Westminster Bridge Road VMAP Stage 5 Submission London Borough of Lambeth
4 November 2016
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805
Notice
This document and its contents have been prepared and are intended solely for London Borough of Lambeth’s and Transport for London’s information and use in relation to base VISSIM model calibration for the Westminster Bridge Road scheme.
Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents.
This document has 21 pages including the cover.
Document History
Job number: 5099203.805 Document ref: VMAP Stage 5 Submission
Revision Purpose Description Originated Checked Reviewed Authorised Date
Rev 1.0 VMAP Stage 5 Report PB XL TE GW 04/11/16
Client signoff
Client London Borough of Lambeth
Project Westminster Bridge Road
Document title VMAP Stage 5 Submission
Job No. 5099203.805
Copy No.
Document reference
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805
Table of contents
Chapter Pages
1. Introduction 4 1.1. Background 4 1.2. Report Structure 4
2. Proposed VISSIM Models 5 2.1. Model Network 5 2.2. Proposals (V503) 6 2.3. Proposed Model Assumptions (V503) 7 2.4. Proposed Model Results 7
3. Summary and Conclusion 13
Appendices 14
Future BaseTraffic Flow Diagrams 15
Proposed Traffic Flow Diagrams 18
Figures Figure 2-1 Extent of study area (outlined in red) ......................................................................................... 6 Figure 2-2 Travel time sections ................................................................................................................... 9
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 4
1. Introduction
1.1. Background Atkins was commissioned by the London Borough of Lambeth to carry out VISSIM modelling for improvement schemes surrounding several junctions on Westminster Bridge Road near Lower Marsh and Kennington Road. The VISSIM model has been extended to include Kennington Road and Lambeth Road as instructed by TfL.
The study area is situated in the London Borough of Lambeth and carries significant volumes of traffic, including buses and HGVs. The purpose of this study is to produce proposed VISSIM models for the following signalised junctions:
Westminster Bridge Road (A302) / Kennington Road (A23) / Baylis Road (B300) / Hercules Road o UTC Region 168 o Comprises:
09/071 – Stream 0 09/372 – Stream 1
Lambeth Road (A3203) / Kennington Road (A23) o UTC Region 277 o Comprises:
09/037
Lambeth Road (A3203) / Hercules Road o UTC Region 277 o Comprises:
09/239
This report covers the proposed traffic modelling process, a description of the proposed scheme, details of the modifications in the models, and an evaluation of the results for the AM and PM peak hours. This process involved the modification of the validated base models to include new designs for the above junctions and changes to the existing road network, as well as the inclusion of future demands (Committed and Development Flows). All VISSIM modelling was completed using VISSIM 5.40.
The report will be submitted to TfL together will all relevant VISSIM modelling as part of the VISSIM Model Auditing Process (VMAP) Stage 5.
1.2. Report Structure The structure of report is as follows:
Section 2: Proposed VISSIM Models;
Section 3: Summary and Conclusions;
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 5
2. Proposed VISSIM Models
Proposed VISSIM models were developed in accordance with TfL’s guidance set out in the Transport for London Modelling Guidelines, Version 3. The models were developed in alignment with the principles of the TfL Model Audit Process (MAP), any deviation from this process has been agreed with TfL.
The proposal required modifications at the junction between Westminster Bridge Road and Kennington Road, with a new diagonal crossing and improved cycle facilities as part of the integrated improvements. Base validated models have been used to provide the model basis. Any changes to the base model are explained within this report.
2.1. Model Network The extent of the VISSIM model is shown in Figure 2-1 and includes:
The junction of Westminster Bridge Road (A302) with Kennington Rad (A23), Baylis Road (B300), and Hercules Road;
Kennington Road (A23) between Lambeth Road (A3203) in the south and Westminster Bridge Road (A302) in the north;
Lambeth Road (A3203) between Hercules Road in the west and Kennington Road (A23) in the east;
Hercules road between Lambeth Road (A3203) in the southwest and Westminster Bridge Road (A302) in the northeast; and
Cosser Street between Hercules Road in the west and Kennington Road (A23) in the east.
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 6
Figure 2-1 Extent of study area (outlined in red)
The network includes the following traffic signal junctions, puffins, and pelicans:
J09/037 Kennington Road (A23) / Lambeth Road (A3203)
J09/071 Westminster Bridge Road (A302) / Kennington Road (A23) / Baylis Road (B300) / Hercules Road
J09/239 Lambeth Road (A3203) / Hercules Road
P09/372 Westminster Bridge Road (A302) / Kennington Road (A23) / Baylis Road (B300) / Hercules Road
2.2. Proposals (V503) The proposal will include a number of changes to the base validated model, all of which are to the Junction at Westminster Bridge Road / Kennington Road / Baylis Road:
A new diagonal crossing at Westminster Bridge Road / Kennington Road / Baylis Road between Lambeth North Underground Station and the wouth west footway;
The left turn from Westminster Bridge Road WB is banned, and the traffic island at this location removed;
The left hand turn from Baylis Road to Westminster Bridge Road is banned;
Hercules Road at the approach to Kennington Road is realigned, and becomes a priority junction;
Realignment of the existing controlled crossing facilities;
Extension of the ASLs on Kennington Road and Baylis Road arms to 7.5m;
Four second head starts for cyclists on Kennington Road and Baylis Road; and
A new 5m ASL on Wesminster Bridge Road WB approach.
