AMENDMENT RECORD ISSUE NO. SECTION NUMBER DATE OF AMENDMENT SIGNED
Prepared By: Checked/Approved By: Date Job Number CT CT 09.05.2016
416.008.00
CONTENTS 1.0 INTRODUCTION 2.0 WATER CONNNECTION 3.0 GAS CONNECTION 4.0 ELECTRICITY CONNECTION 5.0 DIVERSIONS
APPENDICES A. SCOTTISH POWER QUOTE B. SCOTTISH WATER PDE RESPONSE C. SGN BUDGET QUOTE
UTILITIES AVAILABILITY SUMMARY 1.0 INTRODUCTION
Rybka have been appointed by Salters Land Limited to review utility connection availability for their development at The Steading site, Wester Cowden, Dalkeith, EH22 2QA The work undertaken as part of this initial investigation is outlined below and this report provides an overall summary of utility connection options.
• Review available information on existing utility company record plans • Liaise with each utility network operator (Gas / Electricity / Water) to
establish their network availability to meet the demands of the development and the most suitable point of connection location for the development.
• Prepare a Scottish Water Pre-Development Enquiry (PDE) • Obtain budget cost from Scottish Power for point of connection to the
development • Obtain SGN gas budget connection quote
The initial utility enquiries have been processed based on 25 residential units with gas-fired heating installations.
2.0 WATER CONNNECTION
A pre-development enquiry (PDE) was processed with Scottish Water to determine availability of water and drainage services for the development. The PDE response is included in appendix B for reference. The PDE response confirms; Water: There is sufficient capacity in the Rosebery Water Treatment Works and also the local network to service the demands from your development. Connect to the 3" CI main that runs through site. Ensure appropriate standoff distances to the main are applied by new development, otherwise consultation with our Asset Impact Team may be advised. Scottish Water's current minimum level of service for water pressure is 1.0 bar or 10m head in the public main. Any property which cannot be adequately serviced using this pressure may require private pumping arrangements installed, subject to compliance with the current water byelaws. Wastewater: There is sufficient capacity in the Edinburgh Waste Water Treatment Works and the local network to service the demands from your development. Ok for foul only, and surface water should connect via surface water system if it cannot be disposed of on site. Scottish Water supports the principal of a sustainable urban drainage system (SUDS) and the developer should consider utilising this in the surface water drainage design. It is important to note that Scottish Water will not adopt surface water drainage systems that require the flows to be pumped. The SW PDE response confirms the development, subject to processing a successful connection application, can be connected to the existing 3” cast iron main that runs through the site. The existing main may require diversion to suit the new site layout proposals and the extent of this will require to be assessed against the detailed development plans in due course.
3.0 GAS CONNECTION
SGN have provided a budget quotation for gas connections to the development and this is included in appendix C. SGN have advised that gas service to the developments is available from their infrastructure. They note that their work is within close proximity of another GT and crosses third party pipeline. On request of any firm quotation, permissions will be sought from relevant owners and operators.
They have made no allowance for servitudes or third party permissions to carry out the work, these may be required. The costs exclude any diversion allowance – the requirement for same is to be determined following review of detailed site layout proposals and receipt of record utility company plans
4.0 ELECTRICITY CONNECTION
Scottish Power have provided a quotation and outline design drawing, as appendix A, for providing a low voltage (LV) point of connection for the development. The LV point of connection is identified as being at existing LV infrastructure at Easter Langside Crescent. In addition to the PoC works, SP have identified a possible requirement for diversion of their existing HV and LV infrastructure. The potential diversion requirements are noted on the SP drawing within appendix A. The SP quote includes an allowance for the LV diversion cost, however, the exact route will require to be determined to suit the proposed site layout when this detail is available. The SP quote allows only for the non-contestable works associated with the HV diversion, the actual HV diversion work will require to be developed and priced as and when site layout details are available.
5.0 DIVERSIONS
The initial enquiries with Scottish Power / Scottish Water indicate that diversion works may be required to facilitate the development. Copies of the utility company record plans have been requested to allow the nature of the existing assets to be understood. To allow a diversion strategy for the site to be developed, details of the proposed site layout will be required.
