71
WESTERN MASSACHUSETTS HOSPITAL Mechanical Systems Upgrades Project Number DPH 1605 HS1 November 29, 2017 Prepared for: Division of Capital Asset Management Office of Planning, Design and Construction

WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

WESTERN MASSACHUSETTS HOSPITAL Mechanical Systems Upgrades Project Number DPH 1605 HS1 November 29, 2017

Prepared for: Division of Capital Asset Management Office of Planning, Design and Construction

Page 2: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 1 Acknowledgements

SECTION 2 Preface

SECTION 3 Executive Summary

SECTION 4 Introduction

SECTION 5 Existing Conditions

SECTION 6 Accessibility

SECTION 7 Codes & Regulations

SECTION 8 Recommendations

SECTION 9 Alternative Project Considerations

SECTION 10 Implementation Plan & Phasing

SECTION 11 Proposed Schedule of Work & Project Cost

SECTION 12 Appendices

TABLE OF CONTENTS

Page 3: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 1: Acknowledgements

Page 4: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

ACKNOWLEDGEMENTS

DIVISION OF CAPITAL ASSET MANAGEMENT

Carol Gladstone, Commissioner

Elizabeth Minnis, Deputy Commissioner, OPDC

Shirin Karanfiloglu, Director of Programming

Bob Barry, Director of Construction

Robin Luna, Acting Deputy Director of Programming

Zaida Roshandel, Deputy Director for Construction

Rosalyn Elder, Project Manager for Programming

Frank Clare, Project Manager for Construction

Emmanuel Andrade, Project Manager for Accessibility, OPDC

Tom Tagan, Office of Facilities Management

Edward Ransom, Project Manager, Energy Team

Robert Anderson, Project Engineer

WESTERN MASSACHUSETTS HOSPITAL

Valenda Liptak, Chief Executive Officer

Anthony DiStefano, Chief Operating Officer

Brian Sallisky, Director of Facilities Management/Safety Officer

Alan Roberts, Maintenance Supervisor

Pamela Couchon, Administrative Secretary, Facilities Division

RDK ENGINEERS

Joseph Bonanno, Principal

Adam Leonard, P.E., Sr. Associate

Ian Robinson, P.E., Energy Engineer

Patrick Costello, Mechanical Engineer

CGKV ARCHITECTS

Jason Knutson, AIA, Principal

Ernie Vazquez, AIA, Principal

BRYANT ASSOCIATES

Mike Lebeau, Structural Engineer

Georgia Tentas, Structural Engineer

VJ ASSOCIATES

Clive Tysoe, Divisional Director

Jeff Harding, MEP Cost Estimator

Page 5: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 2 Job No. 20160284

YEE CONSULTING GROUP

Chuck Albiani, Sr. Environmental Consultant

Page 6: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 2: Preface

Page 7: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

PREFACE

This study was prepared for the Office of Planning Design and Construction of the Division of Capital Asset

Management, Commonwealth of Massachusetts, in accordance with Massachusetts General Laws Chapter 29,

Sections 7K and 26A. It is intended to investigate agency capital needs, evaluate alternatives, and recommend a

solution that corresponds to the current needs of that agency, in conformance with its current long term capital

facilities development plan.

The study provides a clear and detailed frame of reference for the design and implementation process and

recommends a solution that can be accomplished within the appropriation or authorization for that project. It

includes an equipment layout which reflects the user agency’s needs, a description of the project requirements, an

accurate estimate of capital and operating costs, and an implementation schedule. Conceptual mechanical designs

included are not intended to constrain the final design, but rather to illustrate functional relationships, demonstrate

the practical operation of design criteria and conformance with applicable codes and standards, and serve as the

basis for developing an accurate cost estimate.

Before DCAM can enter into a contract for final design services, this study must be certified by the head of the User

Agency, and by the Director of Programming and the Commissioner of DCAM. Thereafter no substantial changes

can be made to the program during the implementation process.

Page 8: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 3: Executive Summary

Page 9: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

EXECUTIVE SUMMARY

This study was initiated to undertake a thorough evaluation of the mechanical systems of the Western Massachusetts

Hospital located in Westfield, MA in order to make an independent assessment of whether the hospital is a candidate for a

system-wide upgrade of the mechanical infrastructure or whether component repairs are a viable option. The existing 2-pipe

steam feeds an assortment of terminal units (radiators and fan coil units, etc.) and it receives outside make-up air through

operable windows, doors and infiltration. Ventilation is accomplished by the exhaust fans which pull air through the building

and exhaust it without any heat recovery. There is no central ventilation system to provide make-up air to the system and

there is no central temperature control system. There is no central air conditioning but terminal units are provided in patient

rooms and selected administrative spaces.

The results of this study conclude that the Division of Capital Asset Management should consider a complete mechanical

infrastructure upgrade to this facility. A new mechanical system will provide significant enhancements to the patient

experience by maintaining a comfortable environment that satisfies code minimum and Massachusetts Department of Public

Health and Facility Guideline chronic care requirements.

Existing mechanical systems are aged, with many major components approaching 30 years of service, if not longer. Current

systems lack central cooling, are not easily controlled and provide no means of mechanical ventilation or filtration. These

deficiencies not only result in varying degrees of patient comfort throughout the facility, they’re also not capable of providing

an environment that meets present day healthcare minimum code and engineering design standards.

Multiple mechanical system upgrade/replacement solutions were evaluated based on many different factors including

feasibility of installation, maintainability, sustainability, energy use, construction phasing and cost of investment. Following

the conclusion of the Global Workshop conducted on October 4th, 2016, the recommended mechanical system is 4-pipe fan

coil units, air cooled chiller plant, high efficiency condensing boilers, and energy recovery style rooftop air handling units. The

largest factors in recommending this particular system option is due to both first cost and the flexibility of 4-pipe fan coil units

to cope with future renovations and existing envelope limitations.

In order to support the recommended baseline case, additional facility upgrades are required including an increase in utility

normal power capacity and associated normal power distribution systems, additional emergency power infrastructure

consisting of a new 350kW emergency generator, new ceilings and sprinkler system modifications. Additional facility

improvement projects recommended consist of a complete roof replacement, kitchen exhaust and make-up air system

upgrade, complete facility lighting upgrade and a number of ADA improvements. Also considered was a complete facility

window replacement which was ultimately omitted from project upgrades; window replacement is desired pending availability

of funding, and shall be considered an add-alternate in the design.

The implementation and phasing of this project will require close coordination to minimize the impact and displacement of

the sensitive patient population. Planning and design for swing space will be paramount to the project success;

displacement of the patient population to other campus buildings, or to other chronic care facilities will not be considered.

Estimate Construction Cost: $20,300,000.00

Schedule: 44 Weeks for Design Documents

12 Weeks for Bidding and Award

104 Weeks for Construction

Page 10: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 4: Introduction

Page 11: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

INTRODUCTION

Western Massachusetts Hospital is a 93,000 square foot, four story, one hundred two (102) bed inpatient chronic-

care facility located in Westfield, MA. Acute care services such as surgical procedures and emergency room care are

not provided at this facility. Based on a third party system assessment performed in 2012, it was determined that the

age, condition and code deficiencies of the mechanical systems supporting the Main Hospital warranted it a

candidate for system replacement rather than system repair.

Existing heating systems serving the Main Hospital consist of a low pressure steam boiler plant with 2-pipe steam

distribution to several terminal units (radiators, unit heaters, etc). There is no central ventilation or central cooling

system in the facility. Ventilation is currently provided via natural means, i.e. via operable windows and doors and

through envelope infiltration. Space cooling is provided via approximately one hundred thirty-five (135) terminal

window type air conditioning units and sixteen (16) direct expansion split systems (both ducted and ductless

applications). Approximately nineteen (19) dedicated exhaust systems are in place serving varying facility exhaust

requirements.

The objective of this study is to provide the Department of Capital Asset Management and Maintenance with the

knowledge that is needed to make informed decisions regarding potential upgrades and/or replacement of the

mechanical systems serving Western Massachusetts’s Main Hospital building. RDK Engineers Inc. provided a

thorough evaluation of the existing mechanical systems serving the Main Hospital building in order to make an

independent assessment of whether the Hospital is a candidate for a system-wide mechanical infrastructure upgrade

or whether individual component repairs are a viable option. Included in this study are an existing conditions

assessment, code analysis, system recommendations and the associated construction costs, life cycle cost analysis,

schedule and phasing plan.

Page 12: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 5: Existing Conditions

Page 13: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

EXISTING CONDITIONS ASSESSMENT

MECHANICAL SYSTEMS

PRIMARY HEATING

All primary heating for the hospital is provided from the boiler plant; an addition to the north end of the original 1935

facility, which was constructed in 1987. The primary heating equipment consists of two (2) identical low pressure

steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure

(currently operating at 15 psig) steam service. More conventionally, these boilers can generate 150 BHP or 5,021

MBH of heating capacity. The boilers were installed during the 1987 boiler plant addition and are fitted with dual fuel

(no. 2 fuel oil and natural gas) forced draft burners, which are also originally installed with the boilers. Burner blowers

include a forced draft fan, fed with 208V/3PH electric service. Boiler controls are fed with 120V/1PH power.

Photo 1: CB Boiler #1 Photo 2: CB Boiler #2

The boilers are 29 years old and have a typical average life span of approximately 25 years. The equipment is

operating at or beyond expected service life with no operational issues reported via the facility staff. The boilers are

currently sized for complete redundancy (N+1) where any single failure would not result in the loss of steam

production and/or facility heating needs. Boilers are currently operated in a lead/lag arrangement (i.e. the second low

pressure steam boiler is on-line and available for use if the primary boiler fails) and rotated for equal run time. It

should be noted that operating this equipment beyond the average life expectancy may result in increased failures

and unscheduled repairs.

Supplemental steam is provided by three (3) identical medium pressure steam boilers. These boilers were originally

intended to support process steam loads, but have been modified to operate at low pressure. Since conversion to low

pressure steam boilers, the three process boiler’s steam piping distribution has been combined with the primary

boilers described above. Each boiler is a Hurst model C1-GO-10 fire tube style rated for 1,258 lb/hr of low pressure

steam. More conventionally, these boilers can generate approximately 9 BHP or 302 MBH of heating capacity. The

Page 14: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 2 Job No. 20160284

facility reports that these boilers have not been utilized for an extended period of time, as the Cleaver Brooks 150 HP

boilers satisfy all heating loads serving the facility (including process loads such as the kitchen kettles and

dishwasher). The boilers were installed in 2004 and fitted with dual fuel (no. 2 fuel oil and natural gas) forced draft

burners, which were also originally installed with the boilers. Burner blowers include a forced draft fan, fed with

208V/3PH electric service. Boiler controls are fed with 120V/1PH power.

Photo 3: Hurst Boilers #5 & #6 Photo 4: Hurst Boiler #6

The Hurst boilers are 12 years old and in good condition with typical average life span of approximately 25 years. As

the capacity of the process boilers is now superfluous to the Cleaver Brooks boilers described above, it has been

reported that the process boilers are not needed during peak winter design conditions, nor currently operated. The

three (3) process boilers are adequate for continued support of facility process heating loads only.

There are two sets of boiler breeching and stack systems; one set serving boilers 1 and 2, and a separate set serving

boilers 4, 5 and 6. Boiler breeching and stack systems are constructed of double-wall stainless steel duct routed

horizontally from the top of each boiler flue outlet connection to chimney, where the round duct transitions to a square

stack in support of boilers 1 and 2, or 24”x18” rectangular stack in support of boilers 4, 5 and 6. The chimney is

located at the southernmost portion of the boiler plant addition, where it extends vertically 4 stories to roof of the main

hospital.

Page 15: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 3 Job No. 20160284

Photo 5: Hurst Boiler Breeching Photo 6: CB Boiler Breeching

Boiler breeching and stack systems are adequate in design, and in good physical condition as observed within the

boiler plant. The chimney cone at the top of stack discharge is showing signs of significant corrosion, resulting in very

little material remaining. The internal condition of the boiler breeching and stack systems was not able to be

observed. In general, these systems have life spans typical to that of the associated boilers and assumed to be

approaching the end of their service life expectancy.

Steam condensate from the hospital is returned to the boiler plant via a pumped condensate line to boiler feed pump

receivers from two (2) duplex steam condensate receivers located in the existing hospital mechanical room. The

existing hospital mechanical room floor sits level with the hospital crawl space, where condensate from the hospital’s

heating systems is gravity drained to the two condensate receivers described above. Condensate receiver ‘one’ is a

duplex condensate pump consisting of two (2) 1/3 HP motors. This condensate receiver was installed in 1987 during

the boiler plant addition project. Condensate receiver ‘two’ is also a duplex condensate pumps consisting of two (2) X

HP motors. Condensate receiver ‘two’ was installed in XXX. The two condensate receiver assemblies transfer steam

condensate from the existing mechanical room to feed water tanks located within the boiler plant. The feed water tank

serving boiler 1 and 2 is a Feedmiser with triplex transfer pump-set consisting of three (3) 1 HP pumps (one for

redundancy). The feed water tank serving boiler 3, 4 and 5 is a Dunham Bush AWL CHD 1020 with quadraplex

transfer pump-set consisting of four (4) 3/4 HP pumps.

