM 0 7 0 3 7 151 1 0 0 152 10 128 0 0 138 297
9:15 AM 4 8 0 0 12 187 5 0 1 192 20 122 0 0 142 346
9:30 AM 5 8 0 8 13 155 8 0 0 163 10 128 0 0 138 314
9:45 AM 4 13 0 2 17 176 8 0 0 184 11 118 0 0 129 330
Hourly Total 13 36 0 13 49 669 22 0 1 691 51 496 0 0 547 1287
*** BREAK *** - - - - - - - - - - - - - - - -
11:30 AM 7 17 0 3 24 120 21 0 0 141 16 120 0 0 136 301
11:45 AM 6 29 0 5 35 141 13 0 0 154 13 124 0 0 137 326
Hourly Total 13 46 0 8 59 261 34 0 0 295 29 244 0 0 273 627
12:00 PM 8 17 0 2 25 129 7 0 0 136 12 112 0 0 124 285
12:15 PM 7 22 0 10 29 110 15 0 0 125 16 119 0 0 135 289
12:30 PM 6 20 0 2 26 121 10 0 0 131 18 114 0 0 132 289
12:45 PM 10 36 0 1 46 129 6 0 0 135 17 124 0 0 141 322
Hourly Total 31 95 0 15 126 489 38 0 0 527 63 469 0 0 532 1185
1:00 PM 8 24 0 3 32 112 5 0 0 117 26 123 0 0 149 298
1:15 PM 9 21 0 4 30 97 11 0 0 108 23 115 0 0 138 276
*** BREAK *** - - - - - - - - - - - - - - - -
Hourly Total 17 45 0 7 62 209 16 0 0 225 49 238 0 0 287 574
3:00 PM 8 25 0 2 33 112 7 0 1 119 24 140 0 0 164 316
3:15 PM 7 25 0 2 32 145 10 0 0 155 24 165 0 0 189 376
3:30 PM 5 25 0 0 30 157 9 0 0 166 11 154 0 0 165 361
3:45 PM 4 26 0 1 30 153 5 0 0 158 28 182 0 0 210 398
Hourly Total 24 101 0 5 125 567 31 0 1 598 87 641 0 0 728 1451
4:00 PM 7 20 0 3 27 171 5 0 0 176 22 210 0 0 232 435
4:15 PM 3 24 0 6 27 172 10 0 0 182 24 184 0 0 208 417
4:30 PM 8 26 0 5 34 153 11 0 1 164 15 248 0 0 263 461
4:45 PM 3 29 0 4 32 184 10 0 0 194 22 289 0 1 311 537
Hourly Total 21 99 0 18 120 680 36 0 1 716 83 931 0 1 1014 1850
5:00 PM 5 50 0 9 55 190 11 0 0 201 17 251 0 0 268 524
5:15 PM 7 34 0 7 41 203 10 0 0 213 25 245 0 0 270 524
5:30 PM 7 23 0 5 30 174 6 0 0 180 23 217 0 0 240 450
5:45 PM 5 23 1 3 29 143 4 0 0 147 25 197 0 1 222 398
Hourly Total 24 130 1 24 155 710 31 0 0 741 90 910 0 1 1000 1896
Grand Total 146 579 1 99 726 4974 223 0 5 5197 475 5082 0 2 5557 11480
Approach % 20.1 79.8 0.1 - - 95.7 4.3 0.0 - - 8.5 91.5 0.0 - - -
Total % 1.3 5.0 0.0 - 6.3 43.3 1.9 0.0 - 45.3 4.1 44.3 0.0 - 48.4 -
Lights 143 573 1 - 717 4785 219 0 - 5004 474 4916 0 - 5390 11111
% Lights 97.9 99.0 100.0 - 98.8 96.2 98.2 - - 96.3 99.8 96.7 - - 97.0 96.8
Mediums 3 6 0 - 9 185 4 0 - 189 1 161 0 - 162 360
% Mediums 2.1 1.0 0.0 - 1.2 3.7 1.8 - - 3.6 0.2 3.2 - - 2.9 3.1
Articulated Trucks 0 0 0 - 0 3 0 0 - 3 0 5 0 - 5 8
% Articulated Trucks 0.0 0.0 0.0 - 0.0 0.1 0.0 - - 0.1 0.0 0.1 - - 0.1 0.1
Bicycles on Road 0 0 0 - 0 1 0 0 - 1 0 0 0 - 0 1
% Bicycles on Road 0.0 0.0 0.0 - 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - 0.0 - - - - 0.0 - -
Pedestrians - - - 99 - - - - 5 - - - - 2 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
5358 5390 10748
191 162 353
3 5 8
1 0 1
0 0 0
5553 5557 11110
4916 474 0 0
161 1 0 0
5 0 0 0
0 0 0 0
0 0 0 2
5082 475 0 2T L U P
699 0 0 0 5 694
Out
726 0 0 0 9 717
In
14250 0 0 14
1411
Total
Drivew
ay 2 Westm
ount Plac
R 579 0 0 0 6 573
L 146 0 0 0 3 143
U 1 0 0 0 0 1
P 99 99 0 0 0 0
5059 5004 10063
164 189 353
5 3 8
0 1 1
0 0 0
5228 5197 10425Out In Total
Westmount Road [S]
U T R P
0 4785 219 0
0 185 4 0
0 3 0 0
0 1 0 0
0 0 0 5
0 4974 223 5
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (8:00 AM)
Start Time
Driveway 2 Westmount Place Westmount Road Westmount Road
Westbound Northbound Southbound
Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total
8:00 AM 0 5 0 2 5 208 1 0 0 209 3 161 0 0 164 378
8:15 AM 2 6 0 2 8 236 5 0 0 241 5 194 0 0 199 448
8:30 AM 0 3 0 0 3 228 2 0 0 230 4 206 0 0 210 443
8:45 AM 0 3 0 3 3 201 3 0 0 204 5 154 0 0 159 366
Total 2 17 0 7 19 873 11 0 0 884 17 715 0 0 732 1635
Approach % 10.5 89.5 0.0 - - 98.8 1.2 0.0 - - 2.3 97.7 0.0 - - -
Total % 0.1 1.0 0.0 - 1.2 53.4 0.7 0.0 - 54.1 1.0 43.7 0.0 - 44.8 -
PHF 0.250 0.708 0.000 - 0.594 0.925 0.550 0.000 - 0.917 0.850 0.868 0.000 - 0.871 0.912
Lights 2 16 0 - 18 837 9 0 - 846 17 687 0 - 704 1568
% Lights 100.0 94.1 - - 94.7 95.9 81.8 - - 95.7 100.0 96.1 - - 96.2 95.9
Mediums 0 1 0 - 1 35 2 0 - 37 0 27 0 - 27 65
% Mediums 0.0 5.9 - - 5.3 4.0 18.2 - - 4.2 0.0 3.8 - - 3.7 4.0
Articulated Trucks 0 0 0 - 0 1 0 0 - 1 0 1 0 - 1 2
% Articulated Trucks 0.0 0.0 - - 0.0 0.1 0.0 - - 0.1 0.0 0.1 - - 0.1 0.1
Bicycles on Road 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Bicycles on Road 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - - - - - - - - -
Pedestrians - - - 7 - - - - 0 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - - - - - - - - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 8:00 AMEnding At03/07/2019 9:00 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
853 704 1557
36 27 63
1 1 2
0 0 0
0 0 0
890 732 1622
687 17 0 0
27 0 0 0
1 0 0 0
0 0 0 0
0 0 0 0
715 17 0 0T L U P
28 0 0 0 2 26
Out
19 0 0 0 1 18 In
47 0 0 0 3 44
Total
Drivew
ay 2 Westm
ount Plac
R 17 0 0 0 1 16
L 2 0 0 0 0 2
U 0 0 0 0 0 0
P 7 7 0 0 0 0
689 846 1535
27 37 64
1 1 2
0 0 0
0 0 0
717 884 1601Out In Total
Westmount Road [S]
U T R P
0 837 9 0
0 35 2 0
0 1 0 0
0 0 0 0
0 0 0 0
0 873 11 0
Turning Movement Peak Hour Data Plot (8:00 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:30 AM)
Start Time
Driveway 2 Westmount Place Westmount Road Westmount Road
Westbound Northbound Southbound
Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total
11:30 AM 7 17 0 3 24 120 21 0 0 141 16 120 0 0 136 301
11:45 AM 6 29 0 5 35 141 13 0 0 154 13 124 0 0 137 326
12:00 PM 8 17 0 2 25 129 7 0 0 136 12 112 0 0 124 285
12:15 PM 7 22 0 10 29 110 15 0 0 125 16 119 0 0 135 289
Total 28 85 0 20 113 500 56 0 0 556 57 475 0 0 532 1201
Approach % 24.8 75.2 0.0 - - 89.9 10.1 0.0 - - 10.7 89.3 0.0 - - -
Total % 2.3 7.1 0.0 - 9.4 41.6 4.7 0.0 - 46.3 4.7 39.6 0.0 - 44.3 -
PHF 0.875 0.733 0.000 - 0.807 0.887 0.667 0.000 - 0.903 0.891 0.958 0.000 - 0.971 0.921
Lights 27 82 0 - 109 481 55 0 - 536 56 459 0 - 515 1160
% Lights 96.4 96.5 - - 96.5 96.2 98.2 - - 96.4 98.2 96.6 - - 96.8 96.6
Mediums 1 3 0 - 4 18 1 0 - 19 1 15 0 - 16 39
% Mediums 3.6 3.5 - - 3.5 3.6 1.8 - - 3.4 1.8 3.2 - - 3.0 3.2
Articulated Trucks 0 0 0 - 0 0 0 0 - 0 0 1 0 - 1 1
% Articulated Trucks 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 0.2 - - 0.2 0.1
Bicycles on Road 0 0 0 - 0 1 0 0 - 1 0 0 0 - 0 1
% Bicycles on Road 0.0 0.0 - - 0.0 0.2 0.0 - - 0.2 0.0 0.0 - - 0.0 0.1
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - - - - - - - - -
Pedestrians - - - 20 - - - - 0 - - - - 0 - -
% Pedestrians - - - 100.0 - - - - - - - - - - - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:30 AMEnding At03/07/2019 12:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
563 515 1078
21 16 37
0 1 1
1 0 1
0 0 0
585 532 1117
459 56 0 0
15 1 0 0
1 0 0 0
0 0 0 0
0 0 0 0
475 57 0 0T L U P
113 0 0 0 2 111
Out
113 0 0 0 4 109
In
226 0 0 0 6 220
Total
Drivew
ay 2 Westm
ount Plac
R 85 0 0 0 3 82
L 28 0 0 0 1 27
U 0 0 0 0 0 0
P 20 20 0 0 0 0
486 536 1022
16 19 35
1 0 1
0 1 1
0 0 0
503 556 1059Out In Total
Westmount Road [S]
U T R P
0 481 55 0
0 18 1 0
0 0 0 0
0 1 0 0
0 0 0 0
0 500 56 0
Turning Movement Peak Hour Data Plot (11:30 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (4:30 PM)
Start Time
Driveway 2 Westmount Place Westmount Road Westmount Road
Westbound Northbound Southbound
Left Right U-Turn Peds App. Total Thru Right U-Turn Peds App. Total Left Thru U-Turn Peds App. Total Int. Total
4:30 PM 8 26 0 5 34 153 11 0 1 164 15 248 0 0 263 461
4:45 PM 3 29 0 4 32 184 10 0 0 194 22 289 0 1 311 537
5:00 PM 5 50 0 9 55 190 11 0 0 201 17 251 0 0 268 524
5:15 PM 7 34 0 7 41 203 10 0 0 213 25 245 0 0 270 524
Total 23 139 0 25 162 730 42 0 1 772 79 1033 0 1 1112 2046
Approach % 14.2 85.8 0.0 - - 94.6 5.4 0.0 - - 7.1 92.9 0.0 - - -
Total % 1.1 6.8 0.0 - 7.9 35.7 2.1 0.0 - 37.7 3.9 50.5 0.0 - 54.3 -
PHF 0.719 0.695 0.000 - 0.736 0.899 0.955 0.000 - 0.906 0.790 0.894 0.000 - 0.894 0.953
Lights 22 139 0 - 161 708 42 0 - 750 79 1013 0 - 1092 2003
% Lights 95.7 100.0 - - 99.4 97.0 100.0 - - 97.2 100.0 98.1 - - 98.2 97.9
Mediums 1 0 0 - 1 22 0 0 - 22 0 20 0 - 20 43
% Mediums 4.3 0.0 - - 0.6 3.0 0.0 - - 2.8 0.0 1.9 - - 1.8 2.1
Articulated Trucks 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Articulated Trucks 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 0 - 0 0 0 0 - 0 0 0 0 - 0 0
% Bicycles on Road 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Crosswalk - - - 0 - - - - 0 - - - - 0 - -
% Bicycles on Crosswalk - - - 0.0 - - - - 0.0 - - - - 0.0 - -
Pedestrians - - - 25 - - - - 1 - - - - 1 - -
% Pedestrians - - - 100.0 - - - - 100.0 - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 4:30 PMEnding At03/07/2019 5:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
847 1092 1939
22 20 42
0 0 0
0 0 0
0 0 0
869 1112 1981
1013 79 0 0
20 0 0 0
0 0 0 0
0 0 0 0
0 0 0 1
1033 79 0 1T L U P
121 0 0 0 0 121
Out
162 0 0 0 1 161
In
283 0 0 0 1 282
Total
Drivew
ay 2 Westm
ount Plac
R 139 0 0 0 0 139
L 23 0 0 0 1 22
U 0 0 0 0 0 0
P 25 25 0 0 0 0
1035 750 1785
21 22 43
0 0 0
0 0 0
0 0 0
1056 772 1828Out In Total
Westmount Road [S]
U T R P
0 708 42 0
0 22 0 0
0 0 0 0
0 0 0 0
0 0 0 1
0 730 42 1
Turning Movement Peak Hour Data Plot (4:30 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 2 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Eastbound Approach Driveway 1 Westmount Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:00 AM 1 0 1 0 0 2 5 0 1 0 0 6 0 95 15 0 0 110 5 43 0 0 0 48 166
7:15 AM 1 0 0 1 2 2 1 0 2 0 1 3 0 98 26 0 0 124 11 90 0 0 0 101 230
7:30 AM 0 0 1 0 1 1 1 0 5 0 3 6 0 120 35 0 0 155 10 119 0 0 0 129 291
7:45 AM 2 0 1 0 1 3 7 0 5 0 2 12 0 197 33 0 0 230 7 164 0 0 0 171 416
Hourly Total 4 0 3 1 4 8 14 0 13 0 6 27 0 510 109 0 0 619 33 416 0 0 0 449 1103
8:00 AM 3 0 1 0 2 4 5 0 5 0 4 10 0 210 35 0 0 245 13 156 0 0 1 169 428
8:15 AM 1 0 1 0 1 2 3 0 2 0 3 5 1 231 26 0 0 258 5 184 2 0 1 191 456
8:30 AM 1 0 1 0 2 2 2 0 2 0 2 4 0 231 24 0 0 255 10 193 0 0 3 203 464
8:45 AM 0 0 4 0 5 4 5 0 3 0 1 8 0 201 39 0 0 240 15 140 0 0 0 155 407
Hourly Total 5 0 7 0 10 12 15 0 12 0 10 27 1 873 124 0 0 998 43 673 2 0 5 718 1755
9:00 AM 2 0 6 0 1 8 1 0 7 0 3 8 0 153 30 0 2 183 6 123 0 0 0 129 328
9:15 AM 2 0 2 0 0 4 12 0 7 0 3 19 1 163 30 0 0 194 9 108 2 0 2 119 336
9:30 AM 1 0 4 0 3 5 10 0 4 0 9 14 1 160 22 0 0 183 8 118 1 0 0 127 329
9:45 AM 0 0 1 0 3 1 10 1 8 0 3 19 1 165 33 0 0 199 4 117 0 0 0 121 340
Hourly Total 5 0 13 0 7 18 33 1 26 0 18 60 3 641 115 0 2 759 27 466 3 0 2 496 1333
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:30 AM 2 0 4 0 0 6 18 0 7 0 5 25 3 125 22 0 0 150 6 114 2 0 0 122 303
11:45 AM 0 0 1 0 2 1 26 0 13 0 9 39 1 148 26 0 0 175 13 115 0 0 0 128 343
Hourly Total 2 0 5 0 2 7 44 0 20 0 14 64 4 273 48 0 0 325 19 229 2 0 0 250 646
12:00 PM 0 0 3 0 7 3 15 0 9 0 7 24 1 127 12 0 0 140 12 120 0 0 1 132 299
12:15 PM 0 0 1 0 8 1 16 0 4 0 6 20 0 122 28 0 0 150 5 111 1 0 1 117 288
12:30 PM 1 0 0 0 4 1 22 0 10 0 7 32 1 132 17 0 0 150 4 131 0 0 0 135 318
12:45 PM 2 0 0 0 4 2 17 0 8 0 1 25 0 113 17 0 0 130 7 115 0 0 2 122 279
Hourly Total 3 0 4 0 23 7 70 0 31 0 21 101 2 494 74 0 0 570 28 477 1 0 4 506 1184
1:00 PM 0 0 3 0 3 3 17 0 3 0 8 20 0 111 12 0 0 123 6 131 0 0 0 137 283
1:15 PM 1 0 1 0 0 2 19 0 5 0 7 24 1 100 22 0 0 123 6 114 1 0 0 121 270
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 1 0 4 0 3 5 36 0 8 0 15 44 1 211 34 0 0 246 12 245 1 0 0 258 553
3:00 PM 0 0 0 0 0 0 27 0 17 0 3 44 2 109 20 0 0 131 4 161 0 0 1 165 340
3:15 PM 1 0 0 0 0 1 18 0 14 0 1 32 1 153 18 0 0 172 11 138 1 0 1 150 355
3:30 PM 2 0 2 0 3 4 26 0 16 0 1 42 0 136 21 0 0 157 7 169 2 0 0 178 381
3:45 PM 1 0 0 0 0 1 25 0 17 0 0 42 2 143 19 0 0 164 6 181 2 0 1 189 396
Hourly Total 4 0 2 0 3 6 96 0 64 0 5 160 5 541 78 0 0 624 28 649 5 0 3 682 1472
4:00 PM 2 0 1 0 8 3 22 0 14 0 5 36 0 165 26 0 0 191 9 199 0 0 4 208 438
4:15 PM 1 0 4 0 2 5 26 0 18 0 4 44 1 170 20 0 0 191 10 196 2 0 2 208 448
4:30 PM 3 0 3 0 2 6 26 0 17 0 3 43 0 145 18 0 0 163 10 237 2 0 2 249 461
4:45 PM 1 0 6 0 4 7 14 0 25 0 8 39 0 167 28 0 0 195 11 266 0 0 0 277 518
Hourly Total 7 0 14 0 16 21 88 0 74 0 20 162 1 647 92 0 0 740 40 898 4 0 8 942 1865
5:00 PM 3 0 2 0 4 5 27 0 19 0 11 46 3 169 15 0 1 187 9 255 1 0 0 265 503
5:15 PM 1 1 5 0 3 7 22 0 21 0 5 43 4 192 11 0 0 207 10 254 1 0 0 265 522
5:30 PM 0 0 2 0 4 2 15 0 16 0 8 31 1 158 14 0 0 173 8 207 4 0 0 219 425
5:45 PM 1 1 0 0 3 2 16 0 9 0 1 25 1 151 26 0 0 178 4 192 0 0 0 196 401
Hourly Total 5 2 9 0 14 16 80 0 65 0 25 145 9 670 66 0 1 745 31 908 6 0 0 945 1851
Grand Total 36 2 61 1 82 100 476 1 313 0 134 790 26 4860 740 0 3 5626 261 4961 24 0 22 5246 11762
Approach % 36.0 2.0 61.0 1.0 - - 60.3 0.1 39.6 0.0 - - 0.5 86.4 13.2 0.0 - - 5.0 94.6 0.5 0.0 - - -
Total % 0.3 0.0 0.5 0.0 - 0.9 4.0 0.0 2.7 0.0 - 6.7 0.2 41.3 6.3 0.0 - 47.8 2.2 42.2 0.2 0.0 - 44.6 -
Lights 36 2 61 0 - 99 466 1 292 0 - 759 26 4685 724 0 - 5435 256 4796 24 0 - 5076 11369
% Lights 100.0 100.0 100.0 0.0 - 99.0 97.9 100.0 93.3 - - 96.1 100.0 96.4 97.8 - - 96.6 98.1 96.7 100.0 - - 96.8 96.7
Mediums 0 0 0 1 - 1 8 0 20 0 - 28 0 172 14 0 - 186 4 162 0 0 - 166 381
% Mediums 0.0 0.0 0.0 100.0 - 1.0 1.7 0.0 6.4 - - 3.5 0.0 3.5 1.9 - - 3.3 1.5 3.3 0.0 - - 3.2 3.2
Articulated Trucks 0 0 0 0 - 0 1 0 1 0 - 2 0 2 1 0 - 3 1 3 0 0 - 4 9
% ArticulatedTrucks 0.0 0.0 0.0 0.0 - 0.0 0.2 0.0 0.3 - - 0.3 0.0 0.0 0.1 - - 0.1 0.4 0.1 0.0 - - 0.1 0.1
Bicycles on Road 0 0 0 0 - 0 1 0 0 0 - 1 0 1 1 0 - 2 0 0 0 0 - 0 3
% Bicycles onRoad 0.0 0.0 0.0 0.0 - 0.0 0.2 0.0 0.0 - - 0.1 0.0 0.0 0.1 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 82 - - - - - 134 - - - - - 3 - - - - - 22 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
5013 5076 10089
192 166 358
3 4 7
1 0 1
0 0 0
5209 5246 10455
24 4796 256 0 0
0 162 4 0 0
0 3 1 0 0
0 0 0 0 0
0 0 0 0 22
24 4961 261 0 22R T L U P
10030 1 2 18
982
Out
790 0 1 2 28
759
In
17930 2 4 46
1741
Total
Drivew
ay 1 Westm
ount Plac
R 313 0 0 1 20292
T 1 0 0 0 0 1
L 476 0 1 1 8 466
U 0 0 0 0 0 0
P 134134 0 0 0 0
5323 5435 10758
170 186 356
4 3 7
1 2 3
0 0 0
5498 5626 11124Out In Total
Westmount Road [S]
U L T R P
0 26 4685 724 0
0 0 172 14 0
0 0 2 1 0
0 0 1 1 0
0 0 0 0 3
0 26 4860 740 3
Eas
tbou
nd A
ppro
ach
[W]
Tota
l
150 2 0 0 0 152
In 99 1 0 0 0 100
Out 51 1 0 0 0 52
0 1 0 0 0 1 U
36 0 0 0 0 36 L
2 0 0 0 0 2 T
61 0 0 0 0 61 R
0 0 0 0 82 82 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (7:45 AM)
Start Time
Eastbound Approach Driveway 1 Westmount Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:45 AM 2 0 1 0 1 3 7 0 5 0 2 12 0 197 33 0 0 230 7 164 0 0 0 171 416