HI.2
HI.4
HI.3
HI.2
9
5
6
18
47
2
Wester Cowden
86.9m
89.6m
Trac
k
LANE
EASTER
72
97
80
88
93
82
LANGSIDE
11EASTER LANGSIDE AV
EASTER LANGSIDE CRESCENT
EASTER LANGSIDE PL
1
7
5
11
1
7
1
1
7
6
1
2
89.6m
5m
4m
4m
2m
1m
6m
4m
2m
1.0 m
.6m
12m
0505
1.4 m
89.6m
Plo t 28
0.8 7m
Plot 29
plot 32
Plo t 30
89.6m
plot 33
PLOT 2
4
Plo t 26
Plot 27
PLOT 2
5
5.9m
Plot 31
PLOT 2
0
15.8m
Plot 64
Plot 65
Plot 63
BM 89
.29m
Sheepf
old
PO LE3731
Wester
Cowden
WESTERNCOW DEN P /M
35 ( 3) LV in 4" Duct
185 (3 ) AL XLP E 11kV
4 x 3/
0.147
HDC L
V
3 x 3/
0.147
HDC L
VWESTER COWDEN
3732
3733
17564
3720
185mm(3) AL XLPE 11kV
185m
m(3)
AL XL
PE 11
kV
185mm(3) AL XLPE 11kV
185m
m(3)
AL XL
PE 11
kV
PLOT 6
6
Scale:- 1 : 1,098Date:- 11/04/2016 Produced By:-
25th April 2016
Rybka Limited24 Rutland StreetEdinburghEH1 2AN
FAO Chris Thomson
EH22 Dalkeith Wester Cowden Steading siteDevelopment Enquiry Application Our Ref: 730391
Please quote our reference in all future correspondence
Thank you for your DIA Form regarding the above proposed development. Following anassessment of our assets I can now confirm that at this present time:
Water: There is sufficient capacity in the Rosebery Water Treatment Works and also thelocal network to service the demands from your development. Connect to the 3" CI mainthat runs through site. Ensure appropriate standoff distances to the main are applied by newdevelopment, otherwise consultation with our Asset Impact Team may be advised.
Scottish Water's current minimum level of service for water pressure is 1.0 bar or 10m headin the public main. Any property which cannot be adequately serviced using this pressuremay require private pumping arrangements installed, subject to compliance with the currentwater byelaws.
Wastewater: There is sufficient capacity in the Edinburgh Waste Water Treatment Worksand the local network to service the demands from your development. Ok for foul only, andsurface water should connect via surface water system if it cannot be disposed of on site.
Scottish Water supports the principal of a sustainable urban drainage system (SUDS) andthe developer should consider utilising this in the surface water drainage design. It isimportant to note that Scottish Water will not adopt surface water drainage systems thatrequire the flows to be pumped.
However, it is important to note that Scottish Water is unable to reserve capacity andconnections to the water & wastewater networks can only be granted on a first come firstserved basis. For this reason we may have to review our ability to serve the development onreceipt of an application to connect.
SCOTTISH WATER
Customer ConnectionsThe BridgeBuchanan Gate Business ParkCumbernauld RoadSteppsGlasgowG33 6FB
Customer ConnectionsFreephone Number - 0800 3890379E-Mail - [email protected]
You will be required to seek technical approval for your water & wastewater infrastructurefrom our technical design team. The relevant application/connection forms are available onour website at www.scottishwater.co.uk , please complete them and return to the aboveaddress together with all relevant documentation. You will also find many useful guides onScottish Water processes including a step by step guide to filling out the necessary forms.
I trust that the above is acceptable however, if you have any questions relating to the abovedo not hesitate to contact me at the above address.
Yours sincerely
Matthew McAleneyTechnical [email protected]
Scottish Water Disclaimer:
“It is important to note that the information on any such plan provided on Scottish Water’s infrastructure,is for indicative purposes only and its accuracy cannot be relied upon. When the exact location and the nature of the infrastructure on the plan is a material requirement then you should undertake an appropriate site investigation to confirm its actual position in the ground and to determine if it is suitable for its intended purpose. By using the plan you agree that Scottish Water will not be liable for any loss, damage or costs caused by relying upon it or from carrying out any such site investigation."
NF129a v4.0
26 April 2016 SGN Connections
Our Ref: 1132505 Axis House Your Ref: n/a 5 Lonehead Drive
Newbridge Edinburgh EH28 8TG
Chris Thomas Rybka Customer Service 0800 912 1700* 24 Rutland Street Edinburgh EH1 2AN Dear Chris Thomas
25 new properties at the Steading Site, Wester Cowden, Dalkeith, Midlothian, EH22 2QA Thank you for choosing us to give you a budget indication for 25 new connections at the above site, and please find our detailed quote below. Work to be carried out SGN Connections to install appropriately sized gas infrastructure to suitable locations. SGN Connections to carry out all necessary excavation and reinstatement work up to the site boundary. No meter work is included. Your budget indication is £ 94,920.00 (inc VAT) Please note that this figure is a budget indication only, based on the information you’ve given us, and doesn’t represent an offer to carry out the work. The work is within close proximity of another GT and crosses third party pipeline. On request of any firm quotation, permissions will be sought from relevant owners and operators. We’re assuming no servitudes or third party permissions are required to carry out the work. Please note that this budget indication doesn’t allow for any diversion of our existing infrastructure if we find it’s necessary. You can get further detail on this by calling SGN Diversions/Isolations on 0800 912 1722. If you have any further questions, please feel free to contact me on the number at the top of this letter. Yours sincerely Diane Jamieson Design Assistant * All calls are recorded and may be monitored