Page 16: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 4 Job No. 20160284

Photo 7: CB Boilers Feedwater Tank Photo 8: Hurst Boilers Feedwater Tank

Photo 9: Condenate Reciver ‘One’ Photo 10: Condenate Reciver ‘Two’

Duplex condensate pump receiver ‘one’, the triplex transfer pump-set and feed water tank and the quadraplex

transfer pump-set and feed water tank are all 29 years old and have a typical average life span of 15 years. It is

evident that these units have surpassed their useful service life expectancy, as numerous pumps, motors and

miscellaneous components are no longer original. Duplex condensate pump receiver ‘two’ is XX years old and has a

typical average life span of 15 years. The equipment is operating past its expected service life with no operational

Page 17: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 5 Job No. 20160284

issues reported via facility staff. It should be noted that continued operation beyond their average life expectancy may

result in increased failures and unscheduled repairs.

As identified above, all aforementioned boilers are furnished with dual fuel (no. 2 fuel oil and natural gas) forced draft

burners. Number 2 fuel oil is stored in a single wall 20,000 gallon below grade tank located just east of the boiler

plant. Fuel oil is piped from the tanks to a no. 2 fuel oil pump set located within the mechanical room. The pump set

consists of a control panel, piping, valves and two (2) Viking model SG0519G00 pumps, each equipped with a 1 1/2

HP motor. From there, fuel oil is piped to each boiler. Natural gas is piped to each boiler from the house distribution

system. The gas service is supplied by the local utility company. Natural gas is the primary fuel source and no. 2 fuel

oil is the secondary fuel source

Photo 11: No. 2 Fuel Oil Pump Set Photo 12: Typical Fuel Oil Pump Nameplate

The no. 2 fuel oil pumps are 29 years old and have a typical average life span of approximately 20 years. The

equipment is operating beyond its expected service life with no operational issues reported via the facility staff. The

pumps and associated piping show signs of corrosion and fuel oil leaks. Continued use of these pumps may result in

increased failures and unscheduled repairs. The boiler pilots are currently fed via utility provided natural gas;

consequently, boilers may not fire upon disruption of natural gas fuel source, despite having dual fuel burners.

PRIMARY COOLING AND AIR DISTRIBUTION

Centralized ventilation and primary cooling does not currently exist within the facility. Ventilation is only available via

natural means, i.e. through operable windows and/or doors, and via air infiltration. All cooling for the building is

provided via approximately one hundred thirty-five (135) packaged window air conditioning units and approximately

sixteen (16) direct expansion (DX) split system air conditioning units. Window AC units serve perimeter

administration, perimeter patient sleeping rooms and various perimeter support spaces. The split system AC units

serve the following spaces and consist of both ductless and ducted systems:

Page 18: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 6 Job No. 20160284

PACKAGED SPLIT DX AC AREAS SERVED QUANTITY DUCTED OR DUCTLESS

Basement Conference Room One (1) Ducted

Basement Conference Center Two (2) Ductless

Basement Cafeteria Two (2) Ducted

Basement IT/Data Room One (1) Ductless

Basement Maintenance Office One (1) Ductless

Main Entrance One (1) Ducted

2nd Floor Patient Activities One (1) Ducted

2nd Floor South Patient Wing Six (6) Ducted

3rd Floor Operating/Sterile Processing Suite One (1) Ducted

Photo 13: Split Sytem-Typical Ducted Indoor Unit Photo 14: Split Sytem-Typical Ductless Indoor Unit

Photo 15: Typical Window AC Unit Photo 16: Typical Window AC Unit

Page 19: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 7 Job No. 20160284

All units vary in capacity, condition and age and average approximately 10 years (for window air conditioners) and 15

years (for packaged split DX air conditioning units) of service life expectancy. Many of the existing packaged air

conditioners are operating toward the end or beyond their service life expectancy where increased maintenance and

unforeseen failures may occur more frequently. Facility staff reports that window AC units are replaced in kind upon

failure via “off the shelf” air conditioning units. The packaged split DX systems lack ventilation, heating capability and

airflow required to support current healthcare design guidelines and minimum code requirements. Window air

conditioning units are not appropriate for healthcare applications as they lack the appropriate minimum filtration as

defined by ASHRAE 170. For the ducted systems identified above, supply and return ductwork was generally observed

to be in fair condition, depending upon the age of installation.

STEAM DISTRIBUTION SYSTEMS, DOMESTIC HOT WATER AND HUMIDIFICATION

Low pressure steam (LPS) is generated by the low pressure system described in detail above and distributed to the

main hospital building via 10” LPS header, which is appropriately sized for operation of a single boiler at maximum

fire. An 8” LPS main carries steam to adjacent original mechanical room where it is diverted to two semi-

instantaneous steam to hot water domestic water heaters and 6” LPS steam line serving the facilities heating

equipment. Low pressure steam piping is routed throughout the crawlspace, which encompasses the entire footprint

of the existing original hospital. From there, individual LPS and associated low pressure condensate (LPC) branch

piping extends vertically to feed steam radiators, finned tube radiators and steam fired cabinet unit heaters providing

heating for the entire facility. Low pressure steam and condensate piping systems are generally original 1935

construction, showing significant signs of corrosion via leaking throughout the crawlspace. Facility staff reports that

many steam accessories have been replaced and sections of corroded piping is constantly requiring either temporary

patching or sectional replacement. This was confirmed via visual inspection and obvious damage to the pipe

insulation. The steam radiators are of original construction and appear to be in fair operable condition. Steam finned

tube radiators are located where steam radiators have been replaced, and appear to be in good condition (age

unknown). Cabinet unit heaters are located in the service elevator lobby at every floor. Inspection inside these units

was not able to be performed, but it was reported by facility staff that existing elevator lobby cabinet unit heaters are

steam heating only.

Page 20: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 8 Job No. 20160284

Photo 17: Typical Steam Radiator Photo 18: Typical Finned Tube Radiators

Domestic hot water (DHW) is generated via two (2) redundant semi-instantaneous steam to hot water heaters, each

rated for 37 GPM. The DWHs were installed in 2003 at which time the original low pressure steam-fired, copper water

heaters were disconnected from LPS service and abandoned in existing mechanical room. The semi-instantaneous

steam fired domestic hot water heaters are in good condition and operating within their 20 year expected service life.

High temperature hot water (160 degrees) is generated via a gas fired 75 gallon WH, rated for 125 MBH input. This

WH was installed in 2014 and is operating well within its 15 year expected service life. The high temperature WH is

dedicated for the Hospital’s laundry services. No operational problems or issues have been reported by facility staff

for any DHW equipment. The high temperature hot water heater does not have redundancy.

Photo 19: High Temperature DWH Photo 20: (2) Semi-Instantaneous Steam DWHs

Page 21: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 9 Job No. 20160284

The facility does not have global or local humidification systems.

EXHAUST AND MAKE-UP AIR SYSTEMS

The facility has a number of exhaust fans varying in location, configuration and application. The fans provide exhaust

air services to toilet, janitor closets, soiled work rooms, crawlspace, storage areas and various kitchen applications.

The following table details the specifications, location, condition and application for each of the exhaust fans serving

the facility.

TAG AREA SERVED AIRFLOW | SP CFM | in. wc.

TYPE CONDITION

EF-1 Basement, 1st, 2nd & 3rd floor toilet rooms

900 @ 0.75 Down Blast Good

EF-2 1st, 2nd & 3rd floor toilet rooms

580 @ 0.5 Down Blast Good

EF-3 1st, 2nd & 3rd floor toilet rooms

715 @ 0.5 Down Blast Good

EF-4 1st, 2nd & 3rd floor toilet rooms

1,320 @ 0.5 Down Blast Good

EF-5 1st, 2nd & 3rd floor kitchenettes

825 @ 0.5 Down Blast Good

EF-6 Basement & 1st floor toilet rooms

1,405 @ 0.75 Down Blast Good

EF-7 Basement, 1st, 2nd & 3rd floor toilet rooms

3,600 @ 1.0 Down Blast Good

EF-8 3rd floor toilet room 150 @ 0.35 Down Blast Good

TAG AREA SERVED AIRFLOW | SP CFM | in. wc.

TYPE CONDITION

EF-9 1st, 2nd, 3rd floor soiled utility.

1,500 @1.0 Down Blast Good

1800 Kitchen Unknown Utility Set – Side Discharge

Poor

1801 1st, 2nd & 3rd floor utility rooms, Basement and 1st floor toilet rooms

Unknown Utility Set – Side Discharge

Poor

1802 CSR & Basement general exhaust

Unknown Utility Set – Side Discharge

Poor

None Kitchen Grease Exhaust

Unknown Utility Set – Up Blast Excellent

DWEF Dishwasher Unknown Up Blast – Sidewall Fair

None Kitchen Unknown Propeller Poor

None Kitchen Unknown Propeller Poor

None Original Mechanical Rm Unknown Propeller Poor

None Crawlspace Unknown Propeller Poor

None Maintenance Shop (Old Projector Room)

1,000 CFM Utility Set – Side Discharge

Poor

The kitchen is served by numerous exhaust systems, as identified above. Kitchen exhaust includes type I hood

grease exhaust, type II hood kitchen exhaust, dishwasher exhaust and two (2) propeller fans. The fans associated

with these systems are of varying capacity, usage, age and condition (refer to the table above and equipment

assessment sheets for additional information). Make-up air is provided to offset the exhaust in the kitchen via a

Page 22: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 10 Job No. 20160284

dedicated make-up air handling unit. The unit is furnished with natural gas heat, supply fan and 2” washable

aluminum filters. Control of the gas heat exchanger is via discharge air temperature. The make-up air unit

performance was selected at 6,000 CFM @ 0.25” W.C. E.S.P.

Photo 21: Kitchen Prop Fan-1 Photo 22: Kitchen Prop Fan-2

Photo 23: Kitchen Grease Exhaust Fan Photo 24: Kitchen MUA Unit

Page 23: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 11 Job No. 20160284

Photo 25: Kitchen Type II Hood Fan (1800) Photo 26: Newer ABB VFD for Fan 1800

TYPE I GREASE EXHAUST: The grease exhaust fan is 5 years old and in excellent condition with a typical life span

of approximately 20 years. The fan currently operates at constant volume; it is not controlled via temperature or hood

optic sensors and does not interface with make-up unit described above. Grease exhaust ductwork is pre-

manufactured by CaptiveAire, double wall stainless steel with zero clearance to combustibles and appropriately rated

for type-I exhaust with code required clean-outs.

TYPE II KITCHEN EXHAUST: The type II hood exhaust fan is an original construction fan approximately 81 years

old. A newer motor powered via an ABB VFD has been retrofitted to support original type II exhaust fan reportedly to

help reduce overly negative pressure within the kitchen areas. With a typical service life of approximately 20 years,

continued operation may result in increased failures and unscheduled repairs. As the type II hood exhaust fan also

served the grease hood prior to the new grease exhaust fan installation in 2011, it is reasonable to assume that the

ductwork associated with this fan is in poor condition; the ductwork may be original to the 1935 installation, thus

operating significantly beyond expected service life (visual observation both external and internal was not able to be

performed as type-II exhaust ductwork is concealed).

MISCELLANEOUS KITCHEN EXHAUST: The dishwasher exhaust fan is a sidewall, upblast style exhaust fan

operating within its useful service life expectancy and is in fair condition. Fan discharge location is poor, near

operable windows and discharges into vegetation growth. The propeller fans provide general exhaust to the kitchen

and associated support spaces. The two (2) propeller fans are 80 years old and in poor condition with a typical life

span of approximate 20 years.

KITCHEN MAKE-UP AIR: The kitchen make-up air unit is 5 years old and in good condition with a typical life span of

approximately 20 years. It was reported by the facility that the amount of make-up air provided by the unit is

insufficient for the amount of air being exhausted from the kitchen. It is understood that the kitchen and dining room

Page 24: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 12 Job No. 20160284

are negatively pressurized to the extent that it is difficult to operate doors to adjacent spaces, as witnessed during

initial site visit. The kitchen make-up air system does not have cooling, and it was reported that kitchen staff are often

uncomfortable during the summer months. The make-up air unit lacks sufficient capacity and cooling for continued

support of kitchen ventilation requirements.

Mechanical Room make-up air is provided via ceiling suspended heating and ventilating air handing unit. The

performance for this unit was selected at 3,500 CFM @ 1.0” W.C. E.S.P. Unit is equipped with 1 HP supply fan and

steam heating coil with integral face and bypass damper. Supply air is ducted from the unit to three (3) sidewall

double deflection registers. The steam supply to the unit is disconnected and capped, creating a “dead leg” of steam

piping.

Photo 27: Mech Rm Make-up Air Unit Photo 28: Steam Disconected from MUA Unit

The make-up air unit is 28 years old and in poor condition with a typical life span of approximately 25 years. As

mentioned above, the steam supply line is disconnected from the heating coil. This is likely due to a heating coil leak.

Other than the disconnected steam line, there were no operational issues reported via the facility staff. Without a

heating coil, year round operation of this unit may not be feasible. It should be noted that operating this equipment

beyond the average life expectancy may result in increased failures and unscheduled repairs.

As part of the boiler room construction in 1987, high and low combustion air louvers and associated dampers were

provided at the exterior wall of the mechanical room. Dampers are multi-blade parallel type. Control of dampers is

manual; there is no automation or interlock between boilers and dampers. Damper blades do not appear to be

insulated, nor is the exposed housing of the dampers within the space. Louvers are furnished with bird screen, but do

not include any level of filtration.

