Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Twin-Tandem One-Pool Method
FCB Process
150
Twin Tandem One Pool Method
FCB Process
Surface flux Slag
Cu plate
Weld metal
Backing fluxSlag
Air hose
FCB process
Base metal
Wire
Leading wire/arcTrailing wire/arc
PrimerBase metalWeld poolWeld metal
Slag
Leading wire/arcTrailing wire/arc
Base metal
Weld pool
Weld metal
43
SEGARC Process
Welding Consumables for Shipbuilding
A1横: 594×841mm