6
Well Integrity round table discussion Washington 2010 By Olav Inderberg and Jens-Henrik Neuenkirchen

Well Integrity round table discussion

  • Upload
    gerard

  • View
    59

  • Download
    1

Embed Size (px)

DESCRIPTION

Well Integrity round table discussion. Washington 2010 By Olav Inderberg and Jens-Henrik Neuenkirchen. Standards Overview. Uniform Safety Level ? Uniform system integrity requirements ?, Uniform design philosophy, common operational criteria ?. General PSA Norway ISO 13628-1 - PowerPoint PPT Presentation

Citation preview

Page 1: Well Integrity round table discussion

Well Integrityround table discussion

Washington 2010 By Olav Inderberg and Jens-Henrik Neuenkirchen

Page 2: Well Integrity round table discussion

Standards Overview

Wellhead/XT:API spec’sISO

BOPISO’sNORSOK’sNORSOK’sAPI Spec’sAPI RP’sDNV-OS-E101

Casing Tubing, DownholeISO - tubingAPI specAPI ISO (cement)

Drilling Equip. API spec’sAPI RP’sDNV-OS-E101

GeneralPSA NorwayISO 13628-1NORSOK D-001NORSOK D-010NORSOK U-001OLF Guideline 070DNV-OS-C101

Riser/UmbilicalsISO API RP’sAPI Spec’sDNV-OSS-302DNV-OS-F201DNV-RP-F206

Control SystemsISOAPI Spec 16DDNV-OS-E101

Uniform Safety Level ? Uniform system integrity requirements ?,

Uniform design philosophy, common operational criteria ?

Source: DNV

Page 3: Well Integrity round table discussion

ISO 13628 Series Code Break

13628-5

13628-6

13628-4

13628-9

13

62

8-8

13628-2

13628-10

13628-11

13628-12

13628-7

13628-1

Page 4: Well Integrity round table discussion

ETreeConnector Wellhead

Defining the challengeGlobal Riser Analysis

Wellhead Analysis

Loading on the system

Operations

Typical capacity curve

Equipment Capacities

Page 5: Well Integrity round table discussion

The understanding of well integrity and fatigue challenges are in relative early stages. The deeper we “dive” into these issues the more challenges are

becoming apparent.

Operations and materials are two important issues as well as better instrumentation to gain more knowledge.

An understanding of the interdependence of the parts in the overall system and operations is vital to a safe management of these issues.

THANK YOU FOR YOUR ATTENTION

Page 6: Well Integrity round table discussion

Back up slides