Page 25: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 13 Job No. 20160284

Photo 29: High/Low Combustion Air Openings

ELEVATOR HOISTWAYS AND MACHINE ROOMS

The existing facility is equipped with three (3) elevators. The North Elevator and South Elevator are passenger

elevators and the East Elevator is a freight elevator. The North and South elevators have machine rooms above each

respective hoistway while the East elevator has a machine room on the basement level adjacent to the hoistway. The

North and South elevator machine rooms are cooled by window type air conditioning units and have no mechanical

heating. Elevator machine room ventilation is via natural ventilation, i.e. outdoor air is passively obtained via louvered

openings in the penthouse machine room exterior wall. Ventilation for the hoistway is provided via floor opening

between elevator machine room and hoistway. In both penthouse machine rooms, the opening from the machine

room to outdoors is permanently blanked off. The East elevator machine room is heated by an electric baseboard

heater and has no cooling. In the basement machine room, the machine room is vented via one square foot opening

to the hoistway, and the hoistway is vented to the roof via gooseneck ductwork.

Photo 30: E. Elevator Machine Rm Vent Photo 31: East Elevator Hoistway Vent

Page 26: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 14 Job No. 20160284

Photo 32: N. Elevator Hoistway Vent & Photo 33: S. Elevator Hoistway Vent &

Blocked Machine Room Vent Blocked Machine Room Vent

The North and South Elevators passive ventilation is inadequate to support continued service, as the openings

between the machine room and outdoors are permanently blanked off. In addition, the HVAC systems in all three (3)

machine rooms are insufficient for maintaining the code requied 50°F and 90°F space temperature. The North and

South Elevator Machine Rooms are equipped with cooling only, therefore there is no guarantee that the minimum

temperature will be maintained during the winter months. The East Elevator machine room is equipped with heating

only, therefore there is no guarantee that the maximum temperature will be maintained during the summer months.

Page 27: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 15 Job No. 20160284

AIRBORNE INFECTION ISOLATION (AII) ROOMS

The existing facility has three (3) rooms that are utilized for airborne infection isolation (Aii). The heating and cooling

for these spaces are the same as other patient rooms. These spaces are furnished with a system that allows the air

to be HEPA filtered and the room to be maintained at a negative pressure. Essentially, room air is drawn into an

Abatement Technologies HC800C unit which filters the air through a carbon filter and a HEPA filter. Post filtration, a

portion of the air is ducted outside and the remainder of the air is directed through a UV300C-PT germicidal ultraviolet

pass through and returned to the space. Although these rooms are capable of being maintained at a negative

pressure, the pressurization is not quantifiable.

Photo 34: Typical Aii Room Photo 35: Typical Aii Room Ceiling Lay-out

The Aii isolation room systems appear to be in good condition with no reported deficiencies. These systems are

inadequate for continued use for several reason. Minimum ventilation requirements are not satisfied and the

termination location of the air that is being exhausted is not in compliance with the pertinent code

Page 28: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 16 Job No. 20160284

ELECTRICAL SYSTEMS

NORMAL POWER SYSTEMS

The existing facility service is 2,500 amp at 208Y/120V. The condition assessment and possible upgrade of the

service is the subject of a separate study and is not included in this capacity assessment.

Based upon utility metering data from 2011 to 2013, the maximum demand on the existing service is 321 kW.

Assuming a worst case power factor of 0.8, maximum demand is 401kVA or 1,113 amps. NEC Article 220 allows

addition of load to existing with the maximum demand verified by one year of metering data at 125%. 2,500A – (1,113

x 1.25) = 1,100A available. The existing GE switchboard has a Powerbreak main circuit breaker assumed to be 100%

rated.

The majority of branch circuit panels are installed flush mounted in corridor walls throughout the facility.

EMERGENCY POWER SYSTEMS

The existing facility emergency system is comprised of a relatively new Russelectric 208Y/120V generator paralleling

switchgear with (2) 350/437.5 kW/kVA diesel generators. The existing load based upon monthly run data (assumes

each ATS on Emergency) is 224kVA which is approximately 65% of a single engine capacity. The system was

installed with space for an additional generator input section for a full capacity of approximately 900kVA at 2,500

amps retaining N+1 redundancy (engine/generator only). There are space only accommodations for the addition of

(3) 800A frame power circuit breakers.

The paralleling switchgear provides essential power to the hospital via three (3) automatic transfer switches (ATS)

separated into three branches; life safety, critical and equipment. Each of the installed automatic transfer switches

have bypass isolation for repair and maintenance with ability to power the load manually via either the normal or

emergency source.

ATS #1: 600A, 208Y/120V Russelectric RTS-03 series. Life safety branch transfer switch serving 600A life

safety switchboard.

ATS #2: 800A, 208Y/120V Russelectric RTS-03 series. Critical branch transfer switch serving 800A critical

switchboard.

ATS #3: 600A, 208Y/120V Russelectric RTS-03 series. Equipment branch transfer switch serving 600A

equipment switchboard.

Life safety and critical branch circuit panels are primarily installed flush mounted in corridor walls throughout the

facility. The only equipment branch circuit panels in the facility are located in a closet within the essential power

electric room, and serve mechanical plant equipment.

Page 29: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 17 Job No. 20160284

LIGHTING SYSTEMS

Existing lighting throughout the hospital consists largely of fluorescent fixtures controlled via line voltage on/off

switches. Fixtures vary in type and consist of recessed 2x2 and 2x4 lensed devices, surface mounted 1x4 style

fixtures and recessed downlights. While it appears some of the fluorescent fixtures are of the more efficient T8

technology, many of the non-renovated portions of the facility and “back of house” areas contain older, inefficient

surface mounted fixtures. In general, the color temperature throughout patient care spaces appears to be 3500K.

LOW VOLTAGE SYSTEMS

Other low voltage systems consist of fire alarm, nurse call, security and tel/data systems. These systems are not

anticipated to be significant impacted by the mechanical system upgrades and have not been reviewed for condition

and adequacy.

Page 30: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 18 Job No. 20160284

STRUCTURAL SYSTEMS

The original facility was built from drawings dated October 1935. The building has four levels above grade with

mechanical and elevator penthouse on the roof level. The footprint resembles two “T” shaped wings stemming from a

central core. The rectangular outline is about 270’ long x 176’ wide x 50’ high. The total area is approximately 90,000

square feet, 22,150 per upper floor. The highest occupied level is approximately 40’ above grade.

The structure consists of one level completely below grade (Crawl Space Level – EL 199’-9”), one level partially below

grade (Basement Level – EL 206’-9”), three full levels completely above grade (1st Floor – EL 218’-9”, 2nd Floor – EL

228’-9”, and 3rd Floor – EL 238’-9”), the roof slab is at EL 252’-9” with a partial level at the penthouse. Approximate

existing grade varies from the front (high) of the building to the rear (low) of the building.

An incomplete set of structural drawings was provided for review. The interior columns are composed of a structural

steel frame protected by reinforced concrete and masonry. The structure also comprises exterior masonry bearing

walls, beams of structural steel frame protected by reinforced concrete, and reinforced concrete decks. The concrete

basement walls are shown to be typically 16-inch concrete walls. Columns are typically shown to bear on 16 to 20 -

inch thick by 4 to 5 - foot square reinforced concrete footings.

The structure and partition materials are non-combustible and the facades are composed of brick and cast stone.

Subsequent major additions have been for a heating plant, emergency generators and an elevator.

Page 31: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 19 Job No. 20160284

ARCHITECTURAL

Western MA Hospital is a chronic-care facility in Westfield, Massachusetts and presently consists of five principal

buildings. The current project focuses on upgrading the mechanical system in the main hospital building, located at

91 E. Mountain Road.

The main hospital building was constructed ca. 1935. It is approximately 93,000 square feet in area over four main

floor levels (basement, first floor, second floor, third floor) plus below grade crawl space. Mechanical and elevator

penthouse structures are located on the roof. The building appears to be constructed with load bearing solid

masonry perimeter walls and interior structural steel framing. Floor and roof slabs are reinforced concrete.

Page 32: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 6: Accessibility

Page 33: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Accessibility Analysis – Western MA Hospital for DHS1605-HS1 – Mechanical and Energy Improvements project The Western MA Hospital, as a long term and specialty care hospital owned and operated by the Commonwealth of Massachusetts, must comply with state and federal accessibility and non-discrimination laws relative to persons with disabilities. Addressing barriers or other non-compliant accessibility features is a high priority since practically all patients are persons with disabilities. Also, other public programs include an outpatient eye and dental clinic.

The Main Hospital building is substantially accessible to persons with disabilities. Between 2007-2011, as part of a Mechanical and Electrical System Upgrade Project (DPH0203-DC1) significant accessibly improvements were made to the site and building including improving accessible parking and signage, an accessible entrance vestibule was added to the main entrance, new toilet rooms on all floors were added, and new patient bathing rooms on all floors were added.

Although accessibility improvements have been made, there remain several site and building elements that do not comply with current accessibility requirements. The mitigation of these elements must be addressed in upcoming construction projects. The exact level of compliance depends on the scope and cost of work. Where barriers cannot be removed or are not required to be removed, the Hospital must provide program accessibility1 to persons with disabilities.

Construction costs, including possible change orders for unforeseen conditions, for the Mechanical and Energy Improvements project will likely exceed 30% of the CAMIS replacement value of the building. Currently, 30% of the year 2017 CAMIS replacement value is $14,020,912. If the total project cost exceeds this amount, the entire building will need to comply with 521CMR. If the total project cost is less than 30% of the CAMIS replacement value, no additional accessibility work will be required under state accessibility regulations since an accessible entrance and accessible toilet rooms exist. There are no drinking fountains or pay telephones in the building. All work included in the current project with components having state and federal accessibility requirements (such as light switches, outlets, room heating and cooling controls, ect.) must comply.

Additional accessibility improvements required by the 2010 ADA Standards for alterations in an existing facility are not expected to exceed the requirements triggered by 521CMR for full building compliance. However, specific requirements of the 2010 Standards and 521CMR may differ slightly. In cases where these requirements differ, the requirement providing the greater level of accessibility to persons with disabilities must be used.

1 The term program accessibility refers to the ADA, Title II requirement that a public entity’s services, programs, or activities, when viewed in their entirety, must be readily accessible to and usable by individuals with disabilities. Public entities are not necessarily required to remove all barriers at existing facilities built prior to February 26, 1992.

Page 34: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Existing Conditions Relative to Accessible Features An Accessibility Audit of the existing building was completed in March of 2017 by Kessler, McGuiness and Associates (KMA). Below is a summary of elements that do not comply with current accessibility requirements. The full audit is available in Appendix I. Site, Parking, and Entrance Issues The Main Hospital building is located on a hill along East Mountain Road. Accessible parking and a PVTA bus stop is located at the mid-level parking lot closest to the accessible public entrance. An upper parking lot has no accessible parking spaces but is connected to the mid-level lot with a non-compliant walkway. A lower lot has at least one designated accessible parking space on an accessible route to the east entrance by the pavilion. There is a non-compliant walkway connecting the lower parking area to the mid-level parking area on the west side of the building.

Non-compliant site walkways must be reconstructed unless an MAAB variance can be obtained and new walkways complying with accessibility requirements can be constructed with signage indicating the accessible path of travel. Pedestrian paths along East Mountain Road are sidewalks and are exempt from running slope requirements. A variance request would require obtaining the original date of construction of the non-compliant walkway. A more detailed accessibility survey of alternate paths may be needed. Variance requests may require a cost for compliance estimate.

Compliant, accessible parking signage must be provided. Directional signage at the entrance to the upper lot must be provided to indicate the location of accessible parking in the mid-level lot. Van accessible parking signs are needed at the required van accessible parking spaces adjacent to an 8’ wide access aisle. Directional signs are needed at the beginning of all inaccessible walkways directing people to accessible paths of travel.

Designated accessible parking spaces with ponding water must be relocated or the surface must be improved to drain water properly.

The clinic entrance ramp has a running slope which exceeds current accessibility requirements. Additional information is needed to determine whether an MAAB variance is advised or whether the ramp needs to be altered or replaced.

Building-Wide Issues While most of the building is accessible, the following accessibility issues were found in multiple locations:

Some doors lack maneuvering clearance.

Some rooms lack visual alarms.

Nurse call pull cords and window controls require tight grasping to operate.

Some door thresholds have a change in level >0.5”.

Coat hooks are mounted too high.

Objects protrude into the accessible route.

Floor 2 signage lacks tactile characters.

Some counters are mounted too high.

Note: Although standpipes exist as protruding objects in stairways, the MAAB does not consider stairways as part of the accessible route. Therefore, protecting these items is not required by the MAAB.

Page 35: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Existing Conditions Relative to Accessible Features (continued) Toilet Room Issues All public toilet rooms (except for Room 0250) are substantially accessible; however, some elements in these toilet rooms do not comply:

Most paper towel dispensers are not located within reach of the accessible sink.

Some mirrors and soap dispensers are not located at the correct height.

Some toilets have centerlines that are not between 16”-18”.

Some sink rims are >34” AFF.

Inaccessible toilet rooms lack signage with directions to accessible toilet rooms.

Patient Bedrooms and Shower Rooms According to the current revision of 521CMR, 5% of the total number of patient bedrooms with toilets shall be designed as Group 2B Units and 45% of the patient bedrooms with toilets shall be designed as Group 1 Units. Currently, all single patient bedrooms comply with room size requirements and entry door requirements.

If bathrooms rooms are provided in patient bedrooms, they must comply with 521CMR 13.3

There are no visual alarms in patient bedrooms. The MAAB allows use of a plug-in adapter to provide an alarm where a hardwired system cannot be installed.