8:00 AM 3 0 1 0 2 4 5 0 5 0 4 10 0 210 35 0 0 245 13 156 0 0 1 169 428
8:15 AM 1 0 1 0 1 2 3 0 2 0 3 5 1 231 26 0 0 258 5 184 2 0 1 191 456
8:30 AM 1 0 1 0 2 2 2 0 2 0 2 4 0 231 24 0 0 255 10 193 0 0 3 203 464
Total 7 0 4 0 6 11 17 0 14 0 11 31 1 869 118 0 0 988 35 697 2 0 5 734 1764
Approach % 63.6 0.0 36.4 0.0 - - 54.8 0.0 45.2 0.0 - - 0.1 88.0 11.9 0.0 - - 4.8 95.0 0.3 0.0 - - -
Total % 0.4 0.0 0.2 0.0 - 0.6 1.0 0.0 0.8 0.0 - 1.8 0.1 49.3 6.7 0.0 - 56.0 2.0 39.5 0.1 0.0 - 41.6 -
PHF 0.583 0.000 1.000 0.000 - 0.688 0.607 0.000 0.700 0.000 - 0.646 0.250 0.940 0.843 0.000 - 0.957 0.673 0.903 0.250 0.000 - 0.904 0.950
Lights 7 0 4 0 - 11 17 0 10 0 - 27 1 835 117 0 - 953 34 669 2 0 - 705 1696
% Lights 100.0 - 100.0 - - 100.0 100.0 - 71.4 - - 87.1 100.0 96.1 99.2 - - 96.5 97.1 96.0 100.0 - - 96.0 96.1
Mediums 0 0 0 0 - 0 0 0 4 0 - 4 0 33 0 0 - 33 1 27 0 0 - 28 65
% Mediums 0.0 - 0.0 - - 0.0 0.0 - 28.6 - - 12.9 0.0 3.8 0.0 - - 3.3 2.9 3.9 0.0 - - 3.8 3.7
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 1 0 0 - 1 0 1 0 0 - 1 2
% ArticulatedTrucks 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.1 0.0 - - 0.1 0.0 0.1 0.0 - - 0.1 0.1
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 1 0 - 1 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.8 - - 0.1 0.0 0.0 0.0 - - 0.0 0.1
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - - - - - - - 0.0 - -
Pedestrians - - - - 6 - - - - - 11 - - - - - 0 - - - - - 5 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 7:45 AMEnding At03/07/2019 8:45 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
852 705 1557
37 28 65
1 1 2
0 0 0
0 0 0
890 734 1624
2 669 34 0 0
0 27 1 0 0
0 1 0 0 0
0 0 0 0 0
0 0 0 0 5
2 697 35 0 5R T L U P
153 0 1 0 1 151
Out
31 0 0 0 4 27 In
184 0 1 0 5 178
Total
Drivew
ay 1 Westm
ount Plac
R 14 0 0 0 4 10
T 0 0 0 0 0 0
L 17 0 0 0 0 17
U 0 0 0 0 0 0
P 11 11 0 0 0 0
690 953 1643
27 33 60
1 1 2
0 1 1
0 0 0
718 988 1706Out In Total
Westmount Road [S]
U L T R P
0 1 835 117 0
0 0 33 0 0
0 0 1 0 0
0 0 0 1 0
0 0 0 0 0
0 1 869 118 0
Eas
tbou
nd A
ppro
ach
[W]
Tota
l
14 0 0 0 0 14
In 11 0 0 0 0 11
Out 3 0 0 0 0 3
0 0 0 0 0 0 U
7 0 0 0 0 7 L
0 0 0 0 0 0 T
4 0 0 0 0 4 R
0 0 0 0 6 6 P
Turning Movement Peak Hour Data Plot (7:45 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:45 AM)
Start Time
Eastbound Approach Driveway 1 Westmount Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
11:45 AM 0 0 1 0 2 1 26 0 13 0 9 39 1 148 26 0 0 175 13 115 0 0 0 128 343
12:00 PM 0 0 3 0 7 3 15 0 9 0 7 24 1 127 12 0 0 140 12 120 0 0 1 132 299
12:15 PM 0 0 1 0 8 1 16 0 4 0 6 20 0 122 28 0 0 150 5 111 1 0 1 117 288
12:30 PM 1 0 0 0 4 1 22 0 10 0 7 32 1 132 17 0 0 150 4 131 0 0 0 135 318
Total 1 0 5 0 21 6 79 0 36 0 29 115 3 529 83 0 0 615 34 477 1 0 2 512 1248
Approach % 16.7 0.0 83.3 0.0 - - 68.7 0.0 31.3 0.0 - - 0.5 86.0 13.5 0.0 - - 6.6 93.2 0.2 0.0 - - -
Total % 0.1 0.0 0.4 0.0 - 0.5 6.3 0.0 2.9 0.0 - 9.2 0.2 42.4 6.7 0.0 - 49.3 2.7 38.2 0.1 0.0 - 41.0 -
PHF 0.250 0.000 0.417 0.000 - 0.500 0.760 0.000 0.692 0.000 - 0.737 0.750 0.894 0.741 0.000 - 0.879 0.654 0.910 0.250 0.000 - 0.948 0.910
Lights 1 0 5 0 - 6 77 0 33 0 - 110 3 513 80 0 - 596 33 464 1 0 - 498 1210
% Lights 100.0 - 100.0 - - 100.0 97.5 - 91.7 - - 95.7 100.0 97.0 96.4 - - 96.9 97.1 97.3 100.0 - - 97.3 97.0
Mediums 0 0 0 0 - 0 2 0 3 0 - 5 0 16 3 0 - 19 1 13 0 0 - 14 38
% Mediums 0.0 - 0.0 - - 0.0 2.5 - 8.3 - - 4.3 0.0 3.0 3.6 - - 3.1 2.9 2.7 0.0 - - 2.7 3.0
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Bicycles onRoad 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - - - - - - - 0.0 - -
Pedestrians - - - - 21 - - - - - 29 - - - - - 0 - - - - - 2 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - - - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:45 AMEnding At03/07/2019 12:45 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
547 498 1045
19 14 33
0 0 0
0 0 0
0 0 0
566 512 1078
1 464 33 0 0
0 13 1 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 2
1 477 34 0 2R T L U P
117 0 0 0 4 113
Out
115 0 0 0 5 110
In
232 0 0 0 9 223
Total
Drivew
ay 1 Westm
ount Plac
R 36 0 0 0 3 33
T 0 0 0 0 0 0
L 79 0 0 0 2 77
U 0 0 0 0 0 0
P 29 29 0 0 0 0
546 596 1142
15 19 34
0 0 0
0 0 0
0 0 0
561 615 1176Out In Total
Westmount Road [S]
U L T R P
0 3 513 80 0
0 0 16 3 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 3 529 83 0
Eas
tbou
nd A
ppro
ach
[W]
Tota
l
10 0 0 0 0 10
In 6 0 0 0 0 6
Out 4 0 0 0 0 4
0 0 0 0 0 0 U
1 0 0 0 0 1 L
0 0 0 0 0 0 T
5 0 0 0 0 5 R
0 0 0 0 21 21 P
Turning Movement Peak Hour Data Plot (11:45 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (4:30 PM)
Start Time
Eastbound Approach Driveway 1 Westmount Place Westmount Road Westmount Road
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
4:30 PM 3 0 3 0 2 6 26 0 17 0 3 43 0 145 18 0 0 163 10 237 2 0 2 249 461
4:45 PM 1 0 6 0 4 7 14 0 25 0 8 39 0 167 28 0 0 195 11 266 0 0 0 277 518
5:00 PM 3 0 2 0 4 5 27 0 19 0 11 46 3 169 15 0 1 187 9 255 1 0 0 265 503
5:15 PM 1 1 5 0 3 7 22 0 21 0 5 43 4 192 11 0 0 207 10 254 1 0 0 265 522
Total 8 1 16 0 13 25 89 0 82 0 27 171 7 673 72 0 1 752 40 1012 4 0 2 1056 2004
Approach % 32.0 4.0 64.0 0.0 - - 52.0 0.0 48.0 0.0 - - 0.9 89.5 9.6 0.0 - - 3.8 95.8 0.4 0.0 - - -
Total % 0.4 0.0 0.8 0.0 - 1.2 4.4 0.0 4.1 0.0 - 8.5 0.3 33.6 3.6 0.0 - 37.5 2.0 50.5 0.2 0.0 - 52.7 -
PHF 0.667 0.250 0.667 0.000 - 0.893 0.824 0.000 0.820 0.000 - 0.929 0.438 0.876 0.643 0.000 - 0.908 0.909 0.951 0.500 0.000 - 0.953 0.960
Lights 8 1 16 0 - 25 86 0 79 0 - 165 7 655 71 0 - 733 39 992 4 0 - 1035 1958
% Lights 100.0 100.0 100.0 - - 100.0 96.6 - 96.3 - - 96.5 100.0 97.3 98.6 - - 97.5 97.5 98.0 100.0 - - 98.0 97.7
Mediums 0 0 0 0 - 0 3 0 3 0 - 6 0 18 1 0 - 19 1 20 0 0 - 21 46
% Mediums 0.0 0.0 0.0 - - 0.0 3.4 - 3.7 - - 3.5 0.0 2.7 1.4 - - 2.5 2.5 2.0 0.0 - - 2.0 2.3
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Bicycles onRoad 0.0 0.0 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 13 - - - - - 27 - - - - - 1 - - - - - 2 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 4:30 PMEnding At03/07/2019 5:30 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Westmount Road [N]
Out In Total
742 1035 1777
21 21 42
0 0 0
0 0 0
0 0 0
763 1056 1819
4 992 39 0 0
0 20 1 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 2
4 1012 40 0 2R T L U P
113 0 0 0 2 111
Out
171 0 0 0 6 165
In
284 0 0 0 8 276
Total
Drivew
ay 1 Westm
ount Plac
R 82 0 0 0 3 79
T 0 0 0 0 0 0
L 89 0 0 0 3 86
U 0 0 0 0 0 0
P 27 27 0 0 0 0
1094 733 1827
23 19 42
0 0 0
0 0 0
0 0 0
1117 752 1869Out In Total
Westmount Road [S]
U L T R P
0 7 655 71 0
0 0 18 1 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 1
0 7 673 72 1
Eas
tbou
nd A
ppro
ach
[W]
Tota
l
36 0 0 0 0 36
In 25 0 0 0 0 25
Out 11 0 0 0 0 11
0 0 0 0 0 0 U
8 0 0 0 0 8 L
1 0 0 0 0 1 T
16 0 0 0 0 16 R
0 0 0 0 13 13 P
Turning Movement Peak Hour Data Plot (4:30 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 1 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 10
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 1
Turning Movement Data
Start Time
Driveway 4 Westmount Palce Driveway Dietz Avenue Dietz Avenue
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:00 AM 0 0 2 0 1 2 0 0 1 0 1 1 8 0 0 0 0 8 0 0 0 0 0 0 11
7:15 AM 0 1 2 0 1 3 0 0 0 0 1 0 17 2 0 0 0 19 0 0 0 0 0 0 22
7:30 AM 0 0 0 0 0 0 0 0 0 0 1 0 10 2 0 0 0 12 0 0 0 0 0 0 12
7:45 AM 0 0 1 0 2 1 0 0 1 0 2 1 31 1 1 0 0 33 0 0 1 0 2 1 36
Hourly Total 0 1 5 0 4 6 0 0 2 0 5 2 66 5 1 0 0 72 0 0 1 0 2 1 81
8:00 AM 0 0 2 0 0 2 1 0 0 0 0 1 19 0 0 0 0 19 0 0 0 0 1 0 22
8:15 AM 0 0 6 0 4 6 1 0 1 0 2 2 25 2 1 0 1 28 0 0 1 0 6 1 37
8:30 AM 1 0 4 0 2 5 2 0 0 0 0 2 23 2 1 0 1 26 0 1 0 0 3 1 34
8:45 AM 3 0 2 0 1 5 1 1 0 0 0 2 13 3 1 0 0 17 0 1 1 0 3 2 26
Hourly Total 4 0 14 0 7 18 5 1 1 0 2 7 80 7 3 0 2 90 0 2 2 0 13 4 119
9:00 AM 0 0 0 0 0 0 1 1 0 0 0 2 8 3 0 0 0 11 0 2 0 0 3 2 15
9:15 AM 0 3 2 0 1 5 1 0 1 0 1 2 3 2 0 0 0 5 0 2 0 0 4 2 14
9:30 AM 1 0 2 0 0 3 3 2 1 0 0 6 5 4 2 0 1 11 0 0 0 0 6 0 20
9:45 AM 1 2 1 0 0 4 0 1 0 0 1 1 3 2 3 0 0 8 0 1 1 0 2 2 15
Hourly Total 2 5 5 0 1 12 5 4 2 0 2 11 19 11 5 0 1 35 0 5 1 0 15 6 64
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
11:30 AM 0 1 6 0 0 7 6 0 0 0 0 6 2 1 1 0 0 4 0 0 2 0 0 2 19
11:45 AM 0 1 8 0 0 9 1 0 1 0 0 2 3 2 2 0 0 7 0 0 0 0 1 0 18
Hourly Total 0 2 14 0 0 16 7 0 1 0 0 8 5 3 3 0 0 11 0 0 2 0 1 2 37
12:00 PM 3 2 3 0 0 8 3 2 0 0 0 5 3 1 0 0 0 4 1 3 2 0 7 6 23
12:15 PM 2 2 4 0 1 8 1 1 0 0 0 2 2 1 1 0 0 4 0 0 1 1 5 2 16
12:30 PM 2 2 2 0 0 6 2 2 0 0 0 4 7 1 0 0 1 8 0 1 2 1 5 4 22
12:45 PM 0 0 6 0 0 6 1 0 1 0 1 2 3 0 1 0 0 4 1 2 1 0 2 4 16
Hourly Total 7 6 15 0 1 28 7 5 1 0 1 13 15 3 2 0 1 20 2 6 6 2 19 16 77
1:00 PM 0 0 1 0 1 1 1 1 1 0 0 3 2 0 0 0 2 2 0 0 4 0 1 4 10
1:15 PM 0 3 7 0 0 10 3 0 0 0 0 3 0 1 2 0 0 3 0 1 1 0 1 2 18
*** BREAK *** - - - - - - - - - - - - - - - - - - - - - - - - -
Hourly Total 0 3 8 0 1 11 4 1 1 0 0 6 2 1 2 0 2 5 0 1 5 0 2 6 28
3:00 PM 1 0 13 0 0 14 2 0 0 0 0 2 2 1 2 0 1 5 0 1 3 0 8 4 25
3:15 PM 2 0 13 0 0 15 0 0 1 0 1 1 4 1 0 0 0 5 1 0 2 0 2 3 24
3:30 PM 1 0 18 0 1 19 2 1 0 0 0 3 1 1 0 0 0 2 0 1 0 0 3 1 25
3:45 PM 1 0 26 0 0 27 2 2 0 0 1 4 2 2 1 0 0 5 0 1 0 0 4 1 37
Hourly Total 5 0 70 0 1 75 6 3 1 0 2 10 9 5 3 0 1 17 1 3 5 0 17 9 111
4:00 PM 1 0 33 0 0 34 0 0 1 0 3 1 3 0 0 0 2 3 0 2 1 0 1 3 41
4:15 PM 1 0 30 0 0 31 0 1 0 0 4 1 3 2 0 0 0 5 1 2 1 0 0 4 41
4:30 PM 1 0 24 0 0 25 4 0 0 0 4 4 4 3 2 0 1 9 0 0 1 0 3 1 39
4:45 PM 1 0 28 0 1 29 1 0 0 0 0 1 3 1 0 0 0 4 0 2 0 0 4 2 36
Hourly Total 4 0 115 0 1 119 5 1 1 0 11 7 13 6 2 0 3 21 1 6 3 0 8 10 157
5:00 PM 1 0 31 0 1 32 2 0 0 0 0 2 3 0 0 0 1 3 0 1 0 0 7 1 38
5:15 PM 1 0 16 0 3 17 0 1 0 0 0 1 3 0 0 0 0 3 0 1 1 0 3 2 23
5:30 PM 0 0 14 0 0 14 1 1 0 0 1 2 1 0 1 0 0 2 0 0 0 0 2 0 18
5:45 PM 1 1 6 0 1 8 1 0 0 0 0 1 1 2 0 0 0 3 0 0 0 0 2 0 12
Hourly Total 3 1 67 0 5 71 4 2 0 0 1 6 8 2 1 0 1 11 0 2 1 0 14 3 91
Grand Total 25 18 313 0 21 356 43 17 10 0 24 70 217 43 22 0 11 282 4 25 26 2 91 57 765
Approach % 7.0 5.1 87.9 0.0 - - 61.4 24.3 14.3 0.0 - - 77.0 15.2 7.8 0.0 - - 7.0 43.9 45.6 3.5 - - -
Total % 3.3 2.4 40.9 0.0 - 46.5 5.6 2.2 1.3 0.0 - 9.2 28.4 5.6 2.9 0.0 - 36.9 0.5 3.3 3.4 0.3 - 7.5 -
Lights 25 17 312 0 - 354 43 16 10 0 - 69 203 43 22 0 - 268 4 24 25 2 - 55 746
% Lights 100.0 94.4 99.7 - - 99.4 100.0 94.1 100.0 - - 98.6 93.5 100.0 100.0 - - 95.0 100.0 96.0 96.2 100.0 - 96.5 97.5
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 14 0 0 0 - 14 0 0 0 0 - 0 14
% Mediums 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 6.5 0.0 0.0 - - 5.0 0.0 0.0 0.0 0.0 - 0.0 1.8
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0
Bicycles on Road 0 1 1 0 - 2 0 1 0 0 - 1 0 0 0 0 - 0 0 1 1 0 - 2 5
% Bicycles onRoad 0.0 5.6 0.3 - - 0.6 0.0 5.9 0.0 - - 1.4 0.0 0.0 0.0 - - 0.0 0.0 4.0 3.8 0.0 - 3.5 0.7
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 21 - - - - - 24 - - - - - 11 - - - - - 91 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 3
03/07/2019 7:00 AMEnding At03/07/2019 6:00 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue [N]
Out In Total
80 55 135
0 0 0
0 0 0
0 2 2
0 0 0
80 57 137
25 24 4 2 0
0 0 0 0 0
0 0 0 0 0
1 1 0 0 0
0 0 0 0 91
26 25 4 2 91R T L U P
44 0 1 0 0 43
Out
70 0 1 0 0 69 In
114 0 2 0 0 112
Total
Drivew
ay [E]
R 10 0 0 0 0 10
T 17 0 1 0 0 16
L 43 0 0 0 0 43
U 0 0 0 0 0 0
P 24 24 0 0 0 0
379 268 647
0 14 14
0 0 0
2 0 2
0 0 0
381 282 663Out In Total
Dietz Avenue [S]
U L T R P
0 203 43 22 0
0 14 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 11
0 217 43 22 11
Driv
eway
4 W
estm
ount
Pal
c
Tota
l
598
14 0 4 0 616
In 354 0 0 2 0 356
Out
244
14 0 2 0 260
0 0 0 0 0 0 U
25 0 0 0 0 25 L
17 0 0 1 0 18 T
312 0 0 1 0 313 R
0 0 0 0 21 21 P
Turning Movement Data Plot
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 4
Turning Movement Peak Hour Data (7:45 AM)
Start Time
Driveway 4 Westmount Palce Driveway Dietz Avenue Dietz Avenue
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
7:45 AM 0 0 1 0 2 1 0 0 1 0 2 1 31 1 1 0 0 33 0 0 1 0 2 1 36
8:00 AM 0 0 2 0 0 2 1 0 0 0 0 1 19 0 0 0 0 19 0 0 0 0 1 0 22
8:15 AM 0 0 6 0 4 6 1 0 1 0 2 2 25 2 1 0 1 28 0 0 1 0 6 1 37
8:30 AM 1 0 4 0 2 5 2 0 0 0 0 2 23 2 1 0 1 26 0 1 0 0 3 1 34
Total 1 0 13 0 8 14 4 0 2 0 4 6 98 5 3 0 2 106 0 1 2 0 12 3 129
Approach % 7.1 0.0 92.9 0.0 - - 66.7 0.0 33.3 0.0 - - 92.5 4.7 2.8 0.0 - - 0.0 33.3 66.7 0.0 - - -
Total % 0.8 0.0 10.1 0.0 - 10.9 3.1 0.0 1.6 0.0 - 4.7 76.0 3.9 2.3 0.0 - 82.2 0.0 0.8 1.6 0.0 - 2.3 -
PHF 0.250 0.000 0.542 0.000 - 0.583 0.500 0.000 0.500 0.000 - 0.750 0.790 0.625 0.750 0.000 - 0.803 0.000 0.250 0.500 0.000 - 0.750 0.872
Lights 1 0 13 0 - 14 4 0 2 0 - 6 95 5 3 0 - 103 0 1 2 0 - 3 126
% Lights 100.0 - 100.0 - - 100.0 100.0 - 100.0 - - 100.0 96.9 100.0 100.0 - - 97.2 - 100.0 100.0 - - 100.0 97.7
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 3 0 0 0 - 3 0 0 0 0 - 0 3
% Mediums 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 3.1 0.0 0.0 - - 2.8 - 0.0 0.0 - - 0.0 2.3
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 - 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Bicycles onRoad 0.0 - 0.0 - - 0.0 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 - 0.0 0.0 - - 0.0 0.0
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 8 - - - - - 4 - - - - - 2 - - - - - 12 - -
% Pedestrians - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 5
Peak Hour Data
03/07/2019 7:45 AMEnding At03/07/2019 8:45 AM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue [N]
Out In Total
8 3 11
0 0 0
0 0 0
0 0 0
0 0 0
8 3 11
2 1 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 12
2 1 0 0 12R T L U P
3 0 0 0 0 3 Out
6 0 0 0 0 6 In
9 0 0 0 0 9
Total
Drivew
ay [E]
R 2 0 0 0 0 2
T 0 0 0 0 0 0
L 4 0 0 0 0 4
U 0 0 0 0 0 0
P 4 4 0 0 0 0
18 103 121
0 3 3
0 0 0
0 0 0
0 0 0
18 106 124Out In Total
Dietz Avenue [S]
U L T R P
0 95 5 3 0
0 3 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 2
0 98 5 3 2
Driv
eway
4 W
estm
ount
Pal
c
Tota
l
111 3 0 0 0 114
In 14 0 0 0 0 14
Out 97 3 0 0 0 100
0 0 0 0 0 0 U
1 0 0 0 0 1 L
0 0 0 0 0 0 T
13 0 0 0 0 13 R
0 0 0 0 8 8 P
Turning Movement Peak Hour Data Plot (7:45 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 6
Turning Movement Peak Hour Data (11:45 AM)
Start Time
Driveway 4 Westmount Palce Driveway Dietz Avenue Dietz Avenue
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
11:45 AM 0 1 8 0 0 9 1 0 1 0 0 2 3 2 2 0 0 7 0 0 0 0 1 0 18
12:00 PM 3 2 3 0 0 8 3 2 0 0 0 5 3 1 0 0 0 4 1 3 2 0 7 6 23
