Westar Formula Rate and Regulatory Update. Dennis Reed. Transmission Formula Rate. What is a Formula Rate?. A standard Rate is a fixed charge set in a regulatory process through a rate case The fixed rates do not change unless another rate case is filed - PowerPoint PPT Presentation
Citation preview
Westar Formula RateWestar Formula Rate and Regulatory Update and Regulatory Update
Dennis Reed
Transmission Formula RateTransmission Formula Rate
What is aWhat is a Formula Rate? Formula Rate?
• A standard Rate is a fixed charge set in a regulatory process through a rate case– The fixed rates do not change unless another rate
case is filed
• A formula rate is a fixed method for calculating a rate based upon set inputs– The charges to customer update annually– Data input comes from public sources (Form 1)– Recalculation of the charges is done pursuant to a set
of protocols
Revenue Revenue RequirementsRequirements
The sum of the following:• Return on Equity (Rate Base * Rate of Return)
• O&M
• Depreciation Expense
• Taxes other than income
• Income Taxes
Westar’s Westar’s Formula RateFormula Rate
• Revenue Requirements used for billing is for a projected Test Year
• Changes in costs are projected in all five components of the formula
• A “True-up” calculation is done each year to compare the Actual Rev. Req. to the projected
• Any refund or surcharge is an adjustment to the Rev. Req. for the next Projected Period– Minimizes work by not having to do annual refunds or
surcharges
Posting & Review Posting & Review Time LineTime Line
Jan.
1S
tart
of R
ate
Yea
r
Apr
. 15
Form
1 R
elea
sed
Jun.
15
Pos
t Act
ual R
.R fr
om p
revi
ous
yrJu
l. 15
Firs
t Cus
tom
er M
eetin
g
Oct
. 15
Pos
t Pro
ject
ed R
.R fo
r
the
next
Rat
e Y
ear
Oct
. 30
Sec
ond
Cus
tom
er M
eetin
gJa
n. 1
Sta
rt of
the
next
Rat
e Y
ear
Oct
. 22
Jun.
23
You are here!
The Formula Rate The Formula Rate UpdateUpdate
Phase 1Inputting Actual Cost data
(Complete by June 15)
TFR tabs with data:Act. Net Rev Req.
Act. Gross Rev Req.Tabs A1-A12TU (Partial)
Phase 2Inputting Projected Costs (Complete by October 15)
TFR tabs with data:Proj. Net Rev Req.
Proj. Gross Rev Req.Tabs P1-P5
BPFEPP (No projects)
TU (Complete)
Form 1 & Acctg. Data Budget information
SPP
You are here!
Other IssuesOther Issues
• The True-up amount is based upon the results of the TFR effective June 1, 2008 (per settlement in ER08-396)– Rev. Req. is without any “true-up” value from a previous period
(footnote E, TU tab)
• This year’s calculation is still part of the transition – Format of June 2008 formula is different from current one– Historic period to a projected period– Change in “Rate Year” from 12 months ending May to calendar
year period
Formula Rate ChangesFormula Rate Changes
• Since October, 2008 the following two Dockets were approved that affect the formula– ER08-777/ER08-396 – Storm Damage Amortization
Compliance filing modifying footnote S, Actual Gross Revenue Requirement tab.
– ER09-481 – Ministerial Filing to correct several footnote and line description errors.
• Additional footnote errors were discovered in the update process– A subsequent filing is being looked at in the next
several months .
ProtocolsProtocols
• Specify “how” the formula works
• Gives specific rights to Customers– Review input– Point out input errors– Procedures to handle disputes
• Posting – Westar’s OASIS is changing!