There is no accessible storage in patient bedrooms.

Some patient shower rooms lack accessible features like seats and grab bars.

Some transfer type shower dimensions are slightly >36”.

Existing MAAB Variances Currently, an MAAB variance exists for certain elements in the building. Granted in 2007, this variance included waiving the technical requirements for:

clear maneuvering space at landings and egress stair doors in stair #’s 1-5

uneven treads (winders) in stairs #1,2,4, and 5 at the basement level

handrail extensions at various locations in stair #’s 1-5

relief from provision of 521CMR, Section 31.9.2-6 at staff assisted bathing rooms

According to the MAAB, variances expire when work to the building retriggers accessibility improvements. Expired variances require applying for a new variance. The 2007 variance application and decision is documented in Appendix J. An MAAB variance does not relieve the owner of compliance with ADA Title II requirements or the 2010 ADA Standards. Cost Estimate for Full Building Compliance with 521CMR Based on KMA’s report, a cost estimate for mitigating non-compliant items was performed by VJ Associates. This cost estimate can be found in Appendix K. DCAMM’s Statewide Accessibility Initiative has reviewed this cost estimate and has indicated where it recommends requesting variances for certain elements from the MAAB. These are based on structural limitations or where the cost for compliance would be excessive without a substantial benefit for persons with disabilities. These elements are marked with a V. Elements that can be mitigated operationally by the Hospital are marked with an O.

Page 36: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 7: Codes & Regulations

Page 37: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1

CODE REVIEW

OVERVIEW

The intent of this review is to summarize the relevant codes, regulations and standards that apply to the facility’s

existing mechanical system and to identify items that are currently deficient. The evaluation is organized such that all

applicable codes, regulations and standards are acknowledged. The acknowledgments are followed by descriptions

of noted deficiencies with reference to the associated code section. This review does not intend to be all-

encompassing of every code violation that currently exists, but rather to raise awareness about the major code

concerns regarding the existing mechanical system.

The current building code in place is 780 CMR Massachusetts State Building Code 8th Edition. This code is the

Massachusetts amendments to the International Building Code 2009. Chapter 28 of the Massachusetts State Building

Code 8th Edition references the International Mechanical Code 2009. This mechanical code will be used as a basis

for this code review. Chapter 13 of the Massachusetts State Building Code 8th Edition references an amended

version of the International Energy Conservation Code 2012. This energy code will also be used as a basis for code

review.

Ventilation requirements for buildings in Massachusetts are prescribed by ASHRAE Standard 62.1 Ventilation for

Acceptable Indoor Air Quality. This standard is referenced by the International Mechanical Code 2009 and will be

used to evaluate code compliance for non-clinical space ventilation. Ventilation for clinical spaces is set by ASHRAE

Standard 170 Ventilation of Heath Care Facilities. This standard is referenced by the FGI Guidelines for Design and

Construction of Hospitals and Outpatient Facilities. The aforementioned guidelines are formally adopted by the State

of Massachusetts in the form of checklists. Massachusetts Department of Health and Human Services publishes

design compliance checklists for all healthcare facilities that are seeking Department of Public Health (DPH)

certification. The checklists are broken into four (4) facility types: Hospital Inpatient, Outpatient, Long-Term Care and

Hospice Inpatient. Within each facility type, there are numerous sub-categories as they apply to each facility type. A

checklist exists for each sub-category, with a total of fifty-one (51) checklists. Each checklist references the related

section in the FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities. This code analysis

will utilize Compliance Checklist IP1: Medical/ Surgical Nursing Unit.

SUMMARY

In summary, the following codes will be used as a basis for code compliance evaluation:

780 CMR Massachusetts State Building Code 8th Edition

524 CMR Board of Elevator Regulations

International Mechanical Code 2009

International Energy Conservation Code 2012

ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality

ASHRAE Standard 170 Ventilation of Heath Care Facilities

FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities

MA DPH Compliance Checklist IP1: Medical/ Surgical Nursing Unit

Page 38: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 2

VENTILATION, FILTRATION AND PRESSURIZATION

In most cases, the existing mechanical systems lack provisions for code required air changes, space pressure

relationships and filtration. Table 1: Space Design Parameters in Appendix C specifies the space design parameters

for typical clinical spaces within the facility, per ASHRAE Standard 170 Ventilation of Heath Care Facilities. The

column to the right of each parameter indicates whether the typical existing space is compliant with the requirement

or not. It is evident that the systems in place are not capable of providing ventilation or maintaining required pressure

relationships between spaces. In addition, room units are being used to circulate air in numerous spaces in which

room units are not permitted by code. Many spaces that are required to be exhausted directly outdoors are lacking

this requirement.

Table 2: Minimum Ventilation Rate in Appendix C specifies the minimum ventilation rates for typical non-clinical

spaces within the facility, per ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality. The amount of

outdoor air for a space is given as a function of the quantity of people and area of the space. The existing mechanical

systems are not capable of delivering outdoor air to most occupied spaces and as a result, current ventilation is

noncompliant with code requirements.

Filtration requirements vary from space to space. Refer to Table 3: Minimum Filter Efficiencies in Appendix C for

minimum filter efficiencies for various space designations. According to ASHRAE Standard 170 Ventilation of Heath

Care Facilities, for ventilation air, filter bank no. 1 shall be placed upstream of the heating and cooling coils such that

all mixed (outside and return) air is filtered. Filter bank no. 2 shall be installed downstream of all wet-air cooling coils

and the supply fan. These requirements are currently unsatisfied, as no ventilation air is being delivered to the

spaces. For spaces where Table 1: Space Design Parameters permits air to be circulated by room units, the total air

changes per hour may be achieved using the room units with a minimum MERV 6 filtration. As majority of spaces

within the hospital are conditioned with window type air conditioners, the rating of the associated filters is MERV 4

maximum. Consequently, most spaces are not receiving any air changes at all as a result of filtration inadequacy.

ELEVATOR HVAC

At the North Elevator and South Elevator, the hoistway ventilation passes through the machine room floor via floor

grilles. This is an acceptable practice, so long as the opening is sized per the requirements of 524 CMR Board of

Elevator Regulations. However, the existing openings from the machine rooms to outdoors at both elevator machine

rooms are currently permanently blocked off. The code requires a means of ventilation to the outer air from enclosed

elevator hoistways and machine rooms. The fact that these openings from the machine rooms to outdoors are

blocked is in violation of 524 CMR Board of Elevator Regulations. In addition, elevator machine rooms are required to

be maintained between 50°F and 90°F. The North and South Elevator machine rooms are equipped with cooling only,

therefore there is no guarantee that the minimum temperature will be maintained during the winter months. Also, The

East Elevator machine room is equipped with heating only, therefore there is no guarantee that the maximum

temperature will be maintained during the summer months.

MAKE-UP AIR

Chapter 5 section 501.3 of the International Mechanical Code 2009 describes pressure equalization requirements for

a building. To paraphrase, if a greater quantity of air is removed by mechanical exhaust systems than is supplied by a

Page 39: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 3

mechanical ventilating system, adequate make-up air consisting of supply air, transfer air or outdoor air shall be

provided to satisfy the deficiency. Throughout the building there are nineteen (19) exhaust systems and only two (2)

make-up air systems. The make-up air systems are dedicated to the mechanical room and kitchen. It is evident that

that make-up air system for the kitchen is insufficient for the amount of air being exhausted, as the kitchen and dining

room are negatively pressurized to the extent that it is difficult to operate doors to adjacent spaces. The make-up air

system dedicated for the mechanical room does not have a functional heating coil and therefore cannot operate year

round. In addition, the quantity and distribution of air from this unit is inadequate to equalize the negative

pressurization imposed by the exhaust systems throughout the building. This general lack of make-up air throughout

the building is in violation the International Mechanical Code 2009.

DISHWASHER EXHAUST DISCHARGE LOCATION

Section 5.5.1 of ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality specifies minimum distances

between outdoor air intakes and potential outdoor contaminant sources. At Western MA Hospital, the operable

windows can be considered openings that are part of a natural ventilation system. The dishwasher exhaust system

utilizes an upblast style fan that is mounted horizontally in a window opening on the basement level. Per the

abovementioned code section, this discharge location should be a minimum of 10’ from any operable window,

however there is an operable window located approximate 5’ directly above the fan discharge.

Page 40: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 8: Recommendations

Page 41: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1 Job No. 20160284

RECOMMENDATIONS

MECHANICAL

CLIMATIC AND ROOM DESIGN CONDITIONS:

Summer: Indoor conditions shall be able to maintain 75 degrees F and 50% relative humidity in all patient care and

non-patient care areas. Mechanical and electrical rooms shall be able to maintain 80 degrees F without humidity

control. The basis of design shall utilize 91°F DB 73°F WB outdoor air conditions.

Winter: Indoor design conditions shall be able to maintain 70 degrees F and 30% relative humidity in patient care

areas; no humidity control for non-patient care areas. Mechanical and electrical rooms shall be able to maintain 60

degrees F without humidity control. The basis of design shall utilize 0°F DB outdoor air conditions.

*Summer and winter conditions are based on ASHRAE Handbook, Fundamentals - Climatic Design Information

chapter.

PRIMARY HEATING

Hydronic hot water for all facility space heating, ventilation and perimeter heating systems shall be generated by a

completely new hydronic hot water boiler plant. The boiler plant shall consist of multiple high efficiency condensing

boiler modules connected together in parallel piping arrangement. It is intended to locate the new heating equipment

within the existing boiler plant mechanical space. All heating equipment and associated controls shall be powered

from the facilities essential equipment branch.

Boiler plant equipment shall consist of the following:

Three (3) 3,000 MBH or four (4) 2,000 MBH high efficiency condensing fire tube modular boilers with dual

fuel capability. Natural gas is expected to be the primary fuel source with either propane or fuel oil as

secondary fuel source.

Based on preliminary heating loads, the anticipated capacity required to support existing hospital heating

loads is 6,000 MBH. The two boiler options described above are intended to provide N+1 heating

redundancy.

Each boiler module shall be direct vented via stainless steel flue, terminating a minimum of 7’ above the

existing boiler plant roof and a minimum of 10’ horizontally from existing hospital exterior wall. Where

outdoor air openings exist, boiler venting must terminate no less than 25’ from these openings. Combustion

air shall be ducted directly to each boiler module via “gooseneck” termination through existing boiler plant

roof (adjacent to flue termination).

Three (3) base mounted, centrifugal end suction pumps shall circulate hot water from boiler plant to space

heating, ventilation and perimeter heating loads. The three pumps shall provide N+1 redundancy such that

two pumps are required to operate to provide full flow to the facility with the third pump available for

Page 42: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 2 Job No. 20160284

standby operation. Pumps shall be configured in a variable primary arrangement, each with a dedicated

variable frequency drive. Based on preliminary heating loads, it is anticipated that each pump shall have a

capacity of 190 GPM @ 85’ of total dynamic head.

o Option: in lieu of three (3) hot water pumps, provide two (2) hot water pumps each rated for 380

GPM @ 85’ of total dynamic head.

Hydronic specialty equipment shall be required, including floor mounted expansion tank, line size air

separator and glycol holding tank with feed pump.

Hot water supply and return piping shall be installed throughout the facility to support ventilation pre-heat,

terminal heating and perimeter heating systems. The hot water supply and return mains are anticipated to

be 5” diameter, with a minimum of 1-1/2” thick fiberglass insulation (1” insulation is acceptable on pipe

sizes 1-1/4” and smaller). Hydronic piping materials shall consist of type “L” copper for all pipe sizes 2” and

smaller and ASTM A 53 black steel for all pipe sizes 2 1/2” and larger. All piping shall be labeled in

accordance with ASME A13.1, “Scheme for the Identification of Piping Systems,” for letter size, colors,

length of description and viewing angles.

PROCESS HEATING

Process steam shall continue to be supported via existing “medium” pressure steam boilers. As described in existing

conditions section above, these boilers have been converted to operate at low pressure (15 PSI maximum). A new 60

gallon, packaged feed water skid assembly shall provide storage for make-up water and condensate return, and

integral feed water pumps capable of 3 GPM @ 25 psig for boiler feed distribution. The skid shall be pre-assembled

type, with tank, pumps, piping and appurtenances, wiring, control panel and automatic steam preheat. Condensate

return shall be supported via a new duplex cast iron condensate receiver skid, with minimum 15 gallon reservoir and

3 GPM capacity. New steam mains are anticipated to be 2 ½” diameter, with a minimum of 2 ½” thick fiberglass

insulation. All steam piping sizes 2” and smaller shall be schedule 40 welded or schedule 80 threaded. Pipe sizing 2-

1/2” and larger shall be standard weight, welded or flanged.

Page 43: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 3 Job No. 20160284

PRIMARY COOLING

AIR COOLED

Chilled water for all facility space cooling systems shall be generated by a completely new chilled water plant. The

chiller plant shall consist of two (2) air cooled chillers connected together in a parallel piping arrangement. The intent

is to locate the new chillers outdoors on grade and all chilled water system appurtenances within the existing boiler

plant mechanical space. All cooling equipment and associated controls shall be powered from the facilities essential

equipment branch.

Air cooled chiller plant equipment shall consist of the following:

Two (2) 180 ton (nominal) air cooled chillers with screw compressors. Chillers to be furnished with single

point power, convenience receptacle, sound attenuation package, 65KA min AIC rating. Primary chilled

water temperature differential is intended to be 12 degrees, 56 entering and 44 leaving.