12:15 PM 2 2 4 0 1 8 1 1 0 0 0 2 2 1 1 0 0 4 0 0 1 1 5 2 16
12:30 PM 2 2 2 0 0 6 2 2 0 0 0 4 7 1 0 0 1 8 0 1 2 1 5 4 22
Total 7 7 17 0 1 31 7 5 1 0 0 13 15 5 3 0 1 23 1 4 5 2 18 12 79
Approach % 22.6 22.6 54.8 0.0 - - 53.8 38.5 7.7 0.0 - - 65.2 21.7 13.0 0.0 - - 8.3 33.3 41.7 16.7 - - -
Total % 8.9 8.9 21.5 0.0 - 39.2 8.9 6.3 1.3 0.0 - 16.5 19.0 6.3 3.8 0.0 - 29.1 1.3 5.1 6.3 2.5 - 15.2 -
PHF 0.583 0.875 0.531 0.000 - 0.861 0.583 0.625 0.250 0.000 - 0.650 0.536 0.625 0.375 0.000 - 0.719 0.250 0.333 0.625 0.500 - 0.500 0.859
Lights 7 7 17 0 - 31 7 5 1 0 - 13 15 5 3 0 - 23 1 3 4 2 - 10 77
% Lights 100.0 100.0 100.0 - - 100.0 100.0 100.0 100.0 - - 100.0 100.0 100.0 100.0 - - 100.0 100.0 75.0 80.0 100.0 - 83.3 97.5
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% Mediums 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 0.0 - 0.0 0.0
Bicycles on Road 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 1 1 0 - 2 2
% Bicycles onRoad 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 25.0 20.0 0.0 - 16.7 2.5
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - 0.0 - - - - - - - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 1 - - - - - 0 - - - - - 1 - - - - - 18 - -
% Pedestrians - - - - 100.0 - - - - - - - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 7
Peak Hour Data
03/07/2019 11:45 AMEnding At03/07/2019 12:45 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue [N]
Out In Total
15 10 25
0 0 0
0 0 0
0 2 2
0 0 0
15 12 27
4 3 1 2 0
0 0 0 0 0
0 0 0 0 0
1 1 0 0 0
0 0 0 0 18
5 4 1 2 18R T L U P
11 0 0 0 0 11
Out
13 0 0 0 0 13 In
24 0 0 0 0 24
Total
Drivew
ay [E]
R 1 0 0 0 0 1
T 5 0 0 0 0 5
L 7 0 0 0 0 7
U 0 0 0 0 0 0
P 0 0 0 0 0 0
27 23 50
0 0 0
0 0 0
1 0 1
0 0 0
28 23 51Out In Total
Dietz Avenue [S]
U L T R P
0 15 5 3 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 1
0 15 5 3 1
Driv
eway
4 W
estm
ount
Pal
c
Tota
l
55 0 0 1 0 56
In 31 0 0 0 0 31
Out 24 0 0 1 0 25
0 0 0 0 0 0 U
7 0 0 0 0 7 L
7 0 0 0 0 7 T
17 0 0 0 0 17 R
0 0 0 0 1 1 P
Turning Movement Peak Hour Data Plot (11:45 AM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 8
Turning Movement Peak Hour Data (3:45 PM)
Start Time
Driveway 4 Westmount Palce Driveway Dietz Avenue Dietz Avenue
Eastbound Westbound Northbound Southbound
Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Left Thru Right U-Turn Peds App.Total Left Thru Right U-Turn Peds App.
Total Int. Total
3:45 PM 1 0 26 0 0 27 2 2 0 0 1 4 2 2 1 0 0 5 0 1 0 0 4 1 37
4:00 PM 1 0 33 0 0 34 0 0 1 0 3 1 3 0 0 0 2 3 0 2 1 0 1 3 41
4:15 PM 1 0 30 0 0 31 0 1 0 0 4 1 3 2 0 0 0 5 1 2 1 0 0 4 41
4:30 PM 1 0 24 0 0 25 4 0 0 0 4 4 4 3 2 0 1 9 0 0 1 0 3 1 39
Total 4 0 113 0 0 117 6 3 1 0 12 10 12 7 3 0 3 22 1 5 3 0 8 9 158
Approach % 3.4 0.0 96.6 0.0 - - 60.0 30.0 10.0 0.0 - - 54.5 31.8 13.6 0.0 - - 11.1 55.6 33.3 0.0 - - -
Total % 2.5 0.0 71.5 0.0 - 74.1 3.8 1.9 0.6 0.0 - 6.3 7.6 4.4 1.9 0.0 - 13.9 0.6 3.2 1.9 0.0 - 5.7 -
PHF 1.000 0.000 0.856 0.000 - 0.860 0.375 0.375 0.250 0.000 - 0.625 0.750 0.583 0.375 0.000 - 0.611 0.250 0.625 0.750 0.000 - 0.563 0.963
Lights 4 0 112 0 - 116 6 3 1 0 - 10 10 7 3 0 - 20 1 5 3 0 - 9 155
% Lights 100.0 - 99.1 - - 99.1 100.0 100.0 100.0 - - 100.0 83.3 100.0 100.0 - - 90.9 100.0 100.0 100.0 - - 100.0 98.1
Mediums 0 0 0 0 - 0 0 0 0 0 - 0 2 0 0 0 - 2 0 0 0 0 - 0 2
% Mediums 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 16.7 0.0 0.0 - - 9.1 0.0 0.0 0.0 - - 0.0 1.3
Articulated Trucks 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 0
% ArticulatedTrucks 0.0 - 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0
Bicycles on Road 0 0 1 0 - 1 0 0 0 0 - 0 0 0 0 0 - 0 0 0 0 0 - 0 1
% Bicycles onRoad 0.0 - 0.9 - - 0.9 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.0 0.0 0.0 - - 0.0 0.6
Bicycles onCrosswalk - - - - 0 - - - - - 0 - - - - - 0 - - - - - 0 - -
% Bicycles onCrosswalk - - - - - - - - - - 0.0 - - - - - 0.0 - - - - - 0.0 - -
Pedestrians - - - - 0 - - - - - 12 - - - - - 3 - - - - - 8 - -
% Pedestrians - - - - - - - - - - 100.0 - - - - - 100.0 - - - - - 100.0 - -
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 9
Peak Hour Data
03/07/2019 3:45 PMEnding At03/07/2019 4:45 PM
LightsMediumsArticulated TrucksBicycles on RoadOther
Dietz Avenue [N]
Out In Total
12 9 21
0 0 0
0 0 0
0 0 0
0 0 0
12 9 21
3 5 1 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 8
3 5 1 0 8R T L U P
4 0 0 0 0 4 Out
10 0 0 0 0 10 In
14 0 0 0 0 14
Total
Drivew
ay [E]
R 1 0 0 0 0 1
T 3 0 0 0 0 3
L 6 0 0 0 0 6
U 0 0 0 0 0 0
P 12 12 0 0 0 0
123 20 143
0 2 2
0 0 0
1 0 1
0 0 0
124 22 146Out In Total
Dietz Avenue [S]
U L T R P
0 10 7 3 0
0 2 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 3
0 12 7 3 3
Driv
eway
4 W
estm
ount
Pal
c
Tota
l
132 2 0 1 0 135
In 116 0 0 1 0 117
Out 16 2 0 0 0 18
0 0 0 0 0 0 U
4 0 0 0 0 4 L
0 0 0 0 0 0 T
112 0 0 1 0 113 R
0 0 0 0 0 0 P
Turning Movement Peak Hour Data Plot (3:45 PM)
Paradigm Transportation Solutions Limited5A-150 Pinebush Rd
Cambridge, Ontario, Canada N1R 8J8519-896-3163 [email protected]
Count Name: Driveway 4 Westmount PlaceSite Code:Start Date: 03/07/2019Page No: 10
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix B Existing Traffic Operational Conditions
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
2915
1737
515
47
795
8320
667
15
Futur
e Volu
me (v
ph)
2915
1737
515
47
795
8320
667
15
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)7.5
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.99
0.98
0.98
0.99
1.00
1.00
1.00
Frt
0.962
0.850
0.986
0.999
Flt P
rotec
ted0.9
770.9
580.9
500.9
50Sa
td. F
low (p
rot)
013
810
015
6314
4214
6331
470
1635
3199
0Flt
Per
mitte
d0.8
360.7
290.3
950.2
67Sa
td. F
low (p
erm)
011
800
011
7114
1960
231
470
459
3199
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)17
154
111
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)4
1818
420
77
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%7%
6%0%
0%2%
14%
4%6%
2%4%
20%
Adj. F
low (v
ph)
2915
1737
515
47
795
8320
667
15
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
061
00
4215
47
878
020
667
60
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)12
.212
.212
.272
.472
.489
.889
.8Ac
tuated
g/C
Ratio
0.11
0.11
0.11
0.66
0.66
0.82
0.82
v/c R
atio
0.42
0.32
0.52
0.02
0.42
0.40
0.26
Contr
ol De
lay42
.750
.913
.78.9
10.3
4.72.8
Queu
e Dela
y0.0
0.00.0
0.00.0
0.00.0
Total
Dela
y42
.750
.913
.78.9
10.3
4.72.8
LOS
DD
BA
BA
AAp
proa
ch D
elay
42.7
21.6
10.3
3.2
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
CB
AQu
eue L
ength
50th
(m)
9.49.0
0.00.5
43.1
7.013
.3Qu
eue L
ength
95th
(m)
22.3
19.7
18.7
2.772
.215
.524
.1Int
erna
l Link
Dist
(m)
37.2
76.8
39.6
66.2
Turn
Bay
Leng
th (m
)12
.040
.0Ba
se C
apac
ity (v
ph)
416
519
715
396
2074
517
2610
Star
vatio
n Cap
Red
uctn
00
00
00
0Sp
illbac
k Cap
Red
uctn
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
0Re
duce
d v/c
Ratio
0.15
0.08
0.22
0.02
0.42
0.40
0.26
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.52
Inter
secti
on S
ignal
Delay
: 9.3
Inter
secti
on LO
S: A
Inter
secti
on C
apac
ity U
tiliza
tion 9
0.9%
ICU
Leve
l of S
ervic
e EAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
275
3221
195
47
Futur
e Volu
me (v
ph)
275
3221
195
47
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.986
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1557
016
6818
4216
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1557
016
6818
4216
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
1313
7Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
3%6%
0%2%
0%0%
Adj. F
low (v
ph)
275
3221
195
47
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
307
021
195
47
Sign
Con
trol
Free
Free
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
9.0%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
275
3221
195
47
Futur
e Volu
me (V
eh/h)
275
3221
195
47
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
275
3221
195
47
Pede
strian
s7
13La
ne W
idth (
m)3.5
3.5W
alking
Spe
ed (m
/s)1.2
1.2Pe
rcent
Bloc
kage
11
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
80.9
80.9
8vC
, con
flictin
g volu
me32
054
830
4vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l30
153
328
5tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %98
9999
cM ca
pacit
y (ve
h/h)
1238
487
739
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
307
2119
54
7Vo
lume L
eft0
210
40
Volum
e Righ
t32
00
07
cSH
1700
1238
1700
487
739
Volum
e to C
apac
ity0.1
80.0
20.1
10.0
10.0
1Qu
eue L
ength
95th
(m)
0.00.4
0.00.2
0.2Co
ntrol
Delay
(s)
0.08.0
0.012
.59.9
Lane
LOS
AB
AAp
proa
ch D
elay (
s)0.0
0.810
.8Ap
proa
ch LO
SB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.5
Inter
secti
on C
apac
ity U
tiliza
tion
29.0%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
217
873
1117
715
Futur
e Volu
me (v
ph)
217
873
1117
715
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)7.5
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.998
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1668
1388
3195
016
6834
33Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1668
1388
3195
016
6834
33Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
77
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
6%4%
18%
0%4%
Adj. F
low (v
ph)
217
873
1117
715
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
217
884
017
715
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
6.2%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
217
873
1117
715
Futur
e Volu
me (V
eh/h)
217
873
1117
715
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
217
873
1117
715
Pede
strian
s7
Lane
Widt
h (m)
3.5W
alking
Spe
ed (m
/s)1.2
Perce
nt Bl
ocka
ge1
Righ
t turn
flare
(veh
)Me
dian t
ype
TWLT
LNo
neMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
332
64pX
, plat
oon u
nbloc
ked
0.86
0.84
0.84
vC, c
onflic
ting v
olume
1277
449
891
vC1,
stage
1 co
nf vo
l88
6vC
2, sta
ge 2
conf
vol
392
vCu,
unblo
cked
vol
764
047
7tC
, sing
le (s)
6.87.0
4.1tC
, 2 st
age (
s)5.8
tF (s
)3.5
3.42.2
p0 qu
eue f
ree %
100
9898
cM ca
pacit
y (ve
h/h)
458
890
911
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
217
582
302
1735
835
8Vo
lume L
eft2
00
017
00
Volum
e Righ
t0
170
110
00
cSH
458
890
1700
1700
911
1700
1700
Volum
e to C
apac
ity0.0
00.0
20.3
40.1
80.0
20.2
10.2
1Qu
eue L
ength
95th
(m)
0.10.5
0.00.0
0.50.0
0.0Co
ntrol
Delay
(s)
12.9
9.10.0
0.09.0
0.00.0
Lane
LOS
BA
AAp
proa
ch D
elay (
s)9.5
0.00.2
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.2
Inter
secti
on C
apac
ity U
tiliza
tion
36.2%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
70
417
014
186
911
836
697
2Fu
ture V
olume
(vph
)7
04
170
141
869
118
3669
72
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
510.8
500.9
82Flt
Pro
tected
0.969
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1731
016
6812
380
1785
3160
016
1934
330
Flt P
ermi
tted
0.969
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1731
016
6812
380
1785
3160
016
1934
330
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
55
611
116
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
0%0%
29%
0%4%
1%3%
4%0%
Adj. F
low (v
ph)
70
417
014
186
911
836
697
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
110
1714
01
987
036
699
0Si
gn C
ontro
lSt
opSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
5.5%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
70
417
014
186
911
836
697
2Fu
ture V
olume
(Veh
/h)7
04
170
141
869
118
3669
72
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)7
04
170
141
869
118
3669
72
Pede
strian
s6
115
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
10
Righ
t turn
flare
(veh
)Me
dian t
ype
None
TWLT
LMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
198
198
pX, p
latoo
n unb
locke
d0.8
00.8
00.9
80.8
00.8
00.7
90.9
80.7
9vC
, con
flictin
g volu
me12
3217
7635
613
6617
1851
070
599
8vC
1, sta
ge 1
conf
vol
776
776
941
941
vC2,
stage
2 co
nf vo
l45
610
0042
477
7vC
u, un
block
ed vo
l69
213
7030
485
912
980
661
478
tC, s
ingle
(s)7.5
6.56.9
7.56.5
7.54.1
4.2tC
, 2 st
age (
s)6.5
5.56.5
5.5tF
(s)
3.54.0
3.33.5
4.03.6
2.22.2
p0 qu
eue f
ree %
9810
099
9610
098
100
96cM
capa
city (
veh/h
)34
629
868
139
732
078
691
584
5
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
1117
141
579
408
3646
523
4Vo
lume L
eft7
170
10
036
00
Volum
e Righ
t4
014
00
118
00
2cS
H42
139
778
691
517
0017
0084
517
0017
00Vo
lume t
o Cap
acity
0.03
0.04
0.02
0.00
0.34
0.24
0.04
0.27
0.14
Queu
e Len
gth 95
th (m
)0.6
1.10.4
0.00.0
0.01.1
0.00.0
Contr
ol De
lay (s
)13
.814
.59.7
8.90.0
0.09.5
0.00.0
Lane
LOS
BB
AA
AAp
proa
ch D
elay (
s)13
.812
.30.0
0.5Ap
proa
ch LO
SB
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.5
Inter
secti
on C
apac
ity U
tiliza
tion
45.5%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
153
814
261
6223
593
122
746
6011
148
953
Futur
e Volu
me (v
ph)
153
814
261
6223
593
122
746
6011
148
953
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.055
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
80.9
91.0
00.9
60.9
91.0
00.9
90.9
5Fr
t0.9
640.8
500.9
890.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
5831
370
1635
3368
1428
1619
3228
016
1934
6611
96Flt
Per
mitte
d0.5
240.1
230.3
580.1
54Sa
td. F
low (p
erm)
842
3137
021
133
6813
6660
132
280
261
3466
1142
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
4814
98
149
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.327
5.315
8.319
7.7Tr
avel
Time (
s)12
.116
.59.5
11.9
Confl
. Ped
s. (#
/hr)
3217
1732
3331
3133
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)7%
2%1%
2%6%
3%3%
2%0%
3%3%
23%
Adj. F
low (v
ph)
153
814
261
6223
593
122
746
6011
148
953
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
153
1075
062
235
9312
280
60
111
489
53Tu
rn T
ype
pm+p
tNA
pm+p
tNA
Perm
pm+p
tNA
pm+p
tNA
Perm
Prote
cted P
hase
s7
43
85
21
6Pe
rmitte
d Pha
ses
48
82
66
Detec
tor P
hase
74
38
85
21
66
Switc
h Pha
seMi
nimum
Initia
l (s)
5.033
.05.0
33.0
33.0
5.032
.05.0
32.0
32.0
Minim
um S
plit (
s)9.0
39.0
9.039
.039
.09.0
38.0
9.038
.038
.0To
tal S
plit (
s)22
.039
.011
.039
.039
.011
.038
.011
.038
.038
.0To
tal S
plit (
%)
20.0%
35.5%
10.0%
35.5%
35.5%
10.0%
34.5%
10.0%
34.5%
34.5%
Yello
w Tim
e (s)
3.04.0
3.04.0
4.03.0
4.03.0
4.04.0
All-R
ed T
ime (
s)1.0
2.01.0
2.02.0
1.02.0
1.02.0
2.0Lo
st Tim
e Adju
st (s)
0.0-2
.00.0
-2.0
-2.0
0.0-2
.00.0
-2.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
4.04.0
4.0Le
ad/La
gLe
adLa
gLe
adLa
gLa
gLe
adLa
gLe
adLa
gLa
gLe
ad-L
ag O
ptimi
ze?
