NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog Frank Thorenz Holger Blum NLWK Norden

WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

  • Upload
    abbott

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog Frank Thorenz Holger Blum NLWK Norden. Overview. Timetable 12.05.2004. Timetable 13.05.2004. Langeoog arial photo. Langeoog - Western part. Langeoog Impressions 1. Langeoog Impressions 2. - PowerPoint PPT Presentation

Citation preview

Page 1: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

WELCOME

Workshop COMRISK Subproject 9

Risk assessment for the barrier island Langeoog

Frank ThorenzHolger Blum

NLWK Norden

Page 2: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

OverviewOverview

Date Time Activity

Wednesday May 12th 12:00 – 12:30 Arrival at Hotel Reichshof, Norden

12:30 – 13:30 Cold Lunch Buffet at Reichshof

13:30 – 17:30 COMRISK Subproject Langeoog / Foresight Project (GB)

After 17:30 COMRISK Project Team meeting

19:00 Dinner at Reichshof

Thursday May 13th 09:00 Arrival at Reichshof

09:00 – 12:30 Pilot Studies (BE, GB, DK, DE) Progress reports

12:30 – 13:30 Lunch at Reichshof

13:30 End of programme

Page 3: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

13:30 Thorenz (NLWK) Welcome / Introduction Langeoog

13:45 Markau / Reese (Uni Kiel)

Talk 1: Microscale valuation analysis Langeoog - Using the MERK method

14:30 Blum (NLWK) Talk 2: Estimation of flood damage - Using the MERK method

15:00 Coffee break

15:30 Hinnah (OOWV) Talk 3: Drinking water supply of Langeoog

16:00 Führböter/Naumann (Uni Braunschweig)

Talk 4: Flooding of a Dune Area- Numerical Simulation of the Impact on Freshwater body (Drinking water supply)

16:30 Coffee break

16:45 Meadowcroft (EA) Talk 5: Results of Foresight Project (flood and coastal defence project)

17:15 Thorenz (NLWK) Feedback / Discussion

17:30 Closing off – Project team meeting

Timetable 12.05.2004Timetable 12.05.2004

Page 4: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Timetable 13.05.2004Timetable 13.05.2004

09:00 Trouw (IMDC) Talk 6: Pilot Study Flanders

09:30 Floyd (RPA Ltd.) Talk 7: Pilot Study Lincolnshire

10:00 Coffee break

10:30 Kortenhaus (LWI) / Piontkowitz (Kystd.)

Talk 8: Pilot Study Ribe Dyke

11:30 Coffee break

12:00 Blum (NLWK) Talk 9: Pilot Study Langeoog

12:15 Thorenz (NLWK) Discussion

Page 5: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Langeoog arial photoLangeoog arial photo

Page 6: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Langeoog - Western partLangeoog - Western part

Page 7: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Langeoog Impressions 1Langeoog Impressions 1

Page 8: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Langeoog Impressions 2Langeoog Impressions 2

Page 9: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Langeoog - TopographyLangeoog - Topography

Basic Data for DTM: LIDAR Survey 1999Basic Data for DTM: LIDAR Survey 1999

Page 10: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Main dykeMain dyke

Protective Protective dunesdunes

Freshwater Freshwater catchment areacatchment area

Summer dykeSummer dykeGroynesGroynes

Coatal defence systemCoatal defence system

Page 11: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in NordenQuelle: OOWV

Freshwater lensFreshwater lens

Page 12: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Pirolatal Dune 1999Pirolatal Dune 1999

Page 13: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Pirolatal Dune 2000Pirolatal Dune 2000

Page 14: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Pirolatal Dune 2001Pirolatal Dune 2001

Page 15: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Pirolatal Dune 2003Pirolatal Dune 2003

Page 16: WELCOME Workshop COMRISK Subproject 9 Risk assessment for the barrier island Langeoog

NLWK Betriebsstelle Norden COMRISK SP 9 Workshop 12./13.05.2005 in Norden

Dune reinforcementDune reinforcement