Based on preliminary cooling loads, the anticipated capacity required to support existing hospital cooling

load is 310 tons (actual). The chiller option described above is intended to provide 50% redundancy.

Two (2) base mounted, centrifugal end suction pumps shall circulate chilled water from existing boiler plant

to space cooling loads. The two pumps shall provide N+1 redundancy such that one pump is required to

operate to provide full flow to the facility with the second pump available for standby operation. Pumps shall

be configured in a variable primary arrangement, each with a dedicated variable frequency drive. Based on

preliminary cooling loads, it is anticipated that each pump shall have a capacity of 650 GPM @ 100’ of total

dynamic head.

Hydronic specialty equipment shall be required, including floor mounted expansion tank, line size air

separator, glycol holding tank with feed pump and 500 gallon insulated buffer tank.

Each chiller shall be piped in a parallel configuration with underground piping extending from the chillers on

grade to the existing boiler plant mechanical space.

Chilled water supply and return piping shall be installed throughout the facility to support cooling loads. The

chilled water supply and return mains are anticipated to be 6” diameter, with a minimum of 1-1/2” thick

fiberglass insulation (1” insulation is acceptable on pipe sizes 3” and smaller). Chilled water piping

materials shall consist of type “L” copper for all pipe sizes 2” and smaller and ASTM A 53 black steel for all

pipe sizes 2 1/2” and larger. All piping shall be labeled in accordance with ASME A13.1, “Scheme for the

Identification of Piping Systems,” for letter size, colors, length of description and viewing angles.

WATER COOLED

Chilled water for all facility space cooling systems shall be generated by a completely new chilled water plant. The

chiller plant shall consist of two (2) water cooled screw chillers connected together in a parallel piping arrangement.

The intent is to locate the new chillers indoors within a new addition to the existing boiler plant; the new mechanical

space shall house all condenser water system appurtenances. Chilled water system appurtenances shall be located

within existing boiler room. All cooling equipment and associated controls shall be powered from the facilities normal

equipment branch.

Page 44: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 4 Job No. 20160284

Water cooled chiller plant equipment shall consist of the following:

Two (2) 155 ton (nominal) high efficiency water cooled screw chillers.

Based on preliminary cooling loads, the anticipated capacity required to support existing hospital cooling

load is 310 tons (actual). The chiller option described above is intended to provide 50% redundancy.

One dual cell 310 ton cooling tower located at grade on raised steel dunnage. Cooling tower shall be cross-

flow style, induced draft with variable speed drive control fan and stainless steel sump. Alternatively, the

cooling tower shall be mounted directly above the new chiller plant mechanical space.

Two (2) base mounted, centrifugal end suction pumps shall circulate chilled water from new chiller plant to

space cooling loads. The two pumps shall provide N+1 redundancy such that one pump is required to

operate to provide full flow to the facility with the second pump available for standby operation. Pumps shall

be configured in a variable primary arrangement, each with a dedicated variable frequency drive. Based on

preliminary cooling loads, it is anticipated that each pump shall have a capacity of 650 GPM @ 100’ of total

dynamic head.

Two (2) horizontal split case centrifugal pumps shall circulate condenser water from cooling tower cells to

indoor water cooled chillers. The two pumps shall provide N+1 redundancy such that one pump is required

to operate to provide full flow to the facility with the second pump available for standby operation. Each

pump shall be provided with a dedicated variable frequency drive. Based on preliminary cooling loads, it is

anticipated that each pump shall have a capacity of 950 GPM @ 45’ of total dynamic head.

Hydronic specialty equipment shall be required, including floor mounted expansion tank, line size air

separator, glycol holding tank with feed pump, 500 gallon insulated buffer tank and water treatment skid.

Each chiller shall be piped in a parallel configuration with common header. Evaporator and condenser

water control valves will be provided to control flow to multiple chillers.

Complete refrigerant monitoring system shall be provided including refrigerant monitor and sampling tubes,

remote warning beacon (with signage), and dedicated refrigerant exhaust system.

Chilled water supply and return piping shall be installed throughout the facility to support cooling loads. The

chilled water supply and return mains are anticipated to be 6” diameter, with a minimum of 1-1/2” thick

fiberglass insulation (1” insulation is acceptable on pipe sizes 3” and smaller). Chilled water piping

materials shall consist of type “L” copper for all pipe sizes 2” and smaller and ASTM A 53 black steel for all

pipe sizes 2 1/2” and larger. All piping shall be labeled in accordance with ASME A13.1, “Scheme for the

Identification of Piping Systems,” for letter size, colors, length of description and viewing angles.

AIR HANDLING & AIR DISTRIBUTION

PRIMARY VENTILATION & EXHAUST

Ventilation air heating, cooling, humidification, dehumidification and general exhaust shall be provided by three (3)

custom style energy recovery rooftop air handling units. The new rooftop air handlers will be installed on new

structural steel dunnage or roof curbs; appropriate structural support mechanism shall be determined by structural

engineer. These units will supply conditioned ventilation air throughout the entire hospital facility. In addition, they will

support the entire building’s general exhaust requirements and transfer energy from the conditioned exhaust

Page 45: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 5 Job No. 20160284

airstream to the unconditioned incoming ventilation airstream. New rooftop ventilation air handling units will be 100%

outdoor air custom grade units with the following characteristics:

13,000 CFM outdoor air for ventilation supply

12,000 CFM exhaust air

3” external static pressure supply and 3” external static pressure exhaust fan performance.

100% outside air.

All sections welded-frame, double-wall, aluminum interior/exterior, 3” foam insulated panel construction

with thermal breaks.

Stainless steel drain pans and coil racks

Interior drains in all sections.

Factory-mounted and -wired disconnect switches.

Factory-wired interior and service lights and receptacles.

Premium efficiency motors.

Variable speed drives for individual control of all fans and energy recovery wheel.

Access doors and windows in all sections.

Airflow measuring stations (supply, exhaust, and outside air).

Filter bank differential pressure gauges.

Minimum (2) plenum supply and (2) plenum exhaust fans; airfoil centrifugal type.

Ultra-low-leakage dampers.

Smoke dampers (supply and return).

Duct smoke detectors (supply and return).

30% efficient pleated pre-filters.

90% efficient cartridge final filters.

Energy recovery core or energy recovery wheel.

Steam humidifier section, with electric steam generator.

35% propylene glycol hydronic pre-heating coils.

35% propylene glycol chilled water hydronic cooling coils.

Discharge Plenum.

Air handler and controls shall be on emergency power.

Estimated footprint: 19’-1” W * 32’-10” L * 9’-1” H (not including structural support).

Estimated weight 26910 lbs

Low pressure supply ductwork will run along the roof from the roof top units discharge and drop down into multiple

shafts where it will eventually distribute tempered air to either terminal equipment or directly to occupied space via

ceiling diffusers.

Relief from each space shall be returned to the rooftop units in a similar fashion, via low pressure exhaust ductwork

connected to ceiling grilles serving each space. Ductwork traveling vertically will be located within the same shafts as

the supply air duct risers. Any duct shaft penetration (supply, relief, exhaust, etc.) shall be protected by combination

fire smoke dampers interlocked with local duct smoke detectors.

Page 46: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 6 Job No. 20160284

*If VRV system option is selected, energy recovery unit shall be provided with split DX cooling coil in lieu of 35% P.G.

chilled water coil. In addition, provide air-cooled condensing units of quantities and capacities to match DX cooling

coils.

EMERGENCY ELECTRIC ROOM HEATING AND COOLING

Heating and cooling needs for the existing emergency electric room shall be provided via packaged rooftop air

handling unit. The new rooftop air handler will be installed on either new structural steel dunnage or roof curbs;

appropriate structural support mechanism shall be determined by structural engineer. New rooftop air handling unit

will be packaged recirculating type with the following characteristics:

1,500 CFM supply air with 20% outdoor air.

100% enthalpy economizer

1” external static pressure fan performance.

All sections welded-frame, double-wall, galvanized interior/exterior insulated panel construction with

thermal breaks.

Stainless steel drain pans and coil racks

Indirect natural gas furnace.

Package direct expansion (DX) cooling.

Factory-mounted and wired disconnect switches.

Factory-wired service lights and receptacles.

Constant volume premium efficiency motor(s).

Access doors and windows in all sections where possible.

Airflow measuring stations (supply, return, and outside air).

Filter bank differential pressure gauges.

Airfoil centrifugal supply air fan.

Ultra-low-leakage dampers.

Duct smoke detectors (supply and return).

30% efficient pleated pre-filters.

Air handler and controls shall be on emergency power.

Estimated footprint: 5’ W * 7’ L * 4’ H (not including structural support).

Estimated weight 800 lbs

MECHANICAL ROOM HEATING AND COOLING

Heating for the mechanical room shall be provided by two (2) 35 MBH hydronic unit heaters. Units shall be ceiling

suspended and strategically located near outdoor air intake. Cooling for the mechanical room shall utilize a sidewall

relief propeller fan rated at 500 CFM and 0.5” static pressure interlocked with outside air make-up opening; each

opening will be provided with an automatic control damper. The propeller fan and make-up air opening shall be

located on opposite sides of the mechanical room for maximum performance.

Page 47: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 7 Job No. 20160284

TYPE II KITCHEN EXHAUST & MAKE UP AIR SYSTEMS

Type II kitchen exhaust shall be served by a new utility set fan, located in the rooftop penthouse. Fan performance

shall be 8,000 CFM at 3” W.C. external static pressure. Exhaust fan shall be furnished with spring isolators, electrical

disconnect switch and VFD. Provide new 40x22 ductwork from the new fan down to the kitchen on the basement

level. Make-up air for the kitchen shall be provided via new dedicated make-up air unit located outside on grade. Unit

performance shall be 17,500 CFM at 2” W.C. external static pressure. Unit shall be furnished with electrical

disconnect switch, supply fan powered via VFD, chilled water hydronic cooling coil, hot water hydronic heating coil

and MERV-7 pre-filter. Provide new 60x28 ductwork from make-up air unit to the kitchen on the basement level.

As an add alternate option, new type 2 kitchen exhaust and existing type 1 grease exhaust hoods shall be retrofitted

with a demand based variable volume kitchen control system which includes hood optic and temperature sensors that

modulates exhaust airflow based on heat and smoke detected. Each exhaust fan shall be interlocked with proposed

makeup air handling unit to vary the airflow simultaneously based on feedback from hood optic and temperature

sensors.

TERMINAL SYSTEMS

BASELINE AND OPTION 3 – FOUR PIPE FAN COIL UNITS

Heating, cooling and ventilation shall be provided to each zone via 4-pipe terminal fan coil units (FCU). Each fan coil

unit shall consist of a direct drive centrifugal fan powered via ECM motor, hydronic heating and cooling coils, heating

and cooling control valves, condensate drain pan and disposable filter (MERV 6). Fan coils will generally be

horizontal ceiling concealed ducted units. Supply air shall be ducted from FCU outlet to ceiling registers, and return

air will be brought back to the FCU inlet. Primary ventilation air from the roof top air handling equipment will be ducted

directly to the FCU return air duct system. Temperature control zoning shall be based on the following criteria:

1. All patient sleeping rooms shall be individually zoned.

2. Non-sleeping rooms shall be zoned separately based on interior and exterior exposures.

3. Exterior non-sleeping spaces with multiple exposures shall be zoned separately.

4. Multiple FCU’s shall be provided for single spaces consisting of 1,500 sq. ft. or greater.

5. Different departments shall not share zones. Spaces in different departments will be zoned

separately.

OPTION 1 AND OPTION 2 – ACTIVE CHILLED BEAMS

Heating, cooling and ventilation shall be provided to each zone via 4-pipe active chilled beams (ACB). Each ACB

shall consist of a primary air connection (ventilation air), 2 of 4-way air distribution, induction nozzles, hydronic

heating and cooling coils and heating and cooling control valves. Active chilled beams will sit flush in the ceiling and

be supported from the structure above. Every space requiring heating, cooling and ventilation will be provided with at

least one chilled beam; temperature control zoning shall be based on the following table:

Room Type Chilled Beam Linear Feet

Single Occupant Patient Room 6’

Page 48: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 8 Job No. 20160284

Double Occupant Patient Room 8’

Typical Single Occupant Office 4’

Multiple Occupant Office 8’

Small Conference Rooms 16’

Large Conference Rooms 40’

Auditorium 70’

To prevent condensation from forming on the chilled beam cooling coils, careful consideration must be made to

ensure the chilled water supply temperature remains a minimum of 2 degrees above the space dew point

temperature. This impacts the design of the chiller plant, ventilation air handler cooling coils and ACB entering chilled

water temperatures. The primary chiller plant leaving water temperature and temperature differential will be modified

significantly, ranging from 42 degree leaving water temperature to 64 degree return water temperature. The

ventilation air handling unit cooling coil will need to generate 49 degree leaving air and the chilled water supply

temperature serving the ACB’s will be between 56 and 58 degrees. In order to supply “higher” temperature chilled

water to the ACB’s, a secondary pumping system is required for each high temperature chilled water zone. One (1)

secondary inline circulator shall be provided at each chilled water riser takeoff to create a high temperature chilled

water loop. A total of twelve (12) circulators rated for 35 GPM @ 35’ of head will be required.

