Upload
florence-mills
View
214
Download
0
Embed Size (px)
Citation preview
1
West London CCG Commissioning Intentions 2015/16
2
• We have developed our commissioning plans for 2015/16 and sent these to providers at the beginning of October 2014
• We have engaged with a variety of stakeholders to help shape our plans. We also gathered feedback during autumn of 2013, which we are responding to this year and into future years
• The priorities for 2015/16 and beyond fit into 4 categories (Service Reconfiguration; Whole Systems Integration; Primary Care Transformation; and Patient Empowerment)
Introduction
3
Review of last year’s feedback
You said We did
Improve GP access
• Extended GP opening available, including weekend opening covering the whole CCG area
Improve children’s care
• Children’s hubs launched, which involve GPs working together with consultants to improve care for children
Help patients understand how to access services
• Children’s urgent care communications materials produced• Funding signed off for health road shows and ESOL for health
Improve co-ordination between services
• Multi-disciplinary team meetings established in GP practices to improve the co-ordination of care for patients with complex needs
• Primary Care Navigators being rolled out
Improve support for mental health needs
• Continued investment in mental health services for psychological therapies and communications campaign to improve uptake being planned
4
Strategic programme
Description
Patient Empowerment
• Roll out of Primary Care Navigators in 2014/15 and continued into 2015/16 to support older patients with complex needs
• Expert Patient Programme being tendered in 2014/15 and new service to be mobilised in 2015/16 to support patients with long-term conditions. Pilot online EPP early 2015.
• PPE grants awarded to third sector for projects supporting self care and self management (grants awarded in 2014/15 and projects to be running in 2015/16)
• Launch of health road shows and ESOL for Health in 2014/15 and to continue into 2015/16
• Support to Patient Participation Groups in general practices to continue into 2015/16
• Work-streams underway to review and improve programmes for self management and peer support in 2015/16 and beyond
Patient Empowerment
5
Strategic programme
Description
Primary Care Transformation
• The CCG is commissioning a range of services from groups of practices in 2014/15 and into 2015/16. These include diabetes care; care planning and end of life care planning; blood testing; wound care; and care for patients with mental health needs
• The CCG is participating in the Prime Minister’s Challenge Fund, which aims to improve access to primary care. Specific objectives are as follows:o 7 day/week primary care services to be availableo A range of consultation methods to be available to patients
(telephone/email/Skype)o Alternative appointment booking methods to be available
(such as online appointment booking)o Primary care appointments tailored to patients’ needs
(urgent appointments, convenient appointments and continuity where required)
o Shared electronic patient records and patients able to access their records online
Primary Care
6
Strategic programme
Description
Whole Systems Integration
• Whole Systems Integration is a strategic programme in which multiple partners work together to improve care for specific patient groups
• West London is focusing on two population groups:1) Patients aged over 752) Patients with long-term mental health needs
• In 2014/15, the new models of care have been designed in partnership with patients and carers
• In 2015/16, the new models of care will be in place• As part of this work, integrated health and social care teams
will work 7 days to proactively support the needs of patients
Whole Systems Integration
7
Strategic programme
Description
Service Reconfiguration
• The CCG is tendering various community services in 2014/15 (ophthalmology, cardiology, respiratory) and these will be launched in 2015/16 to support the delivery of planned care closer to home
• NHS 111 contract is coming to its end date and is being put out to tender across NWL
• Chelsea and Westminster Urgent Care Centre contract coming to its end date and may be put out to tender
• New service model for St Charles urgent care to be designed in 2014/15 and operational in 2015/16
• Evaluation of pilot children’s hubs with potential to commission wider service
• Ongoing implementation of mental health standards (including Improving Access to Psychological Therapies and dementia)
Service Redesign
8
Questions?