Reca
ll Mod
eNo
neNo
neNo
neNo
neNo
neNo
neMa
xNo
neMa
xMa
xAc
t Effc
t Gre
en (s
)50
.842
.341
.735
.035
.041
.034
.041
.034
.034
.0Ac
tuated
g/C
Ratio
0.49
0.41
0.40
0.34
0.34
0.39
0.33
0.39
0.33
0.33
v/c R
atio
0.31
0.82
0.35
0.21
0.17
0.40
0.76
0.57
0.43
0.11
Contr
ol De
lay16
.733
.220
.725
.81.5
23.5
37.0
31.9
29.3
0.5Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.00.0
0.00.0
Total
Dela
y16
.733
.220
.725
.81.5
23.5
37.0
31.9
29.3
0.5LO
SB
CC
CA
CD
CC
AAp
proa
ch D
elay
31.2
19.2
35.2
27.4
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SC
BD
CQu
eue L
ength
50th
(m)
17.7
105.4
6.718
.50.0
15.5
79.1
14.0
42.4
0.0Qu
eue L
ength
95th
(m)
30.1
134.4
13.9
30.1
2.630
.011
0.3#2
8.861
.70.0
Inter
nal L
ink D
ist (m
)17
8.325
1.313
4.317
3.7Tu
rn B
ay Le
ngth
(m)
130.0
60.0
30.0
20.0
55.0
50.0
Base
Cap
acity
(vph
)53
614
2218
111
3455
830
510
6119
411
3347
3St
arva
tion C
ap R
educ
tn0
00
00
00
00
0Sp
illbac
k Cap
Red
uctn
00
00
00
00
00
Stor
age C
ap R
educ
tn0
00
00
00
00
0Re
duce
d v/c
Ratio
0.29
0.76
0.34
0.21
0.17
0.40
0.76
0.57
0.43
0.11
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
4Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.82
Inter
secti
on S
ignal
Delay
: 30.1
Inter
secti
on LO
S: C
Inter
secti
on C
apac
ity U
tiliza
tion 8
4.8%
ICU
Leve
l of S
ervic
e EAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
3494
617
435
951
33
159
113
Futur
e Volu
me (v
ph)
3494
617
435
951
33
159
113
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.997
0.982
0.904
0.924
Flt P
rotec
ted0.9
980.9
930.9
81Sa
td. F
low (p
rot)
030
270
028
970
013
760
013
890
Flt P
ermi
tted
0.998
0.993
0.981
Satd.
Flow
(per
m)0
3027
00
2897
00
1376
00
1389
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
275.3
150.2
112.8
132.3
Trav
el Tim
e (s)
16.5
9.06.8
7.9Co
nfl. P
eds.
(#/hr
)13
11
137
55
7Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%2%
0%0%
5%6%
0%0%
0%0%
0%0%
Adj. F
low (v
ph)
3494
617
435
951
33
159
113
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
099
70
041
40
021
00
230
Sign
Con
trol
Free
Free
Stop
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 6
1.4%
ICU
Leve
l of S
ervic
e BAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
3494
617
435
951
33
159
113
Futur
e Volu
me (V
eh/h)
3494
617
435
951
33
159
113
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)34
946
174
359
513
315
91
13Pe
destr
ians
75
113
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge1
00
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)27
5pX
, plat
oon u
nbloc
ked
0.76
0.76
0.76
0.76
0.76
0.76
vC, c
onflic
ting v
olume
423
964
1232
1454
488
968
1438
225
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
423
323
674
968
032
894
522
5tC
, sing
le (s)
4.14.1
7.56.5
6.97.5
6.56.9
tC, 2
stag
e (s)
tF (s
)2.2
2.23.5
4.03.3
3.54.0
3.3p0
queu
e fre
e %97
100
9998
9898
9998
cM ca
pacit
y (ve
h/h)
1135
949
246
186
826
426
192
772
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
507
490
184
230
2123
Volum
e Left
340
40
39
Volum
e Righ
t0
170
5115
13cS
H11
3517
0094
917
0045
253
2Vo
lume t
o Cap
acity
0.03
0.29
0.00
0.14
0.05
0.04
Queu
e Len
gth 95
th (m
)0.7
0.00.1
0.01.2
1.1Co
ntrol
Delay
(s)
0.90.0
0.20.0
13.4
12.1
Lane
LOS
AA
BB
Appr
oach
Dela
y (s)
0.40.1
13.4
12.1
Appr
oach
LOS
BB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.7
Inter
secti
on C
apac
ity U
tiliza
tion
61.4%
ICU
Leve
l of S
ervic
e B
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
113
985
12
Futur
e Volu
me (v
ph)
113
985
12
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.875
0.910
Flt P
rotec
ted0.9
960.9
55Sa
td. F
low (p
rot)
1521
00
1515
1485
0Flt
Per
mitte
d0.9
960.9
55Sa
td. F
low (p
erm)
1521
00
1515
1485
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
122
88
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%3%
0%0%
0%Ad
j. Flow
(vph
)1
1398
51
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)14
00
103
30
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
3.9%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
113
985
12
Futur
e Volu
me (V
eh/h)
113
985
12
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
113
985
12
Pede
strian
s8
212
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge1
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
pX, p
latoo
n unb
locke
dvC
, con
flictin
g volu
me22
312
11vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l22
312
11tC
, sing
le (s)
6.46.2
4.1tC
, 2 st
age (
s)tF
(s)
3.53.3
2.2p0
queu
e fre
e %10
099
94cM
capa
city (
veh/h
)71
110
6615
91
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
1410
33
Volum
e Left
198
0Vo
lume R
ight
130
2cS
H10
2915
9117
00Vo
lume t
o Cap
acity
0.01
0.06
0.00
Queu
e Len
gth 95
th (m
)0.3
1.60.0
Contr
ol De
lay (s
)8.5
7.10.0
Lane
LOS
AA
Appr
oach
Dela
y (s)
8.57.1
0.0Ap
proa
ch LO
SA
Inter
secti
on S
umma
ryAv
erag
e Dela
y 7.1
Inter
secti
on C
apac
ity U
tiliza
tion
23.9%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
144
1965
1324
616
753
7215
010
1325
Futur
e Volu
me (v
ph)
144
1965
1324
616
753
7215
010
1325
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)7.5
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.96
0.95
0.98
0.99
0.99
0.98
1.00
Frt
0.931
0.850
0.987
0.996
Flt P
rotec
ted0.9
810.9
600.9
500.9
50Sa
td. F
low (p
rot)
013
460
015
6614
7116
6831
690
1651
3254
0Flt
Per
mitte
d0.8
820.7
950.2
760.2
92Sa
td. F
low (p
erm)
012
080
012
3414
4648
131
690
500
3254
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)19
246
103
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)5
6262
520
4747
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%0%
0%0%
0%0%
0%3%
4%1%
2%0%
Adj. F
low (v
ph)
144
1965
1324
616
753
7215
010
1325
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
037
00
7824
616
825
015
010
380
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)14
.714
.714
.775
.075
.087
.387
.3Ac
tuated
g/C
Ratio
0.13
0.13
0.13
0.68
0.68
0.79
0.79
v/c R
atio
0.21
0.48
0.61
0.05
0.38
0.31
0.40
Contr
ol De
lay26
.852
.712
.08.2
8.84.7
4.3Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
26.8
52.7
12.0
8.28.8
4.74.3
LOS
CD
BA
AA
AAp
proa
ch D
elay
26.8
21.8
8.84.3
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SC
CA
AQu
eue L
ength
50th
(m)
3.616
.60.0
1.036
.16.0
29.1
Queu
e Len
gth 95
th (m
)13
.030
.622
.64.7
63.4
13.8
49.6
Inter
nal L
ink D
ist (m
)37
.276
.839
.666
.2Tu
rn B
ay Le
ngth
(m)
12.0
40.0
Base
Cap
acity
(vph
)42
754
777
832
821
6449
925
84St
arva
tion C
ap R
educ
tn0
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
Stor
age C
ap R
educ
tn0
00
00
00
Redu
ced v
/c Ra
tio0.0
90.1
40.3
20.0
50.3
80.3
00.4
0
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.61
Inter
secti
on S
ignal
Delay
: 8.6
Inter
secti
on LO
S: A
Inter
secti
on C
apac
ity U
tiliza
tion 9
8.1%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
243
139
312
1513
Futur
e Volu
me (v
ph)
243
139
312
1513
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.993
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1584
016
6818
7916
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1584
016
6818
7916
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
88
13
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)2%
8%0%
0%0%
0%Ad
j. Flow
(vph
)24
313
931
215
13Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)25
60
931
215
13Si
gn C
ontro
lFr
eeFr
eeSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
7.4%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
243
139
312
1513
Futur
e Volu
me (V
eh/h)
243
139
312
1513
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
243
139
312
1513
Pede
strian
s1
38
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
90.9
90.9
9vC
, con
flictin
g volu
me26
458
826
0vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l25
658
225
2tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %99
9798
cM ca
pacit
y (ve
h/h)
1304
468
779
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
256
931
215
13Vo
lume L
eft0
90
150
Volum
e Righ
t13
00
013
cSH
1700
1304
1700
468
779
Volum
e to C
apac
ity0.1
50.0
10.1
80.0
30.0
2Qu
eue L
ength
95th
(m)
0.00.2
0.00.8
0.4Co
ntrol
Delay
(s)
0.07.8
0.012
.99.7
Lane
LOS
AB
AAp
proa
ch D
elay (
s)0.0
0.211
.4Ap
proa
ch LO
SB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.6
Inter
secti
on C
apac
ity U
tiliza
tion
27.4%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
2313
973
042
7910
33Fu
ture V
olume
(vph
)23
139
730
4279
1033
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)7.5
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.992
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1603
1471
3217
016
6835
00Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1603
1471
3217
016
6835
00Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
11
2525
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)4%
0%3%
0%0%
2%Ad
j. Flow
(vph
)23
139
730
4279
1033
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
2313
977
20
7910
33Si
gn C
ontro
lSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
1.5%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
2313
973
042
7910
33Fu
ture V
olume
(Veh
/h)23
139
730
4279
1033
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
2313
973
042
7910
33Pe
destr
ians
251
1La
ne W
idth (
m)3.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.2Pe
rcent
Bloc
kage
20
0Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eTW
LTL
None
Media
n stor
age v
eh)
2Up
strea
m sig
nal (m
)33
264
pX, p
latoo
n unb
locke
d0.9
40.9
00.9
0vC
, con
flictin
g volu
me14
5241
279
7vC
1, sta
ge 1
conf
vol
776
vC2,
stage
2 co
nf vo
l67
6vC
u, un
block
ed vo
l92
912
054
9tC
, sing
le (s)
6.96.9
4.1tC
, 2 st
age (
s)5.9
tF (s
)3.5
3.32.2
p0 qu
eue f
ree %
9483
91cM
capa
city (
veh/h
)39
480
590
8
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
2313
948
728
579
516
516
Volum
e Left
230
00
790
0Vo
lume R
ight
013
90
420
00
cSH
394
805
1700
1700
908
1700
1700
Volum
e to C
apac
ity0.0
60.1
70.2
90.1
70.0
90.3
00.3
0Qu
eue L
ength
95th
(m)
1.55.0
0.00.0
2.30.0
0.0Co
ntrol
Delay
(s)
14.7
10.4
0.00.0
9.30.0
0.0La
ne LO
SB
BA
Appr
oach
Dela
y (s)
11.0
0.00.7
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 1.2
Inter
secti
on C
apac
ity U
tiliza
tion
41.5%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
81
1689
082
767
372
4010
124
Futur
e Volu
me (v
ph)
81
1689
082
767
372
4010
124
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
140.8
500.9
860.9
99Flt
Pro
tected
0.984
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1690
016
1915
360
1785
3199
016
1934
970
Flt P
ermi
tted
0.984
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1690
016
1915
360
1785
3199
016
1934
970
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
21
12
1327
2713
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
3%0%
4%0%
3%1%
3%2%
0%Ad
j. Flow
(vph
)8
116
890
827
673
7240
1012
4Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
250
8982
07
745
040
1016
0Si
gn C
ontro
lSt
opSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 5
3.5%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
81
1689
082
767
372
4010
124
Futur
e Volu
me (V
eh/h)
81
1689
082
767
372
4010
124
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)8
116
890
827
673
7240
1012
4Pe
destr
ians
1327
12
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge1
20
0Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neTW
LTL
Media
n stor
age v
eh)
2Up
strea
m sig
nal (m
)19
819
8pX
, plat
oon u
nbloc
ked
0.90
0.90
0.93
0.90
0.90
0.86
0.93
0.86
vC, c
onflic
ting v
olume
1542
1893
522
1354
1859
402
1029
772
vC1,
stage
1 co
nf vo
l11
0711
0775
075
0vC
2, sta
ge 2
conf
vol
434
786
604
1109
vCu,
unblo
cked
vol
1012
1403
327
803
1365
087
441
7tC
, sing
le (s)
7.56.5
6.97.6
6.57.0
4.14.2
tC, 2
stag
e (s)
6.55.5
6.65.5
tF (s
)3.5
4.03.3
3.54.0
3.32.2
2.2p0
queu
e fre
e %97
100
9778
100
9199
96cM
capa
city (
veh/h
)23
826
261
939
626
490
871
695
4
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
2589
827
449
296
4067
534
1Vo
lume L
eft8
890
70
040
00
Volum
e Righ
t16
082
00
720
04
cSH
395
396
908
716
1700
1700
954
1700
1700
Volum
e to C
apac
ity0.0
60.2
20.0
90.0
10.2
60.1
70.0
40.4
00.2
0Qu
eue L
ength
95th
(m)
1.66.8
2.40.2
0.00.0
1.00.0
0.0Co
ntrol
Delay
(s)
14.7
16.7
9.410
.10.0
0.08.9
0.00.0
Lane
LOS
BC
AB
AAp
proa
ch D
elay (
s)14
.713
.20.1
0.3Ap
proa
ch LO
SB
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 1.5
Inter
secti
on C
apac
ity U
tiliza
tion
53.5%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
9441
013
114
367
169
273
582
4613
183
614
1Fu
ture V
olume
(vph
)94
410
131
143
671
6927
358
246
131
836
141
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.050
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
90.9
90.9
90.9
50.9
91.0
00.9
90.9
3Fr
t0.9
640.8
500.9
890.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
3031
410
1668
3535
1428
1668
3227
016
3535
3513
62Flt
Per
mitte
d0.2
280.3
440.1
210.3
00Sa
td. F
low (p
erm)
363
3141
059
835
3513
5921
032
270
510
3535
1273
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
4414
98
149
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.327
5.315
8.319
7.7Tr
avel
Time (
s)12
.116
.59.5
11.9
Confl
. Ped
s. (#
/hr)
3521
2135
5336
3653
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)9%
2%0%
0%1%
3%0%
2%0%
2%1%
8%Ad
j. Flow
(vph
)94
410
131
143
671
6927
358
246
131
836
141
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
9454
10
143
671
6927
362
80
131
836
141
Turn
Typ
epm
+pt
NApm
+pt
NAPe
rmpm
+pt
NApm
+pt
NAPe
rmPr
otecte
d Pha
ses
74
38
52
16
Perm
itted P
hase
s4
88
26
6De
tector
Pha
se7
43
88
52
16
6Sw
itch P
hase
Minim
um In
itial (s
)5.0
31.0
5.031
.031
.05.0
32.0
5.032
.032
.0Mi
nimum
Spli
t (s)
9.037
.09.0
37.0
37.0
9.038
.09.0
38.0
38.0
Total
Spli
t (s)
18.0
37.0
11.0
37.0
37.0
17.0
38.0
17.0
38.0
38.0
Total
Spli
t (%
)16
.4%33
.6%10
.0%33
.6%33
.6%15
.5%34
.5%15
.5%34
.5%34
.5%Ye
llow
Time (
s)3.0
4.03.0
4.04.0
3.04.0
3.04.0
4.0Al
l-Red
Tim
e (s)
1.02.0
1.02.0
2.01.0
2.01.0
2.02.0
Lost
Time A
djust
(s)0.0
-2.0
0.0-2
.0-2
.00.0
-2.0
0.0-2
.0-2
.0To
tal Lo
st Tim
e (s)
4.04.0
4.04.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lead
Lag
Lead
Lag
Lag
Lead
Lag
Lead
Lag
Lag
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
None
Max
None
Max
Max
Act E
ffct G
reen
(s)
44.9
35.7
40.9
35.3
35.3
49.5
36.9
44.1
34.0
34.0
Actua
ted g/
C Ra
tio0.4
20.3
40.3
90.3
30.3
30.4
70.3
50.4
20.3
20.3
2v/c
Rati
o0.3
60.5
00.4
80.5
70.1
20.9
90.5
60.4
10.7
40.2
8Co
ntrol
Delay
21.6
27.1
24.8
32.4
0.578
.630
.520
.236
.85.5
Queu
e Dela
y0.0
0.00.0
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
21.6
27.1
24.8
32.4
0.578
.630
.520
.236
.85.5
LOS
CC
CC
AE
CC
DA
Appr
oach
Dela
y26
.328
.745
.130
.9
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SC
CD
CQu
eue L
ength
50th
(m)
11.8
44.5
18.4
64.3
0.042
.256
.415
.483
.90.0
Queu
e Len
gth 95
th (m
)22
.160
.931
.588
.30.0
#104
.282
.328
.811
2.813
.0Int
erna
l Link
Dist
(m)
178.3
251.3
134.3
173.7
Turn
Bay
Leng
th (m
)13
0.060
.030
.020
.050
.050
.0Ba
se C
apac
ity (v
ph)
314
1215
301
1179
552
277
1131
365
1136
510
Star
vatio
n Cap
Red
uctn
00
00
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
00
00
Redu
ced v
/c Ra
tio0.3
00.4
50.4
80.5
70.1
30.9
90.5
60.3
60.7
40.2
8
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
5.8Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.99
Inter
secti
on S
ignal
Delay
: 33.1
Inter
secti
on LO
S: C
Inter
secti
on C
apac
ity U
tiliza
tion 9
0.5%
ICU
Leve
l of S
ervic
e EAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
356
26
2180
726
40
1836
173
Futur
e Volu
me (v
ph)
356
26
2180
726
40
1836
173
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.998
0.995
0.890
0.910
Flt P
rotec
ted0.9
990.9
910.9
84Sa
td. F
low (p
rot)
030
340
030
340
013
520
013
730
Flt P
ermi
tted
0.999
0.991
0.984
Satd.
Flow
(per
m)0
3034
00
3034
00
1352
00
1373
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
275.3
150.2
112.8
132.3
Trav
el Tim
e (s)
16.5
9.06.8
7.9Co
nfl. P
eds.