Because of the dew point sensitivity of an active chilled beam system, careful consideration must be taken when

retrofitting existing buildings to ensure the envelope is properly sealed, exterior glazing is relatively high performing

and exterior walls are insulated. If the envelope is compromised, unconditioned outdoor air can infiltrate the building

thus increasing interior space dew points. Uncontrolled increases in space dewpoint temperatures can create

condensation on the chilled beam cooling coils which ultimately ends up condensing within the space(s) served.

Additional controls are required to monitor indoor space relative humidity, condensation on cooling coils and provide

the ability to disable the system when indoor conditions are not suitable for chilled beam operation.

OPTION 4 – VARIABLE REFRIGERANT VOLUME

In lieu of primary heating* and cooling systems described above, primary heating and cooling will be generated via

variable refrigerant volume (VRV) direct expansion (DX) heat pump system with heat recovery; the heat recovery

function allows for simultaneous heating and cooling. The VRV system consists of thirty-two (32) 12 ton VRV outdoor

rooftop heat pump systems, direct expansion terminal fan coil units, branch selector cabinets and associated R410A

refrigerant piping distribution system. Heat pump units shall utilize variable speed driven compressors capable of

serving multiple split evaporators. The system is intended to connect outdoor heat pump units to the indoor fan coil

units via a three pipe refrigerant piping system, with branch selector cabinets varying refrigerant flow to each terminal

fan coil unit/zone.

Heating, cooling and ventilation will be provided to each zone via DX terminal fan coil units (FCU). Each fan coil unit

will consist of a direct drive fan, direct expansion heating/cooling coil, control valve, condensate drain pan and

disposable filter (MERV 6). Supplemental heating shall be provided via duct mounted hydronic heating coil fed from

the boiler plant*. While the fan coil units are manufactured in several different configurations (i.e. floor mounted, wall

mounted, concealed ducted, surface mounted ceiling, etc.), the majority of FCU’s proposed for this facility will be

Page 49: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 9 Job No. 20160284

ceiling concealed ducted units, provided with high static blower. Supply air shall be ducted to ceiling registers and

return air shall be ducted to FCU inlet. Primary ventilation air from the rooftop air handing unit will be ducted directly

to the FCU return duct system. Temperature control zoning shall be based on the following criteria:

1. All patient sleeping rooms shall be individually zoned.

2. Non-sleeping rooms shall be zoned separately based on interior and exterior exposures.

3. Exterior non-sleeping spaces with multiple exposures shall be zoned separately.

4. Multiple FCU’s shall be provided for single spaces consisting of 1,500 sq. ft. or greater.

5. Different departments shall not share zones. Spaces in different departments will be zoned separately.

Refrigerant piping shall be copper tube type ACR hard drawn with wrought copper solder joint fittings. Solder joints

shall use lead-silver solder, ASTM B 32,Grade 96 TS. All refrigerant piping shall be insulated with 1-1/2” thick closed

cellular foam insulation. Where exposed to the weather, insulation shall be covered with exterior rated aluminum

jacketing.

* VRV system heating capacity is significantly de-rated when outdoor ambient temperatures drop below 20 degrees

F, and have no published heating data for when outdoor ambient temperatures are below -4 degress F. Because of

these heating limitations, the boiler plant described in primary heating section above is still required to provide

supplemental heating and ventilation pre-heat for VRV terminal system option. The chiller plant(s) described in

primary cooling section above are eliminated if VRV terminal system option is selected. Special considerations shall

be required during design to ensure that the Refrigerant Concentration Limit (RCL) for each space is not exceeded.

DOMESTIC HOT WATER

HIGH EFFICIENCY CONDENSING DOMESTIC HOT WATER HEATER WITH ONBOARD STORAGE.

Domestic hot water generation shall be provided via three (3) 130 gallon, 600 MBH domestic hot water heaters piped

in a parallel arrangement. The hot water heaters shall provide N+1 redundancy such that any two water heaters are

able to support the entire domestic hot water load if any single water heater fails. Multiple master thermostatic mixing

valves shall be provided to regulate hot water temperature in accordance with plumbing code maximum fixture hot

water temperatures. Each water heater shall be able to provide a minimum of 11 GPM of recovery flow at a 90

degree temperature rise. A dedicated hot water recirculation system shall replace the existing, consisting of new

circulation pumps rated for 25 GPM @ 40’ of head.

HIGH EFFICIENCY CONDENSING INSTANTANEOUS (TANK-LESS) HOT WATER HEATER

Domestic hot water generation shall be provided via new tank-less domestic hot water skid consisting of five (5) six

gallon, 199 MBH instantaneous hot water heater modules. The hot water modules shall provide N+1 redundancy

such that any four (4) modules are able to support the entire domestic hot water load if any single module fails.

Multiple master thermostatic mixing valves shall be provided to regulate hot water temperature in accordance with

plumbing code maximum fixture hot water temperatures. A dedicated hot water recirculation system shall replace the

existing, consisting of new circulation pumps rated for 25 GPM @ 40’ of head.

Page 50: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 10 Job No. 20160284

GENERAL

The location of the proposed new domestic hot water heating system shall be in the original mechanical room, where

the current domestic hot water generation equipment is presently located. In order to make way for new domestic hot

water heating system installations, demolition and removal of the abandoned hot water storage tanks will be required.

The anticipated domestic hot water main is expected to be 2”. All domestic water piping shall be type L copper. Cold

water piping shall be insulated with ½” fiberglass insulation and hot water and recirculation piping shall be insulated

with 1” insulation in accordance with IECC 2012. Isolation valves shall be full port, ball type with solder ends. Piping

in exposed areas (i.e. mechanical rooms) shall be jacketed with color coded PVC jackets. Where piping is concealed

(i.e. above ceilings, in wall or within shaft enclosures, etc.), no jacketing is required.

ELEVATOR SYSTEMS

At the north and south passenger elevators, provide each machine room with a new wind driven rain resistant louver,

plenum and smoke damper for machine room and hoistway venting. Louvers shall be 3 square feet minimum free

area. Smoke dampers be class 1A ultra low leakage rated. Smoke dampers shall be closed during normal operation.

Any of the following shall open the damper:

Building general fire alarm dry contact on fire control panel.

Temperature within 2 feet of the top of the shaft rises above 87°F. Damper shall close when temperature

falls below 83°F for 15 minutes. Include high/ low temperature alarms to DDC system.

Power failure

At the north and south passenger elevator machine rooms, provide 2500 BUTH hydronic unit heaters. Units shall be

suspended from the ceiling and controlled by wall-mounted DDC thermostat. At the east freight elevator machine

room, provide a 2 ton split direct expansion (DX) air conditioning unit. Furnish unit with integral condensate pump.

Condensate drain piping shall extend to nearest drain location. The indoor unit shall be wall mounted and controlled

by wall-mounted thermostat. The outdoor unit shall be mounted on sleepers. Provide refrigerant piping between

indoor and outdoor unit per the manufacturer’s recommendation.

AUTOMATIC TEMPERATURE CONTROLS

New HVAC systems shall be controlled via an open protocol direct digital control (DDC) centralized building

automation system (BAS). While the primary function of the BAS is to provide temperature control throughout the

facility, the control system shall also have monitoring, trending, troubleshooting and alarming capabilities. The front

end equipment shall be installed such that the facility and maintenance department will have primary access. In

addition, the BAS system shall have remote access allowing facility personnel to adjust, monitor and troubleshoot

HVAC systems remotely. All recommended equipment shall be interfaced with BAS.

As an alternate option, the BAS system shall be provided as part of a fully integrated building management system.

The intent is that the BAS system would share head end infrastructure with other low voltage facility management

systems including but not limited to lighting control, nurse call, fire alarm and security.

Page 51: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 11 Job No. 20160284

ACCEPTABLE MANUFACTURERS

Equipment Manufacturer

Boilers Hydrotherm; Cleaver Brooks; Approved Equal

Chillers York; Trane; Carrier

Cooling Tower Marley, BAC, Evapco; Approved Equal

Pumps & Accessories B&G; Armstrong; Taco

Air Handlers (Custom) Haakon; Marcraft; Air Enterprises; Approved Equal

Air Handlers (Packaged) York; Trane; Daikin McQuay

Exhaust Fans / Fans Greenheck; Loren Cook; Twin City; Approved Equal

Chilled Beams Trox; Semco; Price; Titus; Approved Equal

Fan Coil Units Price; Williams; Envirotec; Approved Equal

VRV Mitsubishi; Daikin McQuay; LG; Approved Equal

Terminal Heating Equipment Sterling; Airtherm; Approved Equal

Domestic Hot Water Heater – With Tank PVI; Rheem; AO Smith; Approved Equal

Domestic Hot Water Heater - Tankless Rinnai; Rheem; Approved Equal

Automatic Temperature Controls Schneider; Johnson Controls; Honeywell; Siemens

Kitchen Exhaust Controls Melink; Captiveaire; Approved Equal

Page 52: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 12 Job No. 20160284

ELECTRICAL

NORMAL POWER SYSTEMS

The existing normal power electrical service is not of sufficient capacity to support any of the Mechanical options

described above.

There are multiple options for supplying the required additional Normal power:

1. Upgrade the existing system capacity from 2,500 to 4,000 amps at 208Y/120V. This change will increase the

available fault current throughout the existing distribution system.

a. The study to create separation between branches (performed by others) will likely include all new

panelboards which would be specified to handle the increased available fault current. If this separation and

upgrade project was not to proceed, the increase in fault current may require replacement of downstream

panels due to required AIC ratings increase.

b. A full system short circuit study will be required if this approach is used.

c. The ability to install new service equipment within existing space was not researched as part of this scope.

Continuity of service to the facility will be required with minimized outages. Evaluation and associated

phasing costs are assumed to be included in other studies presently underway.

2. Add a new parallel service from 1,600 to 2,500 amps at 208Y/120V. Retain the existing 2,500 amp service and

include a tie (see 1.c. above for challenges associated with the existing service) to the new service for normal

source redundancy in the event of a transformer failure.

a. The added service can be installed without the recommended bus tie. The bus tie should only be considered

where both services are equal sizes.

b. Service sizing is a function of desired installed redundancy. Added loads range from 1,800 amps for chilled

beams with a water cooled chiller to 2,300 amps for a total VRF system.

i. Factoring in the 1,000 amp spare capacity from the existing service, the minimal new parallel

service recommended is 1,600 amps. This approach does not provide capacity redundancy.

ii. The addition of a new parallel 2,500 amp service is sized for the connected load (no demand

applied) and would likely allow full redundancy with expected demand if the new and existing

switchboards had a bus tie.

3. Add a new 1,200 amp 480Y/277V service to supply the proposed major mechanical equipment for the water or air cooled systems options or VRF condensers. The main shall have ground fault and arc reduction capabilities. The 1,200 amp switchboard would power all loads directly from distribution breakers.

Page 53: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 13 Job No. 20160284

EMERGENCY POWER SYSTEMS

The existing emergency power electrical service is not of sufficient capacity to support any of the Mechanical options

described above.

There are multiple options for supplying the required additional Emergency power:

4. Each option requires the following: a. Add an 800A power circuit breaker to the existing Russelectric paralleling switchgear.

b. Provide a new 800A Russelectric ATS with bypass isolation feeding an 800A distribution panel to power

each ERU.

c. Provide (1) 200A 42 pole panelboard to power pumps and miscellaneous equipment in the mechanical

room.

d. HMI and systems programming to monitor and control the added distribution breakers and ATS.

e. No additional generator capacity is required. Added load remains under the capacity of a single generator,

retaining N+1 capacity.

5. Each option, with the exception of Chilled Beam requires the following:

a. Add an 800A power circuit breaker to the existing Russelectric paralleling switchgear.

b. Provide an 800A Russelectric ATS with bypass isolation feeding an 800A distribution panel.

c. Provide (8) 100A 42 pole panelboards to power FCUs. These panels shall be placed to minimize the length

of the 15A 120V branch circuit to each FCU.

6. Any option that requires that the chiller plant be energized via the emergency system shall require the following:

a. Add a 350/437.5 kW/kVA diesel fueled generator in a sound attenuated enclosure with a UL listed double

walled 96 hour belly mounted fuel tank. Provide elevated platform and stairs to match existing.

i. The additional generator is required to retain N+1 capacity. The calculated load is approximately

85% of the existing installed capacity, so will theoretically work if N+1 capacity is not required and a

load shed scheme of the chiller plant was included in the Russelectric programming.

b. Add a generator incoming and control cubicle to the existing paralleling switchgear.

c. Add an 800A power circuit breaker to the existing Russelectric paralleling switchgear distribution.

d. Provide an 800A Russelectric ATS with bypass isolation feeding an 800A distribution panel.

e. Power wire the associated air cooled chiller, water cooled chiller with cooling tower and pumps or the VRV

condensers.

Page 54: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 14 Job No. 20160284

LIGHTING

Remove all existing light fixtures impacted by the scope of the mechanical system upgrades and retain for

reinstallation. All existing power and switch wiring shall be maintained and reconnected once light fixtures are

reinstalled. An allowance should be carried for relocation of existing circuits impacted by the mechanical upgrades.

Provide an add alternate for a complete facility wide lighting upgrade which shall consist of new LED fixtures and a

simple lighting control system which has the ability to integrate with building management system. The lighting control

system shall have the ability to provide for a lighting schedule for common, administration and function spaces.

Patient care spaces shall be controlled via local occupancy sensors and dimming switches.

LOW VOLTAGE SYSTEMS

Provide for an allowance to disconnect and reinstall existing ceiling mounted devices including but not limited to fire

alarm, tel/data and nurse call systems as required to make way for new mechanical system upgrades. Relocation of a

portion of existing circuits impacted by the mechanical upgrades should be expected.