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 7
Northbound Quietway with a stepped cycle track leading into the Kennington Road Advanced Stop Lane; and
Southbound Quietway with a stepped cycle lane leading to a side by side controlled crossing on Kennington Road to access Hercules Road.
2.3. Proposed Model Assumptions (V503) The following assumptions were made when constructing the proposed traffic modelling scenarios:
The proposals’ modelling is based on VMAP Stage 2 and 3 models for the AM peak model (08:15 – 09:15) and the PM peak (18:00 – 19:00);
Junctions J09/071 and P09/372 are affected by the proposals;
The VISSIM base models have been modified according to the schemes that have been described in Sections 2.1 and Error! Reference source not found.2;
Flows for the Future Base and Proposed models have been informed by results of individual ONE model runs, it should be noted that the base model flows were based on on-site observations;
The Proposed model journey time results are compared to the Base and Future Base results;
Proposed signal data, including intergreen times, stage timings, and phase delays for all junctions within the model (09/071, 09/037, 09/239 and 09/372) are based on the LinSig models. The signal timings have been tweaked slightly in Vissim to further optimise journey times.
The ‘.PUA’ and ‘.VAP’ files relating to model have been modified according to the LinSigs;
The lane widths of lane 3 on Kennington Road NB, and lane 2 on Wesminster Bridge Road WB have been increased to incorporate a proposed cycle lane at these locations.
2.4. Proposed Model Results The results from the proposed and future base models have been obtained from a set of 10 simulations, the seed values used were between 17 and 107 (with an increment of 10 between each run).
2.4.1. Traffic Flows (V504) Detail of the traffic flows for the Future Base and Proposed models can be found in Appendix A and Appendix B, respectively. Tables 2-1 and 2-2 below show the traffic flows for the AM and PM peaks respectively. Base, Future Base and proposed flows are included in the results tables.
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 8
Table 2-1 AM Peak Model Flows
Junction
Mo
vem
en
t
Base
Fu
ture
Bas
e
Pro
po
sed
Lambeth Rd/ Kennington Rd S-E 204 96 100
Lambeth Rd/ Kennington Rd S-N 375 278 240
Lambeth Rd/ Kennington Rd S-W 31 53 61
Lambeth Rd/ Kennington Rd E-S 76 26 63
Lambeth Rd/ Kennington Rd E-N 11 0 0
Lambeth Rd/ Kennington Rd E-W 290 156 256
Lambeth Rd/ Kennington Rd W-S 50 30 40
Lambeth Rd/ Kennington Rd N-S 160 102 100
Lambeth Rd/ Kennington Rd N-E 16 14 0
Lambeth Rd/ Kennington Rd W-E 316 232 348
Lambeth Rd/ Kennington Rd W-N 23 32 202
Lambeth Rd/ Kennington Rd N-W 29 96 79
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-E 220 245 249
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-N 24 0 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-S 25 30 24
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-SW 4 0 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-E 11 10 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-S 130 165 156
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-SW 79 0 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd E-W 396 193 307
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd E-S 50 14 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd SW-W 16 61 13
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd S-W 164 98 118
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd SW-N 47 91 20
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd S-N 246 163 321
Lambeth Rd/ Hercules Rd W-E 389 293 472
Lambeth Rd/ Hercules Rd W-N 71 207 10
Lambeth Rd/ Hercules Rd E-W 351 305 387
Lambeth Rd/ Hercules Rd N-W 82 0 9
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 9
Table 2-2 PM Peak Model Flows
Junction
Mo
vem
en
t
Base
Fu
ture
Bas
e
Pro
po
sed
Lambeth Rd/ Kennington Rd S-E 92 55 73
Lambeth Rd/ Kennington Rd S-N 391 159 184
Lambeth Rd/ Kennington Rd S-W 46 32 33
Lambeth Rd/ Kennington Rd E-S 91 60 83
Lambeth Rd/ Kennington Rd E-N 25 0 0
Lambeth Rd/ Kennington Rd E-W 337 233 225
Lambeth Rd/ Kennington Rd W-S 61 67 84
Lambeth Rd/ Kennington Rd N-S 284 316 288
Lambeth Rd/ Kennington Rd N-E 18 11 0
Lambeth Rd/ Kennington Rd W-E 482 264 271
Lambeth Rd/ Kennington Rd W-N 36 12 117
Lambeth Rd/ Kennington Rd N-W 40 89 61
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-E 285 335 342
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-N 34 3 2
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-S 82 0 32
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd W-SW 3 0 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-E 10 3 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-S 209 336 319
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd N-SW 84 6 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd E-W 334 99 112
