Failure to keep thehole full
8/12/2019 Well Control Mechanisms
4/13
Causes
High pulling speeds.
Mud properties withhigh viscosity and highgels.
Tight annulus BHA-hole clearance, orrestricted annulusclearance
Swabbing
8/12/2019 Well Control Mechanisms
5/13
Causes Cavernous or vugular
formations. Naturally fractured, sub-
normally pressured zones. Fractures induced by
excessive pipe runningspeeds.
Excessive pressures causedby breaking circulationwhen mud gel strength ishigh.
Lost Circulation
8/12/2019 Well Control Mechanisms
6/13
Causes
Drilling into an abnormal pressure zone.
Dilution of the drilling fluid.
Reduction in drilling fluid density due toinflux of formation fluids/gas.
After cementing while WOC. Cement losseshydrostatic pressure as is starts to set.
Insufficient Mud density
8/12/2019 Well Control Mechanisms
7/13
Drilling break Increase in flow rate
Pit gain
Pump pressure decrease/Pump strokeincrease
Well flows with pumps off
8/12/2019 Well Control Mechanisms
8/13
Blow outs Underground blow out
Blow Out Underground Blow Out
8/12/2019 Well Control Mechanisms
9/13
Primary Control-(Ph>Pf) Secondary Control-BOPS
Ram Preventers
Blind Ram
Shear Ram
Pipe Ram Annular Preventer
Tertiary Control-(Barite/Cement Plug)
8/12/2019 Well Control Mechanisms
10/13
8/12/2019 Well Control Mechanisms
11/13
Wait & Weight
Method
Kill well in one complete circulation
lowest pressure on the formation
Requires longest waiting time
DrillersMethod
First kick is circulated out then KMW is pumped
Can start circulation right away
Highest casing pressures for longest period
ill Methods
8/12/2019 Well Control Mechanisms
12/13
Bull heading
If High H2S gas influx
Pump Fluid to force formation fluid back into the
formation
Gas by pass
Volumetric
Apply if gas kick cannot be circulated out due to
migration
Drill string above the kick/out of the hole
Allow gas to expand
ill Methods