Page 55: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 15 Job No. 20160284

STRUCTURAL

For the various options vetted in the Option Matrix Study, the following table presents the final options being

proposed. Depending on the final selection, this plan could include the installation of three new AHUs on the existing

roof. Possible alternatives for new chillers include a pre-packaged chiller plant with a roof mounted cooling tower to

be installed on a new exterior slab with accompanying pumps inside the maintenance room on housekeeping pads,

or the addition of a below grade chiller plant building with new foundation/retaining walls and at-grade roof.

Western MA Hospital

Option Table for Structural Support of Mechanical System

Item Description Location Structural Support Needed Reflected RDK Dwg No.

1 Air Cooled Chiller System Exterior Grade

• Reinforced concrete slab on grade H1.1a

2 Water Cooled Chiller System

Exterior Grade or Rooftop Mounted Cooling Tower

• Reinforced concrete slab on grade to support cooling tower. • Foundation/retaining wall system and roof structure for chiller plant building addition • In lieu of grade mounted cooling tower, provide structural steel support for roof mounted cooling tower.

H1.1b

5 Condensing Boilers Basement • Reinforced concrete equipment pads for floor mounted equipment

H1.1a & H1.1b

7 Active Chilled Beams w/ Energy Recovery Ventilation

Throughout Building

• Structural penetrations for ductwork • Structural steel support for rooftop AHU Units

H1.1c - H2.1

8 Variable Refrigerant Volume w/ Energy Recovery Ventilation

Throughout Building

• Structural penetrations for ductwork • Structural steel support for rooftop AHU Units

H1.1c - H2.1

9 Four Pipe Fan Coil w/ Energy Recovery Ventilation

Throughout Building

• Structural penetrations for ductwork • Structural steel support for rooftop AHU Units

H1.1c - H2.1

Chiller System

Boiler System

HVAC System

Page 56: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 16 Job No. 20160284

ROOF SLAB MODIFICATIONS

The existing roof may be required to support new mechanical equipment. The existing drawings do not indicate roof

design live loads.

A design load of 40 psf is being assumed for the existing roof structure, which includes approximately 30 psf for snow

loads and 10 psf for interior mechanical/electrical loads (pipes, ducts, conduits, etc). The new, larger RTUs will also

result in additional snowdrift loads around the units. As the installation of the new units will exceed the original roof

design load, the existing slab would most likely not be able to support any large mechanical equipment directly on top

of it. It is recommended that structural steel platforms be provided to span above the slab and bear directly over the

existing columns to support mechanical equipment.

Depending on weight, additional miscellaneous framing will be required to support RTU curbs that do not fall directly

over existing roof beams, and to box out new roof openings for RTU ducts/pipes.

Use the following for pricing:

New structural steel posts located at (6) minimum existing column locations for each roof top unit location. New steel

beams and girder spanning between posts to support the new equipment. Assume 18 psf for the steel structure.

The bottom of structure is to be 3’-6” above the finished roofing to avoid drifting snow loads. With the steel and RTUs

elevated by this amount the wind will blow under the frame, scouring the snow away from the leeward side of the unit.

Screen walls should not be used because drifting snow will form behind the screen wall as well unless the screen wall

is also elevated such that wind can blow under the wall. If used, assume 12 psf for steel framing.

FIRST, SECOND, AND THIRD FLOOR MODIFICATIONS

Floor openings to bring HVAC ductwork into the interior space is planned. This will require a portion of the structural

slab to be removed between floors. It is assumed that the structural beams can continue across the opening. The

new opening will require further study to determine the impacts to the floor’s diaphragm capacity in this area.

New penetrations beyond a 30” square limit would require additional steel framing to support the cut structure. For

pricing assume that the new framing consists of (2) new steel beams, each 20’-0” long, located on either side of the

new opening, supported by existing steel beams spanning between and connected to columns. The concrete floor

would then be supported by additional steel header beams framing the opening perimeter. Steel members can be

assumed to weigh 40 plf. Steel would be located below the concrete roof or floor structure.

Page 57: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 17 Job No. 20160284

BASEMENT / CRAWL SPACE SLAB MODIFICATIONS

The majority of the existing structure is to remain. In the areas where potentially heavy equipment is required, the

existing slab could require reinforcing or strengthening provided above the existing slab to accommodate heavy

mechanical systems, i.e. boilers. Possible modifications and additions to the existing structure will likely impact local

areas for strengthening footings and columns.

Modifications to the Slab-on-Grade: Multiple sections of the slab-on-grade are anticipated to be removed in order to

facilitate the revised MEP underslab services. Assume a 5” slab with 2 psf of reinforcing drilled and epoxied into the

existing slab for pricing.

NEW EQUIPMENT PADS

An exterior reinforced-concrete slab on grade would be required for the new chiller(s) and/or a prepackaged chiller

plant with roof mounted cooling tower. The pad would likely be 18-24” thick with a 1-2 ft granular base below.

Reinforced concrete housekeeping pads (4” to 6” pads on the existing slab) would be required for any new floor

mounted equipment i.e. condensing boilers, pumps, or small equipment. Structurally isolated slab-on-grade for all

vibration sensitive equipment could be required. Assume 4 psf of reinforcing on an 8” thick concrete pad at units

required to be isolated.

CHILLER PLANT BUILDING ADDITION

The proposed new chiller plant building would construct a new 49’-0”x45’-8” addition to the northeast of the main

building with a connection into the existing building basement. This alternative would require a new foundation and

retaining wall system and roof structure. The north and west walls would be below or at grade; the south and east

walls would be exposed with a brick veneer face. Modifications would be required at the existing northeast basement

wall for the connection to the proposed new building addition.

The existing space being considered is currently occupied by a recycling area with a trash compactor and a concrete

ramp. The design and construction of the new structure would result in the demolition and reconstruction of the

existing ramp.

If the new chiller plant addition alternate progresses past design development, a site specific soils report including soil

boring logs, subsurface soil conditions, and geotechnical requirements and/or recommendations should be prepared

to confirm foundation requirements.

Page 58: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 18 Job No. 20160284

ARCHITECTURAL

In their original Study Option Matrix (July 22, 2016), RDK Engineers identified twelve mechanical systems upgrade

options; three have since been deleted as being not preferred and are not further evaluated following the below table.

System Description Architectural Impact Summary

Primary Cooling: Air Cooled Chiller System

Equipment located at exterior behind existing

generators. [See also terminal systems / air

handling & distribution options.]

Primary Cooling: Water Cooled Chiller System Building addition required for equipment. [See

also terminal systems / air handling &

distribution options.]

Closed Loop Geothermal Primary Heating &

Cooling – Option Deleted

N/A

Low Pressure Steam Boilers – Option Deleted N/A

Primary Heating: Condensing Boilers No major direct architectural impact. [See also

terminal systems / air handling & distribution

options.]

Variable Volume Air Handling System – Option

Deleted

N/A

Terminal Systems / Air Handling & Distribution:

Active Chilled Beams with Energy Recovery

Ventilation

Terminal unit layout in individual spaces will

affect ceilings, lights, and sprinklers. Energy

recovery rooftop air handling units installed at

existing roof. Vertical & horizontal

ductwork/piping distribution required throughout

building.

Page 59: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 19 Job No. 20160284

Terminal Systems / Air Handling & Distribution:

Variable Refrigerant Volume with Energy

Recovery Ventilation

Terminal unit layout in individual spaces will

affect ceilings, lights, and sprinklers. Energy

recovery rooftop air handling units and 32 heat

pumps installed at existing roof. Vertical &

horizontal ductwork/piping distribution required

throughout building.

Terminal Systems / Air Handling & Distribution:

Four Pipe Fan Coil with Energy Recovery

Ventilation

Terminal unit layout in individual spaces will

affect ceilings, lights, and sprinklers. Energy

recovery rooftop air handling units installed at

existing roof. Vertical & horizontal

ductwork/piping distribution required throughout

building.

Domestic Hot Water: Gas Fired Domestic Hot

Water System

No major direct architectural impact.

Domestic Hot Water: Instantaneous Gas Fired

Domestic Hot Water Heating

No major direct architectural impact.

Automatic Temperature Controls: Fully

Integrated Building Management System

No major direct architectural impact.

AIR COOLED CHILLER SYSTEM [PRIMARY COOLING]

An air cooled chiller system would be located on grade at the exterior behind the existing generators to the north of

the boiler plant. The architectural impact on the existing building for this option is minimal, since this area is not

highly visible to the public and is concealed from the front by an existing screen wall. The existing grade also drops

off from front to back, further shielding the chiller(s) from view. Additional screen walls can be constructed to further

reduce the visual impact, if desired. This primary cooling option generally only requires a structural slab at grade and

a route for supply and return piping to the building interior.

See photos 9-12 for the proposed air cooled chiller(s) location.

Page 60: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 20 Job No. 20160284

WATER COOLED CHILLER SYSTEM [PRIMARY COOLING]

A water cooled chiller system would require the construction of a new addition since the equipment must be protected

from the weather and the existing building does not currently appear to have adequate space to house a new chiller

system within it.

A new addition to house the water cooled chiller system can be constructed behind the existing generators on the

north side of the building. The four existing one story storage units near this location would be demolished and

recreated within the addition. The addition could be connected to the existing basement level for easy access to/from

the boiler plant. The existing ramp for the trash compactor at this location would probably need to be rebuilt since it

would interfere with the new building foundation. The size of the addition would be determined by the needs of the

mechanical equipment (and recreated storage), but there is also an opportunity to enlarge the addition to provide

additional storage space or easier access to the trash compactor. [Western MA Hospital expressed a desire to

increase available storage space near the main hospital building.]

See SK-1 through SK-3 for a possible preliminary layout and site location.

CONDENSING BOILERS [PRIMARY HEATING]

There are no major direct architectural implications to the existing building. The existing boiler plant appears to

provide sufficient interior space to accommodate the proposed option.

ACTIVE CHILLED BEAMS WITH ENERGY RECOVERY VENTILATION

Active Chilled Beams would be mounted flush with the suspended ceiling in each room requiring heating, cooling,

and ventilation. [The units are intended to be supported by the existing building structure, and structural support

capacity will need to be confirmed.] To accomplish this work, suspended ceilings throughout most of the building

would need to be removed and reinstalled or replaced entirely. Lighting fixtures, sprinklers, and other systems would

probably need to be relocated to accommodate the new chilled beams, ductwork, and hydronics. The space

available above suspended ceilings varies throughout the building, and sufficient clearance for new equipment should

be confirmed room-by-room early in the design process. See photos 13 and 14 for typical conditions above existing

suspended ceilings.

There are a number of spaces that currently have hard (gypsum wall board) ceilings rather than suspended ceilings

(e.g. – third floor north wing). In these locations, options for installing chilled beams include: surface-mounting* the

unit to the hard ceiling and leaving the unit, ductwork, and piping exposed; surface-mounting* the unit but concealing

ductwork and piping in soffits; modifying the hard ceilings to install the unit, ductwork, and piping above the ceiling;

and removing the hard ceiling and replacing it with a suspended ceiling similar to typical patient rooms. [Note*:

Page 61: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 21 Job No. 20160284

Specific ceiling heights, equipment depth, and clearance requirements must be confirmed if surface-mounting is to be

considered.]

Active chilled beams are sensitive to dew point and operate best with an efficient and tight building envelope to

control possible condensation issues. The ca. 1935 exterior masonry walls at Western MA Hospital most likely do not

include air or vapor barriers and are probably not effectively insulated. Existing windows appear to have had their

original single pane glazing replaced with thin insulated units, but the steel frames are not thermally broken.

Significant forensic research should be performed to determine whether or not the existing building envelope is

adequately efficient and tight to support the installation of an active chilled beam system.

Page 62: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 22 Job No. 20160284

VARIABLE REFRIGERANT VOLUME WITH ENERGY RECOVERY VENTILATION

A Variable Refrigerant Volume (VRV) system would typically incorporate DX terminal fan coil units concealed above

the suspended ceiling in each room. To accomplish this work above the ceilings, new suspended ceilings and new or

reinstalled lighting fixtures might be required throughout the building. Sprinklers would probably need to be relocated

to accommodate the new equipment and ductwork above the ceiling. Space available above suspended ceilings

varies throughout the building, and sufficient clearance for new equipment should be confirmed. See photos 13 and

14 for typical conditions above existing suspended ceilings.

Consideration for spaces with hard ceilings is also required. Options for exposed or concealed equipment, ductwork,

and piping are similar to those described above for active chilled beams.

Per RDK’s initial description, thirty two (32) rooftop mounted heat pumps would supply the VRV system, in lieu of the

primary cooling systems described in Options 1 and 2 above. (A primary heating boiler plant will still be required to

provide supplemental heating for the VRV terminal system option.) A significant amount of work will need to occur on

the roof, and, as stated elsewhere in this report, we would recommend that total roof replacement be added to the

scope of this project. See photos 24-28 for examples of the existing roof condition.

FOUR PIPE FAN COIL WITH ENERGY RECOVERY VENTILATION

Four-pipe fan coil units would be mounted above the ceiling in each room requiring heating, cooling, and ventilation.

As with the active chilled beams and VRV terminal unit systems described above in Options 7 and 8, significant

alterations to ceilings, lighting fixtures, and sprinklers will be required. Space restrictions and existing structural

support capacity above the existing ceilings will need to be confirmed during design. Locations with hard ceilings

also require additional consideration. See photos 13 and 14 for typical conditions above existing suspended ceilings.