(#/hr
)12
1111
125
33
5Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%2%
0%0%
1%20
%0%
0%0%
0%0%
0%Ad
j. Flow
(vph
)3
562
621
807
264
018
361
73Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
571
00
854
00
220
011
00
Sign
Con
trol
Free
Free
Stop
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 6
5.0%
ICU
Leve
l of S
ervic
e CAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
356
26
2180
726
40
1836
173
Futur
e Volu
me (V
eh/h)
356
26
2180
726
40
1836
173
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)3
562
621
807
264
018
361
73Pe
destr
ians
53
1112
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge0
01
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)27
5pX
, plat
oon u
nbloc
ked
0.95
0.95
0.95
0.95
0.95
0.95
vC, c
onflic
ting v
olume
845
579
1106
1469
298
1182
1459
434
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
845
443
1000
1383
147
1080
1373
434
tC, s
ingle
(s)4.1
4.17.5
6.56.9
7.56.5
6.9tC
, 2 st
age (
s)tF
(s)
2.22.2
3.54.0
3.33.5
4.03.3
p0 qu
eue f
ree %
100
9897
100
9877
9987
cM ca
pacit
y (ve
h/h)
793
1058
157
132
824
155
134
568
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
284
287
424
430
2211
0Vo
lume L
eft3
021
04
36Vo
lume R
ight
06
026
1873
cSH
793
1700
1058
1700
465
299
Volum
e to C
apac
ity0.0
00.1
70.0
20.2
50.0
50.3
7Qu
eue L
ength
95th
(m)
0.10.0
0.50.0
1.213
.1Co
ntrol
Delay
(s)
0.10.0
0.60.0
13.1
23.9
Lane
LOS
AA
BC
Appr
oach
Dela
y (s)
0.10.3
13.1
23.9
Appr
oach
LOS
BC
Inter
secti
on S
umma
ryAv
erag
e Dela
y 2.1
Inter
secti
on C
apac
ity U
tiliza
tion
65.0%
ICU
Leve
l of S
ervic
e C
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
411
312
75
3Fu
ture V
olume
(vph
)4
113
127
53
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.870
0.949
Flt P
rotec
ted0.9
980.9
69Sa
td. F
low (p
rot)
1515
00
1428
1548
0Flt
Per
mitte
d0.9
980.9
69Sa
td. F
low (p
erm)
1515
00
1428
1548
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
83
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%17
%0%
0%0%
Adj. F
low (v
ph)
411
312
75
3Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)11
70
019
80
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
3.1%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
411
312
75
3Fu
ture V
olume
(Veh
/h)4
113
127
53
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
411
312
75
3Pe
destr
ians
38
Lane
Widt
h (m)
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
Perce
nt Bl
ocka
ge0
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)pX
, plat
oon u
nbloc
ked
vC, c
onflic
ting v
olume
4610
8vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l46
108
tC, s
ingle
(s)6.4
6.24.3
tC, 2
stag
e (s)
tF (s
)3.5
3.32.4
p0 qu
eue f
ree %
100
8999
cM ca
pacit
y (ve
h/h)
956
1075
1519
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
117
198
Volum
e Left
412
0Vo
lume R
ight
113
03
cSH
1071
1519
1700
Volum
e to C
apac
ity0.1
10.0
10.0
0Qu
eue L
ength
95th
(m)
2.90.2
0.0Co
ntrol
Delay
(s)
8.84.7
0.0La
ne LO
SA
AAp
proa
ch D
elay (
s)8.8
4.70.0
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 7.7
Inter
secti
on C
apac
ity U
tiliza
tion
23.1%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix C Internal Capture
Internal Capture
AM Peak Hour
Appendix CWestmount Place Mixed-Use Development TIS
180289
Internal Capture
PM Peak Hour
Appendix CWestmount Place Mixed-Use Development TIS
180289
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix D New and Pass-by Trip Assignments
Trip Assignment without PassbyAM Peak Hour
Appendix DWestmount Place Mixed-Use Development TIS180289
Father David Bauer Drive
Driveway B
Driveway C Driveway D
0
0 0
16 0
12 0
15 109
10 0 7 5 20 5 0 0
26 0 38
4 0
22 12 20 20 0 20 20
9 14 27 27 10 26
104 16
7 16 22Erb Street West
2 2 5 6
17 0
9 17 108
25 16 3131 0
0D
ietz
Ave
nue
Nor
th
Wes
tmou
nt R
oad
9 108
25 31
Dri
vew
ay E
0
0 0 0 25
108
0 9 38 31
0 0 31 108
0
Private Driveway
0 0 6
29
0 0
0
29 0
6
29
6 0
29
6 0
0
0 0
0
0
0
Wes
tmou
nt R
oad
6
Dri
vew
ay A 7
29 4
6
29
0 0 29 0 7 4
0
0 0 7 7 0 0
0
0 0 4 4 0
13
33
Westcourt Place
0 6 7
4
0
Trip Assignment without PassbyPM Peak Hour
Appendix DWestmount Place Mixed-Use Development TIS180289
Father David Bauer Drive
Driveway B
Driveway C Driveway D
0
0 0
5 0
4 0
12 56
10 0 2 2 15 3 0 0
63 0 71
11 0
16 6 15 15 0 15 15
34 4 45 45 24 63
53
19
28 39 52Erb Street West
6 1 3 13
21 0
10 21 64
21 39 3131 0
0D
ietz
Ave
nue
Nor
th
Wes
tmou
nt R
oad
10 64
21 31
Dri
vew
ay E
0
0 0 0 21
64
0 10 19 31
0 0 31 64
0
Private Driveway
0 0 10
9
0 0
0
9 0
10
9
10 0
9
10 0
0
0 0
0
4
0
Wes
tmou
nt R
oad
10
Dri
vew
ay A
23
9 7
10
9
0 0 8 1 18 3
6
0 0 19 19 1 5
1
0 1 4 4 5
27
11
Westcourt Place
0 9 18
3
0
Passby Trip AssignmentAM Peak Hour
Appendix DWestmount Place Mixed-Use Development TIS180289
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
0 0
0 0
0
0 0
0 0 0 0 0
0 0 0 0
0 0 0
0 0 0
0D
ietz
Ave
nue
Nor
th
Wes
tmou
nt R
oad
0 0
0 0
Dri
vew
ay E
0 0 0
0 0 0 0
0 0 0 0
Private Driveway
0 0
0
0 0
0
0
0 0
0
0
Westcourt Place
0
0 0
0
0 0
0
Wes
tmou
nt R
oad
0
Dri
vew
ay A 0
0 0
0
0
0
0
0 0 0 0
0 0 0
Passby Trip AssignmentPM Peak Hour
Appendix DWestmount Place Mixed-Use Development TIS180289
Father David Bauer Drive
Driveway B
Driveway C Driveway D
Erb Street West
0
0
0 0 0 0
0 0 0 0
Westcourt Place
0 0
0
0 0
0
Wes
tmou
nt R
oad
0
Dri
vew
ay A 0
0 0
0
00 0
0
0
0 0
0 0
Private Driveway -2
5
25
20
0
-20
20
0 25 45 0
0 0 45 0
0 0 0
0 0 0
0D
ietz
Ave
nue
Nor
th
Wes
tmou
nt R
oad
0 0
0 0
Dri
vew
ay E
0 0
0 0 0 0 0
0 0 0 0
0 0
0 0
0
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix E 2031 Background Traffic Operational Conditions
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
3317
1942
517
57
904
9423
476
35
Futur
e Volu
me (v
ph)
3317
1942
517
57
904
9423
476
35
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)0.0
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.99
0.98
0.98
0.99
1.00
1.00
1.00
Frt
0.963
0.850
0.986
0.999
Flt P
rotec
ted0.9
770.9
570.9
500.9
50Sa
td. F
low (p
rot)
013
830
015
6214
4214
6331
470
1635
3199
0Flt
Per
mitte
d0.8
310.7
030.3
610.2
04Sa
td. F
low (p
erm)
011
740
011
3014
1955
031
470
351
3199
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)19
175
111
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)4
1818
420
77
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%7%
6%0%
0%2%
14%
4%6%
2%4%
20%
Adj. F
low (v
ph)
3317
1942
517
57
904
9423
476
35
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
069
00
4717
57
998
023
476
80
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)12
.712
.712
.763
.763
.789
.389
.3Ac
tuated
g/C
Ratio
0.12
0.12
0.12
0.58
0.58
0.81
0.81
v/c R
atio
0.45
0.36
0.55
0.02
0.55
0.44
0.30
Contr
ol De
lay43
.151
.913
.411
.415
.85.2
3.1Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
43.1
51.9
13.4
11.4
15.8
5.23.1
LOS
DD
BB
BA
AAp
proa
ch D
elay
43.1
21.5
15.8
3.6
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
CB
AQu
eue L
ength
50th
(m)
10.7
10.0
0.00.6
64.3
8.516
.3Qu
eue L
ength
95th
(m)
24.3
21.3
19.4
3.196
.918
.629
.5Int
erna
l Link
Dist
(m)
37.2
76.8
39.6
66.2
Turn
Bay
Leng
th (m
)12
.040
.0Ba
se C
apac
ity (v
ph)
415
501
726
318
1828
536
2597
Star
vatio
n Cap
Red
uctn
00
00
00
0Sp
illbac
k Cap
Red
uctn
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
0Re
duce
d v/c
Ratio
0.17
0.09
0.24
0.02
0.55
0.44
0.30
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.55
Inter
secti
on S
ignal
Delay
: 11.8
Inter
secti
on LO
S: B
Inter
secti
on C
apac
ity U
tiliza
tion 9
1.1%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
312
3221
221
47
Futur
e Volu
me (v
ph)
312
3221
221
47
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
0.0La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.987
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1559
016
6818
4216
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1559
016
6818
4216
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
1313
7Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
3%6%
0%2%
0%0%
Adj. F
low (v
ph)
312
3221
221
47
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
344
021
221
47
Sign
Con
trol
Free
Free
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
1.3%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
312
3221
221
47
Futur
e Volu
me (V
eh/h)
312
3221
221
47
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
312
3221
221
47
Pede
strian
s7
13La
ne W
idth (
m)3.5
3.5W
alking
Spe
ed (m
/s)1.2
1.2Pe
rcent
Bloc
kage
11
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
80.9
80.9
8vC
, con
flictin
g volu
me35
761
134
1vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l33
059
031
4tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %98
9999
cM ca
pacit
y (ve
h/h)
1199
447
707
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
344
2122
14
7Vo
lume L
eft0
210
40
Volum
e Righ
t32
00
07
cSH
1700
1199
1700
447
707
Volum
e to C
apac
ity0.2
00.0
20.1
30.0
10.0
1Qu
eue L
ength
95th
(m)
0.00.4
0.00.2
0.2Co
ntrol
Delay
(s)
0.08.1
0.013
.110
.1La
ne LO
SA
BB
Appr
oach
Dela
y (s)
0.00.7
11.2
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.5
Inter
secti
on C
apac
ity U
tiliza
tion
31.3%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
217
993
1117
813
Futur
e Volu
me (v
ph)
217
993
1117
813
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)0.0
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.998
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1668
1388
3196
016
6834
33Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1668
1388
3196
016
6834
33Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
77
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
6%4%
18%
0%4%
Adj. F
low (v
ph)
217
993
1117
813
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
217
1004
017
813
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
9.8%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
217
993
1117
813
Futur
e Volu
me (V
eh/h)
217
993
1117
813
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
217
993
1117
813
Pede
strian
s7
Lane
Widt
h (m)
3.5W
alking
Spe
ed (m
/s)1.2
Perce
nt Bl
ocka
ge1
Righ
t turn
flare
(veh
)Me
dian t
ype
TWLT
LNo
neMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
332
64pX
, plat
oon u
nbloc
ked
0.81
0.79
0.79
vC, c
onflic
ting v
olume
1446
509
1011
vC1,
stage
1 co
nf vo
l10
06vC
2, sta
ge 2
conf
vol
440
vCu,
unblo
cked
vol
790
047
0tC
, sing
le (s)
6.87.0
4.1tC
, 2 st
age (
s)5.8
tF (s
)3.5
3.42.2
p0 qu
eue f
ree %
100
9898
cM ca
pacit
y (ve
h/h)
433
838
862
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
217
662
342
1740
640
6Vo
lume L
eft2
00
017
00
Volum
e Righ
t0
170
110
00
cSH
433
838
1700
1700
862
1700
1700
Volum
e to C
apac
ity0.0
00.0
20.3
90.2
00.0
20.2
40.2
4Qu
eue L
ength
95th
(m)
0.10.5
0.00.0
0.50.0
0.0Co
ntrol
Delay
(s)
13.4
9.40.0
0.09.3
0.00.0
Lane
LOS
BA
AAp
proa
ch D
elay (
s)9.8
0.00.2
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.2
Inter
secti
on C
apac
ity U
tiliza
tion
39.8%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
70
417
014
198
911
836
793
2Fu
ture V
olume
(vph
)7
04
170
141
989
118
3679
32
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
0.00.0
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
510.8
500.9
84Flt
Pro
tected
0.969
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1731
016
6812
380
1785
3165
016
1934
330
Flt P
ermi
tted
0.969
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1731
016
6812
380
1785
3165
016
1934
330
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
55
611
116
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
0%0%
29%
0%4%
1%3%
4%0%
Adj. F
low (v
ph)
70
417
014
198
911
836
793
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
110
1714
01
1107
036
795
0Si
gn C
ontro
lSt
opSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
6.9%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
70
417
014
198
911
836
793
2Fu
ture V
olume
(Veh
/h)7
04
170
141
989
118
3679
32
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)7
04
170
141
989
118
3679
32
Pede
strian
s6
115
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
10
Righ
t turn
flare
(veh
)Me
dian t
ype
None
TWLT
LMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
198
198
pX, p
latoo
n unb
locke
d0.7
70.7
70.9
70.7
70.7
70.7
50.9
70.7
5vC
, con
flictin
g volu
me13
8819
9240
415
3419
3457
080
111
18vC
1, sta
ge 1
conf
vol
872
872
1061
1061
vC2,
stage
2 co
nf vo
l51
611
2047
287
3vC
u, un
block
ed vo
l69
314
8331
288
414
070
723
486
tC, s
ingle
(s)7.5
6.56.9
7.56.5
7.54.1
4.2tC
, 2 st
age (
s)6.5
5.56.5
5.5tF
(s)
3.54.0
3.33.5
4.03.6
2.22.2
p0 qu
eue f
ree %
9810
099
9510
098
100
95cM
capa
city (
veh/h
)31
227
166
337
429
374
185
479
1
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
1117
141
659
448
3652
926
6Vo
lume L
eft7
170
10
036
00
Volum
e Righ
t4
014
00
118
00
2cS
H38
637
474
185
417
0017
0079
117
0017
00Vo
lume t
o Cap
acity
0.03
0.05
0.02
0.00
0.39
0.26
0.05
0.31
0.16
Queu
e Len
gth 95
th (m
)0.7
1.10.5
0.00.0
0.01.1
0.00.0
Contr
ol De
lay (s
)14
.615
.110
.09.2
0.00.0
9.80.0
0.0La
ne LO
SB
CA
AA
Appr
oach
Dela
y (s)
14.6
12.8
0.00.4
Appr
oach
LOS
BB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.5
Inter
secti
on C
apac
ity U
tiliza
tion
46.9%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
174
926
297
7026
710
513
884
968
126
556
60Fu
ture V
olume
(vph
)17
492
629
770
267
105
138
849
6812
655
660
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.055
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
80.9
91.0
00.9
60.9
91.0
00.9
90.9
5Fr
t0.9
640.8
500.9
890.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
5831
370
1635
3368
1428
1619
3228
016
1934
6611
96Flt
Per
mitte
d0.5
090.1
020.3
040.1
21Sa
td. F
low (p
erm)
818
3137
017
533
6813
6651
132
280
205
3466
1142
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
4810
98
109
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.327
5.315
8.319
7.7Tr
avel
Time (
s)12
.116
.59.5
11.9
Confl
. Ped
s. (#
/hr)
3217
1732
3331
3133
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)7%
2%1%
2%6%
3%3%
2%0%
3%3%
23%
Adj. F
low (v
ph)
174
926
297
7026
710
513
884
968
126
556
60Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)17
412
230
7026
710
513
891
70
126
556
60Tu
rn T
ype
pm+p
tNA
pm+p
tNA
Perm
pm+p
tNA
pm+p
tNA
Perm
Prote
cted P
hase
s7
43
85
21
6Pe
rmitte
d Pha
ses
48
82
66
Detec
tor P
hase
74
38
85
21
66
Switc
h Pha
seMi
nimum
Initia
l (s)
5.033
.05.0
33.0
33.0
5.032
.05.0
32.0
32.0
Minim
um S
plit (
s)9.0
39.0
9.039
.039
.09.0
38.0
9.038
.038
.0To
tal S
plit (
s)13
.050
.09.0
46.0
46.0
12.0
39.0
12.0
39.0
39.0
Total
Spli
t (%
)11
.8%45
.5%8.2
%41
.8%41
.8%10
.9%35
.5%10
.9%35
.5%35
.5%Ye
llow
Time (
s)3.0
4.03.0
4.04.0
3.04.0
3.04.0
4.0Al
l-Red
Tim
e (s)
1.02.0
1.02.0
2.01.0
2.01.0
2.02.0
Lost
Time A
djust
(s)0.0
-2.0
0.0-2
.0-2
.00.0
-2.0
0.0-2
.0-2
.0To
tal Lo
st Tim
e (s)
4.04.0
4.04.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lead
Lag
Lead
Lag
Lag
Lead
Lag
Lead
Lag
Lag
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
None
Max
None
Max
Max
Act E
ffct G
reen
(s)
53.5
46.4
45.5
40.5
40.5
42.9
35.0
42.9
35.0
35.0
Actua
ted g/
C Ra
tio0.4
90.4
30.4
20.3
70.3
70.4
00.3
20.4
00.3
20.3
2v/c
Rati
o0.3
80.8
90.5
00.2
10.1
80.4
90.8
80.6
90.5
00.1
4Co
ntrol
Delay
18.2
37.8
27.4
23.5
4.826
.445
.440
.731
.81.3
Queu
e Dela
y0.0
0.00.0
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
18.2
37.8
27.4
23.5
4.826
.445
.440
.731
.81.3
LOS
BD
CC
AC
DD
CA
Appr
oach
Dela
y35
.419
.742
.930
.8
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
BD
CQu
eue L
ength
50th
(m)
21.4
130.1
8.021
.00.0
19.1
102.4
17.3
53.4
0.0Qu
eue L
ength
95th
(m)
35.3
#177
.015
.930
.910
.532
.9#1
39.8
#39.7
70.7
1.7Int
erna
l Link
Dist
(m)
178.3
251.3
134.3
173.7
Turn
Bay
Leng
th (m
)13
0.060
.030
.020
.055
.050
.0Ba
se C
apac
ity (v
ph)
465
1370
141
1305
595
284
1048
185
1120
442
Star
vatio
n Cap
Red
uctn
00
00
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
00
00
Redu
ced v
/c Ra
tio0.3
70.8
90.5
00.2
00.1
80.4
90.8
80.6
80.5
00.1
4
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
8.4Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.89
Inter
secti
on S
ignal
Delay
: 34.7
Inter
secti
on LO
S: C
Inter
secti
on C
apac
ity U
tiliza
tion 9
0.6%
ICU
Leve
l of S
ervic
e EAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
3810
7619
440
858
33
1710
114
Futur
e Volu
me (v
ph)
3810
7619
440
858
33
1710
114
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.997
0.981
0.900
0.924
Flt P
rotec
ted0.9
980.9
940.9
80Sa
td. F
low (p
rot)
030
270
028
940
013
710
013
880
Flt P
ermi
tted
0.998
0.994
0.980
Satd.
Flow
(per
m)0
3027
00
2894
00
1371
00
1388
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
275.3
150.2
112.8
132.3
Trav
el Tim
e (s)
16.5
9.06.8
7.9Co
nfl. P
eds.
