GT 5 Gas Piping Al Udeid Gas Power Plant WELDING INSPECTION REPORT WPS NO: Date PQR NO: drawing no: Line No: JOINT NO. DIA.mm THK.mm W.ID.NO. FIT-UP ROOT VISUAL&DPT FINAL VISUAL&DPT Al Dana QIPT (QA) Al Dana QIPT (QA) Al Dana QIPT (QA) LEGEND :- SAT :- SATISFACTORY UNSAT :- UNSATISFACTORY RW :- RE WORK Sl. NO. JOINT TYPE

Welding Inspection Report

Embed Size (px)

DESCRIPTION

nmn

Citation preview

Page 1: Welding Inspection Report

GT 5 Gas Piping

Al Udeid Gas Power Plant

WELDING INSPECTION REPORT

WPS NO: Date

PQR NO:

drawing no: Line No:

JOINT NO. DIA.mm THK.mm W.ID.NO.

FIT-UP ROOT VISUAL&DPT FINAL VISUAL&DPT

REMARKAl Dana QIPT (QA) Al Dana QIPT (QA) Al Dana QIPT (QA)

LEGEND :-

SAT :- SATISFACTORY UNSAT :- UNSATISFACTORY RW :- RE WORK RO :- RE OFFER

for Al Dana For QIPT

Sl. NO.

JOINT TYPE

Page 2: Welding Inspection Report

for Al Dana For QIPT

Page 3: Welding Inspection Report

GT 5 Gas Piping

Al Udeid Gas Power Plant

WELDING INSPECTION REPORTWPS NO:

PQR NO:

drawing no: Line No:

JOINT NO. DIA.mm THK.mm W.ID.NO.

FIT-UP ROOT VISUAL&DPT

Al Dana QIPT (QA) Al Dana

LEGEND:RMIR-RAW MATERIAL IDENTIFICATION REPORT

P1-PART.1 P2-PART.2

for Al Dana

Sl. NO.

JOINT TYPE

Page 4: Welding Inspection Report

GT 5 Gas Piping

Al Udeid Gas Power Plant

WELDING INSPECTION REPORTREPORT NO:

PQR NO:

Line No:

ROOT VISUAL&DPT FINAL VISUAL&DPT

REMARKQIPT (QA) Al Dana QIPT (QA)

forQIPT

LPE REPORT

NO.

LPE REPORT NO.