Page 63: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 23 Job No. 20160284

GAS FIRED DOMESTIC HOT WATER SYSTEM

Domestic hot water heating system equipment is intended to be located in the main mechanical room; there are no

major direct architectural implications.

INSTANTANEOUS GAS FIRED DOMESTIC HOT WATER HEATING

Domestic hot water heating system equipment is intended to be located in the main mechanical room; there are no

major direct architectural implications.

FULLY INTEGRATED BUILDING MANAGEMENT SYSTEM [AUTOMATIC TEMPERATURE CONTROLS]

There are no major direct architectural implications.

PRIMARY VENTILATION AND EXHAUST:

RDK proposes that ventilation air heating, cooling, humidification, dehumidification, and general exhaust be provided

by three energy recovery rooftop air handling units. Requirements for rooftop structural support must be determined

by the structural engineer. In addition to the units themselves, new exposed ductwork will also be installed on the

roof.

Removal of obsolete equipment and installation of new systems will have a significant impact on the existing finished

roof. Based on the age and condition of the existing roof, we would recommend a complete roof replacement be

included along with this mechanical work. The existing roof appears to be a single-ply EPDM membrane roof which

can be replaced in-kind with new EPDM. Other single-ply membrane options include PVC or TPO. These so-called

thermoplastic membrane options provide heat welded seams rather than adhered seams and are available in several

thicknesses and colors. Additional roof insulation should be provided during the roof replacement to improve the

thermal efficiency of the building and minimize heat loss through the roof. New guardrails will be required at the roof

edge where new equipment is located within 10’-0” of the edge per OSHA requirements.

See photos 24-28 for examples of the existing roofing condition.

Each of the three rooftop air handling units will serve approximately one third of the building, divided into the north

wing, center wing, and south wing. Supply and return ductwork will run vertically to and from each unit from the roof

down to the basement ceiling. The north and south wings are expected to be served by one large vertical chase

each, while the center wing will require three smaller vertical chases to serve the area. RDK has identified

preliminary locations for these vertical chases, and field observations suggest that they are generally feasible. Some

interior spaces will be affected by the build out required to create the vertical chases. Penetrations through the

Page 64: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 24 Job No. 20160284

existing floor slabs will need to be considered by the structural engineer, and requirements for fire dampers and fire

stopping will be studied during design.

Supply and return ductwork will run horizontally at each floor level from the vertical chase locations to all spaces

requiring ventilation. Supply ductwork is currently proposed to run down the main corridors and branch off to each

served space. Return ductwork is typically located around the perimeter near exterior walls. Horizontal ductwork is

intended to be concealed above existing suspended ceilings. The impact on the existing suspended ceilings will be

significant, requiring removal and reinstallation or complete replacement throughout most areas of the building.

Lighting fixtures, sprinklers, and other systems located on or above ceilings will need to be relocated or replaced.

Several areas currently have hard, gypsum board or plaster, ceilings. Significant alterations would be required to

conceal ductwork in these areas. The historic coffered plaster ceiling at the first floor main entry lobby should be the

subject of particular attention during design in order to preserve its character. See photos 15 and 16 for views of the

entry lobby.

Ductwork routing will also result in a large quantity of horizontal penetrations through walls and partitions, which will

require thorough study during design for fire dampers and fire stopping locations.

HYDRONICS:

A system of hot water supply and return pipes and cold water supply and return pipes will run throughout the building

to serve terminal units and rooftop air handlers. In most options explored by RDK, the piping will run to and from the

basement boiler plant up through the building to the roof. Piping will run in three main vertical chases serving the

north, center, and south wings of the building. These chases are adjacent to some of the ventilation ductwork chases

described above.

At each floor level, supply and return piping will generally run above the ceilings at the main corridors and branch into

each room requiring heating and cooling. Although piping installation is generally more flexible than ductwork, there

will be impacts to existing suspended ceilings, hard ceilings, lighting fixtures, sprinklers, and other items located on or

above ceilings.

Some of the proposed HVAC system options require additional piping such as condensate return and refrigerant

piping.

Page 65: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 25 Job No. 20160284

EXISTING WINDOWS AND AIR CONDITIONERS:

Most existing patient rooms, administrative spaces, and activity areas are currently cooled via +/- 135 window air

conditioners. These air conditioners will become obsolete after the mechanical upgrades, so we recommend

removing them and reinstalling insulated glazing units to match the existing. The steel windows are original to the ca.

1935 construction, but the single pane glass has been replaced with insulated glazing units. While this may have

improved the thermal performance of the windows to some extent, new commercial grade aluminum windows with

thermal breaks and modern glazing would further improve their energy efficiency. Complete window replacement

should be considered as part of this project or a future project to maximize the benefits of the mechanical upgrades.

New windows might also help to control condensation if “Option #7: Active Chilled Beams” is selected.

PROJECT PHASING AND COORDINATION:

Swing space should be planned within the building to accommodate temporary displacement of patients. Relocation

of one third to one half of the patients on each typical wing of each floor would provide efficient work areas for phased

construction work to occur. A number of locations within the building were identified by hospital staff as possible

locations to create temporary patient swing space, including the basement auditorium and the second floor activity

room. CGKV’s recommendation is to reconfigure the unused third floor operating room suite into temporary patient

sleeping rooms.

Based on the attached sketch, SK-4, approximately nine patient rooms with eleven patient beds can be created in the

existing +/- 2,200 SF operating room suite plus Room 3960 across the hall. Relocating eleven patients to this

temporary location would allow the contractor to perform construction in approximately half of the north wing, for

example. See photos 19-23 for views of the existing operating room suite.

As described by hospital staff, the space needs and level of accommodation for temporary patient rooms are

relatively simple. Rooms can be constructed with steel stud and painted drywall partitions, VCT floors, and

suspended acoustical tile ceilings. Lighting, ventilation, and power will be required. Some patients may need

oxygen. Although temporary, these patient rooms will need to meet applicable codes, and we recommend consulting

with health care professionals at the hospital during the design phase to confirm exact patient needs.

Page 66: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 9: Alternative Project Considerations

Page 67: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1

ALTERNATIVE PROJECT CONSIDERATIONS

In order to accommodate the proposed mechanical system upgrades, significant alterations and upgrades to non-

mechanical systems are assumed to be required. Required projects include:

Ceilings – Significant alterations are required to conceal ductwork and piping throughout the facility. The

extent of the work is such that removal and reinstallation may not be feasible, rendering complete new

suspended ceiling systems throughout.

Sprinkler Modifications - Significant modifications to the exiting wet sprinkler system will be required to

facilitate the installation of new terminal equipment and associated duct and piping systems.

Fire Alarm – It is our understanding that the Owner is planning a facility wide fire alarm upgrade project. As

this project is being performed by a separate design team, the mechanical system upgrades will need to be

coordinated with this concurrent project. It is expected that local ceiling mounted devices will need to be

moved and/or relocated to accommodate proposed mechanical system installations.

Normal Power Upgrade - It is our understanding that the Owner is planning to upgrade/renovate the existing

normal power switchgear. As this project is being performed by a separate design team, the mechanical

system upgrades will need to be coordinated with this concurrent project. Added load for the options being

considered range from 650 to 800 kVA connected. Utility data provided indicates that spare capacity does

exist, however it is not enough to cover even the lower anticipated increase.

Emergency Power Upgrade - Added load for the options being considered range from 200 to 350 kVA

connected. Generator test data provided indicates that spare capacity does exist, however it is not enough

to cover even the lower anticipated increase without addition of distribution breakers, ATS and panelboards.

Separation of Power - It is our understanding that the Owner is planning an electrical separation project

which requires the creation of new normal and emergency power closets to house panelboards throughout

the facility. As this project is being performed by a separate design team, the mechanical system upgrades

will need to be coordinated with this concurrent project.

In addition to the required projects described above, a number of optional projects have been identified and

recommended due to the extensive impact the mechanical system installations will have on other parts of the facility.

Optional, but recommended project considerations consist of:

Lighting – The extent of ceiling work necessary to facilitate the installation of the proposed new mechanical

systems (terminal equipment, ductwork, piping, etc.) may require a change to the existing lighting layout and

mounting concepts (i.e. surface mounted, suspended, recessed, etc.). A facility wide lighting upgrade to all

LED fixtures should be considered.

Roof Replacement – Per Owner feedback, the existing roof is a candidate for replacement. Visual

observation reveals numerous patching, pooling and both previously repaired and new leaks. As the

architect identified, the roof work required to support the mechanical system upgrades is significant, and it is

recommended to replace the entire roof membrane upon completion of the mechanical roof work.

Window Replacement – The steel windows are original to the 1935 construction, but single pane glass has

been replaced with insulated glazing units. While this may have improved the thermal performance of the

windows to some extent, new commercial grade aluminum windows with thermal breaks and modern

glazing would further improve their energy efficiency. Nearly 135 packaged window air conditioning units will

be removed and replaced with new insulated glazing units as part of the mechanical upgrade project.

Complete window replacement should be considered to maximize the benefits of the mechanical upgrades.

Page 68: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 10: Implementation Plan & Phasing Considerations

Page 69: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1

IMPLEMENTATION PLAN & PHASING CONSIDERATIONS

The proposed mechanical system upgrades are extensive and will have a significant impact on all areas of the

facility. Western MA Hospital has made it clear that operations must not be interrupted, and that the safety and well-

being of patients is paramount. To that end, the project must be designed with detailed phasing and coordination in

mind. Preliminary phasing and implementation strategies may resemble the following:

INITIAL PHASING: Install major mechanical system infrastructure and vertical distribution systems.

The initial construction activities shall revolve around the installation of new cooling and heating plants, new air

handling equipment and their associated piping and duct distribution systems. Work will be mostly contained within

mechanical rooms, crawlspace, roof and non-patient care areas. The intent of the initial phase is to have new cooling,

heating and ventilation systems operational prior to impacting patient care spaces. New vertical piping and duct

distribution systems shall be installed such that work performed in future phases will be limited to horizontal

distribution only.

INTERIM PHASING: Renovate patient care, administration and support spaces.

Swing space shall be planned within the building to accommodate temporary displacement of patients while

administrative functions can be temporarily relocated to other on campus facilities. There were a number of locations

within the building identified by the hospital staff as potential temporary patient swing space including:

Basement auditorium

Second floor patient activity room

Third floor abandoned operating suite

Third floor patient activity room

It is recommended to reconfigure the unused third floor operating suite and patient activities room to accommodate

approximately 2,200 sq. ft. of patient sleeping room swing space. Relocating eleven (11) patients to this temporary

location would allow for mechanical system upgrades to occur in approximately six (6) phases per floor. In each

phase, horizontal distribution shall be extended from the vertical systems installed during initial phasing. In general,

the intent would be to renovate from a top to bottom approach beginning with the highest level, the 3rd floor.

FINAL PHASING: Decommission and remove obsolete mechanical systems

The existing low pressure steam boiler plant will be required to remain online throughout the duration of the

construction efforts while the existing heating systems are being converted from steam to hot water. Upon completion

of the interim phases, the existing steam boiler plant and all associated accessories and piping shall be removed to

the maximum extent practical. It is assumed that vertical steam risers and portions of horizontal distribution piping will

be abandoned in place to minimize disturbance to hazardous materials and impact to recently renovated spaces.

Secondary single wall buried fuel oil storage tank, fuel delivery equipment and associated piping and accessories

shall also be removed.

ADDITIONAL PHASING CONSIDERATIONS

To make room for new high efficiency condensing boiler plant installation, one of the two low pressure

steam boilers will need to be demolished. This will eliminate redundancy for the facility for the duration of

construction. Alternatively, temporary boilers can be rented for the duration of construction and piped into

existing low pressure steam header.

Existing process boilers shall be prepared to support process steam requirements. Existing process

boiler feed water system shall be replaced in kind. During feed water system replacement, process steam

boilers will not be functional.

Existing abandoned hot water storage tanks shall be removed to make way for new gas fired domestic

hot water heaters.

Page 70: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

SECTION 11: Proposed Schedule of Work & Project Costs

Page 71: WESTERN MASSACHUSETTS HOSPITAL · 11/29/2017  · steam boilers. Each boiler is Cleaver Brooks model CB, 900-150 fire tube style rated for 20,920 lb/hr of low pressure (currently

Western Massachusetts Hospital – Mechanical System Upgrades Westfield, Massachusetts

Project No. DPH 1605 HS1 Page 1

PROPOSED SCHEDULE OF WORK & PROJECT COSTS

FORECAST OF APPROXIMATE SCHEDULE

Upon certification of the study document and when project funding is available and approved for spending, we

anticipate that the schedule outlined below would provide for a reasonable timeframe for project completion.

Design Documents – 44 weeks

Planning Programming – 12 weeks

o 10 weeks design

o 2 weeks review/approval

Schematic Design – 8 weeks

o 6 weeks design

o 2 weeks review/approval

Design Development – 12 weeks

o 10 weeks design

o 2 weeks review/approval

Construction Documents – 12 weeks

o 10 weeks design

o 2 weeks review/approval

Bidding/Award – 12 weeks

Bidding – 8 weeks

Award – 4 weeks

Construction Duration (with phasing) – 104 weeks (24 months)

ANTICIPATED PROJECT COSTS

A conceptual construction cost estimate for the preferred alternative scope of work was prepared by VJ Associates;

refer to Appendix H for comprehensive construction cost estimate. The estimated construction cost is currently

$20,300,000.00.