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd E-S 48 79 0
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd SW-W 16 26 1
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd S-W 139 27 52
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd SW-N 112 58 6
Westminster Bridge Rd/ Kennington Rd/ Baylis Rd S-N 304 126 254
Lambeth Rd/ Hercules Rd W-E 578 348 462
Lambeth Rd/ Hercules Rd W-N 132 114 11
Lambeth Rd/ Hercules Rd E-W 423 352 310
Lambeth Rd/ Hercules Rd N-W 88 6 11
2.4.2. Saturation Flows, Queue Lengths, and Journey Times (V505) Travel time sections are shown in Figure 2-2 below.
Figure 2-2 Travel time sections
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 10
In the VISSIM base model, the surveyed travel times were compared to the modelled data for both the AM and PM peak periods. In the proposed model the modelled travel times have been compared to the modelled future base, and the base for the AM and PM peak period.
Table 2-3 AM Peak Journey Time Comparison - General Traffic
General traffic journey times results for the AM peak period in the proposed model indicate an increased journey time when compared to the future base scenario for all routes. The maximum increase in journey time is 13.9 seconds on route 1 southbound. The closure of Hercules as a through route results in an increased volume of traffic along routes 1 and 2, resulting in increased journey times.
When compared to the base journey times, the proposed model also indicates a small increase in journey time on all sections.
Route Base (s) Futurebase (s) Proposed (s) Difference (between future
base and proposed) (s)
Difference (between base and proposed)
(s)
1 NB 55.6 52.2 62.4 10.2 6.8
1 SB 49.2 54.0 67.9 13.9 18.7
2 EB 58.9 66.3 77.0 3.7 18.1
2 WB 34.4 26.8 39.3 13.5 4.9
3 NB 70.0 188.9 n/a - -
3 SB 85.5 n/a n/a - -
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 11
Table 2-4 AM Peak Journey Time Comparison - Buses
Bus journey time results for the AM peak period in the proposed model indicate an increase on route 1 southbound (10.8s) and route 2 eastbound (14.9s), but a decrease on routes 1 northbound (-9.4s), and route 2 westbound (-7.9s). Taking into account all journey time sections, overall there is only a very slight negative impact on bus journey times.
When compared to the base journey times, the proposed results indicate a significant improvement on route 1 northbound (-14.7s) and route 2 westbound (-7.0s), and a slight increase in journey times on route 1 southbound (3.3s) and route 2 eastbound (1.6s).
Table 2-5 PM Peak Journey Time Comparison - General Traffic
General traffic journey time results for the PM peak period in the proposed model indicate slightly decreased journey times on routes 1 northbound (-2.8s), route 2 eastbound remains the same, while route 1 southbound (5.5s) and route 2 westbound (8.0s) see an increase in journey times.
When compared to base journey times, the proposal results show increased journey times on route 2, both eastbound (25.7s) and westbound (8.8s), and redcued journey times on route 1, both northbound (-4.6s) and southbound (-12.3s).
Table 2-6 PM Peak Journey Time Comparison - Buses
Route Base (s) Future base (s) Proposed (s) Difference (between future
base and proposed) (s)
Difference (between base and proposed)
(s)
1 NB 75.2 69.9 60.5 -9.4 -14.7
1 SB 85.2 77.7 88.5 10.8 3.3
2 EB 91.5 78.2 93.1 14.9 1.6
2 WB 105.0 105.9 98.0 -7.9 -7.0
Route Base (s) Future base (s) Proposed (s) Difference (between future
base and proposed) (s)
Difference (between base and proposed)
(s)
1 NB 51.0 49.2 46.4 -2.8 -4.6
1 SB 62.6 44.8 50.3 5.5 -12.3
2 EB 63.2 88.3 88.9 0.6 25.7
2 WB 31.2 32.0 40.0 8.0 8.8
3 NB 68.0 62.6 n/a - -
3 SB 84.8 87.5 n/a - -
Route Base (s) Future base (s) Proposed (s) Difference (between future
base and proposed) (s)
Difference (between base and proposed)
(s)
1 NB 56.0 55.2 51.0 -4.2 -5.0
1 SB 97.3 78.6 85.5 6.9 -11.8
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 12
Bus journey time results for the PM peak in the proposed model show a decrease on routes 1 northbound (-4.2s) and 2 eastbound (-6.3s) when compared to future base. There is an increase in journey times for routes 1 southbound (6.9s) and 2 westbound (8.7s).