(#/hr
)13
11
137
55
7Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%2%
0%0%
5%6%
0%0%
0%0%
0%0%
Adj. F
low (v
ph)
3810
7619
440
858
33
1710
114
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
011
330
047
00
023
00
250
Sign
Con
trol
Free
Free
Stop
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 6
8.1%
ICU
Leve
l of S
ervic
e CAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
3810
7619
440
858
33
1710
114
Futur
e Volu
me (V
eh/h)
3810
7619
440
858
33
1710
114
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)38
1076
194
408
583
317
101
14Pe
destr
ians
75
113
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge1
00
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)27
5pX
, plat
oon u
nbloc
ked
0.70
0.70
0.70
0.70
0.70
0.70
vC, c
onflic
ting v
olume
479
1096
1396
1650
554
1096
1630
253
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
479
280
708
1071
027
910
4325
3tC
, sing
le (s)
4.14.1
7.56.5
6.97.5
6.56.9
tC, 2
stag
e (s)
tF (s
)2.2
2.23.5
4.03.3
3.54.0
3.3p0
queu
e fre
e %96
100
9998
9898
9998
cM ca
pacit
y (ve
h/h)
1082
905
212
148
760
419
154
740
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
576
557
208
262
2325
Volum
e Left
380
40
310
Volum
e Righ
t0
190
5817
14cS
H10
8217
0090
517
0040
550
8Vo
lume t
o Cap
acity
0.04
0.33
0.00
0.15
0.06
0.05
Queu
e Len
gth 95
th (m
)0.9
0.00.1
0.01.4
1.2Co
ntrol
Delay
(s)
1.00.0
0.20.0
14.4
12.5
Lane
LOS
AA
BB
Appr
oach
Dela
y (s)
0.50.1
14.4
12.5
Appr
oach
LOS
BB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.8
Inter
secti
on C
apac
ity U
tiliza
tion
68.1%
ICU
Leve
l of S
ervic
e C
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
113
985
12
Futur
e Volu
me (v
ph)
113
985
12
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.875
0.910
Flt P
rotec
ted0.9
960.9
55Sa
td. F
low (p
rot)
1521
00
1515
1485
0Flt
Per
mitte
d0.9
960.9
55Sa
td. F
low (p
erm)
1521
00
1515
1485
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
122
88
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%3%
0%0%
0%Ad
j. Flow
(vph
)1
1398
51
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)14
00
103
30
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
3.9%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
113
985
12
Futur
e Volu
me (V
eh/h)
113
985
12
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
113
985
12
Pede
strian
s8
212
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge1
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
pX, p
latoo
n unb
locke
dvC
, con
flictin
g volu
me22
312
11vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l22
312
11tC
, sing
le (s)
6.46.2
4.1tC
, 2 st
age (
s)tF
(s)
3.53.3
2.2p0
queu
e fre
e %10
099
94cM
capa
city (
veh/h
)71
110
6615
91
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
1410
33
Volum
e Left
198
0Vo
lume R
ight
130
2cS
H10
2915
9117
00Vo
lume t
o Cap
acity
0.01
0.06
0.00
Queu
e Len
gth 95
th (m
)0.3
1.60.0
Contr
ol De
lay (s
)8.5
7.10.0
Lane
LOS
AA
Appr
oach
Dela
y (s)
8.57.1
0.0Ap
proa
ch LO
SA
Inter
secti
on S
umma
ryAv
erag
e Dela
y 7.1
Inter
secti
on C
apac
ity U
tiliza
tion
23.9%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
154
2173
1427
918
856
8117
011
5228
Futur
e Volu
me (v
ph)
154
2173
1427
918
856
8117
011
5228
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)0.0
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.96
0.95
0.98
1.00
0.99
0.99
1.00
Frt
0.929
0.850
0.987
0.996
Flt P
rotec
ted0.9
820.9
600.9
500.9
50Sa
td. F
low (p
rot)
013
440
015
6614
7116
6831
690
1651
3254
0Flt
Per
mitte
d0.8
810.7
880.2
390.2
44Sa
td. F
low (p
erm)
012
030
012
2314
4641
831
690
419
3254
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)21
238
103
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)5
6262
520
4747
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%0%
0%0%
0%0%
0%3%
4%1%
2%0%
Adj. F
low (v
ph)
154
2173
1427
918
856
8117
011
5228
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
040
00
8727
918
937
017
011
800
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)15
.615
.615
.671
.071
.086
.486
.4Ac
tuated
g/C
Ratio
0.14
0.14
0.14
0.65
0.65
0.79
0.79
v/c R
atio
0.21
0.50
0.68
0.07
0.46
0.37
0.46
Contr
ol De
lay25
.452
.417
.611
.011
.85.8
5.1Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
25.4
52.4
17.6
11.0
11.8
5.85.1
LOS
CD
BB
BA
AAp
proa
ch D
elay
25.4
25.9
11.8
5.2
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SC
CB
AQu
eue L
ength
50th
(m)
3.818
.58.3
1.449
.87.3
37.3
Queu
e Len
gth 95
th (m
)13
.332
.934
.05.9
87.3
17.0
65.9
Inter
nal L
ink D
ist (m
)37
.276
.839
.666
.2Tu
rn B
ay Le
ngth
(m)
12.0
40.0
Base
Cap
acity
(vph
)42
754
277
326
920
4846
125
55St
arva
tion C
ap R
educ
tn0
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
Stor
age C
ap R
educ
tn0
00
00
00
Redu
ced v
/c Ra
tio0.0
90.1
60.3
60.0
70.4
60.3
70.4
6
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.68
Inter
secti
on S
ignal
Delay
: 10.6
Inter
secti
on LO
S: B
Inter
secti
on C
apac
ity U
tiliza
tion 1
01.6%
ICU
Leve
l of S
ervic
e GAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
276
139
355
1513
Futur
e Volu
me (v
ph)
276
139
355
1513
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
0.0La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.994
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1586
016
6818
7916
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1586
016
6818
7916
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
88
13
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)2%
8%0%
0%0%
0%Ad
j. Flow
(vph
)27
613
935
515
13Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)28
90
935
515
13Si
gn C
ontro
lFr
eeFr
eeSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
9.6%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
276
139
355
1513
Futur
e Volu
me (V
eh/h)
276
139
355
1513
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
276
139
355
1513
Pede
strian
s1
38
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
90.9
90.9
9vC
, con
flictin
g volu
me29
766
429
4vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l28
165
327
8tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %99
9698
cM ca
pacit
y (ve
h/h)
1268
423
749
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
289
935
515
13Vo
lume L
eft0
90
150
Volum
e Righ
t13
00
013
cSH
1700
1268
1700
423
749
Volum
e to C
apac
ity0.1
70.0
10.2
10.0
40.0
2Qu
eue L
ength
95th
(m)
0.00.2
0.00.9
0.4Co
ntrol
Delay
(s)
0.07.9
0.013
.89.9
Lane
LOS
AB
AAp
proa
ch D
elay (
s)0.0
0.212
.0Ap
proa
ch LO
SB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.6
Inter
secti
on C
apac
ity U
tiliza
tion
29.6%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
2313
983
042
7911
75Fu
ture V
olume
(vph
)23
139
830
4279
1175
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)0.0
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.993
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1603
1471
3220
016
6835
00Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1603
1471
3220
016
6835
00Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
11
2525
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)4%
0%3%
0%0%
2%Ad
j. Flow
(vph
)23
139
830
4279
1175
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
2313
987
20
7911
75Si
gn C
ontro
lSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
4.4%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
2313
983
042
7911
75Fu
ture V
olume
(Veh
/h)23
139
830
4279
1175
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
2313
983
042
7911
75Pe
destr
ians
251
1La
ne W
idth (
m)3.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.2Pe
rcent
Bloc
kage
20
0Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eTW
LTL
None
Media
n stor
age v
eh)
2Up
strea
m sig
nal (m
)33
264
pX, p
latoo
n unb
locke
d0.9
40.8
80.8
8vC
, con
flictin
g volu
me16
2246
289
7vC
1, sta
ge 1
conf
vol
876
vC2,
stage
2 co
nf vo
l74
6vC
u, un
block
ed vo
l98
213
062
2tC
, sing
le (s)
6.96.9
4.1tC
, 2 st
age (
s)5.9
tF (s
)3.5
3.32.2
p0 qu
eue f
ree %
9482
91cM
capa
city (
veh/h
)36
478
183
9
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
2313
955
331
979
588
588
Volum
e Left
230
00
790
0Vo
lume R
ight
013
90
420
00
cSH
364
781
1700
1700
839
1700
1700
Volum
e to C
apac
ity0.0
60.1
80.3
30.1
90.0
90.3
50.3
5Qu
eue L
ength
95th
(m)
1.65.2
0.00.0
2.50.0
0.0Co
ntrol
Delay
(s)
15.5
10.6
0.00.0
9.70.0
0.0La
ne LO
SC
BA
Appr
oach
Dela
y (s)
11.3
0.00.6
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 1.1
Inter
secti
on C
apac
ity U
tiliza
tion
44.4%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
91
1889
082
776
572
4011
514
Futur
e Volu
me (v
ph)
91
1889
082
776
572
4011
514
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
0.00.0
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
130.8
500.9
870.9
99Flt
Pro
tected
0.984
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1688
016
1915
360
1785
3201
016
1934
970
Flt P
ermi
tted
0.984
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1688
016
1915
360
1785
3201
016
1934
970
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
21
12
1327
2713
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
3%0%
4%0%
3%1%
3%2%
0%Ad
j. Flow
(vph
)9
118
890
827
765
7240
1151
4Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
280
8982
07
837
040
1155
0Si
gn C
ontro
lSt
opSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 5
4.3%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
91
1889
082
776
572
4011
514
Futur
e Volu
me (V
eh/h)
91
1889
082
776
572
4011
514
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)9
118
890
827
765
7240
1151
4Pe
destr
ians
1327
12
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge1
20
0Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neTW
LTL
Media
n stor
age v
eh)
2Up
strea
m sig
nal (m
)19
819
8pX
, plat
oon u
nbloc
ked
0.90
0.90
0.90
0.90
0.90
0.85
0.90
0.85
vC, c
onflic
ting v
olume
1726
2124
592
1517
2090
448
1168
864
vC1,
stage
1 co
nf vo
l12
4612
4684
284
2vC
2, sta
ge 2
conf
vol
480
878
675
1248
vCu,
unblo
cked
vol
1078
1518
315
846
1480
595
749
4tC
, sing
le (s)
7.56.5
6.97.6
6.57.0
4.14.2
tC, 2
stag
e (s)
6.55.5
6.65.5
tF (s
)3.5
4.03.3
3.54.0
3.32.2
2.2p0
queu
e fre
e %96
100
9776
100
9199
95cM
capa
city (
veh/h
)20
423
160
936
723
289
064
588
3
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
2889
827
510
327
4076
738
8Vo
lume L
eft9
890
70
040
00
Volum
e Righ
t18
082
00
720
04
cSH
359
367
890
645
1700
1700
883
1700
1700
Volum
e to C
apac
ity0.0
80.2
40.0
90.0
10.3
00.1
90.0
50.4
50.2
3Qu
eue L
ength
95th
(m)
2.07.5
2.40.3
0.00.0
1.10.0
0.0Co
ntrol
Delay
(s)
15.9
17.9
9.510
.60.0
0.09.3
0.00.0
Lane
LOS
CC
AB
AAp
proa
ch D
elay (
s)15
.913
.90.1
0.3Ap
proa
ch LO
SC
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 1.5
Inter
secti
on C
apac
ity U
tiliza
tion
54.3%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
106
466
149
162
763
7831
066
252
149
951
160
Futur
e Volu
me (v
ph)
106
466
149
162
763
7831
066
252
149
951
160
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.050
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
90.9
90.9
90.9
50.9
91.0
00.9
90.9
3Fr
t0.9
640.8
500.9
890.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
3031
410
1668
3535
1428
1668
3227
016
3535
3513
62Flt
Per
mitte
d0.1
530.2
470.1
060.3
40Sa
td. F
low (p
erm)
244
3141
043
035
3513
5918
532
270
577
3535
1273
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
4014
99
149
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.327
5.315
8.319
7.7Tr
avel
Time (
s)12
.116
.59.5
11.9
Confl
. Ped
s. (#
/hr)
3521
2135
5336
3653
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)9%
2%0%
0%1%
3%0%
2%0%
2%1%
8%Ad
j. Flow
(vph
)10
646
614
916
276
378
310
662
5214
995
116
0Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)10
661
50
162
763
7831
071
40
149
951
160
Turn
Typ
epm
+pt
NApm
+pt
NAPe
rmpm
+pt
NApm
+pt
NAPe
rmPr
otecte
d Pha
ses
74
38
52
16
Perm
itted P
hase
s4
88
26
6De
tector
Pha
se7
43
88
52
16
6Sw
itch P
hase
Minim
um In
itial (s
)5.0
31.0
5.031
.031
.05.0
32.0
5.032
.032
.0Mi
nimum
Spli
t (s)
9.037
.09.0
37.0
37.0
9.038
.09.0
38.0
38.0
Total
Spli
t (s)
10.0
37.0
10.0
37.0
37.0
25.0
49.0
14.0
38.0
38.0
Total
Spli
t (%
)9.1
%33
.6%9.1
%33
.6%33
.6%22
.7%44
.5%12
.7%34
.5%34
.5%Ye
llow
Time (
s)3.0
4.03.0
4.04.0
3.04.0
3.04.0
4.0Al
l-Red
Tim
e (s)
1.02.0
1.02.0
2.01.0
2.01.0
2.02.0
Lost
Time A
djust
(s)0.0
-2.0
0.0-2
.0-2
.00.0
-2.0
0.0-2
.0-2
.0To
tal Lo
st Tim
e (s)
4.04.0
4.04.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lead
Lag
Lead
Lag
Lag
Lead
Lag
Lead
Lag
Lag
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
None
Max
None
Max
Max
Act E
ffct G
reen
(s)
39.0
33.0
39.0
33.0
33.0
58.3
45.0
45.0
35.7
35.7
Actua
ted g/
C Ra
tio0.3
60.3
00.3
60.3
00.3
00.5
30.4
10.4
10.3
30.3
3v/c
Rati
o0.6
80.6
30.7
30.7
20.1
50.8
80.5
40.4
60.8
20.3
1Co
ntrol
Delay
45.9
34.2
46.2
38.6
0.653
.325
.919
.241
.87.4
Queu
e Dela
y0.0
0.00.0
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
45.9
34.2
46.2
38.6
0.653
.325
.919
.241
.87.4
LOS
DC
DD
AD
CB
DA
Appr
oach
Dela
y35
.936
.834
.234
.7
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
DC
CQu
eue L
ength
50th
(m)
15.4
59.1
24.4
80.7
0.051
.162
.416
.410
6.51.7
Queu
e Len
gth 95
th (m
)#3
1.579
.0#4
9.610
3.40.0
#96.4
81.2
27.9
#141
.517
.3Int
erna
l Link
Dist
(m)
178.3
251.3
134.3
173.7
Turn
Bay
Leng
th (m
)13
0.060
.030
.020
.050
.050
.0Ba
se C
apac
ity (v
ph)
157
976
221
1067
514
383
1333
337
1153
515
Star
vatio
n Cap
Red
uctn
00
00
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
00
00
Redu
ced v
/c Ra
tio0.6
80.6
30.7
30.7
20.1
50.8
10.5
40.4
40.8
20.3
1
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
9.3Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.88
Inter
secti
on S
ignal
Delay
: 35.3
Inter
secti
on LO
S: D
Inter
secti
on C
apac
ity U
tiliza
tion 9
3.8%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
363
96
2391
829
40
2040
183
Futur
e Volu
me (v
ph)
363
96
2391
829
40
2040
183
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.999
0.996
0.887
0.910
Flt P
rotec
ted0.9
990.9
920.9
84Sa
td. F
low (p
rot)
030
370
030
380
013
490
013
730
Flt P
ermi
tted
0.999
0.992
0.984
Satd.
Flow
(per
m)0
3037
00
3038
00
1349
00
1373
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
275.3
150.2
112.8
132.3
Trav
el Tim
e (s)
16.5
9.06.8
7.9Co
nfl. P
eds.
(#/hr
)12
1111
125
33
5Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%2%
0%0%
1%20
%0%
0%0%
0%0%
0%Ad
j. Flow
(vph
)3
639
623
918
294
020
401
83Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
648
00
970
00
240
012
40
Sign
Con
trol
Free
Free
Stop
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 7
2.1%
ICU
Leve
l of S
ervic
e CAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
363
96
2391
829
40
2040
183
Futur
e Volu
me (V
eh/h)
363
96
2391
829
40
2040
183
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)3
639
623
918
294
020
401
83Pe
destr
ians
53
1112
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge0
01
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)27
5pX
, plat
oon u
nbloc
ked
0.91
0.91
0.91
0.91
0.91
0.91
vC, c
onflic
ting v
olume
959
656
1252
1664
336
1339
1652
490
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
959
425
1080
1532
7411
7515
2049
0tC
, sing
le (s)
4.14.1
7.56.5
6.97.5
6.56.9
tC, 2
stag
e (s)
tF (s
)2.2
2.23.5
4.03.3
3.54.0
3.3p0
queu
e fre
e %10
098
9710
098
6899
84cM
capa
city (
veh/h
)71
810
3312
710
288
212
710
452
2
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
322
326
482
488
2412
4Vo
lume L
eft3
023
04
40Vo
lume R
ight
06
029
2083
cSH
718
1700
1033
1700
443
256
Volum
e to C
apac
ity0.0
00.1
90.0
20.2
90.0
50.4
8Qu
eue L
ength
95th
(m)
0.10.0
0.50.0
1.419
.6Co
ntrol
Delay
(s)
0.10.0
0.70.0
13.6
31.6
Lane
LOS
AA
BD
Appr
oach
Dela
y (s)
0.10.3
13.6
31.6
Appr
oach
LOS
BD
Inter
secti
on S
umma
ryAv
erag
e Dela
y 2.6
Inter
secti
on C
apac
ity U
tiliza
tion
72.1%
ICU
Leve
l of S
ervic
e C
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
411
312
75
3Fu
ture V
olume
(vph
)4
113
127
53
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.870
0.949
Flt P
rotec
ted0.9
980.9
69Sa
td. F
low (p
rot)
1515
00
1428
1548
0Flt
Per
mitte
d0.9
980.9
69Sa
td. F
low (p
erm)
1515
00
1428
1548
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
83
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%17
%0%
0%0%
Adj. F
low (v
ph)
411
312
75
3Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)11
70
019
80
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
3.1%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
411
312
75
3Fu
ture V
olume
(Veh
/h)4
113
127
53
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
411
312
75
3Pe
destr
ians
38
Lane
Widt
h (m)
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
Perce
nt Bl
ocka
ge0
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)pX
, plat
oon u
nbloc
ked
vC, c
onflic
ting v
olume
4610
8vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l46
108
tC, s
ingle
(s)6.4
6.24.3
tC, 2
stag
e (s)
tF (s
)3.5
3.32.4
p0 qu
eue f
ree %
100
8999
cM ca
pacit
y (ve
h/h)
956
1075
1519
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
117
198
Volum
e Left
412
0Vo
lume R
ight
113
03
cSH
1071
1519
1700
Volum
e to C
apac
ity0.1
10.0
10.0
0Qu
eue L
ength
95th
(m)
2.90.2
0.0Co
ntrol
Delay
(s)
8.84.7
0.0La
ne LO
SA
AAp
proa
ch D
elay (
s)8.8
4.70.0
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 7.7
Inter
secti
on C
apac
ity U
tiliza
tion
23.1%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix F 2031 Total Traffic Operational Conditions
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
3317
1942
517
97
933
9424
176
95
Futur
e Volu
me (v
ph)
3317
1942
517
97
933
9424
176
95
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)0.0
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.99
0.98
0.98
0.99
1.00
1.00
1.00
Frt
0.963
0.850
0.986
0.999
Flt P
rotec
ted0.9
770.9
570.9
500.9
50Sa
td. F
low (p
rot)
013
830
015
6214
4214
6331
480
1635
3199
0Flt
Per
mitte
d0.8
310.7
030.3
580.1
91Sa
td. F
low (p
erm)
011
740
011
3014
1954
631
480
328
3199
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)19
179
111
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)4
1818
420
77
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%7%
6%0%
0%2%
14%
4%6%
2%4%
20%
Adj. F
low (v
ph)
3317
1942
517
97
933
9424
176
95
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
069
00
4717
97
1027
024
177
40
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)12
.712
.712
.762
.662
.689
.389
.3Ac
tuated
g/C
Ratio
0.12
0.12
0.12
0.57
0.57
0.81
0.81
v/c R
atio
0.45
0.36
0.56
0.02
0.57
0.45
0.30
Contr
ol De
lay43
.151
.913
.411
.616
.86.1
3.1Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
43.1
51.9
13.4
11.6
16.8
6.13.1
LOS
DD
BB
BA
AAp
proa
ch D
elay
43.1
21.4
16.7
3.8
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
CB
AQu
eue L
ength
50th
(m)
10.7
10.0
0.00.6
68.5
8.816
.5Qu
eue L
ength
95th
(m)
24.3
21.3
20.0
3.110
2.122
.629
.8Int
erna
l Link
Dist
(m)
37.2
76.8
39.6
66.2
Turn
Bay
Leng
th (m
)12
.040
.0Ba
se C
apac
ity (v
ph)
415
501
729
311
1797
535
2597
Star
vatio
n Cap
Red
uctn
00
00
00
0Sp
illbac
k Cap
Red
uctn
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
0Re
duce
d v/c
Ratio
0.17
0.09
0.25
0.02
0.57
0.45
0.30
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.57
Inter
secti
on S
ignal
Delay
: 12.4
Inter
secti
on LO
S: B
Inter
secti
on C
apac
ity U
tiliza
tion 9
1.1%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
312
3921
221
87
Futur
e Volu
me (v
ph)
312
3921
221
87
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
0.0La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.985
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1555
016
6818
4216
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1555
016
6818
4216
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
1313
7Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
3%6%
0%2%
0%0%
Adj. F
low (v
ph)
312
3921
221
87
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
351
021
221
87
Sign
Con
trol
Free
Free
Stop
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
1.8%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
312
3921
221
87
Futur
e Volu
me (V
eh/h)
312
3921
221
87
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
312
3921
221
87
Pede
strian
s7
13La
ne W
idth (
m)3.5
3.5W
alking
Spe
ed (m
/s)1.2
1.2Pe
rcent
Bloc
kage
11
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
80.9
80.9
8vC
, con
flictin
g volu
me36
461
434
4vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l33
559
231
5tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %98
9899
cM ca
pacit
y (ve
h/h)
1192
445
704
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
351
2122
18
7Vo
lume L
eft0
210
80
Volum
e Righ
t39
00
07
cSH
1700
1192
1700
445
704
Volum
e to C
apac
ity0.2
10.0
20.1
30.0
20.0
1Qu
eue L
ength
95th
(m)
0.00.4
0.00.4
0.2Co
ntrol
Delay
(s)
0.08.1
0.013
.210
.2La
ne LO
SA
BB
Appr
oach
Dela
y (s)
0.00.7
11.8
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.6
Inter
secti
on C
apac
ity U
tiliza
tion
31.8%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
217
1022
1117
819
Futur
e Volu
me (v
ph)
217
1022
1117
819
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)0.0
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.998
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1668
1388
3196
016
6834
33Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1668
1388
3196
016
6834
33Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
77
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
6%4%
18%
0%4%
Adj. F
low (v
ph)
217
1022
1117
819
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
217
1033
017
819
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
0.6%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
217
1022
1117
819
Futur
e Volu
me (V
eh/h)
217
1022
1117
819
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
217
1022
1117
819
Pede
strian
s7
Lane
Widt
h (m)
3.5W
alking
Spe
ed (m
/s)1.2
Perce
nt Bl
ocka
ge1
Righ
t turn
flare
(veh
)Me
dian t
ype
TWLT
LNo
neMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
332
64pX
, plat
oon u
nbloc
ked
0.82
0.79
0.79
vC, c
onflic
ting v
olume
1478
524
1040
vC1,
stage
1 co
nf vo
l10
34vC
2, sta
ge 2
conf
vol
444
vCu,
unblo
cked
vol
831
051
3tC
, sing
le (s)
6.87.0
4.1tC
, 2 st
age (
s)5.8
tF (s
)3.5
3.42.2
p0 qu
eue f
ree %
100
9898
cM ca
pacit
y (ve
h/h)
415
840
833
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
217
681
352
1741
041
0Vo
lume L
eft2
00
017
00
Volum
e Righ
t0
170
110
00
cSH
415
840
1700
1700
833
1700
1700
Volum
e to C
apac
ity0.0
00.0
20.4
00.2
10.0
20.2
40.2
4Qu
eue L
ength
95th
(m)
0.10.5
0.00.0
0.50.0
0.0Co
ntrol
Delay
(s)
13.7
9.40.0
0.09.4
0.00.0
Lane
LOS
BA
AAp
proa
ch D
elay (
s)9.8
0.00.2
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.2
Inter
secti
on C
apac
ity U
tiliza
tion
40.6%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
70
426
043
198
914
342
793
2Fu
ture V
olume
(vph
)7
04
260
431
989
143
4279
32
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
0.00.0
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
510.8
500.9
81Flt
Pro
tected
0.969
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1731
016
6812
380
1785
3157
016
1934
330
Flt P
ermi
tted
0.969
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1731
016
6812
380
1785
3157
016
1934
330
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
55
611
116
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
0%0%
29%
0%4%
1%3%
4%0%
Adj. F
low (v
ph)
70
426
043
198
914
342
793
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
110
2643
01
1132
042
795
0Si
gn C
ontro
lSt
opSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 5
0.8%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
70
426
043
198
914
342
793
2Fu
ture V
olume
(Veh
/h)7
04
260
431
989
143
4279
32
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)7
04
260
431
989
143
4279
32
Pede
strian
s6
115
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
10
Righ
t turn
flare
(veh
)Me
dian t
ype
None
TWLT
LMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
198
198
pX, p
latoo
n unb
locke
d0.7
60.7
60.9
70.7
60.7
60.7
40.9
70.7
4vC
, con
flictin
g volu
me14
2820
2940
415
5819
5858
280
111
43vC
1, sta
ge 1
conf
vol
884
884
1074
1074
vC2,
stage
2 co
nf vo
l54
411
4548
488
5vC
u, un
block
ed vo
l73
315
2231
290
314
290
723
503
tC, s
ingle
(s)7.5
6.56.9
7.56.5
7.54.1
4.2tC
, 2 st
age (
s)6.5
5.56.5
5.5tF
(s)
3.54.0
3.33.5
4.03.6
2.22.2
p0 qu
eue f
ree %
9810
099
9310
094
100
95cM
capa
city (
veh/h
)30
226
166
336
828
773
685
477
4
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
1126
431
659
473
4252
926
6Vo
lume L
eft7
260
10
042
00
Volum
e Righ
t4
043
00
143
00
2cS
H37
736
873
685
417
0017
0077
417
0017
00Vo
lume t
o Cap
acity
0.03
0.07
0.06
0.00
0.39
0.28
0.05
0.31
0.16
Queu
e Len
gth 95
th (m
)0.7
1.81.5
0.00.0
0.01.4
0.00.0
Contr
ol De
lay (s
)14
.815
.510
.29.2
0.00.0
9.90.0
0.0La
ne LO
SB
CB
AA
Appr
oach
Dela
y (s)
14.8
12.2
0.00.5
Appr
oach
LOS
BB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.7
Inter
secti
on C
apac
ity U
tiliza
tion
50.8%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
186
936
297
8427
411
113
885
673
131
558
62Fu
ture V
olume
(vph
)18
693
629
784
274
111
138
856
7313
155
862
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.055
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
80.9
91.0
00.9
60.9
91.0
00.9
90.9
5Fr
t0.9
640.8
500.9
880.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
5831
380
1635
3368
1428
1619
3224
016
1934
6611
96Flt
Per
mitte
d0.5
040.1
020.3
030.1
21Sa
td. F
low (p
erm)
810
3138
017
533
6813
6651
032
240
205
3466
1142
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
4711
18
109
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.314
1.515
8.319
7.7Tr
avel
Time (
s)12
.18.5
9.511
.9Co
nfl. P
eds.
