Flexalen the solution. Thermaflex Insulation México Westin Hotel Panamá Chilled water & Hot sanitary water distribution networks

Westin Hotel Instalation En

Embed Size (px)

DESCRIPTION

Short presentation on Flexalen installation of the Westin Hotel in Panama, Central America.

Citation preview

Page 1: Westin Hotel Instalation En

Flexalen the solution.Flexalen the solution.

Thermaflex Insulation México

Westin Hotel Panamá

Chilled water & Hot sanitary water distribution

networks

Thermaflex Insulation México

Westin Hotel Panamá

Chilled water & Hot sanitary water distribution

networks

Page 2: Westin Hotel Instalation En

The projectThe project

PROJECT INFORMATION

• HOTEL Westin Hotel• OWNER Empresas BERN• LOCATION Playa Bonita, Republic of Panama, Central America• INSTALLATION COMPANY Empresas BERN• APPLICATION Indoor – Chilled / Hot Water

Outdoor – Chilled water (trench) • USED LIQUID Pure potable water with no corrosion treatment

(network mixes with steel)• THERMAFLEX PRODUCTS 16,130 mts PB-1 pipes

270 mts Flexalen 600 single pipe

17,200 mts of insulation.• INSULATION Thermasmart and Thermasheet• WELDING TECHNIQUES Poli-fusion, Electro-fusion and Butt fusion• ANCHORING done by installation company

Page 3: Westin Hotel Instalation En

Coronado Bay HotelCoronado Bay Hotel

• The Hotel is located in Playa Bonita, beach known for its natural beauty and rainforest environment. Designed to offer its guests luxurious rooms for business and/or pleasure.

• The project: 620 rooms with different sizes and comfort levels, 23 floors, six magna conference rooms, clubhouse, four restaurants, shopping center and one of the largest swimming pools in the region.

• Flexalen was selected as the best option for chilled water and hot water networks.

Page 4: Westin Hotel Instalation En

Flexalen the best optionFlexalen the best option

• Flexalen system was selected because:

• Fast and easy to install• Energy savings• Long life (+50 years)• Less risks for installers• Speed flow benefits• Less risks of leakages• Experience in two previous

installations

Page 5: Westin Hotel Instalation En

InstallationInstallation

• The Hotel is located directly in front of the ocean and next to the mangrove. The humidity conditions are extremely wet (up to 90%).

• The PB single pipes are insulated with 25mm of Thermasmart with a range of 25mm to 110mm diameter.

Page 6: Westin Hotel Instalation En

InstallationInstallation

• The first levels are a mix of PB pipes and steel. The main raiser is 10” diameter and the derivations are as shown in these pictures, with steel couplings with transition to PB with flange connectors.

Page 7: Westin Hotel Instalation En

InstallationInstallation

• The flexibility allows to save accessories in certain points like derivations; for example elbows 45º were not considered for the entire network.

• Steel pipes are being insulated with Thermasheet 2” insulation thickness

Page 8: Westin Hotel Instalation En

Chilled / Hot water linesChilled / Hot water lines

• Chilled water is protected by Thermasmart insulation but not corrugated protection. The indoor application require condensation protection but not mechanical, even when all the lines will be allocated in the same corridor, the anchoring for Flexalen is exclusive.

• The how water lines are connected to cupper adaptors and these lines goes inside the wall. Again the accessories were not necessary due to flexibility and the advance program is two weeks before the original one, good motivation for installers.

Page 9: Westin Hotel Instalation En

Installing fan coilInstalling fan coil

• The valves of fan coil equipments are insulated with Thermasmart, there are 1,240 sections to insulate and an special group prepares these sections and once ready they are installed.

• The installers received the training also in insulation some moths ago.

Page 10: Westin Hotel Instalation En

Installing air handlerInstalling air handler

• The air handlers are not on site, but the connections are ready. With metallic transitions from PB-1 to steel, the system is welded.

• Transition PB-1 pipe to Steel pipe in the beginning of the main line of the corridor.

Page 11: Westin Hotel Instalation En

InformationInformation

• Temp of chilled water supply 5ºC• Temp of hot water network62ºC• Ambient temperature up to 36ºC• Insulation ¾” – 4” pipes 25mm (1” Thermasmart)• Insulation 6” pipe 50mm ( 2” Thermasheet)• Humidity 65% - 90%