When compared to the base journey times, the proposal results show a decrease on route 1, both northbound (-5.0s) and southbound (-11.8s), and on route 1 eastbound (-10.9s). There is an increase in journey time on route 2 eastbound (9.9s).
2 EB 86.3 81.7 75.4 -6.3 -10.9
2 WB 76.2 77.4 86.1 8.7 9.9
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 13
3. Summary and Conclusion
Calibrated and validated VISSIM base models (for the VMAP stage 5) were developed for the study area for the AM (08:15 to 09:15 hours) and PM (18:00 to 19:00 hours) peak hours.
As agreed with TfL, the model is required to be audited through TfL’s Model Auditing Process (MAP). The VISSIM model files have been supplied along with this report to allow that review.
Traffic flow analysis and journey time analysis have been undertaken for the models. Traffic flow analysis shows that the improvements at Westminster Bridge Road / Kenninton Road / Baylis Road and closure of Hercules Road to through traffic, have a very minimal negative impact on journey times for general traffic and buses. There is a general slight increase in journey time across all routes in the AM peak for both general traffic, but bus journey times have improved on certain routes while slightly worsened on others. The journey time results in the PM peak generally show that an increased journey time in one direction of travel has been accompanied by a journey time improvement in the other direction of travel, for both general traffic and buses. The changes in journey times in the most part are under 10 seconds.
Appendices
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 15
Future BaseTraffic Flow Diagrams
AM General Traffic (excluding Taxi)
AM Taxi
6
194
164
6
168
6284
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
0
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
22146
93
0167
26
72
1004
8
26031
2850
299
146
0 0
285
229
142
86
229176
176
299
229
0
170
299
285
27
75
31
4
52
897
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
3
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
8014
9
018
5
36
1812
27
63
680
36
82
0 0
68
107
76
87
10766
66
36
107
0
58
36
68
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 16
AM Cyclist
PM General Traffic (excluding Taxi)
8
8
28
2
131
2
679
83
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
3
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
79641
62
178
2
1
361
7
1041
1200
112
85
12 0
120
804
0 12
2
125
80438
38
112
0
297
332
2
95
38183
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
4
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
14011
43
0214
59
54
3027
3
25366
2790
322
73
6 0
279
143
68
28
143363
363
322
143
7
325
322
279
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 17
PM Taxi
PM Cyclist
0
75
37
1
11
4646
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
10
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
2022
13
019
10
42
356
9
304
830
43
45
0 0
83
29
42
25
2983
83
43
29
0
37
43
83
89
84
389
1
23
0
57
13
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
5
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
702
4
063
44
2
4760
7
6134
670
102
0
69 0
67
77
3 66
0
20
77478
478
102
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 18
Proposed Traffic Flow Diagrams
AM General Traffic (excluding Taxi)
AM Taxi
5
215
163
0
310
0308
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
0
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
24663
105
0245
46
65
980
149
26935
3703
445
4
5 8
373
395
5
92
395165
163
453
395
3
165
453
373
2
19
77
21
0
60
088
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
3
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
4724
11
017
9
17
160
77
1110
544
89
6
4 9
58
124
27
63
12437
33
98
124
3
37
98
58
4
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 19
AM Cyclist
PM General Traffic (excluding Taxi)
8
8
28
2
131
2
679
83
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
3
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
79641
62
178
2
1
361
7
1041
1200
112
85
12 0
120
804
0 12
2
125
80438
38
112
31
293
324
0
108
0189
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
4
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
14020
53
0222
73
50
3000
73
26584
2902
415
6
4 7
292
213
3
27
213352
350
422
213
3
352
422
292
2
Westminster Bridge Road VMAP Stage 5 Submission
Atkins VMAP Stage 5 Submission | Version 1.0 | 4 May 2016 | 5099203.805 20
PM Taxi
PM Cyclist
6
80
22
0
12
041
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
10
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
1642
22
015
11
10
180
43
257
616
70
3
7 5
67
59
4
22
5928
28
75
59
0
28
75
83
89
84
389
1
23
0
57
13
Westminster Bridge Road (A203)
Westminster Bridge Road (A203)
Kennington Road (A203)
Hercules Road
Baylis Road (B300)
5
Lambeth Road (A3203)
Lambeth Road (A3203)
Lambeth Road (A3203)
Kennington Road (A23)
702
4
063
44
2
4760
7
6134
670
102
0
69 0
67
77
3 66
0
20
77478
478
102
© Atkins Ltd except where stated otherwise. The Atkins logo, ‘Carbon Critical Design’ and the strapline ‘Plan Design Enable’ are trademarks of Atkins Ltd.
Tom Emmitt Atkins Euston Tower 286 Euston Road London NW1 3AT