(#/hr
)32
1717
3233
3131
33Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
7%2%
1%2%
6%3%
3%2%
0%3%
3%23
%Ad
j. Flow
(vph
)18
693
629
784
274
111
138
856
7313
155
862
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
186
1233
084
274
111
138
929
013
155
862
Turn
Typ
epm
+pt
NApm
+pt
NAPe
rmpm
+pt
NApm
+pt
NAPe
rmPr
otecte
d Pha
ses
74
38
52
16
Perm
itted P
hase
s4
88
26
6De
tector
Pha
se7
43
88
52
16
6Sw
itch P
hase
Minim
um In
itial (s
)5.0
33.0
5.033
.033
.05.0
32.0
5.032
.032
.0Mi
nimum
Spli
t (s)
9.039
.09.0
39.0
39.0
9.038
.09.0
38.0
38.0
Total
Spli
t (s)
13.0
50.0
9.046
.046
.012
.039
.012
.039
.039
.0To
tal S
plit (
%)
11.8%
45.5%
8.2%
41.8%
41.8%
10.9%
35.5%
10.9%
35.5%
35.5%
Yello
w Tim
e (s)
3.04.0
3.04.0
4.03.0
4.03.0
4.04.0
All-R
ed T
ime (
s)1.0
2.01.0
2.02.0
1.02.0
1.02.0
2.0Lo
st Tim
e Adju
st (s)
0.0-2
.00.0
-2.0
-2.0
0.0-2
.00.0
-2.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
4.04.0
4.0Le
ad/La
gLe
adLa
gLe
adLa
gLa
gLe
adLa
gLe
adLa
gLa
gLe
ad-L
ag O
ptimi
ze?
Reca
ll Mod
eNo
neNo
neNo
neNo
neNo
neNo
neMa
xNo
neMa
xMa
xAc
t Effc
t Gre
en (s
)53
.546
.445
.540
.540
.542
.935
.043
.035
.135
.1Ac
tuated
g/C
Ratio
0.49
0.43
0.42
0.37
0.37
0.40
0.32
0.40
0.32
0.32
v/c R
atio
0.40
0.90
0.60
0.22
0.19
0.49
0.89
0.71
0.50
0.14
Contr
ol De
lay18
.738
.634
.323
.65.1
26.4
46.7
42.8
31.8
1.6Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.00.0
0.00.0
Total
Dela
y18
.738
.634
.323
.65.1
26.4
46.7
42.8
31.8
1.6LO
SB
DC
CA
CD
DC
AAp
proa
ch D
elay
36.0
21.2
44.1
31.2
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
CD
CQu
eue L
ength
50th
(m)
23.0
132.1
9.721
.60.0
19.1
104.3
18.1
53.6
0.0Qu
eue L
ength
95th
(m)
37.7
#179
.6#2
2.431
.611
.432
.9#1
43.0
#42.6
71.0
2.0Int
erna
l Link
Dist
(m)
178.3
117.5
134.3
173.7
Turn
Bay
Leng
th (m
)13
0.060
.030
.020
.055
.050
.0Ba
se C
apac
ity (v
ph)
462
1369
141
1303
597
284
1046
185
1120
443
Star
vatio
n Cap
Red
uctn
00
00
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
00
00
Redu
ced v
/c Ra
tio0.4
00.9
00.6
00.2
10.1
90.4
90.8
90.7
10.5
00.1
4
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
8.5Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.90
Inter
secti
on S
ignal
Delay
: 35.5
Inter
secti
on LO
S: D
Inter
secti
on C
apac
ity U
tiliza
tion 9
2.4%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
5310
8119
443
074
33
1711
41
18Fu
ture V
olume
(vph
)53
1081
194
430
743
317
114
118
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.998
0.978
0.900
0.982
Flt P
rotec
ted0.9
980.9
940.9
59Sa
td. F
low (p
rot)
030
310
028
850
013
710
014
430
Flt P
ermi
tted
0.998
0.994
0.959
Satd.
Flow
(per
m)0
3031
00
2885
00
1371
00
1443
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
133.8
150.2
112.8
132.3
Trav
el Tim
e (s)
8.09.0
6.87.9
Confl
. Ped
s. (#
/hr)
131
113
75
57
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
2%0%
0%5%
6%0%
0%0%
0%0%
0%Ad
j. Flow
(vph
)53
1081
194
430
743
317
114
118
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
011
530
050
80
023
00
133
0Si
gn C
ontro
lFr
eeFr
eeSt
opSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 7
9.5%
ICU
Leve
l of S
ervic
e DAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
5310
8119
443
074
33
1711
41
18Fu
ture V
olume
(Veh
/h)53
1081
194
430
743
317
114
118
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)53
1081
194
430
743
317
114
118
Pede
strian
s7
51
13La
ne W
idth (
m)3.5
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
1.2Pe
rcent
Bloc
kage
10
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
275
pX, p
latoo
n unb
locke
d0.6
90.6
90.6
90.6
90.6
90.6
9vC
, con
flictin
g volu
me51
711
0114
4617
2255
611
5816
9527
2vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l51
726
476
111
600
346
1120
272
tC, s
ingle
(s)4.1
4.17.5
6.56.9
7.56.5
6.9tC
, 2 st
age (
s)tF
(s)
2.22.2
3.54.0
3.33.5
4.03.3
p0 qu
eue f
ree %
9510
098
9898
6999
97cM
capa
city (
veh/h
)10
4891
018
912
875
436
713
572
0
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
594
560
219
289
2313
3Vo
lume L
eft53
04
03
114
Volum
e Righ
t0
190
7417
18cS
H10
4817
0091
017
0037
238
8Vo
lume t
o Cap
acity
0.05
0.33
0.00
0.17
0.06
0.34
Queu
e Len
gth 95
th (m
)1.3
0.00.1
0.01.6
12.0
Contr
ol De
lay (s
)1.4
0.00.2
0.015
.319
.0La
ne LO
SA
AC
CAp
proa
ch D
elay (
s)0.7
0.115
.319
.0Ap
proa
ch LO
SC
C
Inter
secti
on S
umma
ryAv
erag
e Dela
y 2.1
Inter
secti
on C
apac
ity U
tiliza
tion
79.5%
ICU
Leve
l of S
ervic
e D
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
112
112
95
12
Futur
e Volu
me (v
ph)
112
112
95
12
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.866
0.910
Flt P
rotec
ted0.9
54Sa
td. F
low (p
rot)
1512
00
1513
1485
0Flt
Per
mitte
d0.9
54Sa
td. F
low (p
erm)
1512
00
1513
1485
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
122
88
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%3%
0%0%
0%Ad
j. Flow
(vph
)1
121
129
51
2Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)12
20
013
43
0Si
gn C
ontro
lSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
0.5%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
112
112
95
12
Futur
e Volu
me (V
eh/h)
112
112
95
12
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
112
112
95
12
Pede
strian
s8
212
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge1
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
pX, p
latoo
n unb
locke
dvC
, con
flictin
g volu
me28
512
11vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l28
512
11tC
, sing
le (s)
6.46.2
4.1tC
, 2 st
age (
s)tF
(s)
3.53.3
2.2p0
queu
e fre
e %10
089
92cM
capa
city (
veh/h
)64
110
6615
91
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
122
134
3Vo
lume L
eft1
129
0Vo
lume R
ight
121
02
cSH
1060
1591
1700
Volum
e to C
apac
ity0.1
20.0
80.0
0Qu
eue L
ength
95th
(m)
3.12.1
0.0Co
ntrol
Delay
(s)
8.87.2
0.0La
ne LO
SA
AAp
proa
ch D
elay (
s)8.8
7.20.0
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 7.9
Inter
secti
on C
apac
ity U
tiliza
tion
30.5%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 15
Lane
Gro
upEB
LEB
TW
BTW
BRSB
LSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
011
4143
616
017
Futur
e Volu
me (v
ph)
011
4143
616
017
Ideal
Flow
(vphp
l)19
0019
0019
0019
0019
0019
00La
ne U
til. F
actor
1.00
0.95
0.95
0.95
1.00
1.00
Frt
0.995
0.865
Flt P
rotec
tedSa
td. F
low (p
rot)
035
0034
820
015
93Flt
Per
mitte
dSa
td. F
low (p
erm)
035
0034
820
015
93Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)14
1.513
3.869
.3Tr
avel
Time (
s)8.5
8.04.2
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ad
j. Flow
(vph
)0
1141
436
160
17Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
1141
452
00
17Si
gn C
ontro
lFr
eeFr
eeSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
4.9%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 16
Move
ment
EBL
EBT
WBT
WBR
SBL
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
011
4143
616
017
Futur
e Volu
me (V
eh/h)
011
4143
616
017
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
011
4143
616
017
Pede
strian
sLa
ne W
idth (
m)W
alking
Spe
ed (m
/s)Pe
rcent
Bloc
kage
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
141
pX, p
latoo
n unb
locke
d0.6
7vC
, con
flictin
g volu
me43
610
1422
6vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l43
615
226
tC, s
ingle
(s)4.1
6.86.9
tC, 2
stag
e (s)
tF (s
)2.2
3.53.3
p0 qu
eue f
ree %
100
100
98cM
capa
city (
veh/h
)11
2066
677
7
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2SB
1Vo
lume T
otal
570
570
291
161
17Vo
lume L
eft0
00
00
Volum
e Righ
t0
00
1617
cSH
1700
1700
1700
1700
777
Volum
e to C
apac
ity0.3
40.3
40.1
70.0
90.0
2Qu
eue L
ength
95th
(m)
0.00.0
0.00.0
0.5Co
ntrol
Delay
(s)
0.00.0
0.00.0
9.7La
ne LO
SA
Appr
oach
Dela
y (s)
0.00.0
9.7Ap
proa
ch LO
SA
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.1
Inter
secti
on C
apac
ity U
tiliza
tion
34.9%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 1
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
154
2174
1428
218
864
8218
811
6128
Futur
e Volu
me (v
ph)
154
2174
1428
218
864
8218
811
6128
Ideal
Flow
(vphp
l)19
0015
5019
0019
0016
5017
5017
7517
7519
0017
7517
7519
00St
orag
e Len
gth (m
)0.0
0.070
.00.0
12.0
0.040
.00.0
Stor
age L
anes
00
01
10
10
Tape
r Len
gth (m
)0.0
7.57.5
7.5La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.95
0.95
1.00
0.95
0.95
Ped B
ike F
actor
0.96
0.95
0.98
1.00
0.99
0.99
1.00
Frt
0.929
0.850
0.987
0.996
Flt P
rotec
ted0.9
820.9
600.9
500.9
50Sa
td. F
low (p
rot)
013
440
015
6614
7116
6831
690
1651
3254
0Flt
Per
mitte
d0.8
820.7
880.2
370.2
35Sa
td. F
low (p
erm)
012
050
012
2214
4641
431
690
404
3254
0Ri
ght T
urn o
n Red
Yes
Yes
Yes
Yes
Satd.
Flow
(RTO
R)21
237
103
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)61
.210
0.863
.690
.2Tr
avel
Time (
s)3.7
6.03.8
5.4Co
nfl. P
eds.
(#/hr
)5
6262
520
4747
20Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
0%0%
0%0%
0%0%
0%3%
4%1%
2%0%
Adj. F
low (v
ph)
154
2174
1428
218
864
8218
811
6128
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
040
00
8828
218
946
018
811
890
Turn
Typ
ePe
rmNA
pm+p
tNA
Perm
Perm
NApm
+pt
NAPr
otecte
d Pha
ses
43
82
16
Perm
itted P
hase
s4
88
26
Detec
tor P
hase
44
38
82
21
6Sw
itch P
hase
Minim
um In
itial (s
)8.0
8.05.0
8.08.0
38.0
38.0
5.038
.0Mi
nimum
Spli
t (s)
41.8
41.8
9.041
.841
.844
.044
.09.0
44.0
Total
Spli
t (s)
41.8
41.8
11.0
41.8
41.8
44.0
44.0
13.2
44.0
Total
Spli
t (%
)38
.0%38
.0%10
.0%38
.0%38
.0%40
.0%40
.0%12
.0%40
.0%Ye
llow
Time (
s)4.0
4.03.0
4.04.0
4.04.0
3.04.0
All-R
ed T
ime (
s)2.0
2.01.0
2.02.0
2.02.0
1.02.0
Lost
Time A
djust
(s)-2
.0-2
.0-2
.0-2
.0-2
.00.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
Lead
/Lag
Lag
Lag
Lead
Lag
Lag
Lead
Lead
-Lag
Opti
mize
?Re
call M
ode
None
None
None
None
None
C-Ma
xC-
Max
None
C-Ma
xAc
t Effc
t Gre
en (s
)15
.815
.815
.869
.069
.086
.286
.2Ac
tuated
g/C
Ratio
0.14
0.14
0.14
0.63
0.63
0.78
0.78
v/c R
atio
0.21
0.50
0.69
0.07
0.48
0.40
0.47
Contr
ol De
lay25
.252
.318
.111
.913
.06.1
5.2Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.0To
tal D
elay
25.2
52.3
18.1
11.9
13.0
6.15.2
LOS
CD
BB
BA
AAp
proa
ch D
elay
25.2
26.2
13.0
5.3
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 2
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SC
CB
AQu
eue L
ength
50th
(m)
3.818
.79.2
1.554
.48.2
38.1
Queu
e Len
gth 95
th (m
)13
.232
.835
.36.1
92.0
19.0
67.5
Inter
nal L
ink D
ist (m
)37
.276
.839
.666
.2Tu
rn B
ay Le
ngth
(m)
12.0
40.0
Base
Cap
acity
(vph
)42
754
277
325
919
9046
825
51St
arva
tion C
ap R
educ
tn0
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
Stor
age C
ap R
educ
tn0
00
00
00
Redu
ced v
/c Ra
tio0.0
90.1
60.3
60.0
70.4
80.4
00.4
7
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 11
0Of
fset: 6
9.3 (6
3%),
Refer
ence
d to p
hase
2:NB
TL an
d 6:S
BTL,
Star
t of G
reen
Natur
al Cy
cle: 1
05Co
ntrol
Type
: Actu
ated-
Coor
dinate
dMa
ximum
v/c R
atio:
0.69
Inter
secti
on S
ignal
Delay
: 11.1
Inter
secti
on LO
S: B
Inter
secti
on C
apac
ity U
tiliza
tion 1
01.8%
ICU
Leve
l of S
ervic
e GAn
alysis
Per
iod (m
in) 15
Splits
and P
hase
s:
1: W
estm
ount
Road
& W
estco
urt P
lace/F
ather
Dav
id Ba
uer D
rive
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 3
Lane
Gro
upEB
TEB
RW
BLW
BTNB
LNB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
277
3114
356
1817
Futur
e Volu
me (v
ph)
277
3114
356
1817
Ideal
Flow
(vphp
l)16
5019
0017
7519
0017
7517
50St
orag
e Len
gth (m
)0.0
80.0
0.00.0
Stor
age L
anes
01
11
Tape
r Len
gth (m
)7.5
0.0La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.986
0.850
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1568
016
6818
7916
6814
71Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1568
016
6818
7916
6814
71Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)10
0.899
.292
.1Tr
avel
Time (
s)6.0
6.05.5
Confl
. Ped
s. (#
/hr)
88
13
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)2%
8%0%
0%0%
0%Ad
j. Flow
(vph
)27
731
1435
618
17Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)30
80
1435
618
17Si
gn C
ontro
lFr
eeFr
eeSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
0.0%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 4
Move
ment
EBT
EBR
WBL
WBT
NBL
NBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
277
3114
356
1817
Futur
e Volu
me (V
eh/h)
277
3114
356
1817
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
277
3114
356
1817
Pede
strian
s1
38
Lane
Widt
h (m)
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
Perce
nt Bl
ocka
ge0
01
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
101
pX, p
latoo
n unb
locke
d0.9
80.9
80.9
8vC
, con
flictin
g volu
me31
668
630
4vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l29
567
128
2tC
, sing
le (s)
4.16.4
6.2tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %99
9698
cM ca
pacit
y (ve
h/h)
1248
410
742
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2Vo
lume T
otal
308
1435
618
17Vo
lume L
eft0
140
180
Volum
e Righ
t31
00
017
cSH
1700
1248
1700
410
742
Volum
e to C
apac
ity0.1
80.0
10.2
10.0
40.0
2Qu
eue L
ength
95th
(m)
0.00.3
0.01.1
0.6Co
ntrol
Delay
(s)
0.07.9
0.014
.210
.0La
ne LO
SA
BA
Appr
oach
Dela
y (s)
0.00.3
12.1
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.8
Inter
secti
on C
apac
ity U
tiliza
tion
30.0%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 5
Lane
Gro
upW
BLW
BRNB
TNB
RSB
LSB
TLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
2313
983
942
7911
85Fu
ture V
olume
(vph
)23
139
839
4279
1185
Ideal
Flow
(vphp
l)17
7517
5017
7519
0017
7519
00St
orag
e Len
gth (m
)0.0
0.00.0
13.0
Stor
age L
anes
11
01
Tape
r Len
gth (m
)0.0
7.5La
ne U
til. F
actor
1.00
1.00
0.95
0.95
1.00
0.95
Ped B
ike F
actor
Frt
0.850
0.993
Flt P
rotec
ted0.9
500.9
50Sa
td. F
low (p
rot)
1603
1471
3220
016
6835
00Flt
Per
mitte
d0.9
500.9
50Sa
td. F
low (p
erm)
1603
1471
3220
016
6835
00Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)46
.913
4.663
.6Tr
avel
Time (
s)2.8
8.13.8
Confl
. Ped
s. (#
/hr)
11
2525
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)4%
0%3%
0%0%
2%Ad
j. Flow
(vph
)23
139
839
4279
1185
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
2313
988
10
7911
85Si
gn C
ontro
lSt
opFr
eeFr
ee
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 4
4.7%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 6
Move
ment
WBL
WBR
NBT
NBR
SBL
SBT
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
2313
983
942
7911
85Fu
ture V
olume
(Veh
/h)23
139
839
4279
1185
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
2313
983
942
7911
85Pe
destr
ians
251
1La
ne W
idth (
m)3.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.2Pe
rcent
Bloc
kage
20
0Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eTW
LTL
None
Media
n stor
age v
eh)
2Up
strea
m sig
nal (m
)33
264
pX, p
latoo
n unb
locke
d0.9
30.8
90.8
9vC
, con
flictin
g volu
me16
3646
690
6vC
1, sta
ge 1
conf
vol
885
vC2,
stage
2 co
nf vo
l75
2vC
u, un
block
ed vo
l10
2016
065
2tC
, sing
le (s)
6.96.9
4.1tC
, 2 st
age (
s)5.9
tF (s
)3.5
3.32.2
p0 qu
eue f
ree %
9482
90cM
capa
city (
veh/h
)35
575
482
5
Dire
ction
, Lan
e #W
B 1
WB
2NB
1NB
2SB
1SB
2SB
3Vo
lume T
otal
2313
955
932
279
592
592
Volum
e Left
230
00
790
0Vo
lume R
ight
013
90
420
00
cSH
355
754
1700
1700
825
1700
1700
Volum
e to C
apac
ity0.0
60.1
80.3
30.1
90.1
00.3
50.3
5Qu
eue L
ength
95th
(m)
1.75.4
0.00.0
2.50.0
0.0Co
ntrol
Delay
(s)
15.8
10.8
0.00.0
9.80.0
0.0La
ne LO
SC
BA
Appr
oach
Dela
y (s)
11.6
0.00.6
Appr
oach
LOS
B
Inter
secti
on S
umma
ryAv
erag
e Dela
y 1.1
Inter
secti
on C
apac
ity U
tiliza
tion
44.7%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 7
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
91
1812
40
111
774
511
375
1126
4Fu
ture V
olume
(vph
)9
118
124
011
17
745
113
7511
264
Ideal
Flow
(vphp
l)19
0019
0019
0017
7519
0017
5019
0017
7519
0017
7519
0019
00St
orag
e Len
gth (m
)0.0
0.00.0
0.025
.00.0
30.0
0.0St
orag
e Lan
es0
01
01
01
0Ta
per L
ength
(m)
0.00.0
7.57.5
Lane
Util.
Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
00.9
50.9
51.0
00.9
50.9
5Pe
d Bike
Fac
torFr
t0.9
130.8
500.9
800.9
99Flt
Pro
tected
0.984
0.950
0.950
0.950
Satd.
Flow
(pro
t)0
1688
016
1915
360
1785
3181
016
1934
970
Flt P
ermi
tted
0.984
0.950
0.950
0.950
Satd.
Flow
(per
m)0
1688
016
1915
360
1785
3181
016
1934
970
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)57
.560
.419
7.713
4.6Tr
avel
Time (
s)3.5
3.611
.98.1
Confl
. Ped
s. (#
/hr)
21
12
1327
2713
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%0%
3%0%
4%0%
3%1%
3%2%
0%Ad
j. Flow
(vph
)9
118
124
011
17
745
113
7511
264
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
028
012
411
10
785
80
7511
300
Sign
Con
trol
Stop
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 5
8.6%
ICU
Leve
l of S
ervic
e BAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 8
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
91
1812
40
111
774
511
375
1126
4Fu
ture V
olume
(Veh
/h)9
118
124
011
17
745
113
7511
264
Sign
Con
trol
Stop
Stop
Free
Free
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)9
118
124
011
17
745
113
7511
264
Pede
strian
s13
271
2La
ne W
idth (
m)3.5
3.53.5
3.5W
alking
Spe
ed (m
/s)1.2
1.21.2
1.2Pe
rcent
Bloc
kage
12
00
Righ
t turn
flare
(veh
)Me
dian t
ype
None
TWLT
LMe
dian s
torag
e veh
)2
Upstr
eam
signa
l (m)
198
198
pX, p
latoo
n unb
locke
d0.9
00.9
00.9
00.9
00.9
00.8
50.9
00.8
5vC
, con
flictin
g volu
me17
9021
9057
915
7521
3645
811
4388
5vC
1, sta
ge 1
conf
vol
1291
1291
842
842
vC2,
stage
2 co
nf vo
l50
089
973
212
93vC
u, un
block
ed vo
l11
4415
8930
590
415
290
933
504
tC, s
ingle
(s)7.5
6.56.9
7.66.5
7.04.1
4.2tC
, 2 st
age (
s)6.5
5.56.6
5.5tF
(s)
3.54.0
3.33.5
4.03.3
2.22.2
p0 qu
eue f
ree %
9510
097
6410
088
9991
cM ca
pacit
y (ve
h/h)
181
207
619
340
212
892
659
870
Dire
ction
, Lan
e #EB
1W
B 1
WB
2NB
1NB
2NB
3SB
1SB
2SB
3Vo
lume T
otal
2812
411
17
497
361
7575
137
9Vo
lume L
eft9
124
07
00
750
0Vo
lume R
ight
180
111
00
113
00
4cS
H33
534
089
265
917
0017
0087
017
0017
00Vo
lume t
o Cap
acity
0.08
0.36
0.12
0.01
0.29
0.21
0.09
0.44
0.22
Queu
e Len
gth 95
th (m
)2.2
13.0
3.40.3
0.00.0
2.30.0
0.0Co
ntrol
Delay
(s)
16.7
21.5
9.610
.50.0
0.09.5
0.00.0
Lane
LOS
CC
AB
AAp
proa
ch D
elay (
s)16
.715
.90.1
0.6Ap
proa
ch LO
SC
C
Inter
secti
on S
umma
ryAv
erag
e Dela
y 2.1
Inter
secti
on C
apac
ity U
tiliza
tion
58.6%
ICU
Leve
l of S
ervic
e B
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 9
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
112
476
149
166
791
9131
066
454
152
952
166
Futur
e Volu
me (v
ph)
112
476
149
166
791
9131
066
454
152
952
166
Ideal
Flow
(vphp
l)17
7517
7519
0017
7519
0017
5017
7517
7519
0017
7519
0017
50St
orag
e Len
gth (m
)13
0.00.0
60.0
30.0
20.0
0.050
.050
.0St
orag
e Lan
es1
01
11
01
1Ta
per L
ength
(m)
7.57.5
7.57.5
Lane
Util.
Fac
tor1.0
00.9
50.9
51.0
00.9
51.0
01.0
00.9
50.9
51.0
00.9
51.0
0Pe
d Bike
Fac
tor0.9
90.9
90.9
90.9
50.9
91.0
00.9
90.9
3Fr
t0.9
640.8
500.9
890.8
50Flt
Pro
tected
0.950
0.950
0.950
0.950
Satd.
Flow
(pro
t)15
3031
410
1668
3535
1428
1668
3227
016
3535
3513
62Flt
Per
mitte
d0.1
440.2
460.1
090.3
21Sa
td. F
low (p
erm)
230
3141
042
935
3513
5919
032
270
545
3535
1273
Righ
t Tur
n on R
edYe
sYe
sYe
sYe
sSa
td. F
low (R
TOR)
3914
99
149
Link S
peed
(k/h)
6060
6060
Link D
istan
ce (m
)20
2.314
2.015
8.319
7.7Tr
avel
Time (
s)12
.18.5
9.511
.9Co
nfl. P
eds.
(#/hr
)35
2121
3553
3636
53Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Heav
y Veh
icles
(%)
9%2%
0%0%
1%3%
0%2%
0%2%
1%8%
Adj. F
low (v
ph)
112
476
149
166
791
9131
066
454
152
952
166
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
112
625
016
679
191
310
718
015
295
216
6Tu
rn T
ype
pm+p
tNA
pm+p
tNA
Perm
pm+p
tNA
pm+p
tNA
Perm
Prote
cted P
hase
s7
43
85
21
6Pe
rmitte
d Pha
ses
48
82
66
Detec
tor P
hase
74
38
85
21
66
Switc
h Pha
seMi
nimum
Initia
l (s)
5.031
.05.0
31.0
31.0
5.032
.05.0
32.0
32.0
Minim
um S
plit (
s)9.0
37.0
9.037
.037
.09.0
38.0
9.038
.038
.0To
tal S
plit (
s)10
.038
.010
.038
.038
.024
.047
.015
.038
.038
.0To
tal S
plit (
%)
9.1%
34.5%
9.1%
34.5%
34.5%
21.8%
42.7%
13.6%
34.5%
34.5%
Yello
w Tim
e (s)
3.04.0
3.04.0
4.03.0
4.03.0
4.04.0
All-R
ed T
ime (
s)1.0
2.01.0
2.02.0
1.02.0
1.02.0
2.0Lo
st Tim
e Adju
st (s)
0.0-2
.00.0
-2.0
-2.0
0.0-2
.00.0
-2.0
-2.0
Total
Lost
Time (
s)4.0
4.04.0
4.04.0
4.04.0
4.04.0
4.0Le
ad/La
gLe
adLa
gLe
adLa
gLa
gLe
adLa
gLe
adLa
gLa
gLe
ad-L
ag O
ptimi
ze?
Reca
ll Mod
eNo
neNo
neNo
neNo
neNo
neNo
neMa
xNo
neMa
xMa
xAc
t Effc
t Gre
en (s
)39
.433
.439
.433
.433
.457
.043
.144
.634
.734
.7Ac
tuated
g/C
Ratio
0.36
0.31
0.36
0.31
0.31
0.53
0.40
0.41
0.32
0.32
v/c R
atio
0.72
0.63
0.74
0.73
0.17
0.89
0.56
0.47
0.84
0.33
Contr
ol De
lay50
.333
.545
.938
.21.4
54.5
27.2
19.7
42.9
8.0Qu
eue D
elay
0.00.0
0.00.0
0.00.0
0.00.0
0.00.0
Total
Dela
y50
.333
.545
.938
.21.4
54.5
27.2
19.7
42.9
8.0LO
SD
CD
DA
DC
BD
AAp
proa
ch D
elay
36.0
36.2
35.4
35.5
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 10
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RAp
proa
ch LO
SD
DD
DQu
eue L
ength
50th
(m)
16.1
59.5
24.6
83.4
0.050
.663
.516
.810
5.12.7
Queu
e Len
gth 95
th (m
)#3
6.179
.5#4
9.810
6.32.2
#99.3
84.4
28.9
#141
.818
.8Int
erna
l Link
Dist
(m)
178.3
118.0
134.3
173.7
Turn
Bay
Leng
th (m
)13
0.060
.030
.020
.050
.050
.0Ba
se C
apac
ity (v
ph)
155
1012
224
1109
528
372
1287
340
1131
508
Star
vatio
n Cap
Red
uctn
00
00
00
00
00
Spillb
ack C
ap R
educ
tn0
00
00
00
00
0St
orag
e Cap
Red
uctn
00
00
00
00
00
Redu
ced v
/c Ra
tio0.7
20.6
20.7
40.7
10.1
70.8
30.5
60.4
50.8
40.3
3
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCy
cle Le
ngth:
110
Actua
ted C
ycle
Leng
th: 10
8.4Na
tural
Cycle
: 95
Contr
ol Ty
pe: A
ctuate
d-Un
coor
dinate
dMa
ximum
v/c R
atio:
0.89
Inter
secti
on S
ignal
Delay
: 35.8
Inter
secti
on LO
S: D
Inter
secti
on C
apac
ity U
tiliza
tion 9
4.1%
ICU
Leve
l of S
ervic
e FAn
alysis
Per
iod (m
in) 15
# 9
5th pe
rcenti
le vo
lume e
xcee
ds ca
pacit
y, qu
eue m
ay be
long
er.
Q
ueue
show
n is m
axim
um af
ter tw
o cyc
les.
Splits
and P
hase
s:
5: W
estm
ount
Road
& E
rb S
treet
Wes
t
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 11
Lane
Gro
upEB
LEB
TEB
RW
BLW
BTW
BRNB
LNB
TNB
RSB
LSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
1564
26
2397
048
40
2093
194
Futur
e Volu
me (v
ph)
1564
26
2397
048
40
2093
194
Ideal
Flow
(vphp
l)19
0016
5019
0019
0016
5019
0019
0015
5019
0019
0015
5019
00La
ne U
til. F
actor
0.95
0.95
0.95
0.95
0.95
0.95
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.999
0.993
0.887
0.932
Flt P
rotec
ted0.9
990.9
990.9
920.9
76Sa
td. F
low (p
rot)
030
350
030
190
013
490
013
940
Flt P
ermi
tted
0.999
0.999
0.992
0.976
Satd.
Flow
(per
m)0
3035
00
3019
00
1349
00
1394
0Lin
k Spe
ed (k
/h)60
6060
60Lin
k Dist
ance
(m)
133.3
150.2
112.8
132.3
Trav
el Tim
e (s)
8.09.0
6.87.9
Confl
. Ped
s. (#
/hr)
1211
1112
53
35
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
2%0%
0%1%
20%
0%0%
0%0%
0%0%
Adj. F
low (v
ph)
1564
26
2397
048
40
2093
194
Shar
ed La
ne T
raffic
(%)
Lane
Gro
up F
low (v
ph)
066
30
010
410
024
00
188
0Si
gn C
ontro
lFr
eeFr
eeSt
opSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 7
8.8%
ICU
Leve
l of S
ervic
e DAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 12
Move
ment
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
1564
26
2397
048
40
2093
194
Futur
e Volu
me (V
eh/h)
1564
26
2397
048
40
2093
194
Sign
Con
trol
Free
Free
Stop
Stop
Grad
e0%
0%0%
0%Pe
ak H
our F
actor
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Hour
ly flo
w ra
te (vp
h)15
642
623
970
484
020
931
94Pe
destr
ians
53
1112
Lane
Widt
h (m)
3.53.5
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
1.21.2
Perce
nt Bl
ocka
ge0
01
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)27
5pX
, plat
oon u
nbloc
ked
0.91
0.91
0.91
0.91
0.91
0.91
vC, c
onflic
ting v
olume
1030
659
1316
1762
338
1426
1741
526
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
1030
421
1145
1636
6712
6616
1352
6tC
, sing
le (s)
4.14.1
7.56.5
6.97.5
6.56.9
tC, 2
stag
e (s)
tF (s
)2.2
2.23.5
4.03.3
3.54.0
3.3p0
queu
e fre
e %98
9896
100
9813
9981
cM ca
pacit
y (ve
h/h)
676
1034
108
8788
810
790
495
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2NB
1SB
1Vo
lume T
otal
336
327
508
533
2418
8Vo
lume L
eft15
023
04
93Vo
lume R
ight
06
048
2094
cSH
676
1700
1034
1700
402
175
Volum
e to C
apac
ity0.0
20.1
90.0
20.3
10.0
61.0
7Qu
eue L
ength
95th
(m)
0.50.0
0.50.0
1.573
.7Co
ntrol
Delay
(s)
0.70.0
0.60.0
14.5
142.3
Lane
LOS
AA
BF
Appr
oach
Dela
y (s)
0.40.3
14.5
142.3
Appr
oach
LOS
BF
Inter
secti
on S
umma
ryAv
erag
e Dela
y 14
.4Int
erse
ction
Cap
acity
Utili
zatio
n 78
.8%IC
U Le
vel o
f Ser
vice
DAn
alysis
Per
iod (m
in)15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 13
Lane
Gro
upEB
LEB
RNB
LNB
TSB
TSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
417
743
75
3Fu
ture V
olume
(vph
)4
177
437
53
Ideal
Flow
(vphp
l)17
6519
0019
0016
5016
5019
00La
ne U
til. F
actor
1.00
1.00
1.00
1.00
1.00
1.00
Ped B
ike F
actor
Frt
0.868
0.949
Flt P
rotec
ted0.9
990.9
59Sa
td. F
low (p
rot)
1513
00
1365
1548
0Flt
Per
mitte
d0.9
990.9
59Sa
td. F
low (p
erm)
1513
00
1365
1548
0Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)56
.113
2.361
.8Tr
avel
Time (
s)3.4
7.93.7
Confl
. Ped
s. (#
/hr)
83
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0He
avy V
ehicl
es (%
)0%
0%17
%0%
0%0%
Adj. F
low (v
ph)
417
743
75
3Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)18
10
050
80
Sign
Con
trol
Stop
Free
Free
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 2
8.9%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 14
Move
ment
EBL
EBR
NBL
NBT
SBT
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
417
743
75
3Fu
ture V
olume
(Veh
/h)4
177
437
53
Sign
Con
trol
Stop
Free
Free
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
417
743
75
3Pe
destr
ians
38
Lane
Widt
h (m)
3.53.5
Walk
ing S
peed
(m/s)
1.21.2
Perce
nt Bl
ocka
ge0
1Ri
ght tu
rn fla
re (v
eh)
Media
n typ
eNo
neNo
neMe
dian s
torag
e veh
)Up
strea
m sig
nal (m
)pX
, plat
oon u
nbloc
ked
vC, c
onflic
ting v
olume
108
108
vC1,
stage
1 co
nf vo
lvC
2, sta
ge 2
conf
vol
vCu,
unblo
cked
vol
108
108
tC, s
ingle
(s)6.4
6.24.3
tC, 2
stag
e (s)
tF (s
)3.5
3.32.4
p0 qu
eue f
ree %
100
8497
cM ca
pacit
y (ve
h/h)
864
1075
1519
Dire
ction
, Lan
e #EB
1NB
1SB
1Vo
lume T
otal
181
508
Volum
e Left
443
0Vo
lume R
ight
177
03
cSH
1069
1519
1700
Volum
e to C
apac
ity0.1
70.0
30.0
0Qu
eue L
ength
95th
(m)
4.90.7
0.0Co
ntrol
Delay
(s)
9.16.4
0.0La
ne LO
SA
AAp
proa
ch D
elay (
s)9.1
6.40.0
Appr
oach
LOS
A
Inter
secti
on S
umma
ryAv
erag
e Dela
y 8.2
Inter
secti
on C
apac
ity U
tiliza
tion
28.9%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 15
Lane
Gro
upEB
LEB
TW
BTW
BRSB
LSB
RLa
ne C
onfig
urati
ons
Traff
ic Vo
lume (
vph)
068
310
3039
021
Futur
e Volu
me (v
ph)
068
310
3039
021
Ideal
Flow
(vphp
l)19
0019
0019
0019
0019
0019
00La
ne U
til. F
actor
1.00
0.95
0.95
0.95
1.00
1.00
Frt
0.995
0.865
Flt P
rotec
tedSa
td. F
low (p
rot)
035
0034
820
015
93Flt
Per
mitte
dSa
td. F
low (p
erm)
035
0034
820
015
93Lin
k Spe
ed (k
/h)60
6060
Link D
istan
ce (m
)14
2.013
3.391
.5Tr
avel
Time (
s)8.5
8.05.5
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ad
j. Flow
(vph
)0
683
1030
390
21Sh
ared
Lane
Tra
ffic (%
)La
ne G
roup
Flow
(vph
)0
683
1069
00
21Si
gn C
ontro
lFr
eeFr
eeSt
op
Inter
secti
on S
umma
ryAr
ea T
ype:
Othe
rCo
ntrol
Type
: Uns
ignali
zed
Inter
secti
on C
apac
ity U
tiliza
tion 3
9.7%
ICU
Leve
l of S
ervic
e AAn
alysis
Per
iod (m
in) 15
1802
89 -
Wes
tmou
nt Pl
ace
Para
digm
Tran
spor
tation
Solu
tions
Limi
tedSy
nchr
o 9 R
epor
tPa
ge 16
Move
ment
EBL
EBT
WBT
WBR
SBL
SBR
Lane
Con
figur
ation
sTr
affic
Volum
e (ve
h/h)
068
310
3039
021
Futur
e Volu
me (V
eh/h)
068
310
3039
021
Sign
Con
trol
Free
Free
Stop
Grad
e0%
0%0%
Peak
Hou
r Fac
tor1.0
01.0
01.0
01.0
01.0
01.0
0Ho
urly
flow
rate
(vph)
068
310
3039
021
Pede
strian
sLa
ne W
idth (
m)W
alking
Spe
ed (m
/s)Pe
rcent
Bloc
kage
Righ
t turn
flare
(veh
)Me
dian t
ype
None
None
Media
n stor
age v
eh)
Upstr
eam
signa
l (m)
142
pX, p
latoo
n unb
locke
d0.8
7vC
, con
flictin
g volu
me10
3013
9153
4vC
1, sta
ge 1
conf
vol
vC2,
stage
2 co
nf vo
lvC
u, un
block
ed vo
l10
3011
4453
4tC
, sing
le (s)
4.16.8
6.9tC
, 2 st
age (
s)tF
(s)
2.23.5
3.3p0
queu
e fre
e %10
010
096
cM ca
pacit
y (ve
h/h)
670
168
490
Dire
ction
, Lan
e #EB
1EB
2W
B 1
WB
2SB
1Vo
lume T
otal
342
342
687
382
21Vo
lume L
eft0
00
00
Volum
e Righ
t0
00
3921
cSH
1700
1700
1700
1700
490
Volum
e to C
apac
ity0.2
00.2
00.4
00.2
20.0
4Qu
eue L
ength
95th
(m)
0.00.0
0.00.0
1.1Co
ntrol
Delay
(s)
0.00.0
0.00.0
12.7
Lane
LOS
BAp
proa
ch D
elay (
s)0.0
0.012
.7Ap
proa
ch LO
SB
Inter
secti
on S
umma
ryAv
erag
e Dela
y 0.2
Inter
secti
on C
apac
ity U
tiliza
tion
39.7%
ICU
Leve
l of S
ervic
e A
Analy
sis P
eriod
(min)
15
Westmount Place Mixed-Use Development | Transportation Impact Study | 180289 | April 2019
Paradigm Transportation Solutions Limited | Appendices
Appendix G OTM Signal Warrants
OTM Signal WarrantsAppendix HWestmount Place Mixed-Use Development TIS
180289
OTM Signal WarrantsAppendix HWestmount Place Mixed-Use Development TIS